Projects

AE Projects

S.No Project Name Tender No Tender Date Tender Start Date Tender End Date Document
1 Independent Engineer services for Supervision of Development of six lane Sargi - Basanwahi Section of NH-130-CD Road from km 42.800 to km 99.500 under Raipur-Visakhapatnam Economic Corridor in the state of Chhattisgarh on Hybrid Annuity Mode (Package-CG(02)) NHAI/BM/Raipur-Vishakhapatnam/CG/IE/Pkg-II/2021 30/12/2021 30/12/2021 08/02/2022
Time 11:0Hrs
2 IE services for Balance work of Construction of 4Lane road from Km 140.700 to Km 190.587 (Design ch Km 0.000 to Km 49.230) on Narimbanglo Jatinga Jn Harangajo Section of NH54 (New NH27EW) in Assam under BMP on HAM NHAI/Tech/NE/AS21 n 22(Bal.)/IE 30/12/2021 28/12/2021 21/02/2022
Time 11:0Hrs
3 Independent Engineer Services for Rehabilitation and Up-gradation of existing road to 2-lane with Paved shoulders from End of Hamirpur Bypass (near ChilBahal) to Bhangbar section of NH-88 (New NH-3 303) (Design Chainage-Km. 138.295 to Km. 175.270 (Design Length -36.975 Km) in the state of Himachal Pradesh under NH(O) on HAM (Package-IV) 2021-NHAI-99626-1 04/01/2022 27/12/2021 02/03/2022
Time 11:0Hrs
4 Independent Engineer Services during O and M Period for the project of Design, Construction, Development, Finance, Operation and Maintenance of Km. 1189 to Km. 1271.455 Old Km. 16.000 to Km. 98.455 on NH No. 44 in the States of UP and MP on BOT Annuity Basis. 2021 NHAI 99328 1 24/12/2021 23/12/2021 06/01/2022
Time 11:0Hrs
5 DPR for Augmentation of 4-laning of Anakapalli–Annavaram–Diwancheruvu Section from Km. 741.255 to Km. 903.000 of NH-16 (Package–3 and 4 of TOT Bundle–1) to 6 lane Partial Access Controlled Highway standard in the state of Andhra Pradesh NHAI/Tech/AP/DPR/NH16/Anakappali – Annavaram – Diwancheruvu section/2021 20/12/2021 20/12/2021 09/02/2022
Time 15:30Hrs
6 PMC Services for Upgradation to 2 4 6 lane with PS of Newly decd NH216H sting frm its Jn with NH216 near Pedana connecting Gudlavalleru Gudivada Hanuman Jn Nuzveedu Vissannapeta Mallela terminating at its Jn with NH30 near Laxmipuram in AP PIU/MPT/NH216H/PMC/2020-21 17/12/2021 17/12/2021 27/01/2022
Time 17:0Hrs
7 SC services during O and M stage of 2 laning with paved shoulder of Bhilwara Ladpura section of NH 758 from 87.250 to 155.000 (Length Km. 67.250 Km) in the state of Rajasthan NHAI/CHT/ NH-758/BHL-LDP/SC/2021/ 17/12/2021 17/12/2021 09/02/2022
Time 11:0Hrs
8 IE Services during O and M stage of Bikaner-Phalodi section to 2 lane from Km 4.200 to Km 55.250 (New NH 11) on BOT (Toll) and 2 lane with Paved Shoulder of Khajuwala Poogal section and Poogal Bap section of NH-911 HAM under Bharatmala Pariyojana NHAI/11011/1/Admn/2021-ROJ/ Tenders/IE/BP-KB 16/12/2021 16/12/2021 10/02/2022
Time 11:0Hrs
9 Independent Engineer services for Construction of Six-Lane Access Controlled Greenfield Highway section of NH-150C as part of Solapur - Kurnool-Chennai Economic Corridor in the State of Telangana on HAM under Bharatmala Pariyojna i) from KN/TS border at Raichur Gadwal road to Julekal Village (Design Ch 202 - 900 to 242-200 for length of 39-300 km) ii) from Julekal Village to Kurnool town on NH-40 (Design 242.200 to 280.400 for Length of 38.2Km) NHAI/HQ/TSTD/GM(T)/DGM(T)/Kar-Tel Border-Julekal/IE (Pkg-I)/10-2021 16/12/2021 16/12/2021 21/02/2022
Time 11:0Hrs
10 Independent Engineer Services from Km. 484.000 to Km. 580.700 of NH-16 under Tolling, Operation, Maintenance - Transfer (TOT) and O-M (Capacity Augmentation) from Km. 470.415 (Icchapuram) at Odisha/AP Border to Km. 580.700 (Narasannapeta) in the State of Andhra Pradesh. NHAI/RO-VJA/IE Services/TOT/OandM/2021-22 17/12/2021 16/12/2021 07/02/2022
Time 15:0Hrs
11 Independent Engineer services for supervision of Upgradation and Four Laning of Poanta Saheb-Ballupur Section of NH-72 in the State of Himachal Pradesh and Uttarakhand under NH(O) on Hybrid Annuity Mode (Package-I & Package-II). - Poanta Saheb – Ballupur Chowk (Dehradun) from Design Ch 0.000 to Ch 44.800. 2021-NHAI-98470-1 21/12/2021 15/12/2021 04/04/2022
Time 11:0Hrs
12 Independent Engineer Services for Improvement and Up-gradation of existing road to 4–lane with paved shoulder configuration from Km 174-641 to 229-070 End of Hardoi Bypass to End of Hardoi District of NH-731 (Pkg-III) on Hybrid Annuity Mode under NH (O) in the State of Uttar Pradesh Independent Engineer Services for Improvement and Up-gradation of existing road to 4–lane with paved shoulder configuration from Km 174-641 to 229-070 End of Hardoi Bypass to End of Hardoi District of NH-731 (Pkg-III) on Hybrid Annuity Mode under NH (O) in the State of Uttar Pradesh 23/12/2021 10/12/2021 24/01/2022
Time 11:0Hrs
13 Consultancy services of Authority Engineer for the project Improvement and Up-gradation of Existing Road to 2/4–lane with Paved Shoulder from Km 40-000 to 88-750 start of Khutar bypass to start of Shahjahanpur bypass of NH 731 on EPC basis in the state of Uttar Pradesh Consultancy services of Authority Engineer for the project Improvement and Up-gradation of Existing Road to 2/4–lane with Paved Shoulder from Km 40-000 to 88-750 start of Khutar bypass to start of Shahjahanpur bypass of NH 731 on EPC basis in the state of Uttar Pradesh 23/12/2021 10/12/2021 18/01/2022
Time 11:0Hrs
14 Supervision Consultancy Services for construction supervision of Balance works of Widening and Strengthening of existing NH-31C from 2-lane to 4 lane from Shrirampur (Km. 0.000) to Kochugaon (km 30.000) of Bijni to Assam/West Bengal Border Section of NH-31C in Assam on Item rate Basis NHAI/NE/AS-12(Bal)/CSC/E-118956 13/12/2021 10/12/2021 27/01/2022
Time 11:0Hrs
15 Consultancy Services for Independent Engineer services for Supervision of Development of six lane of Raipur-Visakhapatnam Economic Corridor from Baraja to Tumbigura section Design Chainage 338.500 to Design Chainage 365.033 of NH-130-CD in the state of Odisha on Hybrid Annunity Mode (OD/Package-III) NHAI/BM/ Raipur-Visakhapatnam/OD/IE/Pkg-III/2021 20/12/2021 09/12/2021 24/01/2022
Time 11:0Hrs
16 Consultancy services for Independent Engineer services for Construction of 6-lane upgradable to Eight lane of Kanpur Lucknow Expressway (NE-6) starting from Lucknow Ring Road near Shaheed Path at km 10-980 to km 28-500 of NH-27 Package-1 and starting from Bani km 28-500 to 73-744 on NH-27 including spur Package-2 on Hybrid Annuity Mode under Bharatmala Pariyojna in the state of Uttar Pradesh 2021-NHAI-97784-1 17/12/2021 09/12/2021 27/01/2022
Time 11:0Hrs
17 Consultancy services for Authority Engineer services for Construction Four Lane Bypasses for Jagatpur Babuganj Unchahar Alapur Bypass and Sai River Bridge and upgradation of carriageway Km 180-200 to 188-700 of Raebareli-Prayagraj section of NH-30 Old NH-24B in the State of Uttar Pradesh on EPC mode under Bharatmala Pariyojna ICR 2021-NHAI-97818-1 17/12/2021 09/12/2021 18/01/2022
Time 11:0Hrs
18 DPR for (i) 6-laning of Ranasthalam Town (4.14 Km), (ii) Construction of underpasses /flyovers on NH-16 passing through Visakhapatanam City limits (58 Kms) and (iii) 6-lane flyover from Mahanadu junction to Nidamanuru Railway Bridge on NH-16 (6.50 Kms) NHAI/RO-VJA/RFP / DPR/3projects / 2021-2022 20/12/2021 07/12/2021 03/03/2022
Time 15:0Hrs
19 Independent Engineer services for Four laning of Sonauli - Gorakhpur section of NH-29E from Design Ch 0 000 to Design Ch 79 540 (from existing Ch 0 000 to existing Ch 80 295) on Hybrid Annuity Mode in the state of Uttar Pradesh 2021-NHAI-97248-1 08/12/2021 06/12/2021 20/01/2022
Time 11:0Hrs
20 Independent Engineer Services during Operation and Maintenance Period for Four Laning of Jhansi Khajuraho section Pkg II of NH 39 from Design Chainage km. 76.603 Existing Chainage 82.100 near village Chhatipahari to Design Chainage km 162.132 Existing Chainage km 57.9 near Bamitha town in the state of UP and MP under NHDP Phase III on Hybrid Annuity Mode NHAI/ROMP/CHHP/IE/2021/ 21/12/2021 03/12/2021 04/01/2022
Time 11:0Hrs
21 CS for IE for Supervision of 4Laning of NH530B from Mathura Bypass at 154.20 of NH44 to Gaju Village Design length 32.982 km in UP on HAM PKG-1B and 4Laning of NH530B from Gaju Village to Devinagar Bypass Design length 33.018 km in UP on HAM PKG-1C 2021-NHAI-96776-1 09/12/2021 01/12/2021 03/01/2022
Time 11:0Hrs
22 Supervision Consultancy Services during Maintenance of Raebareli-Banda Section of NH 232(2-Lane with paved shoulders) from km 148.993 to km 285.818 in the State of Uttar Pradesh under NHDP IVB on EPC mode. NHAI/PIU-RBLY/SC/NH232/2021 01/12/2021 01/12/2021 03/01/2022
Time 13:0Hrs
23 Independent Engineer Services during Operation & Maintenance stage of Two Laning with Paved Shoulder of Raebareli to Prayagraj section (Km 82.700 to Km 188.600) of NH-30 (Old NH-24B) in the State of Uttar Pradesh under NHDP IVA on BOT (Toll) basis NHAI/PIU-RBLY/IE/NH30/2021 01/12/2021 01/12/2021 03/01/2022
Time 13:0Hrs
24 Independent Engineer Services During Operation & Maintenance Period For Two Laning Of Raebareli To Jaunpur Section Of Nh-31 (Old Nh- 231) From Km 0.000 To Km 166.400 In The State Of Uttar Pradesh Under NHDP Phase-Iva On Bot (Annuity) On DBFOT Pattern NHAI/PIU-RBLY/IE/NH31/2021 01/12/2021 01/12/2021 03/01/2022
Time 13:0Hrs
25 Supervision Consultancy Services During Maintenance of Two-Lane with Paved Shoulders of Tanda- Raebareli Section Of NH-128 (Total Design Length-162.050 Km Including 13.060 Km Of NH-330) On EPC Mode Under NHDP Phase-IVB in the State Of Uttar Pradesh. NHAI/PIU-RBLY/SC/NH128/2021 01/12/2021 01/12/2021 03/01/2022
Time 13:0Hrs
26 Consultancy Services for Independent Engineer for Supervision of (i) Construction of Six laning from Naidupeta (Green Fields) to Turpu Kanupur Ch KM 57.046 to Ch KM 91.930 and greenfield area which falls in Nellore district, in the State of Andhra Pradesh on HAM Mode. (ii) Construction of Four Laning of Chillakuru Cross Road to Turpu Kanupur (Part 1 of Package-II) Km 0.000 (131.500 of NH-16) to Km 23.770 on New NH-516W including six lane flyover and approaches on NH-16 (Length Km 1.050) and Six NHAI/11011/PC/BM/Naidupeta and Chillakuru/IE/2021 06/12/2021 01/12/2021 09/08/2022
Time 11:0Hrs
27 Consultancy services for Authoritys Engineer for Supervision of Development of Six Laning of Kadambattukonam (Km. 517.250) Kazhakuttam Jn. (Km. 547.080) section of New NH-66 (Old NH-47) in Kerala under BMP on EPC mode 2021-NHAI-96424-1 16/12/2021 29/11/2021 18/01/2022
Time 11:0Hrs
28 Independent Engineering Services for Six laning from Kappirikkad Design ch 335.850(Ex km 349.260) Thalikulam Design Ch 369.015(Ex. km 382.300) Kodungallar Design Ch 397.750(Ex. km 411.850) section of NH 66 in the state of Kerala on Hybrid Annuity Mode under Bharatmala Pariyojan NHAI/HQ/Kerala/ Kap-Thali/IE/NH-66/2020-21 27/12/2021 26/11/2021 11/01/2022
Time 11:0Hrs
29 Independent Engineer (IE) services during Operation and Maintenance stage of Gorakhpur- Kasya - UP/Bihar Border Section of NH-28 from Km 279-800 to Km 360-915 (New Ch Km. 285-002 to 366-117) (Total length 81-115 Km) NHAI/PIU-GKP/IE/OMT/2021-2022 17/12/2021 26/11/2021 10/01/2022
Time 11:0Hrs
30 Independent Engineer (IE) services during Operation and Maintenance stage of Gorakhpur- Kasya - UP/Bihar Border Section of NH-28 from Km 279-800 to Km 360-915 (New Ch Km. 285-002 to 366-117) (Total length 81-115 Km) NHAI/PU-GKP/IE/OMT/2021-2022 27/01/2022 26/11/2021 10/02/2022
Time 15:0Hrs
31 Authority Engineer services during Construction and Defect Liability Period of rectification works of MoRTH identified Blackspots and Works proposed in Value Addition of Lakhanpur Vijaypur Section of NH 44 in Jammu and Kashmir (2nd Call) JK/AE/LJ/2021-22/02 23/11/2021 23/11/2021 13/01/2022
Time 17:0Hrs
32 Independent Engineer services for six laning of Kagal-Satara section of NH-48 (old NH-4) [Package – I from km 592.240 to km 658.000] in the State of Maharashtra to be executed on BOT (Toll) mode under Bharatmala Pariyojana NHAI/Tech/MH/IE/BOT/K – S/Pkg-I/2021 28/11/2021 18/11/2021 13/01/2022
Time 11:0Hrs
33 Independent Engineer services for six laning of Kagal-Satara section of NH-48 (old NH-4) [Package – II from km 658.000 to km 725.000] in the State of Maharashtra to be executed on BOT (Toll) mode under Bharatmala Pariyojana NHAI/Tech/MH/IE/BOT/K – S/Pkg-II/2021 28/11/2021 18/11/2021 13/01/2022
Time 11:0Hrs
34 Independent Engineer services for Four laning of Ratnagiri - Kolhapur section of NH-166 for (a) Package – I from km 0.000 to km 19.769 and km 31.000 to km 67.140 (b) Package – II from km 67.140 to km 112.340 and (c) Package – III from km 112.340 to km 145.300 in the State of Maharashtra to be executed on Hybrid Annuity Mode under NH (O) NHAI/Tech/MH/IE/NH-166/R-K/2021 28/11/2021 18/11/2021 05/01/2022
Time 11:0Hrs
35 Consultancy Services for Authority’s Engineer for Supervision of Development of 4/6 lane Mohali (Design Ch. 0.000) to Sirhind (Design Ch. 27.370) section of New NH-205AG (Design length 27.370 Km) under Bharatmala Pariyojana in the state of Punjab on EPC mode 2021-NHAI-95306-1 06/12/2021 18/11/2021 04/05/2022
Time 11:0Hrs
-
36 Consultancy Services for AE for Supervision of Four laning of existing 2/4 lane stretch from Lonand (Design km 166.400) to Dive Ghat (Design km 220.900) {Design Length – 54.500 km} of Mohol – Alandi section (Package - V) of NH-965 in the State of Maharashtra to be executed on EPC Mode under Bharatmala Pariyojana NHAI/Tech/MH/AE/NH-965/Pkg-V/2021 28/11/2021 17/11/2021 16/12/2021
Time 11:0Hrs
37 Independent Engineer Services during O and M Period for the project of Design Construction Development Finance Operation and Maintenance of Km 1189 to Km 1271/455 Old Km 16.000 to Km 98/455 on NH No 44 in the states of UP and MP on BOT Annuity 2021-NHAI-94852-1 09/12/2021 15/11/2021 21/12/2021
Time 11:0Hrs
38 Independent Engineering Services for Operation and Maintenance of four laning of Durg Bypass from Km. 308.600 to 323.600 of NH-06 (New-53) and Raipur- Aurang section from Km. 239.000 Km. to 281.000 of NH-6 (New-53) in the state of Chhattisgarh executed as (BOT) basis. 11052/RO-Raipur/Tender/Raipur to Aurang and Durg bypasss 24/11/2021 12/11/2021 23/12/2021
Time 15:0Hrs
39 Independent Engineering Services for Operation and Maintenance of four laning of Orissa Border-Aurang section from Km.88.000 to Km.239.000 of NH-06 (New-53) in the state of Chhattisgarh executed as (BOT) basis. 11052/RO-Raipur/Tender/IE/A-S 24/11/2021 12/11/2021 23/12/2021
Time 15:0Hrs
40 Independent Engineering Services for Operation and Maintenance of four laning of End of durg bypass to Chhattisgarh/Maharashtra border section from Km. 322.000 to Km.405.000 of NH-06 (New-53) in the state of Chhattisgarh executed as (BOT) basis. 11052/RO-Raipur/Tender/IE/End of Durg bypass to CG/MH border 24/11/2021 12/11/2021 23/12/2021
Time 15:0Hrs
41 Consultancy Services as Independent Engineer during Operation and Maintenance for Six laning of Hubli Haveri section from Km.340.000 to 403.400 of NH 48 Old NH 4 in the State of Karnataka on HAM Mode Under NHDP Phase V NIT No.42 NHAI RO BNG 14016 Tender 2021 22 dated 11.11.2021 07/12/2021 11/11/2021 14/12/2021
Time 15:0Hrs
42 CS for AE for supervision for the projects Construction of Agra Bypass connecting 174.500 km141.000 of Yamuna Expressways Construction of leftout portion of Agra Inner Ring Road connecting village Deori (CH 0) to NH-44 (CH. 7.772) in UP on EPC mode. 2021-NHAI-94339-1 11/11/2021 10/11/2021 13/12/2021
Time 11:0Hrs
43 Supervision Consultancy Services during operation and maintenancs of Two Lane with paved shoulder of indo Nepal Border Kakrwhwa to Rudhauli town, section of NH-233 from Km. 0.000 to Km. 65.870 and Rudhauli to Basti Section Km. 65.870 to 122.270 in UP NHAI/PIU-GKP/Supervision Consultancy/21-22 12/11/2021 09/11/2021 09/12/2021
Time 12:0Hrs
44 CS for AE of Construction of new 4Lane Bridge over River Ganga at Downstream of Farakka Barrage including approaches connecting Farakka Raiganj of NH34 from km 290.940 (design chainage 0 km) to km 296.805 (design chainage 5.468 km) in WB on EPC Mode 2021-NHAI-94204-1 10/11/2021 09/11/2021 30/12/2021
Time 11:0Hrs
45 Supervision Consultancy Services during operation and maintenance of Two Lane with paved shoulder of indo Nepal Border Kakrwhwa to Rudhauli town, section of NH-233 from Km. 0.000 to Km. 65.870 and Rudhauli to Basti Section Km. 65.870 to 122.270 in Uttar Pradesh NHAI/PIU-GKP/Supervision Consultancy/2021-2022 16/12/2021 09/11/2021 30/12/2021
Time 12:0Hrs
46 Independent Engineer services for Four Laning of NH-71 from (i) Madanapalle to Pileru Section(Design Km 0.000 to Design Km 55.900) (Design Length-55.900 Km)-Package-I & (ii) Pileru to Kalur (Tirupati Rural) Section (Design Km 55.900 to Design Km. 92.800) & (Design Km 94.800 to Design Km 95.717) (Design Length - 37.817 Km)- Package-II on Hybrid Annuity Mode in the State of Andhra Pradesh under Bharatmala Pariyojana NHAI/Tech/AP/NH-71/Mad-TPT/IE/2021 08/12/2021 05/11/2021 30/12/2021
Time 11:0Hrs
47 IE Services for 4-laning of Chandesari to Khedakhajuriya (Pkg I) Km0.0 to (-)75-Km0.0 to km41.4 Khedakhajuria to Suhagadi (Pkg II) Km41.4-Km89.2 and Suhagada to Bardiya Amra (Pkg III) Km89.2 to Km135.351 section of NH-148NG in MP on HAM 2021-NHAI-93923-1 08/11/2021 05/11/2021 30/12/2021
Time 11:0Hrs
48 Consultancy Services of Authority Engineer for Construction of 2-lane Greenfield highway from km 134.737 to Km 163.253 Sagar Link Road Berkhedi Sagar Stage-1 under Bharatmala Pariyojana in the State of Madhya Pradesh on EPC mode 2021-NHAI-93920-1 08/11/2021 05/11/2021 11/01/2022
Time 11:0Hrs
49 Independent Engineer services during Operation & Maintenance Period for 6-laining of Dankuni - Kharagpur section of NH-6 from Km 17.6 to KM 129.000 in the state of West Bengal under NHDP phase V 14/O and M/Dankuni-Kharagpur/2021-22 05/11/2021 05/11/2021 04/01/2022
Time 15:0Hrs
50 Independent Engineer Services for 4-Laning of Ujjain-Badnawar Section of SH-18 from km 29.6 to km 96.00 (Length-69.1 km) In the State of Madhya Pradesh on HAM 2021-NHAI-93755-1 08/11/2021 03/11/2021 30/12/2021
Time 11:0Hrs
51 Independent Engineer services during Operation and Maintenance period for 4 laning of Farakka-Raiganj section of NH-34 from km 295.000 to km 398.000 in the state of West Bengal under DBFOT Toll Basis under NHDP Phase-III 13/OandM/Farakka-Raiganj/2021-22 05/11/2021 03/11/2021 03/01/2022
Time 15:0Hrs
52 AE for the Project Construction of 4 lane Western side spur of Rampur Rudrapur section connecting NH24 to NH87 bypassing Rampur town and 2-lane existing bypass of Rampur to be developed to 4lane on EPC mode in the State of Uttar Pradesh 2021-NHAI-93821-1 11/11/2021 03/11/2021 06/12/2021
Time 11:0Hrs
53 IE Services for 6 laning of Gurgaon Kotputli Jaipur Section of NH 8 from Km. 42.700 to Km. 273.00 in the state of Haryana and Rajasthan to be executed as BOT (Toll) on DBFO Pattern under NHDP Phase V NHAI/11011/1/Admn/2021-ROJ/ Tenders/GKJ/2nd 08/11/2021 02/11/2021 16/12/2021
Time 11:0Hrs
54 Independent Engineer services during Operation & Maintenance Period for 4-laning of Krishnagar - Baharampore section of NH-34 from Km 115.000 to Km 193.000 in the state of West Bengal under NHDP-III on DBFOT 12/OandM/Krish-Bah/2021-22 06/12/2021 02/11/2021 03/01/2022
Time 15:0Hrs
55 Independent Engineer services during Operation & Maintenance Period for Four laining of Krishnagar-Baharampore section of NH-34 from Km. 115.00 to KM. 193.000 in the state of West Bengal under NHDP phase III on (Package No. NHDP/III/BOT/WB/02)-” on DBFOT(Annuity)Basis 12/OandM/Krish-Bah/21-22 02/11/2021 02/11/2021 02/12/2021
Time 15:0Hrs
56 (i) Consultancy services for Authority Engineer for Supervision of Construction of 6 laning from Belgaum to Sankeshwar Bypass from Km 515/000 to Km 555/017 (Package-I) and (ii) Construction of 6 laning from Sankeshwar Bypass to MH-KNT Border from Km 555/017 to Km 592/853 (Package-II) of NH-48 in the state of Karnataka on Engineering Procurement and Construction (EPC) Mode under Bharatmala Pariyojana NHAI/KNT/NH-48/Belgaum - MH-KNT Border/AE/2020-21 06/12/2021 29/10/2021 23/12/2021
Time 11:0Hrs
57 Independent Engineer Services for Operation & Maintenance of Allahabad Bypass (Including Ganga Bridge PKG ABP-1) from Km.158.000 (628.753) to Km. 242.708 (713.461) of NH-19 (Old NH-2) in the State of Uttar Pradesh under NHDP-V on OMT Basis NHAI/PIU/Prg./2021-22/06 02/12/2021 29/10/2021 07/12/2021
Time 11:0Hrs
-
58 SC Services during O and M stage of Jaisalmer Barmer Section of New NH 68 and Barmer Sanchore Gujrat Border (upto Gandhav NHAI/11011/1/Admn/2021-ROJ/ Tenders/JB-BS 03/12/2021 29/10/2021 13/12/2021
Time 11:0Hrs
59 Consultancy Services for Authority Engineer for Supervision of Construction of new 2-lane major bridge including approaches over Brahmaputra between Majuli on North bank and Jorhat on South bank from km 11/690 to km 19/715 NH-12014/15/2020/AS/Zone-V 12/11/2021 28/10/2021 04/01/2022
Time 15:0Hrs
60 Independent Engineer services for OM Period for National Highway Projects of MPRDC in the State of Madhya Pradesh under NHDP-IV on Design, Build, Finance Operate and Transfer (DBFOT) Toll Basis, MPRDCL Bhopal 2021-MoRTH-650725-1 03/11/2021 27/10/2021 11/12/2021
Time 17:0Hrs
61 Independent Engineer services for 4-laning of Karimnagar Warangal Section of NH-563 from Design Ch.49.275 km (Existing Ch. 170.400 km of SH-1) at Manakondur bypass to Design Ch. 116.875 km (Existing Ch.144.050 km of NH-163) at Palvelpula near Hanamkonda (Design Length 67.600 km) in the State of Telangana on Hybrid Annuity Mode under Bharatmala Pariyojana. NHAI/HQ/TSTD/GM(T)/DGM(T)/Kar-War/IE/10-2021 28/10/2021 25/10/2021 15/02/2022
Time 11:0Hrs
62 SC Services during O and M stage of 2 lane with paved shoulder of Jodhpur Pokaran section and 2 Lane with Paved Shoulder or 4 Lane of Jodhpur Barmer section (Jodhpur to Pachpadra Package I), Jodhpur Barmer Section (Bagundi to Barmer Package II) NHAI/11011/1/Admn/2021-ROJ/ Tenders/SC/JP-BB-JP/2n 22/10/2021 22/10/2021 07/12/2021
Time 11:0Hrs
63 Supervision Consultancy (SC) Services during O and M stage of 4 Lane of Kota Baran section oKota Bypass section excluding Cable Stayed Bridge on NH-27 of East-West Corridor Gulabpura to Uniara section in the State of Rajasthan on EPC Basis under NHDP NHAI/11011/1/Admn/2021-ROJ/ Tender-KB-KB-GU/2 22/10/2021 22/10/2021 07/12/2021
Time 15:0Hrs
64 Independent Engineer (IE) Services for operation and maintenance stage under BOT mode of existing four lanes Jetpur-Gondal-Rajkot section from 117.600 to 185.000 on NH-8B in the state of Gujarat. NHAI/RO-GNR /Jet-Gon-Raj /O-M/ IE /2021 04/12/2021 18/10/2021 20/12/2021
Time 11:0Hrs
65 Independent Engineer services during Operation & Maintenance Period for four-laned Srinagar - Banihal Section from Km 220.700 to Km 286.110 on BOT (Annuity) in Jammu & Kashmir under NHDP-Phase-II including supervision of balance works (3rd Call) J K/IE/SB/2020-21/O and M/03 15/10/2021 15/10/2021 30/11/2021
Time 17:0Hrs
66 Consultancy services of Authority Engineer for the project Improvement and Up-gradation of Existing Road to 4–lane with Paved Shoulder from Km 229-070 to 260-800 End of Hardoi District to Lucknow of NH 731 on EPC basis in the State of Uttar Pradesh. NHAI/11013/2021/Hardoi-Lucknow/Pkg-IV/AE /110168 27/10/2021 14/10/2021 13/12/2021
Time 15:0Hrs
67 Consultancy Services for Supervision Consultant of Operation Maintenance of 4 laning of (i) Madurai to Kanyakumari section of NH-7 From Km 0/000 to Km 52/300 (ii) Madurai to Kanyakumari section of NH-7 From Km 52/300 to Km 116/500 (iii) Madurai to Kanyakumari section of NH-7From Km 116/500 to Km 180/000 and (iv) Madurai to Kanyakumari section of NH-7 From Km 180/000 to Km 243/170 of NH-7 (New NH-44) in the state of Tamil Nadu on Tolling Operation Maintenance and Transfer (TOT) Mode NHAI/ Tech/TN/TOT/M-K/2021/IE 13/10/2021 12/10/2021 29/11/2021
Time 11:0Hrs
68 Consultancy Services for Supervision Consultant (SC) of Routine Maintenance including Incident Management for Operation and Maintenance of Mydukur – Dornala T junction from Km 589.00 to Km.641.000 of NH 67 and Dornala T junction - Nellore section from Km.641.000 to Km 741.950 of NH 67. NHAI/ROVJA/M-D-N/2021 08/11/2021 12/10/2021 14/12/2021
Time 11:0Hrs
69 CONSULTANCY SERVICES FOR INDEPENDENT ENGINEER (IE) DURING OPERATION AND MAINTENANCE PERIOD FOR TWO LANE PAVED SHOULDER GADU-PORBANDAR SECTION OF NH-51 FROM KM. 287.430 TO KM. 379.100 ON HAM IN THE STATE OF GUJARAT INCLUDING SERVICES FOR AUTHORITY ENGINEER DURING CONSTRUCTION OF TWO LANE TO FOUR LANING OF MADHAVPUR-PORBANDAR SECTION OF NH-51 FROM KM. 338.4 TO KM. 379.100 ON EPC MODE IN THE STATE OF GUJARAT NHAI/2020-RO-GNR/Gadu-Por/Madh /IE-AE/Tender/2021 23/10/2021 09/10/2021 09/12/2021
Time 11:0Hrs
70 INDEPENDENT ENGINEER (IE) SERVICES FOR OPERATION AND MAINTENANCE STAGE UNDER TOT MODE OF FOUR LANING WITH PAVED SHOULDER OF PORBANDAR - JETPUR SECTION OF NH - 27 FROM KM. 1.960 TO 17.600 IN THE STATE OF GUJARAT NHAI/RO-GNR/Porb-Jet/ NH27/2021/IE 18/11/2021 05/10/2021 09/12/2021
Time 11:0Hrs
71 Consultancy Services for Authoritys Engineer for Supervision of Construction of Four laning of Karwar (Km 281 980 of NH 62 Nagaur road) to Dangiyavas section Package-II (design length 30 093 km) of Jodhpur ring road on EPC mode in Rajasthan 2021-NHAI-90361-1 11/10/2021 04/10/2021 07/12/2021
Time 11:0Hrs
72 Independent Engineer services for OM Period for National Highway Projects of MPRDC in the State of Madhya Pradesh under NHDP-IV on Design, Build, Finance Operate and Transfer (DBFOT) Toll Basis, MPRDCL Bhopal 2021-MoRTH-650725-1 27/10/2021 01/10/2021 02/11/2021
Time 17:30Hrs
73 Consultancy services for Authority Engineer for Supervision of Construction OF SUNGAL TUNNEL (LENGTH 2.79KM) AND ITS APPROACHES ON NH-144A THROUGH BRO, PROJECT SAMPARK, IN THE UT OF JAMMU KASHMIR TO BE IMPLEMENTED ON EPC MODE RW/NH-12014/1484/2020/JK/Z-II 23/09/2021 23/09/2021 25/10/2021
Time 11:0Hrs
74 Independent Engineer services for Four laning of NH-163 from Hyderabad at ORR Appa Junction (Design Km 14.000/Existing Km 14.000) to Manneguda (Design Km 60.405/Existing Km 59.500) (Design Length = 46.405 Km) in the State of Telangana under NH (O) on Hybrid Annuity Mode. NHAI/Tech/AP-TS/NH-163/Hyd-Man/IE/2017-18 28/09/2021 23/09/2021 21/12/2021
Time 11:30Hrs
75 INDEPENDENT ENGINEER(IE) SERVICES DURING OPERATION AND MAINTENANCE PERIOD FOR PALANPUR-SWAROOPGANJ SECTION OF (KM 601.00 TO KM 677.00) ON NH-27 IN THE STATE OF GUJARAT AND RAJASTHAN 4L HIGHWAY CONSTRUCTED ON BOT(ANNUITY) BASIS UNDER NHDP PHASE-III NHAI/RO-GNR/Pal-Swa/NH-27/ IE/Tender/2021 23/10/2021 22/09/2021 09/12/2021
Time 11:0Hrs
76 Consultancy services for Authority’s Engineer for Supervision of CONSTRUCTION OF SIX LANE LINK ROAD (NH-166S) WITH PAVED SHOULDER CONFIGURATIFON TO MOPA AIRPORT IN THE STATE OF GOA ON EPC MODE 2021-22/WD-VII(NH)/PWD/ASW/15 dt 20.09.2021 20/09/2021 20/09/2021 08/11/2021
Time 11:0Hrs
77 Consultancy services for Authority Engineer for Supervision of four laning of existing Beas – Baba Bakala - Dera Baba Nanak Section (NH-503D) starting from Beas NH-3 (Km. 417.700) and terminating at Kartarpur Sahib Corridor (Km. 0.000 of NH-354B and Km. 153.800 of NH-354) at Dera Baba Nanak under Bharatmala Pariyojana on EPC mode in the State of Punjab-Package-I and II NHAI/36044/1/2021/PB/BBDN 21/09/2021 20/09/2021 21/12/2021
Time 11:0Hrs
78 Independent Engineer Services during Operation & Maintenance stage of the Project Widening of existing road to 2 lane NH standards along with improvement and re-alignments from Nechipu to Hoj via Seppa, Khodaso, Sagalee (part of Trans-Arunachal Highway) on NH-229 in Arunachal Pradesh under Arunachal Pradesh package of Roads and Bridges of SARDP-NE on BOT (Annuity) basis RW/NH/30007/2/BOT/N-H-IE/21-22 04/10/2021 18/09/2021 09/10/2021
Time 17:0Hrs
79 Supervision Consultancy Services during O and M stage of 2-Laning With Paved Shoulders of Aligarh Moradabad Section of NH-93 From Km 85.650 To Km 232.000 In The State Of Uttar Pradesh Under NHDP Phase IV On Engineering Procurement And Construction Mode NHAI/NH-93/IE/2021-22 01/10/2021 17/09/2021 01/11/2021
Time 11:0Hrs
80 Independent Engineer services for Supervision of Construction of Eight lane access controlled Expressway from Km 69.800 to Km 79.783 (Bhoj to Morbe Section-SPUR of Vadodara Mumbai Expressway) in the State of Maharashtra on Hybrid Annuity mode under Bharatmala Pariyojana (Phase II-Package XVII) NHAI/ VME /PPPAC/2016/Pkg XVII/IE 27/09/2021 17/09/2021 06/01/2022
Time 11:0Hrs
81 Independent Engineer Services during Operation - Maintenance of 6-Lane Narasannapeta- Ranasthalam section of NH-16 from km 580.700 to km 634.000 under NHDP Phase-V on Hybrid Annuity mode in the State of Andhra Pradesh NHAI/RO-VJA/IE-OM/NSPT-RNST 17/09/2021 16/09/2021 30/11/2021
Time 15:30Hrs
82 Consultancy Services for Authoritys Engineer for Supervision of Construction of 4 lane ROB and its approaches at km 14.800 (Jerai), at km 36.800 (Jarua) and km 72.000 of NH 26A on Sagar to Bina road of Sagar District in the state of Madhya Pradesh on EPC 2021-MoRTH-648243-1 27/09/2021 14/09/2021 08/10/2021
Time 17:30Hrs
83 Independent Engineer Services for Six laning from Kodungallur to Edapally section of NH- 66 (old NH-17) from Design Ch. 397.750 (Ex. Km 411.850 of NH 17) to Design Chainage 423.780 (Ex. km 343.330 of NH 47) in the state of Kerala on Hybrid Annuity Mode under Bharatmala Pariyojana NHAI/KL/Kodu-Edap/NH 66/IE/2021 20/09/2021 13/09/2021 22/11/2021
Time 11:0Hrs
84 Consultancy Services for Authority’s Engineer for Up gradation 2OR4 lane NH connectivity under Sagarmala Scheme SH2 Haveri Yekambi (54 Km) SH 69 Yekambi Kumta/Belekere under State of Karnataka (Sirsi to Haveri road) (Package No NHAI/PC/SM/04) 2021 NHAI 87903 1 14/09/2021 10/09/2021 13/10/2021
Time 11:0Hrs
85 Independent Engineer(IE) Services for Operation and Maintenance Stage Under HAM Mode of 4L With Paved Shoulder of Porbandar-Dwarka Section of NH-51(Ext) From Km.356.766(Design Ch.Km.379.100) To 473.000 (Design Ch.Km.496.848) in the State of Gujarat NHAI/RO-GNR/IE/OM/POR-DWA /PKG-8/2021 07/09/2021 06/09/2021 09/12/2021
Time 11:0Hrs
86 SC services during OM of 4-Laning of Ghaghra Bridge to Varanasi section of NH-233 from Km. 121.800 to 180.420 2nd call NHAI/PIU-AZM/SC/OM/2021-22/02 12/10/2021 02/09/2021 18/11/2021
Time 12:0Hrs
87 Independent Engineer services for supervision of Upgradation and Four Laning of Haridwar Bypass Package-1 From Ch. 0.000 (Km 188.100 of NH-58) to Ch. 15.100 (Km 5.100 of NH 74) in the state of Uttarakhand on Hybrid Annuity mode. 2021-NHAI-86705-1 03/09/2021 01/09/2021 11/11/2021
Time 11:0Hrs
88 IE services during O and M period for the work of 4-laning of Hazipur- Muzaffarpur Section of NH77 from Km 0.000 to 46.300 and 16.870 Km new bypass starting at Km. 46.300 and connecting NH28 of East West Corridor at Km 515.045 in the State of Bihar (2nd Call) NIT No- 131/RO-PATNA/NHAI/2021-22 10/09/2021 01/09/2021 07/10/2021
Time 11:0Hrs
89 Consultancy Services for Independent Engineer for Supervision of Development of 6-lane access controlled Spur to Haridwar from Delhi-Saharanpur-Dehradun Economic Corridor from Design Chainage 0.000 (Delhi-Dehradun Highway) to Design Chainage 50.700 (Bahadrabad) in the state of Uttar Pradesh and Uttarakhand on Hybrid Annuity Mode under Bharatmala Pariyojana [DS/Package-III] NHAI/BM/ Delhi-Saharanpur/DS/IE/Pkg-III/2021 01/09/2021 01/09/2021 12/10/2021
Time 11:0Hrs
90 Independent Engineer Services for Rehabilitation and Upgradation to Four Lane configuration & Strengthening of Sihuni to Rajol from Km 51 000 to Km 72 000 of NH-20 (New NH-154) (Design Length 18.450 KM) of Pathankot-Mandi Section under NH (O) in HP on HAM basis (Package-IIA) NHAI/Sihuni-Mataur/PkgIIA/IE/HP/2021 07/09/2021 31/08/2021 22/02/2022
Time 11:0Hrs
91 AE for 4Lane of GF Rd connecting NandS IC of Khandaleru Creek near Krishnapatnam port at Thamminapatnam to Mollur near Muthukur 0.000 to 16.046 Part1 and 6Lane for extn of Dedicated port Rd on NH67 from 18.000 to 19.300 Part2 on EPC Mode in AP, BMP NHAI/PC/BM/2021 (Thaminapatnam- Mollur )/AE 17/09/2021 27/08/2021 31/10/2022
Time 11:0Hrs
92 Consultancy Services For Authority Engineer For Supervision of Rehabilitation and Upgradation of NH-565 from Km 86.057 to 132.920 Nagarjuna Sagar Dam to Davulapally section to to two lane with paved shoulder in the State of Andhra Pradesh through EPC RW/NH12014/66/2020AP/Z-III/709 27/08/2021 27/08/2021 20/10/2021
Time 15:0Hrs
93 Independent Engineer Services for Development of Memmadpur (Ambala) – Banur (IT City Chowk) – Kharar (Chandigarh) Corridor under Bharatmala Pariyojana – Package-I – 6 laning of Ambala-Chandigarh greenfield with spur to Lalru (4 lane) in the State of Punjab on Hybrid Annuity Mode (Design Ch. 0.000 to 25.000 Spur to Lalru-Design Ch. 0.000 to 5.828, Total Length 30.828 Kms) 2021-NHAI-85879-1 02/09/2021 24/08/2021 04/05/2022
Time 11:0Hrs
-
94 CS for AE for Supervision of Construction of 6 lane flyovers at Boragaon Gorchuk Lokhra Basistha Junction along with 6 laning of approaches from section Ch. Km 146.172 to Km 162.620 on Guwahati Bypass NH37 in Assam under BMP on EPC basis NHAI/NE/AE/GuwahatiBypass/2021 24/08/2021 24/08/2021 23/09/2021
Time 11:0Hrs
95 Supervision Consultancy Services for construction supervision of Left Out Work Four laning of Talaja – Mahuva Section of NH – 8E from km 53 585 to km 100 100 (design chainage from km 54 990 to km 100 450) (Package – II) and construction supervision of Left out Work of Four Laning of Mahuva to Kagavadar of NH-8E from Km 100 100 to Km 139 915 (Design Chainage from Km 100 450 to km 140 470) (Package-III) in the State of Gujarat on single percentage item rate Contract basis under NHDP Phase IV 2021NHAI858331 25/08/2021 24/08/2021 23/09/2021
Time 11:0Hrs
96 SC services during O and M stage of 4 Lane of Swaroopganj Pindwara Section and Debari to Pratapnagar Section, 2 lane existing Udaipur Bypass from Pratapnagar to Balicha and 4 Lane of Balicha to Kaya Section of in the state of Rajasthan NHAI/11011/1/Admn/2021-ROJ/ Tenders/SC/ SP-DUK/ 24/08/2021 19/08/2021 04/10/2021
Time 11:0Hrs
97 Independent Engineer Services during O and M stage of 4 or 2 laning with paved shoulder Of Dausa Lalsot Kothoon section of New NH 148 and New NH 23 in the state of Rajasthan under NHDP Phase IV on Hybrid Annuity Mode NHAI/11011/1/Admn/2021-ROJ/ Tenders/IE/DLK 31/08/2021 19/08/2021 04/10/2021
Time 11:0Hrs
98 SC services during O and M stage of 2 laning with paved shoulder of Karauli Dholpur section and Uncha Nagla Khanuan Roopvas Dholpur section of NH 123 length 75.008 km in the state of Rajasthan or Uttar Pradesh under NHDP Phase IV on EPC mod NHAI/11011/1/Admn/2021-ROJ/ Tenders/SC/KD-UD 31/08/2021 19/08/2021 04/10/2021
Time 11:0Hrs
99 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF (1) Up-gradation to 4 lane with paved shoulder from exiting km. 58.245 to existing km. 108.600 of NH-8 (2) Up-gradation to 4 lane with paved shoulder from exiting km. 108.600 to existing km. 144.00 and km. 158.419 to km. 173.30 of NH-8 (3) Up-gradation to 4 lane with paved shoulder from exiting km. 144.00 to existing km. 158.419 of NH-8 (Beawar-Gomti section) on EPC mode in the State of Rajasthan on EPC MODE 03/2021-22 19/08/2021 19/08/2021 21/09/2021
Time 11:0Hrs
100 IE service during O and M stage of 2 lane with paved shoulder of NH 70 from Munabao (NH 25E) Sundra Myajlar Dhanan Asutar Ghotaru Tanot under Phase 1 of Bharatmala Pariyojana in the State of Rajasthan on HAM. NHAI/11011/1/Admn/2021-ROJ /Tenders/IE/MT/2nd 18/08/2021 18/08/2021 04/10/2021
Time 11:0Hrs
101 Consultancy Services for Authoritys Engineer for supervision of 1 Construction of 4 Lane Elevated Highway and at grade improvements at Gopalganj Town from Design Ch 384 000 Existing Ch 384 000 to Design Ch 386 750 Existing Ch 386 410 on NH 28 on EPC Mode 2 Construction of leftover portion of additional 2-lane Gandak Bridge and rehabilitation of Existing operational 2 lane Gandak bridge in Km 423 to Km 424 of NH 28 new NH 27 in the state of Bihar 2021-NHAI-84807-1 24/08/2021 12/08/2021 14/09/2021
Time 11:0Hrs
-
102 Consultancy service for Authority s Engineer for supervision of Widening of Major Bridge at Ch 171.601 (Existing chainage 172.310) on NH- 150A (Jewaragi-Chamarajnagar Section) on EPC mode in the State of Karnataka. (Job No.NH-150A-KNT-2020-21-913). EE/NHD/VJP/NH-150A/21-22/2123 12/08/2021 11/08/2021 20/08/2021
Time 17:0Hrs
103 Independent Engineer services for O&M Period for Four Laning of Patna-Bakhtiyarpur section of NH-30 from Km 181.300 to km. 231.950 in the state of Bihar under NHDP-III on DBFOT Toll Basis (3rd Call). 128/RO-Patna/NHAI/2021-22 23/08/2021 11/08/2021 20/09/2021
Time 11:0Hrs
104 Consultancy services for Authoritys Engineer for Supervision of Balance work for Rehabilitation and Upgradation of Sidhi-Singrauli from km 82.400 to 187.993 section of NH-39 (Old NH-75E) (Design Length 105.593 km) to 4 lane with paved shoulder on EPC mode 2021-MoRTH-642447-1 06/09/2021 10/08/2021 13/09/2021
Time 17:30Hrs
105 Consultancy Services For Authoritys Engineer For Supervision of Rehabilitation and Up gradation of existing road to 2 Lane with PS configuration from Design Chainage Km.36/400 to Km.107/224 of NH167BG from Duttaluru to Kavali in state of AP on EPC RW/NH-12014/55/ 2020-AP/Z-III/711 10/08/2021 10/08/2021 30/09/2021
Time 15:0Hrs
106 Consultancy Services for AE for Supervision of Construction of Six lane Bhandara Bypass Section of NH-53 (Old NH-06) from km 485.000 (Design km 485.000) to km 499.545 (Design km 499.800) under BMP in the state of Maharashtra on EPC mode NHAI/Tech/MH/AE/Bhandara Bypass/2021 10/08/2021 10/08/2021 08/09/2021
Time 11:0Hrs
107 Authority Engineer services during Construction and Defect Liability Period of rectification works of MoRTH identified Blackspots and Works proposed in Value Addition of Lakhanpur Vijaypur Section of NH 44 in Jammu and Kashmir JK/AE/LJ/2021-22/01 07/08/2021 09/08/2021 30/09/2021
Time 17:0Hrs
108 Consultancy Services for Authority Engineer for Supervision of Widening of Urban Link (Anantapur Town) of NH-42 to 4-lane Km 0 to Km9.2 and formation of Mudigubba bypass 2LPS from Km130.400 to Km137.500 on NH42 on EPC Mode in Andhra Pradesh RW/NH12014/42/2020AP/Z-III/704 09/08/2021 09/08/2021 29/09/2021
Time 15:0Hrs
109 CS for AE for Supervision of Development of 4Lane RC from existing East break water upto Convent Junction from Phase1 from Km.0.312 End of Visakhapatnam Port Trust and Ends at Km.3.800 VCTPL Exit Gate having a total length of 3.488 Km in AP under BMP NHAI/PC/BM/2021 (Eastbreakwater- Convent Junction)/AE 18/08/2021 03/08/2021 02/09/2021
Time 15:0Hrs
110 Independent Engineer Services for Four laning of existing two lane road from Ghoman to Tanda (NH-503A) from Km 54.000 too Km 85.500 (Design Length 31.500 km) on Hybrid Annuity Mode in the State of Punjab under NH(O) (Package-II) 2021-NHAI-83898-1 23/08/2021 03/08/2021 21/09/2021
Time 11:0Hrs
111 Independent Engineer Services during Operation & Maintenance stage of the Project Widening of existing road to 2 lane NH standards along with improvement and re-alignments from Nechipu to Hoj via Seppa, Khodaso, Sagalee (part of TransArunachal Highway) on NH-229 in Arunachal Pradesh under Arunachal Pradesh package of Roads and Bridges of SARDP-NE on BOT (Annuity) basis RW/NH/30007/2/BOT/N-H-IE/2021-22/RO-Ita 05/08/2021 03/08/2021 04/09/2021
Time 17:0Hrs
112 Independent Engineer services for Operation & Maintenance of (i) Chennai Bypass from Km 0.000 to Km 32.600 in the State of Tamil Nadu , (ii) Chennai – Tada Section of NH-5 from Km 11.000 to Km 21.400 in the State of Tamil Nadu and (iii) Koyambedu - Madurovayol section of NH-4 from Km 9.410 to 13.535 in the state of Tamil Nadu NHAI/RO Chennai/IE/O&M/2020-21/53 18/08/2021 26/07/2021 26/08/2021
Time 11:0Hrs
113 Independent Engineer services during Operation and Maintenance of Kanwas–Khanpur–Aklera Section of SH–74, Deoli–Kanwas Section of SH–74A, Alot (MP)–Gangdhar–Suwansara–(MP) Section of SH-19C and Kherli–Pahari Section of SH-22 (Total Length 175.36 Km) under RSHIP Tranche-I, Package-01 on Annuity mode under design, build, finance, operate and transfer (“DBFOT”) basis in the State of Rajasthan NIT-13/2021-22 22/07/2021 22/07/2021 11/08/2021
Time 11:0Hrs
114 CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF CONSTRUCTION OF 2 LANE PAVED SHOULDERS TIRORA GONDIA AND AMGAON GONDIA IN THE STATE OF MAHARASHTRA NIT-04/2021-22 11/08/2021 20/07/2021 20/09/2021
Time 17:0Hrs
115 Independent Engineer services for Supervision of Construction of Four laning of (i) Puducherry – Poondiyankuppam section from Km 29 000 to Km 67 000 and (ii) Poondiyankuppam - Sattanathapuram section from Km 67 000 to Km 123 800 of NH 45A (New NH 32) in the State of Tamil Nadu and Union Territory of Puducherry under Bharatmala Pariyojna on Hybrid Annuity Mode NHAI/Tech/TN/NH-45A/Pud-Sat/2021/IE 11/08/2021 19/07/2021 20/09/2021
Time 11:0Hrs
116 Independent Engineer services for Supervision of Construction of four/six-lane access-controlled expressway from Junction with Pathankot-Gurdaspur road (NH-54) near Balsua to Junction with Hiranagar Road near village Gurha Baildaran (km 423.500 to km 468.100) of Delhi Amritsar Katra Expressway on HAM mode under Bharatmala Pariyojna in the state of Punjab and UT of J&K (Phase II-Package XIV) NHAI/BM/DAKExpressway/2021/PkgXIV/IE 12/08/2021 19/07/2021 23/11/2021
Time 11:0Hrs
117 Independent Engineer services for Supervision of Construction of four/six-lane access-controlled expressway from Junction with Hiranagar Road near village Gurha Baildaran to Junction with Jammu Ring Road NH 244A near Jakh village section as part of Delhi-Amritsar-Katra Expressway on HAM mode under Bharatmala Pariyojana (Design Ch. 468.100 to 503.250) in the UT of J&K (Phase II-Package XV) NHAI/BM/DAKExpressway/2021/PkgXV/IE 12/08/2021 19/07/2021 21/10/2021
Time 11:0Hrs
118 Independent Engineer services for Supervision of Development of Jakh (Vijaypur)-Kunjwani section of NH-44 to six-lane Expressway standards as part of Delhi-Amritsar-Katra Expressway [Design Km 503.200 to Km 515.000] including development of Kunjwani to 4th Tawi Bridge section of NH-144A to four-lane NH standards [Ch. 0.000 to 7.385 of NH-144A, Spur Connectivity to Jammu Airport] in the UT of Jammu & Kashmir on HAM (Phase II-Package XVI) NHAI/BM/DAKExpressway/2021/PkgXVI/IE 12/08/2021 19/07/2021 21/10/2021
Time 11:0Hrs
119 Engagement of Safety Consultant Services during Operation and Maintenance of Ayodhya -Gorakhpur-Gorakhpur Bypass-Kasia (UP-Bihar Border) Section from KM 137-970 to km 366-117 of NH-28 (new NH-27) TotalLength 229-485 km-Third call NHAI/PIU-GKP/Safety consultant/20-21/Third call 19/07/2021 19/07/2021 16/08/2021
Time 11:0Hrs
120 Consultancy service for Authoritys Engineer for supervision of Construction of Elevated Corridor from Km 135.650 to 136.450 on NH 63, from Km 249.00 to 250.050 on NH4 and from km 192.800 to 193.350 on NH 218 for Decongestion of traffic at Rani Chennamma Circle in Hubli City Taluk in the state of Karnataka on EPC mode. 461 Dt. 13.07.2021 15/07/2021 15/07/2021 13/08/2021
Time 17:0Hrs
121 Consultancy for Engineer Authority Engineer for the EPC Work for (i) Widening Strengthening/Up-gradation to two lane with paved shoulder from existing chainage Chainage 148.170 (Junction with NH-8) to 211.100 (Deval- Dungarpur- Hirata- Varda- Sagwara) Section of NH-927A in the State of Rajasthan on EPC mode (Package-IV) and (ii) Widening/Strengthening/Up-gradation to two lane with paved shoulder from existing chainage Km. 216.440 to 227.470, 243.630 to 251.120 & Strengthen SE PWD NH Circle Udaipur NIT No. 3/2021-22 09/09/2021 15/07/2021 27/09/2021
Time 11:0Hrs
122 Supervision Consultant (SC) for Routine Maintenance including Incident Management for Operation and Maintenance of Mydukur – Dornala T junction section from Km 589.00 to Km 641.00 of NH 67 NHAI/ROVJA/MD/KDP/2021 02/08/2021 14/07/2021 28/09/2021
Time 11:0Hrs
123 CS for AE for Supervision of Up-gradation of port connectivity NH configuration from existing 2-4-lane road from Achhampeta junction (NH-216) to Kakinada anchorage port connecting Vakalpudi light house (from Ch.0.0 to Ch.13.198)under Bharatmala Scheme NHAI/11011/PC/ Achhampeta-Kakinada Port/AE 19/07/2021 09/07/2021 23/08/2021
Time 11:0Hrs
124 Independent Engineer services for Supervision of Development of six lane of Raipur-Visakhapatnam Economic Corridor from Boriguma to Pattangi section Design Chainage 249.000 to Design Chainage 338.500 of NH-130-CD in the state of Odisha on Hybrid Annunity Mode (Package-II) NHAI/BM/Raipur-Vishakhapatnam/OD/IE/Pkg-II/2021 19/07/2021 29/06/2021 16/08/2021
Time 11:0Hrs
125 Independent Engineer services for Supervision of Development of six lane Abhanpur – Magerlod Section of NH-130-CD Road from km 000.000 to km 42.852 under Raipur-Visakhapatnam Economic Corridor in the state of Chhattisgarh on Hybrid Annuity Mode (Package-CG(01)) NHAI/BM/Raipur-Vishakhapatnam/CG/IE/Pkg-I/2021 19/07/2021 29/06/2021 11/08/2021
Time 11:0Hrs
126 IE Services during O and M Period for 4-Laning of Moradabad-Bareilly Section of NH-24 from Km 149.250 to Km 271.050 in the state of Uttar Pradesh on DBFOT basis under NHDP Phase-IIIA 11017/1/2021/IE/Tender/PIU-MBD 06/08/2021 25/06/2021 09/08/2021
Time 12:0Hrs
127 Consultancy Services For Authority S Engineer For Supervision Of Construction Of Four Laning Of Pinjore (End Of Pinjore Bypass) Nallagarh Section (Km 4 200 To 35 395) On Nh 105 (Old Nh 21a) In The State Of Haryana And Himachal Pradesh On Epc Mode Under Bharatmala Pariyojna 2021 NHAI 79888 1 21/06/2021 17/06/2021 19/07/2021
Time 11:0Hrs
128 Independent Engineer services 6-laning of Ghaziabad-Aligarh Section of NH-91 and Authority Engineer services for Construction and Development of 4/6 lane divided carriageway for THDCIL NHAI/11013/IE-AE/NH-91/2020-21 15/06/2021 15/06/2021 27/07/2021
Time 11:0Hrs
-
129 IE Services during Oand M stage of 4 Laning of Beawar Pali Pindwara Section and 6 laning of the existing road of Kishangarh Ajmer Beawar section under NHDP Phase III on DBFOT basis in the State of Rajasthan (Total Length 336.370 Km) NHAI/11011/1/Admn/2021-ROJ/Tenders/IE/KAB-BPP 15/06/2021 15/06/2021 27/01/2022
Time 11:0Hrs
130 IC Services during O and M Period of 4-Lane Dual Carriageway from km 488.270 to km 413.200 (Lucknow–Sitapur Section) of NH-30 (old NH-24) in the State of Uttar Pradesh on Build, Operate and Transfer (BOT) basis. NHAI/PIU-Lucknow/IE/NH-24/2021/06 14/06/2021 14/06/2021 28/07/2021
Time 11:0Hrs
131 Construction of 4 Laning of part of Ramban to Banihal Section of NH-1A including Cons of Twin Tube Tunnel(PKG-I)Cons of 4Laning of NH-1A (including construction of Twin Tube Tunnel(PKG-II) Construction of 4Laning ofNH-1A(PKG-III)in the UT of JK on EPC 2021 NHAI 79400 1 16/06/2021 11/06/2021 27/07/2021
Time 11:0Hrs
132 Independent Engineer Services for Operation & Maintenance Period of 4 lane divided carriageway facility of Salem – Kumarapalayam Section from Km.0/000 to Km.53/525 (TN-06) and Kumarapalayam – Chengapalli Section from Km.53/525 to Km.102/035 (TN-07) of NH-544 (Old NH-47) in the State of Tamil Nadu RO-Chennai/IE/O&M-NH-47/2020-21/44 22/06/2021 10/06/2021 21/07/2021
Time 17:0Hrs
133 Independent Engineer Services for Operation & Maintenance of 6-laning from Km 102.035 to Km 144.680 on the Chengapalli to the start of Coimbatore Bypass and 4-lanning from Km 170.880 to Km 183.010 from the end of Coimbatore Bypass to TN/Kerala Border Section of NH-544 (Old NH-47) (TN-01) in the State of Tamil Nadu RO Chennai/IE/O&M/NH-47/2020-21/45 22/06/2021 10/06/2021 21/07/2021
Time 17:0Hrs
134 Consultancy Services for supervision of Special Repair of NH 702 from Mon to Tizit Stretc 2021NHIDC6332701 09/06/2021 09/06/2021 30/06/2021
Time 15:0Hrs
135 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF Construction of High Altitude Hill road from Tedadege TO Henkaer from KM 0.000 to KM 28.550 in West Siang District of the state of Arunachal Pradesh on EPC Mode and Construction of High Altitude Hill road from Doginala TO Gau from KM 0.000 to KM 15.320 in Upper Subansiri District of the state of Arunachal Pradesh on EPC Mode NHIDCL/AP/AE/ICBR /TH-DG-TG/2021 22/06/2021 08/06/2021 08/07/2021
Time 14:30Hrs
136 Independent Engineer Services Four-Laning of Baharampore – Farakka Section of NH-34 from Km. 191.700 to Km. 292.294 in the state of West Bengal on design, Build, Finance, Operate and Transfer (DBFOT) Toll Basis under NHDP Phase-III 2021-NHAI-79014-1 29/06/2021 07/06/2021 19/07/2021
Time 11:0Hrs
137 Supervision Consultancy Services During Operation And Maintance of Two - Lane with Paved Shoulder of Rudhauli to Basti SECTION ( Km 65.870 to 122.270) of NH- 233 on EPC Mode under NHDP phase - IV in the State of Uttar Pradesh. 11022/12/RO/UP(E)/2021/PIU-GKP 07/06/2021 07/06/2021 21/07/2021
Time 15:0Hrs
138 Independent Engineer Services during Operation & Maintenance stage of Two Laning with Paved Shoulder of Raebareli to Prayagraj section (Km 82.700 to Km 188.600) of NH-30 (Old NH-24B) in the State of Uttar Pradesh under NHDP IVA on BOT (Toll) basis NHAI/PIU RBLY/NH30/IE/2021 03/06/2021 03/06/2021 15/07/2021
Time 13:0Hrs
139 IE service during O and M stage of 2 lane with paved shoulder of NH 70 from Munabao (NH 25E) Sundra Myajlar Dhanan Asutar Ghotaru Tanot under Phase 1 of Bharatmala Pariyojana in the State of Rajasthan on HAM NHAI/11011/1/Admn/2021-ROJ /Tenders/IE/MT 26/05/2021 26/05/2021 08/07/2021
Time 11:0Hrs
140 IE Services during O and M stage of Bikaner Phalodi section to 4 lane from Km 4.200 to Km 55.250 and 2 lane with paved shoulders from Km 55.250 to Km 163.500 of NH 15 (New NH 11) and 2 lane with Paved Shoulder of Khajuwala Poogal section and Poogal NHAI/11011/1/Admn/2021-ROJ /Tenders/IE/BP-KB 29/06/2021 26/05/2021 15/07/2021
Time 11:0Hrs
141 Supervision Consultancy Services during Operation and Maintenance of Two-Lane with paved shoulder Sonauli to Gorakhpur Section NH-29E (New-24) from km 000 to 80-00 in the state of Uttar Pradesh NHAI/PIU-GKP/NH-24/20-21 12/07/2021 18/05/2021 22/07/2021
Time 12:0Hrs
142 Independent Engineer Services for Four Laning of Munger to Kharia village junction (Package 01), Kharia village junction to start of existing Bhagalpur bypass (Package 02) on Hybrid Annuity Mode in the State of Bihar. 2021-NHAI-77577-1 17/05/2021 17/05/2021 16/06/2021
Time 11:0Hrs
143 Independent Engineer Services for Four Laning of Bhagalpur bypass to Rasulpur (Package 03) Rasulpur to Mirzachauki (Package 04) on Hybrid Annuity Mode in the State of Bihar 2021-NHAI-77570-1 17/05/2021 17/05/2021 16/06/2021
Time 11:0Hrs
144 Consultancy Service for Authoritys Engineer for Improvement into two lane with paved shoulder/four lane of NH-40 between Shillong to Dawki section including construction of Dawki bridge Design length - 63.91 Km (Ch 0-000 To Ch 71-520 of NH-40 & Ch 0-000 to Ch 0-900 of NH-44) (Package-I II IV & V) excluding pynursula bypass in Meghalaya under JICA loan assistance (2nd Phase) on Engineering, Procurement, Construction (EPC) Mode 2021-NHIDC-629837-1 03/06/2021 12/05/2021 21/06/2021
Time 14:30Hrs
145 Consultancy Services for Authoritys Engineer for Supervision of Six Laning of Thuravoor(Km. 379.100) – Paravoor(Km. 417.000) - Kottukulangara (Km.454.500) section of New NH-66 (Old NH-47) in the State of Kerala on EPC Mode under Bharatmala Pariyojana NHAI/Tech/KL/Thur-Para-Kot/NH-47/AE/2021 27/05/2021 11/05/2021 22/07/2021
Time 11:0Hrs
146 Independent Engineer Services for Development of 6 lane Amritsar Bathinda Greenfield section of NH 754A from village Tiba on NE 5A to junction with Bhagta Bhai Ka Bhadaur Road near Dyalpura Bhai Ka from km 00 000 to km 93 000 as a part of Amritsar Jamnagar Economic Corridor in the state of Punjab on Hybrid Annuity Mode under Bharatmala Pariyojana Phase I 2021-NHAI-77307-1 12/05/2021 11/05/2021 14/06/2021
Time 11:0Hrs
147 Independent Engineer Services for Development of 6-lane Amritsar-Bathinda Greenfield section of NH-754A from Bhagta Bhai Ka-Bhadaur Road near Dyalpura Bhai Ka to junction with Mandi Dabwali Bathinda Road on NH-54 near Sangat Kalan (from km 93 000 to km 154 866) as a part of Amritsar-Jamnagar Economic Corridor in the state of Punjab on Hybrid Annuity Mode under Bharatmala Pariyojana Phase-I (Package-3) 2021-NHAI-77308-1 12/05/2021 11/05/2021 14/06/2021
Time 11:0Hrs
148 Independent Engineer Services for Development of 6-lane access controlled Ludhiana-Bathinda Greenfield highway section of NH-754AD from junction with Amritsar-Bathinda Greenfield Road (NH-754A) near Rampura Phul to junction with Delhi-Katra Expressway (NE-5) near Ludhiana (village Ballowal) (from km 00 00 to km 75 543) as a part of Ludhiana-Ajmer Economic Corridor in the state of Punjab on Hybrid Annuity Mode under Bharatmala Pariyojana Phase-I 2021-NHAI-77311-1 12/05/2021 11/05/2021 14/06/2021
Time 11:0Hrs
149 Independent Engineer Services during Operation and Maintenance stage of Development of Delhi-Meerut Expressway (package-I II & III) from Km. 0-000 to Km. 50-270 (Nizamuddin Ring Road Delhi to Hapur) in the State of Delhi Uttar Pradesh (Total Length 50-270 Km) 2021-NHAI-76890-1 18/05/2021 03/05/2021 03/06/2021
Time 11:0Hrs
150 CONSULTANCY SERVICES FOR AUTHORITY ENGINEER FOR SUPERVISION OF Rehabilitation And 01/AP/2021-22/01/AE/RO-VJA Dt29-04-2021 29/04/2021 29/04/2021 19/06/2021
Time 11:0Hrs
151 Independent Engineering Services for Six laning from Kappirikkad Design ch 335-850 (Ex km 349-260) -Thalikulam Design Ch 369-015(Ex km 382-300) - Kodungallar Design Ch 397-750(Ex km 411-850) section of NH - 66 (old NH-17) in the state of Kerala on Hybrid Annuity Mode under Bharatmala Pariyojana NHAI/HQ/Kerala/Kap-Thali/IE/NH-66/2020-21 02/06/2021 23/04/2021 22/07/2021
Time 11:0Hrs
152 Consultancy Services as Independent Engineer during Operation and Maintenance for Six laning of Chitradurga to Davanagere section from Km 189 000 to Km 260 000 Design Km 0 000 to Km 20 700 Km 208 000 to Km 260 000 of NH 48 Old NH 4 in the State of Karnataka under NHDP Phase V on HAM Mode NIT No 04 NHAI RO BNG 13017 Tender 2021 22 dated 22 04 2021 04/05/2021 22/04/2021 14/06/2021
Time 15:0Hrs
153 Consultancy Services as Independent Engineer during Operation and Maintenance for Six laning of Davanagere to Haveri section from Km 260 000 to 338 923 of NH 48 Old NH 4 in the State of Karnataka under DBFOT under NHDP Phase V on HAM Mode NIT No 05 NHAI RO-BNG 13018 Tender 2021 22 dated 22 04 2021 04/05/2021 22/04/2021 14/06/2021
Time 15:0Hrs
154 Consultancy services for Authority Engineer for Supervision of Construction of Six Lane Bridge across Palguni River at km 368/849 of length 182/50m and improvement works from Design Chainage km 368/356 (Existing Chainage Km 368/356) to Design Chainage km 369/132 (Existing Chainage Km 369/132) on NH-66 on EPC mode in the state of Karnataka NHAI/KNT/NH-66/Kullur Bridge/AE/2021-22 22/04/2021 20/04/2021 03/06/2021
Time 11:0Hrs
155 Independent Engineer Services for Construction/upgradation of two lanes with paved shoulders of NH-911 from Sriganganagar to Raisinghnagar (Design Chainage -0.500 km to Design Chainage 101.000 km) (length 102.076 km) under NH (O) on Hybrid Annuity Mode in the State of Rajasthan (Package-I) 2021-NHAI-76049-1 03/05/2021 19/04/2021 06/07/2021
Time 11:0Hrs
156 Independent Engineer Services during Operation and Maintenance of Jodhpur – Pali Section of NH-65 from Km. 308.000 to Km.366.000 and including Bypass to Pali starting from Km. 366.000 of NH-65, Connecting NH - 14 at Km. 114.000 in the state of Rajasthan through Public Private Partnership (PPP) on Design, Built, Finance, Operate and Transfer Basis stage of selected road stretches under BOT projects in the State of Rajasthan 2021 MoRTH 625657 1 02/05/2021 17/04/2021 20/05/2021
Time 11:0Hrs
157 Supervision consultant services during operation and maintenance of two lane with paved shoulder sonauli to gorakhpur section NH29E (new NH24) from km0 to km 80 in the state of uttar pradesh NHAI/PIU-GKP/NH-24/20-21/11 03/05/2021 15/04/2021 29/06/2021
Time 12:0Hrs
158 Independent Engineer Services for Operation & Maintenance of 6-lane Handia-Rajatalab section from Km 712.900 to Km 785.544 of NH-19 (old NH-2) in the state of Uttar Pradesh under NHDP -V on Hybrid Annuity Mode 01/NHAI/PIU-PRG/2021-22 13/05/2021 14/04/2021 10/06/2021
Time 11:0Hrs
159 Consultancy Services for IE for Supervision of Development of six lane access control of Raipur- Visakhapatnam EC under BMP from Design Chainage km 365.033 Aluru to Design Chainage 421.100 Korlam in Andhra Pradesh on HAM Mode (Package-I) NHAI/BM/Raipur-Vishakhapatnam /AP/IE/Pkg-I/2021 19/04/2021 10/04/2021 17/05/2021
Time 11:0Hrs
160 Consultancy Services for IE for Supervision of Development of six lane access control of Raipur- Visakhapatnam EC under BMP from Design Chainage km 421.100 Korlam to Design Chainage 464.662 Sabbavaram in Andhra Pradesh on HAM Mode (Package-II) NHAI/BM/Raipur-Vishakhapatnam /AP/IE/Pkg-II/2021 19/04/2021 10/04/2021 24/05/2021
Time 11:0Hrs
161 Consultancy Services for IE for Supervision of Development of Six Lane Chittoor-Thatchur Highway from km 0.000 (Varadharajula) to km 61.380 (Veera Kaveri Raja Puram) on HAM under BMP in Andhra Pradesh and Tamil Nadu on HAM Mode (Package-I) NHAI/BM/Chittoor-Thatchur /IE/Pkg-I/2021 19/04/2021 10/04/2021 24/05/2021
Time 11:0Hrs
162 Consultancy Services for IE for Supervision of Development of Six Lane Chittoor-Thatchur Highway from km 61.380 (Veera Kaveri Raja Puram) to km 116.100 (Kannigaipair) on HAM under BMP in Andhra Pradesh and Tamil Nadu on HAM Mode (Package-II) NHAI/BM/ Chittoor-Thatchur /IE/Pkg-II/2021 19/04/2021 10/04/2021 24/05/2021
Time 11:0Hrs
163 Consultancy Services for IE for Supervision of Development of 6-lane access control of Raipur- Visakhapatnam EC under BMP from Design Chainage 124.611 Dhanara (Odisha-Chhattisgarh) to Design Chainage 249.000 Kaliagura in Odisha on HAM Mode (PKG-I) NHAI/BM/Raipur-Vishakhapatnam /OD/IE/Pkg-I/2021 19/04/2021 10/04/2021 17/05/2021
Time 11:0Hrs
164 Consultancy Services for Authority’s Engineer for Supervision of Development of six lane access control greenfield highway of Delhi-Saharanpur-Dehradun economic corridor under Bharatmala Pariyojana from Junction of EPE (Vill-Mavikalan) Design Chainage 0.000 to Design Chainage 56.500 (Vill-Karaunda Mahajan) in the state of Uttar Pradesh on EPC Mode under Bharatmala Pariyojana (Phase-I) [Construction Supervision/Package-I] NHAI/BM/EC/Delhi-Saharanpur -Greenfield/AE-1/ 2021 16/04/2021 08/04/2021 19/05/2021
Time 11:0Hrs
165 Consultancy Services for Authority’s Engineer for Supervision of Development of six lane access control greenfield highway of Delhi-Saharanpur-Dehradun economic corridor under Bharatmala Pariyojana from Design Chainage 56.500 (Vill-Karaunda Mahajan) to Design Chainage 119.790 (Vill-Latifpur at Saharanpur Bypass) in the state of Uttar Pradesh on EPC Mode (Package-II) NHAI/BM/EC/Delhi-Saharanpur- Greenfield/AE-2/2021 16/04/2021 08/04/2021 19/05/2021
Time 11:0Hrs
166 Consultancy Services for Authoritys Engineer for Supervision of Development of six – lane access controlled highway of Ganeshpur – Dehradun section of NH-72A under Bharatmala Pariyojna from Design Chainage 0.000 (Ganeshpur) to Design Chainage Km 19.785 in the state of Uttar Pradesh & Uttarakhand on EPC mode under Bharatmala Pariyojana (Phase-I) NHAI/BM/EC/Ganeshpur-Dehradun/AE/2021 13/04/2021 01/04/2021 03/05/2021
Time 11:0Hrs
167 Independent Engineer services for Supervision of Construction of Eight lane access controlled Expressway from Km 43.000 to Km 69.800 (Amne to Bhoj Section-SPUR of Vadodara Mumbai Expressway) in the State of Maharashtra on Hybrid Annuity mode under Bharatmala Pariyojana NHAI/VME/PPPAC/2016/IE-III 06/04/2021 26/03/2021 29/07/2021
Time 11:0Hrs
168 Independent Engineer services for Supervision of Construction of Eight lane access controlled Expressway from Km 3.000 to Km 43.000 (Shirsad to Amne Section-SPUR of Vadodara Mumbai Expressway) in the State of Maharashtra on Hybrid Annuity mode under Bharatmala Pariyojana NHAI/VME/PPPAC/2016/IE-II 06/04/2021 26/03/2021 29/07/2021
Time 11:0Hrs
169 Consultancy Services for Authority s Engineer for Supervision of construction of Four Lane Divided Carriageway with Paved Shoulder from Patan km 49 775 design Near Khan Sarover lake to Gojariya km 128 940 design of NH 68 in the State of Gujarat NHAI/Guj/Patan Gojariya/AE/21 11/05/2021 25/03/2021 10/06/2021
Time 15:0Hrs
170 Independent Engineer Services during O and M stage of 4 laning of Gomati Chouraha-Udaipur section of NH-8 (New NH-58) and 4 laning of Rajsamand-Bhilwara Section of NH-758 from Km 0.000 to Km 87.250 under NHDP Phase IV on DBFOT (Toll) basis in the State of Rajasthan NHAI/11011/1/Admn/2021-ROJ/ Tenders/IE/RB-GCU 24/03/2021 24/03/2021 22/06/2021
Time 11:0Hrs
171 SC Services during O and M stage of 2 lane with paved shoulder of Jodhpur Pokaran section and 2 Lane with Paved Shoulder or 4 Lane of Jodhpur Barmer section (Jodhpur to Pachpadra Package I), Jodhpur Barmer Section (Bagundi to Barmer Package II) of NH-112 (New NH 25) in the State of Rajasthan NHAI/11011/1/Admn/2021-ROJ/ Tenders/SC/JP-BB-JP 24/03/2021 24/03/2021 22/06/2021
Time 11:0Hrs
172 Consultancy Services for Authority s Engineer for Supervision of construction of Four Lane Divided Carriageway with Paved Shoulder from Patan km 49 775 (design) (Near Khan Sarover lake) to Gojariya km 128 940 (design) of NH-68 in the State of Gujarat NHAI/Guj/Patan-Gojariya/AE/2021 01/04/2021 24/03/2021 10/05/2021
Time 11:0Hrs
173 Independent Engineer Services during O and M stage of (1) Four laning of Jaipur to Deoli section of NH-12 (New NH-52) from Km.18.700 to Km 165.000 on DBFOT basis under NHDP Phase-III (Length 148.770 Km.), and (2) Six laning of Jaipur-Kishangarh section from Ch. 273.500 to Ch. 363.885 of NH-8 (New NH-48) on BOT basis (Length 90.385 Km) in the State of Rajasthan (Total Length 239.155). NHAI/11011/1/Admn/2021-ROJ/ Tenders/ IE/JK-JTD 16/04/2021 23/03/2021 22/06/2021
Time 11:0Hrs
174 Supervision Consultancy (SC) Services during O and M stage of 4 Lane of Kota Baran section oKota Bypass section excluding Cable Stayed Bridge on NH-27 of East-West Corridor Gulabpura to Uniara section in the State of Rajasthan on EPC Basis under NHDP Phase -IV NHAI/11011/1/Admn/2021-ROJ/Tender-KB-KB(CSB)-GU/ 23/03/2021 23/03/2021 22/06/2021
Time 11:0Hrs
175 Independent Engineer Services during O and M stage of 4 laning of Jaipur-Reengus Section of NH-11 (New NH-52), 4 laning of Reengus-Sikar section of NH-11 (New NH-52) and 2 laning with paved shoulder of Salasar-Nagaur Section of NH-65 (New NH-58) on Hybrid Annuity Mode under NHDP Phase-IV in the state of Rajasthan 11011/1/Admn/2021/ROJ/Tenders/ JR-RS-SN 23/03/2021 23/03/2021 22/06/2021
Time 11:0Hrs
176 Independent Engineer Services for supervision of (i) Palanpur-Radhanpur-Samakhiyali Section of NH-27 from Km 589-600 to Km 536-000 in the state of Gujarat TOT Bundle- 5(A-1) on Tolling Operation Maintenance Transfer (TOT) mode and (ii) Palanpur-Radhanpur-Samakhiyali Section of NH-27 from Km 536-000 to Km 430-100 TOT Bundle- 5(A-2) in the state of Gujarat on Tolling Operation Maintenance Transfer (TOT) mode 2021-NHAI- 73513-1 17/05/2021 17/03/2021 31/05/2021
Time 11:0Hrs
177 Supervision Consultancy Services for Operation & Maintenance of Jetpur-Somnath section of NH-151(old NH-8D) from (Km. 0.000 to Km. 123.454) in state of Gujarat including existing Junagadh bypass NHAI/RO-GNR/ SC/OM/Jet-Som/2021 18/03/2021 16/03/2021 27/07/2021
Time 11:0Hrs
-
178 Appointment of Safety Consultants for 3 projects (Lucknow-Sitapur of NH-30, Lucknow- Raebareli of NH-30 and Lucknow- Sultanpur of NH-731) in PIU- Lucknow in the State of U.P.-3rd Call PIU-LKO/Safety Consultant/2021/04 08/03/2021 08/03/2021 06/04/2021
Time 11:0Hrs
179 Consultancy Services for Authoritys Engineer for Supervision of Construction of High Level Bridge across Jamni River on Tikamgarh-Jhansi road and Betwa River on Orchha-Tikamgarh road in the State of Madhya Pradesh on EPC mode 2021-MoRTH-606805-1 06/03/2021 03/03/2021 30/03/2021
Time 17:30Hrs
180 Independent Engineer Services for Rehabilitation and Upgradation to Four Lane configuration & Strengthening of Mo to Sihuni from Km 42.000 to Km 51.000 (Design Length 8.330 KM) of NH-20 (New NH-154) of Pathankot-Mandi Section in the state of Himachal Pradesh on Hybrid Annuity Mode (HAM) (Package-IB) NHAI/Pathankot-Mandi/Pkg-IB/HP/IE/2021 03/03/2021 02/03/2021 15/04/2021
Time 11:0Hrs
181 Independent Engineer Services for Rehabilitation and Upgrading of Existing 2 lane to 4 lane from Bhangbar (Near Ranital) to Kangra Bypass Section of NH-88 (New NH-303 - 503) up to Intersection with NH-154 (Design Chainage - Km 175.270 to Km 193.400, Design Length-18.130 Km) in the State of Himachal Pradesh under NH (O) on HAM Mode (Package-VB) NHAI/Shimla Mataur/Pkg- VB/HAM/HP/IE/2021 03/03/2021 02/03/2021 15/04/2021
Time 11:0Hrs
182 Independent Engineer services during Operation and Maintenance Period for four lanedSrinagar Banihal Section from Km 220.700 to Km 286.110 on BOT (Annuity) in Jammuand Kashmir under NHDP Phase II (2nd Call) J K/IE/SB/2020-21/O and M/02 01/03/2021 01/03/2021 22/04/2021
Time 17:0Hrs
183 Engagement of Supervision Consultant (Assisting Authority Engineer) For Construction of Kawai, Chhipabarod, Aklera Bypass and Construction of High Levfel RCC Major Bridge Parwan River EE PWD NH DIV. JHALAWAR NITNO-08-2020-21 05/03/2021 27/02/2021 30/03/2021
Time 11:0Hrs
184 Supervision Consultancy Services during Maintenance of Raebareli-Banda Section of NH 232(2-Lane with paved shoulders) from km 148.993 to km 285.818 in the State of Uttar Pradesh under NHDP IVB on EPC mode. NHAI/PIU-RBLY/NH-232(RBL-Banda)/SC/O&M/2020-21 26/02/2021 26/02/2021 10/06/2021
Time 12:0Hrs
185 Consultancy Services as Independent Engineer during Operation and Maintenance for Four laning of Hospet Chitradurga section of NH 13 New NH 50 from Km 299 000 to Km 418 750 in the State of Karnataka under National Highways Development Project NHDP Phase III on DBFOT Toll basis NIT No 52 NHAI RO BNG 13031 Tender 2020 21 dated 26 02 2021 15/03/2021 26/02/2021 23/03/2021
Time 15:0Hrs
186 Consultancy services for Independent Engineer for supervision of Construction of Four laning of Sannur to Bikarnakette section from Existing Km 698/850 (Design Km 691/350) to Existing Km 744/190 (Design Km 736/362) of NH- 169 under Bharathmala Pariyojana on Hybrid Annuity Mode in the State of Karnataka (Package- III) NHAI/KNT/NH-169/Sannur- Bikarnakette/4L/IE/2020-21 26/02/2021 25/02/2021 26/04/2021
Time 11:0Hrs
187 Consultancy Services for Authority Engineer for Supervision of Two Four laning of Raebareli Jagdishpur section of NH330A from Km. 0.000 to Km. 47.80 Design Length 46.02 km. including Jagdishpur Bypass and excluding 4.1 km. overlapping Length of Jagdishpur Bypass with NH731, old NH56, in the State of Uttar Pradesh under NHO on EPC mode 2021-NHAI-71444-1 05/03/2021 25/02/2021 27/05/2021
Time 11:0Hrs
188 Consultancy Services for Authority Engineer for supervision of 6-laning with access control from km 29/435 to km 74/168 of Neelmangala – Tumkur including Tumkur bypass section of NH-48 (Old NH-4) in the State of Karnataka on EPC mode under Bharatmala Pariyojana NHAI/KNT/NH-4/Neel-Tumkur/6L/AE/2020-21 26/02/2021 24/02/2021 22/04/2021
Time 11:0Hrs
189 Consultancy Services for Authority Engineer for Supervision of 4-laning of Sagar-Mohari section of NH-934 from Design Chainage 8.000 to 50.300 (Length = 42.300 Km) under Bharatmala Pariyojana Phase-I (Economic Corridor category) in the State of Madhya Pradesh on EPC mode. NHAI/HQ/MP/Sagar-Mohari/AE/2021 17/03/2021 22/02/2021 24/03/2021
Time 11:0Hrs
190 Independent Engineer Services for Operation & Maintenance of 4-laning from Krishnagiri – Thumbipadi Section of NH-44 (Old NH-7) (TN-01) from Km.94/000 to Km.180/000 in the State of Tamil Nadu RO Chennai/IE/O&M/2020-21/39 20/02/2021 20/02/2021 22/03/2021
Time 17:0Hrs
191 Independent Engineer Services during Operation & Maintenance for 4-laning Thumbipadi – Salem – Namakkal section from Km.180/000 to Km.248/625 (TN02) and 4-laning Namakkal – Karur Section from Km.248/625 to Km.292/600 (TN-03) of NH-44 (Old NH-7) in the State of Tamil Nadu RO Chennai/IE/O&M/2020-21/40 20/02/2021 20/02/2021 22/03/2021
Time 17:0Hrs
192 Independent Engineer Services during Operation and Maintenance stage of Two Laning with Paved Shoulder of Raebareli to Prayagraj section (Km 82.700 to Km 188.600) of NH-30 in the State of Uttar Pradesh under NHDP IVA on BOT (Toll) basis NHAI/PIU-RBLY/NH-30(RBL-PRJ)/IE/O&M/2020-21 18/02/2021 19/02/2021 26/04/2021
Time 12:0Hrs
193 Consultancy Services for Authority Engineer for Supervision of (i) 4 lane divided carriageway of Missing link section of NH 39 (Rewa Bypass) from Junction with NH 30 near Bela to Junction with MPRDC ring road near Silpara on SH9 (design length 13.100km) (ii) 2- lane with paved shoulder from Km 80.800 to Km 120.125 (Satna-Maihar section) of NH 135BG (design length 39.325 km) in the State of Madhya Pradesh on EPC Basis. NHAI/HQ/MP/NH-39/Rewa-Town/AE/2021 15/03/2021 19/02/2021 22/03/2021
Time 11:0Hrs
194 Independent Engineer Services during Operation and Maintenance stage of Four laning of Jorabat - Shillong (Barapani) section of NH-40 from 0.000 to km 61.800 in the state of Assam and Meghalaya on DBFOT pattern under SARDP-NE in BOT (Annuity). 2021-NHAI-7041-21 18/02/2021 17/02/2021 19/04/2021
Time 17:0Hrs
195 Consultancy services for Authority Engineer for supervision of Four Laning from Design Km 255/140 to Km 270/270 of Addahole-Bantwal section of NH-75(Old Nh-48) Under NHDP Phase IV on EPC Mode in the state of Karnataka and Consultancy Services for Authority Engineer for supervision of Four-laning of Bangalore-Mangalore Section from km 270/270 (Periya Shanthi) to km 318/755 (Bantwal) including 6-lane Flyover at Kalladka Town in km 311 – km 314 on NH-75 on EPC Basis in Karnataka NHAI/KNT/NH-75/Addahole-Bantwal/Pkg-I and II/AE/2020-21 17/02/2021 17/02/2021 14/04/2021
Time 11:0Hrs
196 Independent Engineer Services for Rehabilitation and Upgradation to Four Lane configuration & Strengthening of Punjab/HP Border to Mo from Km 11.000 to Km 42.000 (Design Length 28.700 KM) of NH-20 (New NH-154) of Pathankot-Mandi Section in the state of Himachal Pradesh on Hybrid Annuity Mode (HAM) (Package-IA) NHAI/Pathankot-Mandi/Pkg-IA/HP/HAM /2021/IE 20/02/2021 16/02/2021 18/03/2021
Time 11:0Hrs
-
197 Consultancy service for Authoritys Engineer for supervision of Construction of Elevated Corridor from Km 135.650 to 136.450 on NH 63, from Km 249.00 to 250.050 on NH4 and from km 192.800 to 193.350 on NH 218 for Decongestion of traffic at Rani Chennamma Circle in Hubli City Taluk in the state of Karnataka on EPC mode. 2065 Dt.15.02.2021 18/02/2021 15/02/2021 21/04/2021
Time 17:0Hrs
198 Consultancy Services for Authoritys Engineer for Supervision of Construction of 4-lane ROB and its approaches Jerai on NH-26A, Jarua on NH-26A and NH 26-A on Katni-Bina Railway line at level crossing on Sagar in the state of Madhya Pradesh on EPC Mode. 2021-MoRTH-606999-2 27/02/2021 13/02/2021 15/03/2021
Time 17:30Hrs
199 Independent Engineer Services during Operation AND Maintenance stage of Six Laning of Agra Etawah Bypass Section of NH2 from Km. 199.660 to Km. 323.525 in the State of Uttar Pradesh NHAI/PIU/AGRA/Misc./ 2020-21/13 01/04/2021 12/02/2021 29/04/2021
Time 12:0Hrs
200 Consultancy Services for Authority’s Engineer for Supervision of Construction of four-lane Greenfield Amritsar connectivity for Connection of Amritsar with Delhi-Amritsar-Katra Expressway from MDR Junction at ch. 40.900 Dhunda Village to Junction with NH354 Ajanala road near Harsh china village chainage 99.020 (km 40.900 to km 99.020 of Amritsar connectivity) on EPC mode under Bharatmala Pariyojna in the state of Punjab [NHAI/BM/DAKExpressway/Spur/2020/AE/Pkg1] NHAI/BM/DAKExpressway/Spur/2020/AE/Pkg1 16/02/2021 11/02/2021 15/04/2021
Time 11:0Hrs
201 Consultancy services for Authority’s Engineer for Supervision of Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Jalandhar-Kapurthala road (NH-703A) near Khojewal village to Junction with Pathankot-Gurdaspur road (NH-54) near Gurdaspur (Km 319.400 to Km 397.700) on EPC mode under Bharatmala Pariyojna in the state of Punjab NHAI/BM/DAKExpressway/AE/2021/Pkg.4 17/02/2021 11/02/2021 15/04/2021
Time 11:0Hrs
202 Independent Engineer Services for Widening and Rehabilitation of existing two lane to four lane road Champa-Korba-Katghora Section of NH-149B (Pkg-I) under NH(O) in the state of Chhattisgarh on Hybrid Annuity Mode 2021-NHAI-69814-1 25/02/2021 10/02/2021 11/03/2021
Time 11:0Hrs
203 Independent Engineer services for Four laning of Ahmednagar – Mirajgaon – Karmala - Tembhurni section of NH-516A for (a) Package – I from design km 0.000 (Ahmednagar) to design km 38.775 (Ghogargaon) and (b) Package –II from design km 38.775 (Ghogargaon) to design km 80.390 (Ahmednagar-Solapur Border)] in the state of Maharashtra under Bharatmala Pariyojana on Hybrid Annuity Mode NHAI/Tech/MH/IE/NH-516A (Package-I&II)/ 2021 15/02/2021 09/02/2021 10/03/2021
Time 11:0Hrs
204 Consultancy Services for Authority Engineer for Operation and Maintenance of project of Four Laning of Saragaon - Bilaspur section (from Km 91.026 to Km. 126.525) of Raipur-Bilaspur stretch of NH-200 in the State of Chhattisgarh 11052/RO-Raipur/Tender/S-B/AE 23/02/2021 08/02/2021 15/03/2021
Time 15:0Hrs
205 Consultancy Services for Authority Engineer for Supervision of(i) Construction of 2-lane Chisopani Traffic Tunnel of length 250 m including approaches from Km 67-080 to Km 67-500 on NH-10 in East District of Sikkim on EPC basis and (ii) Special protection work on rehabilitation and restoration of sliding/sinking zone from Km 70-900 to Km 71-100 and Km 71-550 to Km 71-850 with JICA Technical Assistance including widening of narrow zone from Km 53-775 to Km 54-100 and fom Km 63-045 to Km 63-470 o 614224 04/02/2021 04/02/2021 04/02/2021
Time 15:0Hrs
-
206 Consultancy Services for Authority Engineer for Supervision of(i) Construction of 2-lane Chisopani Traffic Tunnel of length 250 m including approaches from Km 67-080 to Km 67-500 on NH-10 in East District of Sikkim on EPC basis and (ii) Special protection work on rehabilitation and restoration of sliding/sinking zone from Km 70-900 to Km 71-100 and Km 71-550 to Km 71-850 with JICA Technical Assistance including widening of narrow zone from Km 53-775 to Km 54-100 and fom Km 63-045 to Km 63-470 o NHIDCL/AE/Sikkim/NH-10/2020 04/02/2021 04/02/2021 04/03/2021
Time 15:0Hrs
207 Consultancy Services for AE for supervision of Four laning of Honnavar Port Connectivity road from Km 0.00 to 2.58 connecting Honnavar Port with NH66 at Km 196.00 and to improve NH66 from Km 195.00 to 197.00 to integrate PC road on EPC Karnataka 2021-NHAI-68919-1 10/02/2021 02/02/2021 05/07/2021
Time 11:0Hrs
208 Independent Engineer Services for Construction of Four/Six lane Greenfield Ludhiana – Rupnagar National Highway no. NH-205K from junction with NE-5 village near to Manewal (Ludhiana) to junction with NH-205 near Bheora Village (Rupnagar) including spur to Kharar with Ludhiana bypass under Bharatmala Pariyojana in the State of Punjab on Hybrid Annuity Mode Package-3 (Design Ch. 66.000 to Design Ch. 91.000 and spur to kharar Design Ch. 0.000 to Design Ch. 19.500 total length 44.50 km) NHAI/35044/1/2021/PB/LRK-LB/PKG-3 04/02/2021 01/02/2021 26/07/2021
Time 11:0Hrs
209 Independent Engineer Services for Construction of Four/Six lane Greenfield Ludhiana – Rupnagar National Highway no. NH-205K from junction with NE-5 village near to Manewal (Ludhiana) to junction with NH-205 near Bheora Village (Rupnagar) including spur to Kharar with Ludhiana bypass under Bharatmala Pariyojana in the State of Punjab on Hybrid Annuity Mode, Package-1 (Section from Design Ch. 0.000 To Design Ch. 37.700, total length 37.700 km) NHAI/35044/1/2021/PB/LRK-LB/PKG-1 04/02/2021 01/02/2021 06/07/2021
Time 11:0Hrs
210 Independent Engineer services for Development of 6-lane Jalandhar Bypass starting from Kahlwan (NH-03) (Design km. 0.000) ending at Kang Sahbu (NH-703) (Design km. 46.500 ) via Sarmastpur (NH-44) - Madara (NH-03) - Khajurla (NH-44) (Design Length- 46.50 kms) as part of North-South Corridor decongestion in the State of Punjab on HAM mode under Bharatmala Pariyojana NHAI/26044/1/2021/PB 04/02/2021 01/02/2021 05/07/2021
Time 11:0Hrs
211 Independent Engineer Services for four/six lane Greenfield Ludhiana – Rupnagar National Highway no. NH-205K from junction with NE-5 village near to Manewal (Ludhiana) to junction with NH-205 near Bheora Village (Rupnagar) including spur to Kharar with Ludhiana bypass under Bharatmala Pariyojana in the State of Punjab on Hybrid Annuity Mode, Package-2 (Design Ch. 37.700 to Design Ch. 66.000 and Ludhiana Bypass Design Ch. 0.000 to Design Ch. 18.500, total length 46.80 km) NHAI/35044/1/2021/PB/LRK-LB/PKG-2 04/02/2021 01/02/2021 22/07/2021
Time 11:0Hrs
212 Consultancy services for Authority Engineer for supervision of Balance work of construction of Two/Four lane with paved shoulders from Km. 422.00 to 523.600 (Chitradurga to Shivamogga section) of NH-13 in the state of Karnataka on EPC mode NH-13-KNT-2020-21-915-AE 01/02/2021 01/02/2021 15/03/2021
Time 15:0Hrs
213 Consultancy Services for Authoritys Engineer for Supervision of Construction of new link (NH-133B) from Km 0.200 (Km 200.700 of Sahibganj Bypass) in Jharkhand to Km 15.885 (Km 25.240 of NH-131A) including Ganga Bridge and construction of Manihari Bypass from Km 0.000 (Km 25.240 of 131A) to Km 5.500 (Km 34.100 of NH-131A near Narenpur) and widening of NH-131A from Km 5.500 (Km 34.100 of NH-131A) to Km 6.000 (Km 34.600 of NH-131A) in the state of Bihar to 4 lane standard on EPC Mode 2021-NHAI-68782-1 03/02/2021 01/02/2021 08/03/2021
Time 11:0Hrs
214 SUPERVISION CONSULTANCY SERVICES DURING OPERATION ANDMAINTENANCE OF TWO – LANE WITH PAVED SHOULDER RUDHAULI TO BASTI SECTION (KM 65.870 TO 122.270) OF NH-233 ON EPC MODE UNDER NHDP PHASE-IVB IN THE STATE OF UTTAR PRADESH 11022/5/RO/UP(E)/2021/PIU-Gkp 07/04/2021 30/01/2021 19/04/2021
Time 17:0Hrs
215 Consultancy Services for Authority’s Engineer for Supervision of Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Patiala-Samana-Patran road (SH-10) near Ghagga village to Junction with Ludhiana-Malerkotla road (SH-11) near Bhogiwal village (Km 157.920 to Km 225.770) on EPC mode under Bharatmala Pariyojna in the state of Punjab NHAI/BM/DAKExpressway/AE/2021/Pkg.1 17/02/2021 29/01/2021 15/04/2021
Time 11:0Hrs
216 Consultancy Services for Authority’s Engineer for Supervision of Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Ludhiana-Malerkotla road (SH-11) near Bhogiwal village to Junction with Jalandhar-Moga road (NH-703) near Kang Sahibu village (Km 225.770 to Km 303.900) on EPC mode under Bharatmala Pariyojna in the state of Punjab NHAI/BM/DAKExpressway/AE/2021/Pkg.2 17/02/2021 29/01/2021 15/04/2021
Time 11:0Hrs
217 Consultancy Services for Authority’s Engineer for Supervision of Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Jalandhar-Moga road (NH-703) to Junction with Jalandhar-Kapurthala road (NH-703A) (Km 303.900 to km 319.400 of main expressway) and Junction with Jalandhar-Moga road (NH-703) to Junction with Kapurthala-Sultanpur Lodhi road (NH-703A) (km 0.000 to km 24.000 of Amritsar connectivity) on EPC mode under Bharatmala Pariyojna in the state of Punjab NHAI/BM/DAKExpressway/AE/2021/Pkg.3 17/02/2021 29/01/2021 15/04/2021
Time 11:0Hrs
218 Consultancy Services of Supervision Consultant (SC) for Operation & Maintenance from Km.154.900 to Km.198.694 (Design chainage from Km.153.939 to 197.318) of Davulapalli to Markapuram Section of 2-lane with paved shoulder configuration of NH – 565 in the State of Andhra Pradesh. NHAI/RO-VJA/PIU-AMR/D-M/21 08/02/2021 28/01/2021 16/03/2021
Time 11:0Hrs
219 Consultancy Services of Supervision Consultant for Operation Maintenance from Km.198.694 to Km.294.000 of Markapuram to Vaggampalle Section of 2lane with paved shoulder configuration of NH 565 in the State of Andhra Pradesh NHAI/RO-VJA/PIU-AMR/M-V/21 08/02/2021 28/01/2021 16/02/2021
Time 11:0Hrs
220 CS for AE for SC of four laning of NH-965 G from (a)Patas-Vasunde Phata-Baramati and Baramati Length 41.369 km (Package-I) (b)km 41.369 to km 83.500 (Package-II) and (c)km 83.500 to km 130.202 (Package-III) in Maharashtra under BMP on EPC mode NHAI/Tech/MH/Palkhi Marg/AE/2021 15/02/2021 28/01/2021 03/03/2021
Time 11:0Hrs
221 Consultancy Services for AE for Supervision of (a) Up-gradation to Four Lane with Paved Shoulder configuration of the highway starting from existing km 88.400 (Savali Vihir) to km 163.400 (start of Ahmednagar bypass) (Design Length-75.000 km) and (b) 4 lane Elevated structure (flyover) from Sakkar Chowk to SB Chowk on Pune-Aurangabad road along NH-222, in Ahmednagar city limit in the state of Maharashtra on EPC mode NHAI/Tech/MH/AE/Ahmednagar/2021 15/02/2021 28/01/2021 03/03/2021
Time 11:0Hrs
222 Consultancy Services of Supervision Consultant for Operation Maintenance from Km.198.694 to Km.294.000 of Markapuram to Vaggampalle Section of 2lane with paved shoulder configuration of NH 565 in the State of AP NHAI/RO-VJA/NH565/PIU-AMR 12/03/2021 28/01/2021 16/03/2021
Time 11:0Hrs
223 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF (i) Construction of two lane with paved shoulders road of Tamenglong to Muhur in the state of Manipur from km 0.000 at Tamenglong to km 10.000 near Dialong (Length-10.00km) (PKG-1) on EPC mode. (ii) Construction of two lane with paved shoulders road of Tamenglong Mahur section in the state of Manipur from km 10.000 at Dialong to km 20.500 near Old Tamenglong (Length10.5km) (PKG-2) on EPC mode. (iii) Construction of two lane NHIDCL/Manipur/T-M(Pkg1-4)/AE 27/01/2021 27/01/2021 12/03/2021
Time 15:0Hrs
224 CONSULTANCY SERVICES FOR AUTHORITY ENGINEER FOR SUPERVISION OF- (i) Construction of High Altitude Hill road from Dembuen TO Bruni from KM 0.000 to KM 36.300 in Anini District of the state of Arunachal Pradesh on EPC Mode (ii) Construction of High Altitude Hill road from Mipi TO Mathun (Basam) from KM 0.000 to KM 16.730 in Anini District of the state of Arunachal Pradesh on EPC Mode NHIDCL/Ar Pr /AE/ICBR/DB-MM/2020 12/01/2021 27/01/2021 18/02/2021
Time 14:30Hrs
225 Consultancy Services For Authority’s Engineer For Supervision of 4-laning of Balwara to Dhangaon section of NH-347BG & 753L (Indore to Boregaon- Pkg III) Design Ch. 42.260 to Design Ch. 82.810 (Length 40.40Km) under Bharatmala Pariyojana Phase-I in the State of Madhya Pradesh (Length-40.40 km) on EPC Mode. NHAI/MP/Balwara-Dhangaon/AE/01/2021 03/02/2021 25/01/2021 01/03/2021
Time 11:0Hrs
226 Consultancy Services For Authority’s Engineer For Supervision of balance work of 4-laning of Indore-Gujarat/MP Border from km 106.210 to km 115.250 (Start and end point of Bird Sanctuary), km 121.740 to km 127.140 (Machilya Ghat Section) and Forest portion km 149.800 to km 150.850, km 158.250 to km 158.850 of NH-47 (Old-59) on EPC Mode in the State of Madhya Pradesh. NHAI/MP/Machilya Ghat/AE/01/2021 03/02/2021 22/01/2021 22/02/2021
Time 11:0Hrs
227 Consultancy services for Independent Engineer for supervision of Construction of Four lane Bangalore Chennai Expressway from (i) Km 156.000 to Km 180.000 (Gudipala in the State of Andhra Pradesh to Walajahpet in the State Tamil Nadu) (Package-I), (ii) Km 180.000 to Km 204.500 (Walajahpet to Arakkonam Section) (Package-II), (iii) Km 204.500 to Km 230.000 (Arakkonam to Kancheepuram Section) (Package-III) and (iv) Km 230.000 to Km. 261.705 (Kanchepuram to Sriperumbudur Section) (Package-IV) in the NHAI/Tech/TN/BCE/Phase-III/2021/IE 06/02/2021 22/01/2021 08/03/2021
Time 11:0Hrs
-
228 CONSULTANCY SERVICES FOR AE FOR SUPERVISION OF Construction of High Altitude Hill road from Ladda (Graziang) TO Basai from KM 0.000 to KM 35.260 in East Kameng District of Arunachal Pradesh on EPC Mode NHIDCL/AP/ AE/ICBR/L-B/2020 12/01/2021 22/01/2021 18/02/2021
Time 14:30Hrs
229 Consultancy Services for Authority Engineer for Supervision of Four Laning of Amritsar Bypass (Greenfield Alignment) from New Tarn Taran Road to Ajnala Road from Design km. 0.750 to Design km. 43.750 (Design Length 43.00 kms) and Upgradation of existing Amritsar - Khemkaran Road (NH-354) to Four Lane Configuration from Design km. 71.496 to Design km. 78.440 (Design Length 6.944 kms) (Total Design Length 49.944 kms) (Package-III) in the State of Punjab under Bharatmala Pariyojana on EPC mode 2021-NHAI-67754-1 25/01/2021 21/01/2021 01/03/2021
Time 11:0Hrs
230 Consultancy Services for Authority Engineer for Supervision of Development of Memmadpur (Ambala) - Banur (IT City Chowk) – Kharar (Chandigarh) Corridor under Bharatmala Pariyojana - Package-II - 6 laning of IT City Chowk to Kurali Chandigarh Road (Design length 31.23 Km) in the state of Punjab on EPC mode 2021-NHAI-67750-1 25/01/2021 21/01/2021 15/03/2021
Time 11:0Hrs
231 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF (i) Construction of High Altitude Hill road from Tedadege TO Henkaer from KM 0.000 to KM 28.550 in West Siang District(ii) Construction of High Altitude Hill road from Doginala TO Gau from KM 0.000 to KM 15.320 in Upper Subansiri District(iii) Construction of High Altitude Hill road from Taksing to Ghora from KM 0.000 to KM 7.090 in Upper Subansiri District of the state of Arunachal Pradesh on EPC Mode NHIDCL/AP/AE/ ICBR/TH-DG-TG/2020 15/02/2021 21/01/2021 15/03/2021
Time 14:30Hrs
232 Independent Engineer services during Operation & Maintenance Period 4-laned Wardha – Butibori Section of NH-361 from Km.465.500 to Km.524.690 (Design length 59.190 Km.) under NH (O) in the State of Maharashtra on Hybrid Annuity Mode - Consultancy Package No.IE-O&M/NH-361/NAG-18 NHAI/RO-NAG/TENDERS/2020-21/28 18/01/2021 18/01/2021 15/03/2021
Time 11:0Hrs
233 Independent Engineer services during Operation & Maintenance Period 4-laned Yavatmal to Wardha (Package-III) Section of NH-361 from Km.400.575 to Km.465.500 (Design length 64.925 Km.) under NHDP Phase-IV on Hybrid Annuity Mode - Consultancy Package No.IE-O&M/NH-361/NAG-19 NHAI/RO-NAG/TENDERS/2020-21/29 18/01/2021 18/01/2021 15/03/2021
Time 11:0Hrs
234 Independent Engineer services during Operation & Maintenance Period 4-laned Mahagaon to Yavatmal Section of NH-361 from Km.320.580 to Km.400.575 (Package-II) in the State of Maharashtra under NHDP Phase-IV on Hybrid Annuity Mode - Consultancy Package No.IE-O&M/NH-361/NAG-20 NHAI/RO-NAG/TENDERS/2020-21/30 18/01/2021 18/01/2021 15/03/2021
Time 11:0Hrs
235 Independent Engineer services during Operation & Maintenance Period 4-laned Yedeshi – Aurangabad Section of NH-211 (New NH-52) from Km.100.000 to Km.290.200 in the State of Maharashtra to be executed as BOT (Toll) on DBFOT NHDP Phase-IVB - Consultancy Package No.IE-O&M/NH-52/NAG-21 NHAI/RO-NAG/TENDERS/2020-21/31 18/01/2021 18/01/2021 04/03/2021
Time 11:0Hrs
236 Development and Maintenance of Inter Modal Station at Ajni Railway Station Nagpur in the State of Maharashtra on EPC mode NHAI/BM/IMS-NAGPUR/2021 28/03/2021 15/01/2021 17/05/2021
Time 11:0Hrs
237 Consultancy Services for Authoritys Engineer for Supervision of Construction of 4-lane ROB and its approaches Jerai on NH-26A, Jarua on NH-26A and NH 26-A on Katni-Bina Railway line at level crossing on Sagar in the state of Madhya Pradesh on EPC Mode. 2021-MoRTH-606999-1 13/02/2021 14/01/2021 22/02/2021
Time 17:30Hrs
238 Consultancy Services for Authority Engineer for Supervision of 2-lane with Paved shoulder of Ujjain – Jhalawar (upto Rajasthan Border) from km 000.000 to km 132.955 (133.575 km) section of NH-552G in the state of Madhya Pradesh on EPC Basis NHAI/MP/Ujjain-MP-Rajasthan Border/AE/01/2021 21/01/2021 14/01/2021 01/03/2021
Time 11:0Hrs
239 Consultancy services for Independent Engineer for supervision of Construction of Four lane of NH-365A from Kodad (Design Km 0.00) to Khammam (Design Km 31.800) (Design Length 31.800 Km) in the State of Telangana under Bharatmala Pariyojana on HAM mode NHAI/Tech/AP/NH-365A/ Kod-Khm/IE/2021 20/01/2021 13/01/2021 01/03/2021
Time 11:0Hrs
240 Appointment of Safety Consultants for 3 projects (Lucknow-Sitapur of NH-30, Lucknow- Raebareli of NH-30 and Lucknow- Sultanpur of NH-731) in PIU- Lucknow in the State of U.P.-2nd Call RO UP-(E) VNS/PIU-LKO/Safety Consultant/2021/01 13/01/2021 13/01/2021 11/02/2021
Time 11:0Hrs
241 Consultancy service for Authority’s Engineer for supervision of Construction of 4-lane ROB and its approaches in lieu of existing Level Crossing No.48/E at km.66.900 on NH-50(Railway Chainage 96/6-7) Near Naubad in the state of Karnataka on EPC Mode (Job No.NH-50-KNT(14)/17-S&R(B)-013) EE/NHD/KLB/AE-1/NH-50/Job-013/NIT/2020-21/1241 11/01/2021 11/01/2021 05/03/2021
Time 17:0Hrs
-
242 RFP for Consultancy services for Authority’s Engineer for Supervision of i) Improvement of existing road to 2 laning with Hard Shoulders of MaramPeren section (Package-IA length 22.340 Km) from Design Chainage 0.000 km to 22.340 Km on NH-129A in the State of Manipur on EPC Mode. (ii) Improvement of existing road to 2 laning with Hard Shoulders of MaramPeren section (Package-IB length 17.660 Km) from Design Chainage 22.340 Km to Km 40.000 on NH-129A in the State of Manipur on EPC mode. (iii) Im NHIDCL/Manipur/AE/M-P(Pkg-1A 1B 2A 2B 3A 3B)/NH-129A/2020 08/01/2021 08/01/2021 22/02/2021
Time 15:0Hrs
243 Consultancy Services for Authority’s Engineer for supervision of construction of Four lane ring road/bypass around Srinagar city from km 0.000 to km 42.100 (Phase-I) on Engineering, Procurement and Construction (EPC) mode under NHDP phase VII in the Union Territory of Jammu and Kashmir under Bharatmala Pariyojana NHAI/12011/Srinagar Bypass/2020/AE 21/01/2021 08/01/2021 24/02/2021
Time 11:0Hrs
-
244 CUNSULTANCY SERVICES FOR AUTHORIYYS ENGINEER FOR SUPERVISION OF CIVIL CONSTRUCTION WORK OF NEW 4 LANE BRIDGE ACROSS RIVER KOSI AT PHULAUT INCLUDING REHABILITATION AND UP GRADATION OF EXISTING BIRPUR-BIHPURSECTION OF NH-106 FROM KM106 TO KM 136 TO 2 LANE WITH PAVED SOULDER IN THE STATE OF BIHAR ON EPC MODE RW/NH-12014/7/2020/BR/ZONE-1 25/01/2021 08/01/2021 31/03/2021
Time 15:0Hrs
245 Consultancy services for Authority’s Engineer for Supervision of i) fConstruction of 2 Laning with Hard Shoulder of Peren – Dimapur section(Length – 17.384 Km) (Pkg – III) (ii) Construction of 2 Laning with Hard Shoulder of Peren – Dimapur section (Pkg – IV) (iii) Construction of 2 Laning with Hard Shoulder of Peren – Dimapur section on NH – 129A from Design Km 173.850 to Km 190.850 (Length – 17.00 Km) in the state of Nagaland on EPC mode (Pkg – V) under NH(O) - TSP NHIDCL/Nagaland/AE/Peren Dimapur 345/2020 28/01/2021 07/01/2021 25/02/2021
Time 11:0Hrs
-
246 Independent Engineer services for supervision of Construction of Four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with KMP Expressway near Jussur Kheri village to Junction with Jind-Panipat road (NH-352A) near Gangana village (Km 0.000 to Km 60.800) on Hybrid Annuity Mode under Bharatmala Pariyojna in the State of Haryana NHAI/BM/DAK Expressway/IE/2021/Pkg.1 27/01/2021 06/01/2021 18/02/2021
Time 11:30Hrs
247 Independent Engineer services for supervision of Construction of Four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Jind-Panipat road (NH-352A) near Gangana village to Junction with Ambala-Kaithal-Hissar road (NH-152) near Kharak Pandwa village (Km 60.800 to Km 120.250) on Hybrid Annuity Mode under Bharatmala Pariyojna in the State of Haryana NHAI/BM/DAK Expressway/IE/2021/Pkg.2 27/01/2021 06/01/2021 18/02/2021
Time 11:30Hrs
248 Independent Engineer services for Supervision of Construction of Four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Ambala-Kaithal-Hissar road (NH-152) near Kharak Pandwa village to Junction with Patiala-Samana-Patran road (SH-10) near Ghagga village (Km 120.250 to Km 157.920) on Hybrid Annuity Mode under Bharatmala Pariyojna in the State of Haryana and Punjab NHAI/BM/DAK Expressway/IE/2021/Pkg.3 27/01/2021 06/01/2021 18/02/2021
Time 11:30Hrs
249 Independent Engineer services for Six Laning of Kottukulangara (Design Km. 454.500) - Start of Kollam Bypass (Km. 486.000) - Kadambattukonam (Design Km. 517.250) section of New NH-66 (Old NH-47) in the State of Kerala on Hybrid Annuity Mode Under Bharatmala Pariyojna NHAI/Tech/KL/Kot-Koll-Kad/NH-47/IE/2021 09/02/2021 05/01/2021 19/02/2021
Time 11:0Hrs
250 Consultancy services for Authoritys Engineer for the construction of new 4 lane Bridge (Parallel to existing Vikramshila Setu)from Km 8-920 to Km 13-375 (including approach road 35m in Naugachhia side and 53m in Bhagalpur side) across river ganga on newly decleared NH131B at Bhagalpur in the state of Bihar in EPC Mode NH-12014/75/2020-RO Patna 19/01/2021 04/01/2021 19/02/2021
Time 17:0Hrs
251 Consultancy services for Independent Engineer for supervision of Construction of 4 lane Access Controlled New Greenfield Highway Section of NH-365BG (Khammam-Devarapalle) from Thallampadu village to Somavaram village (Design Chainage 0.000 to 33.604) of length 33.604 km (Package–I) from Somavaram village to Chintagudem village (Design Chainage 33.604 to 63.117) of length 29.513 km(Package–II) from Chintagudem village to Recherla village (Design Chainage 63.117 to 105.236) of length 42.119 km NHAI/Tech/AP/Khm-Dvr/ Pkg-I II III/IE/2021 05/01/2021 01/01/2021 16/02/2021
Time 11:0Hrs
252 Consultancy services for Independent Engineer for supervision of Construction of 4 lane Access Controlled New Greenfield Highway Section of NH-365BG (Khammam-Devarapalle) from Recherla village to Gurvaygudem village (Design Chainage 105.236 to 132.664) of length 27.428 km (Package –IV) from Gurvaygudem village to Devarapalle village (Design Chainage 132.664 to 162.126) of length 29.462 km under Inter Corridor Route under Bharatmala Pariyojana on HAM in the state of Andhra Pradesh NHAI/Tech/AP/Khm-Dvr/ Pkg-IV V/IE/2020 05/01/2021 01/01/2021 16/02/2021
Time 11:0Hrs
253 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF CIVIL CONSTRUCTION WORKS FOR REHABILITATION AND UP-GRADATION TO 2 LANE WITH PAVED SHOULDER INCLDING 260M LONG KANDI TUNNEL FROM EXISTING CHAINAGE KM 30.053 TO KM 49.150 (DESIGN CHAINAGE KM 30.000 TO KM 46.450) (PACKAGE-I), REHABILITATION AND UP-GRADATION TO 2 LANE WITH PAVED SHOULDER FROM EXISTING CHAINAGE KM 64.535 TO KM 85.385 (DESIGN CHAINAGE KM 55.800 TO KM 74.350) (PACKAGE-III) AND REHABILITATION AND UP-GRADATION TO 2 LANE WIT SPK/AP RD/PKG-I,III and IV/AE/2020-21 01/01/2021 01/01/2021 15/03/2021
Time 11:0Hrs
254 Consultancy services for Independent Engineer for supervision of Construction of Four lane Bangalore Chennai Expressway from Km 71.000 to Km 96.000 of Bethamangala to Baireddypalle Section (Package-I) from Km 96.000 to Km 125.000 of Baireddypalle to Bangarupalem Section (Package-II) and from Km 125.000 to Km 156.000 of Bangarupalem to Gudipala Section (Package-III) in the State of Andhra Pradesh under Bharatmala Pariyojna on Hybrid Annuity Mode (Phase II) NHAI/Tech/AP/BCE/Phase-II/2020/IE 11/01/2021 30/12/2020 15/02/2021
Time 11:0Hrs
255 Operation & Maintenance of Penchalakona to Yerpedu section from 425.400-509.400 of NH-565 in the state of Andhra Pradesh NHAI/RO-VJA/NH565/2020 01/01/2021 29/12/2020 10/02/2021
Time 17:0Hrs
256 Consultancy services for Authoritys Engineer for Supervision of Construction of New Six Lane Bridge including its approaches across River Ganga on NH-96 (New NH-330) at Phaphamau, Prayagraj in Uttar Pradesh on EPC mode. CE-RO/LKO/NH-96(Phaphamau Bridge)/AE/Rev.-2/2020-21 29/12/2020 29/12/2020 04/02/2021
Time 17:0Hrs
257 Consultancy Services for Supervision Consultants (SC) of Operation & Maintenance of Penchalkona to Yerpedu section from Km 425.400-509.400 of NH-565 in the State of Andhra Pradesh NHAI/RO-VJA/NH565/2021 12/02/2021 29/12/2020 17/02/2021
Time 17:0Hrs
258 Consultancy Services for Supervision Consultants (SC) of Operation & Maintenance of Penchalkona to Yerpedu section from Km 425.400-509.400 of NH-565 in the State of Andhra Pradesh NHAI/RO-VJA/NH565/2020-21 18/02/2021 29/12/2020 23/02/2021
Time 15:0Hrs
259 Consultancy Services for Supervision Consultants (SC) of Operation & Maintenance of Penchalkona to Yerpedu section from Km 425.400-509.400 of NH-565 in the State of AP NHAI/RO-VJA/PE/2021 18/02/2021 29/12/2020 23/02/2021
Time 15:0Hrs
260 Supervision Consultancy (SC) Services for Operation Maintenance of the stretch from (i) Km 72/600 to 121/000 of Tanamcherla Jamandlapally Section and (ii) Km. 154 to 187 of Mangalwarpet to Mallampalli Section of NH 365 in the State of Telangana 65609 04/02/2021 29/12/2020 24/02/2021
Time 17:0Hrs
261 Independent Engineer Services during Operation & Maintenance for four lane divided carriageway of Tindivanam to Ulundurpet Section of NH-45 from Km.121/000 to Km.193/900 executed under BOT (Toll) in the State of Tamil Nadu NHAI/RO Chennai/IE/O&M/2020/33 27/12/2020 27/12/2020 12/02/2021
Time 11:30Hrs
262 Independent Engineer Services for supervision of Four Laning of Munger to Kharia village junction (Package 01), Kharia village junction to start of existing Bhagalpur bypass (Package 02) Bhagalpur bypass to Rasulpur (Package 03) Rasulpur to Mirzachauki (Package 04) on Hybrid Annuity Mode in the State of Bihar. NHAI/BH/NH-80/MUN-MIRZA/IE 28/12/2020 23/12/2020 17/03/2021
Time 11:0Hrs
263 Independent Engineer Services during Operation & maintenance of RanastalamAnandapuram section of NH-16 km 634.000 to km 681.000 under NHDP Phase V on Hybrid Annuity mode in the State of Andhra Pradesh) NHAI/RO-VJA/IE-RA/2020-21 01/01/2021 23/12/2020 10/02/2021
Time 15:0Hrs
264 Independent Engineer Services during Operation & Maintenance period for Six laning of Ranastalam- Anandapuram section of NH-16 km 634.000 to km 681.000 under NHDP Phase V on Hybrid Annuity mode in the State of Andhra Pradesh NHAI/RO-VJA/IE-RA/2020 -21 16/02/2021 23/12/2020 17/02/2021
Time 15:0Hrs
265 Independent Engineer services during Operation & Maintenance Period for Madhya Pradesh-Maharashtra Border Nagpur Section of NH-7 from Km. 652.00 (New Km. 653.225) to KM. 729.000 including Construction of Kamptee-Kanhan and Nagpur Bypass and Maintenance of Already 4-laned Section from Km.14.585 to Km.36.600 NH-7 (Nagpur-Hyderabad Section) in the State of Maharashtra under NHDP Phase-II on (DBFOT) Basis- IE-OMNH-361NAG-14 NHAI/RO-NAG/TENDERS/2020-21/21 15/12/2020 15/12/2020 04/01/2021
Time 11:0Hrs
266 Independent Engineer services during Operation & Maintenance Period for Nagpur-Saoner-Betul Section of NH-69 (New NH-47) from Km.3.000 to Km.59.300 in the State of Maharashtra and from Km.137.000 to Km.257.400 in the State of Madhya Pradesh on Design, Build, Finance Operate and Transfer (Annuity) Basis-Consultancy Package No.IE-OMNH-47NAG-15 NHAI/RO-NAG/TENDERS/2020-21/22 15/12/2020 15/12/2020 04/01/2021
Time 11:0Hrs
267 Independent Engineer services during Operation and Maintenance Period for Kondhali - Talegaon section of NH-53 (old NH-6) from Km 50.000 to Km 100.000 in the State of Maharashtra under NHDP Phase-III on Build, Operate and Transfer (BOT) basis - IE-OMNH-53NAG-16 NHAI/RO-NAG/TENDERS/2020-21/23 15/12/2020 15/12/2020 04/01/2021
Time 11:0Hrs
268 Independent Engineer services during Operation Maintenance Period for Design, Engineering, Finance, Construction, Development, Operation and Maintenance of the 4 Laned MPMaharashtra Border- Dhule Section of NH-52 (Old NH-3) from Km 168.500 to Km. 265.000 in the State of Maharashtra under NHDP Phase-III on Design, Build, Finance, Operate and Transfer (DBFOT) Basis - Consultancy Package No.IE-OMNH-52NAG-17 NHAI/RO-NAG/TENDERS/2020-21/24 15/12/2020 15/12/2020 04/01/2021
Time 11:0Hrs
269 Consultancy Services for Supervision of Special repair of NH702-D, Mokukchung-Mariani Road(from Km 0.000 to 63.000 Km) (Total length - 63.00 Km) in the state of Nagaland for the FY 2020-21-3rd Call NHIDCL/ROKma/SC/M-M/Vol-I/03 15/12/2020 15/12/2020 26/12/2020
Time 15:0Hrs
270 Consultancy Services for Supervision of Special repair of NH 202 Mokukchung-Tuensang Road (from Km 0 to 95 Km) (Total Length - 95 Km) in the state of Nagaland for the FY 2020-21-3rd Call NHIDCL/ROKma/SC/M-T/Vol-I/03 15/12/2020 15/12/2020 26/12/2020
Time 15:0Hrs
271 Consultancy Services for Authority’s Engineer for Supervision of Construction of Eight Lane access-controlled expressway starting from MP-Gujarat Border near Chhayan village and ending at Junction with NH-47 near Bhamaiya Village in Panchmahal District (Ch. 696.920 to Ch. 781.282) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under Bharatmala Pariyojana in the State of Gujarat [Delhi- Vadodara/NH-148N/AE/Pkg11] NHAI/BM/Delhi-Vadodara/NH-148N/AE/Pkg11 17/12/2020 14/12/2020 27/01/2021
Time 11:0Hrs
272 Authority’s Engineer for “Improvement and Widening to two lane with paved shoulder of Kailashahar - Khowai section of NH-208 in the state of Tripura on Engineering, Procurement & Construction (EPC) mode - starting near Kirtanthali (near Kailashahar town) at km 21.100 and ending near Ganki in Khowai district at km 101.300 (Package-I, II, III, IV & V) under JICA ODA loan Phase-IV on Engineering, Procurement, Construction (EPC) Mode 2020-NHIDC-602726-1 18/01/2021 12/12/2020 25/01/2021
Time 14:30Hrs
-
273 Consultancy Services of Supervision Consultancy Services (SC) for Operation and Maintenance of Hyderabad – Bangalore Section from Km 211.000 to 462.164 on NH 44 (old NH 7) in the State of Andhra Pradesh NHAI/RO-Vijayawada/RFP/2020/02 22/12/2020 11/12/2020 17/02/2021
Time 11:0Hrs
274 Consultancy services for Independent Engineer for supervision of Construction of 4-lane Bangalore-Chennai Expressway from Km 180/000 to Km 204/500 (Walajahpet to Arakkonam Section) in the State of Tamil Nadu under Bharatmala on Hybrid Annuity Mode (Phase-III/Package-II) NHAI/ Tech/TN/BCE/PhaseIII/P-II/2020/IE 11/12/2020 10/12/2020 25/01/2021
Time 11:0Hrs
275 Independent Engineer for supervision 4 Laning from km 0/000 to km 26/400 (along with 0/700 km approach towards NH 207 with interchange on NH4 at start point) of Bangalore-Malur Section ( Package I) from km 26/400 to km 53/500 of Malur-Bangarpet Section( Package II) and from 53/500 to km 71/000 of Bangarpet-Bethamangala Section(Package III) of Bangalore Chennai Expressway on HAM under Bharatmala Pariyojna in the state of Karnataka PhaseI NHAI/Bang-Chennai Exp/Phase-1/IE/2020 dated 08/12/2020 11/12/2020 08/12/2020 15/02/2021
Time 11:0Hrs
276 Consultancy services for Authority Engineer for Supervision of Construction OF SUNGAL TUNNEL (LENGTH 2.79KM) AND ITS APPROACHES ON NH-144A THROUGH BRO, PROJECT SAMPARK, IN THE UT OF JAMMU KASHMIR TO BE IMPLEMENTED ON EPC MODE RW/NH-12014/1484/2020/JK/ZII 07/12/2020 07/12/2020 22/01/2021
Time 11:0Hrs
277 Independent Engineer Services during Operation and Maintenance period for the work of 4-laning of Hazipur- Muzaffarpur Section of NH – 77 from Km 0.000 to 46.300 and Construction of 16.870 Km new bypass starting at Km. 46.300 and connecting NH 28 of East West Corridor at Km. 515.045 in the State of Bihar. NIT No- 109/RO-PATNA/NHAI/2020-21 05/12/2020 04/12/2020 25/03/2021
Time 13:0Hrs
278 Independent Engineer Services during Operation and Maintenance period for the work of Purnea – Dalkhola Section from Km 410.700 to Km 447.000 of NH -31 in the State of Bihar. NIT No- 110/RO-PATNA/NHAI/2020-21 05/12/2020 04/12/2020 14/01/2021
Time 11:0Hrs
279 Independent Engineer Services during Operation and Maintenance period for the work of 4-laning of Chhapra – Hazipur Section from Km 143.200 to 209.940 of NH – 19 in the State of Bihar. NIT No- 111/RO-PATNA/NHAI/2020-21 05/12/2020 04/12/2020 11/01/2021
Time 11:0Hrs
280 Consultancy Services for Authority’s Engineer for Supervision of construction of 6-laning of Nashik Phata to Khed Pkg-II (from Design Ch.24.230 km at Indrayani river to Ch.42.000 km at village Chandoli/Khed) total length 17.770 km, on Pune-Nashik section of NH-60 (Old NH-50) in the state of Maharashtra on EPC Mode. NHAI/GM(T)/NP-K/Pkg-II/AE/2020 07/12/2020 04/12/2020 07/01/2021
Time 11:0Hrs
281 Consultancy services for Authoritys Engineer for Supervision of Balance work for Rehabilitation and Upgradation of Sidhi-Singrauli from km 82.400 to 187.993 section of NH-39 (Old NH-75E) (Design Length 105.593 km) to 4 lane with paved shoulder on EPC mode 2020-MoRTH-599041-1 30/12/2020 04/12/2020 13/01/2021
Time 17:30Hrs
282 Consultancy services for Independent Engineer for supervision of Construction of 4-lane Bangalore-Chennai Expressway from Km 204/500 to Km 230/000 (Arakkonam to Kancheepuram Section) in the State of Tamil Nadu under Bharatmala on Hybrid Annuity Mode (Phase-III/Package-III) NHAI/ Tech/TN/BCE/PhaseIII/P-III/2020/IE 11/12/2020 27/11/2020 11/01/2021
Time 11:0Hrs
283 Independent Engineer for supervision of (i) 4-laning of existing 2-lane Galgalia-Bahadurganj Section from design Ch 0/000 to design Ch 49/000 (ii) 4-laning of existing 2-lane Bahadurganj-Araria Section from design Ch 49/000 to design Ch 93/983 on NH-327E in the State of Bihar under Bharatmala Pariyojana on Hybrid Annuity Mode NHAI/BH/Galgalia-Araria/NH-327E/IE/Proc 24/11/2020 23/11/2020 18/01/2021
Time 11:0Hrs
284 Consultancy Services for Authority’s Engineer for Supervision of (i)“Construction of 2 laning with Hard shoulder of Peren- Dimapur section on NH 129A from Design Km 109.494 to Km 126.775 (Length – 17.281 Km) in the state of Nagaland on EPC mode (Package I) under NH(O)- TSP) (ii) Construction of 2 Laning with Hard Shoulder of Peren – Dimapur section on NH – 129A from Design Km 126.775 to Km 146.450 (Length – 19.675 Km) in the state of Nagaland on EPC mode (Pkg – II) under Bharatmala NH(O) - TSP NHIDCL/Nagaland/AE/Peren Dimapur/Pkg 1&2 23/11/2020 23/11/2020 08/12/2020
Time 11:0Hrs
-
285 IE services during Operation and Maintenance Period for four laning of Quazigund to Banihal section of NH 1A, from KM 189.350 to KM 204.700 including Tunnel (2 lane) of 8.45 Km length on DBFOT (Annuity) basis in the UT of Jammu and Kashmir J K/IE/QB/2020-21/O and M/01 19/11/2020 20/11/2020 18/01/2021
Time 17:0Hrs
286 Consultancy services for Authority’s Engineer for supervision of 4-laning of existing two lane section of Malout-Mandi Dabwali section of NH- 09 from Danewala at km 7.000 (Design Ch. Km 7.00) to Mandi Dabwali at km 29.500 (Design Ch. 29.500) having design length of 22.5 km under Bharatmala Pariyojana in the state of Punjab (Package-1) 2020-NHAI-62704-1 20/11/2020 20/11/2020 21/12/2020
Time 11:0Hrs
287 SC services during OM of 4-laning of ghaghra bridge to varanasi section of NH-233 from Km. 121.800 to 180.420 NHAI/PIU-AZM/NH-233/SC/2020-21/01 23/11/2020 20/11/2020 07/01/2021
Time 12:0Hrs
288 Consultancy services for Independent Engineer for supervision of Construction of 4 lane Bangalore Chennai Expressway from Km 156/000 to Km 180/000 (Gudipala to Walajahpet Section in the State of Andhra Pradesh and Tamil Nadu under Bharatmala on Hybrid Annuity Mode (Phase III/Package I) NHAI/ Tech/TN/BCE/PhaseIII/P-I/2020/IE 11/12/2020 20/11/2020 04/01/2021
Time 11:0Hrs
289 CS for AE for Supervision of Development of 6-lane access controlled in Delhi and UP portion of Delhi- Saharanpur Highway from Akshardham NH-9 Junction to EPE Junction (Ch.0.000 to Ch.31.600) in Delhi and UP on EPC mode under EC in phase-1 of BMP NHAI/BM/EC/Akshardham-EPE /AE/2020 07/12/2020 20/11/2020 30/12/2020
Time 11:0Hrs
290 SC services during OM of 4-Laning of Ghaghra Bridge to Varanasi section of NH-233 from Km. 121.800 to 180.420 NHAI/PIU-AZM/NH-233/SC/2020-21/02 11/01/2021 20/11/2020 28/01/2021
Time 12:0Hrs
291 Consultancy Services for Authority’s Engineer for supervision of Widening/Improvement to 4 (Four) Lane with Paved Shoulder Dokmoka – LoringThepi Section (Package-3) and Loring Thepi – Ganapath Gaur Gaon Section - (Package-4) of NH-29 in the state of Assam on EPC mode NHIDCL/AE/NH-29/Dab-Man/ Pkg-3/2020 17/11/2020 17/11/2020 02/12/2020
Time 14:30Hrs
292 Consultancy services for Independent Engineer for supervision of Construction of 4-lane Bangalore-Chennai Expressway from Km 127.000 (Bangarupalem) to Km 156.000 (Gudipala) Section in the State of Andhra Pradesh under Bharatmala on Hybrid Annuity Mode (Phase II/Package III) 2020-NHAI-62328-1 04/12/2020 16/11/2020 30/12/2020
Time 11:0Hrs
293 Consultancy services for Independent Engineer for supervision of six laning of proposed Chilkaluripet Bypass on NH-16 (Old NH05) from Km 357.400 to Km 371.920 (bypass length-16.384 kms) on Hybrid Annuity Mode in the state of Andhra Pradesh under Bharatmala Pariyojana 2020-NHAI-62332-1 06/12/2020 16/11/2020 28/01/2021
Time 11:0Hrs
294 Consultancy services for Independent Engineer for supervision of Construction of Eight-lane Vadodara-Mumbai Expressway from Ch. 103.400 to Ch. 190.000 (Talasari to Gandeva section of Vadodara-Mumbai expressway) in the state of Gujarat, UT of DNH and Maharashtra on Hybrid Annuity Mode under Bharatmala Pariyojana NHAI/BM/VME/Phase IB/2018/IE-II 19/11/2020 13/11/2020 08/01/2021
Time 11:0Hrs
295 Consultancy Services for Authority’s Engineer for Supervision of construction of 4-Laning of existing 2/4-laning stretch of Mohol-Alandi (Pkg-IV) from Dharmapuri to Lonand (design Chainage 117.000 km to 166.400 km with design length 49.400 km) Section of NH-965 in the state of Maharashtra on EPC Mode NHAI/GM(T)/M-A/Pkg-4/NH-965/AE/2020” 12/11/2020 12/11/2020 17/12/2020
Time 11:0Hrs
296 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF- (i) Construction of two lane with hard shoulders of Arrowa-Khupa-Hayuliang Section of NH-113 from Ch 68.550 Km to 91.633 in the state of Arunachal Pradesh on EPC Mode under NH(O)-NE. (ii) Construction of two lane with hard shoulders of Demwe-Brahmkund section of NH-13 from Ch 0.000 Km to 18.464 in the state of Arunachal Pradesh on EPC Mode under NH(O)-NE NHIDCL/AP/AE/DB-AK /2020 12/11/2020 10/11/2020 12/12/2020
Time 14:30Hrs
297 Consultancy Services for supervision of Construction and Upgradation of existing road on NH-510 between Rabangla to Gyalshing to 2-lane with paved shoulder configuration in the State of Sikkim under SARDP-NE Phase A on EPC mode for (i) Km 32/500 to Km 33/600 (Package-III) (ii) Km 33/600 to Km 58/840 (Package-IV) (iii) Km 58/840 to Km 75/000 (Package-V) (iv) Km 75 to Km 90/210 (Package-VI) (2nd Call) NHIDCL /AE/Sikkim/NH-510/2020 06/11/2020 06/11/2020 21/12/2020
Time 15:0Hrs
298 AE sevices for Supervision of 4 Laning of Pangare to Waranga Phata section from Km 134.500 to Km 174.645 (Design Chainage) of NH 161 including Bypasses at Kalamnuri and Akhada Balapur and additional lengths of 800 m from Waranga Junction to Nanded (NH 161) (existing Chainage 244.360) and 700 m road from Waranga Junction (NH 161) to Mahagaon (NH 361) (existing Chainage 253.700) in the State of Maharashtra on EPC mode NHAI/Tech/MH/AE/P-WP/2020 20/11/2020 04/11/2020 14/12/2020
Time 11:0Hrs
299 Consultancy Services for Authority’s Engineer for Supervision of construction of four lane Nagpur-Katol section of NH-353J from km 13.000 to km 62.900 (Design Chainage) in the State of Maharashtra on EPC mode NHAI/Tech/MH/AE/Nag-Katol/2020 20/11/2020 04/11/2020 14/12/2020
Time 11:0Hrs
300 Consultancy Services of Supervision Consultant (SC) for Operation & Maintenance from Km.294.000 to Km.360.156 of Vaggampalle to Dornala T-junction Section of two lanes with paved shoulders of NH – 565 in the State of Andhra Pradesh. NHAI/ROVJA/Vijayawada/2020-21 06/11/2020 04/11/2020 19/12/2020
Time 11:0Hrs
301 Appointment of Safety Consultants for 3 projects (NH-330A Jagdishpur-Ayodhya, NH-31 Raebareli-Jaunpur & NH-30 Raebareli-Prayagraj) Length-332.52 km in PIU- Raebareli-2nd call NHAI PIU RBLY SAFETY CONSULTANT 2nd CALL 23/11/2020 03/11/2020 01/12/2020
Time 12:0Hrs
302 Improvement into two lane with paved shoulder/four lane of NH-40 between Shillong to Dawki section including construction of Dawki bridge Design length = 63.91 Km (Ch. 0.000 To Ch.71.520 of NH-40 & Ch. 0.000 to Ch. 0.900 of NH-44) (Package-I, II, IV & V) excluding pynursula bypass in Meghalaya under JICA loan assistance (2nd Phase) 2020-NHIDC-593856-1 04/12/2020 29/10/2020 10/12/2020
Time 14:30Hrs
-
303 Independent Engineer Services during Operation and Maintenance stage of Two laning with paved shoulders of Kanpur to Kabrai Section of NH 86 from Km 7 430 to Km 130 100 2020-NHAI-60936-1 28/10/2020 28/10/2020 09/12/2020
Time 12:0Hrs
304 CONSULTANCY SERVICES FOR AUTHORITY ENGINEER FOR SUPERVISION OF 4 Laning of NH37 New NH -127 (i) Nagaon to Teilagaon Package 1 (ii) Teliagaon to Rangagara Package 2 (iii)Rangagara to Kalibor Tiniali in the State of Assam NHIDCL/Assam/NH-37/N-KT/2016 27/10/2020 27/10/2020 02/12/2020
Time 15:30Hrs
305 CONSULTANCY SERVICES FOR AUTHORITY(S) ENGINEER FOR SUPERVISION OF CIVIL CONSTRUCTION WORKS FOR REHABILITATION AND UP-GRADATION TO 2 LANE WITH PAVED SHOULDER FROM EXISTING CHAINAGE KM 30.053 TO KM 49.150 (DESIGN CHAINAGE KM 30.000 TO KM 46.450) (PACKAGE-I) AND REHABILITATION AND UP-GRADATION TO 2 LANE WITH PAVED SHOULDER FROM EXISTING CHAINAGE KM 64.535 TO KM 85.385 (DESIGN CHAINAGE KM 55.800 TO KM 74.350) (PACKAGE-III) BOTH UNDER 13 BRTF ON AKHNOOR - POONCH ROAD (NH-144A) UNDER PROJECT SAMPARK ( SPK/AP RD/PKG-I and III/AE/2020-21 27/10/2020 27/10/2020 22/12/2020
Time 11:0Hrs
306 Independent Engineer Services for Operation & Maintenance period 4-lane divided Carriageway of Ulundurpet – Padalur section of NH-45B from Km 192/750 to Km 285/000 – Padalur – Trichy section of NH-45 from Km 285/000 to Km 325/000 in the State of Tamil Nadu under NHDP Phase-III on BOT basis 2020-NHAI-60896-1 18/11/2020 27/10/2020 10/12/2020
Time 17:0Hrs
307 Independent Engineer Services for Operation & Maintenance period of 2/4 laning of Trichy to Karur section of NH-67 from Km 135/800 to Km 218/028 (including Lalapet ROB 2.28 Km) in the State of Tamil Nadu 2020 NHAI 60802 1 18/11/2020 26/10/2020 10/12/2020
Time 16:0Hrs
308 Independent Engineer Services during Operation & Maintenance stage of four laning of Cuddappah – Kurnool section of NH-18 (New NH-40) from Km.167.750 to Km.356.502 in the state of Andhra Pradesh on BOT (Toll) project under NHDP Phase NHAI/RO-VIJ/21011-12/IE Services 24/11/2020 23/10/2020 05/12/2020
Time 11:0Hrs
309 Independent Engineer services for Six laning from start of Valanchery bypass to Kappirikkad section of NH-66 (old NH-17) from Design Ch 298-500 (Ex km 304-250) to Design Chainage 335-850 (Ex km 349-260) in the state of Kerala on Hybrid Annuity Mode under Bharatmala Pariyojana NHAI/HQ/Kerala/Vala-Kap/NH-66/IE/2020-21 25/11/2020 23/10/2020 11/01/2021
Time 11:0Hrs
310 Independent Engineer Services during Operation & Maintenance stage of four laning of Cuddappah – Kurnool section of NH-18 (New NH-40) from Km.167.750 to Km.356.502 in the state of Andhra Pradesh on BOT (Toll) -Extended NHAI/RO-VIJ/21011-12/IE Services/2 05/12/2020 23/10/2020 10/12/2020
Time 15:0Hrs
311 Independent Engineer Services for Four laning of existing 2-lane road of Amritsar-Ghoman-Tanda-Una Section of NH-503A from Design Chainage Km 8.270 to Design Chainage Km 54.000 (design length 45.73 Km) in the State of Punjab on Hybrid Annuity Mode (Package-I) under NH-(O) NHAI/28044/1/2020/PB 27/10/2020 23/10/2020 30/12/2020
Time 11:0Hrs
312 Independent Engineer services for Six Laning of Ramanattukara Junction to start of Valanchery bypass section of NH-66 (old NH-17) from Design Ch 258/818 (Ex km 27/840 of Kozhikode bypass) to Design Chainage 298/500 (Ex km 304/250) in the state of Kerala on Hybrid Annuity Mode under Bharatmala Pariyojana NHAI/HQ/Kerala/Raman-Val/NH-66/IE/2020-21 17/11/2020 21/10/2020 11/01/2021
Time 11:0Hrs
313 Consultancy Services for assisting Authoritys Engineer for Supervision of Rehabilitation and Up-Gradation of NH544D of two lane to four lane from Km 0/0 to 5/0 of Ananthapuramu to Guntur in the state of Andhra Pradesh Through Engineering Procurement Construction (EPC) Basis Contract. 13/2020-21 21/10/2020 20/10/2020 21/12/2020
Time 15:0Hrs
314 Authority Engineer for Supervision of Rehabilitation and augmentation of New NH354 of Amritsar (airport junction) to Ramdas from km ASR 100.835 to km 139.965 for Length of 39.130 km into Four Lane under Bharatmala in Punjab (PackageIV) in EPC Mode NHAI/31044/1/2020/PB/PKG-IV 21/10/2020 20/10/2020 21/12/2020
Time 11:0Hrs
315 Consultancy Services for assisting Authoritys Engineer for Supervision of Formation of Bypass road to Kadiri town from design ch 0/0 to 11/078 and 0/0 to 1/500 (existing ch 159/250 to ch. 168/450) on NH-42 of two lane with paved shoulder road in the state of Andhra Pradesh on EPC Mode. NIT 14/2020-21 22/10/2020 20/10/2020 21/12/2020
Time 15:0Hrs
316 Consultancy Services for assisting Authoritys Engineer for Supervision of Rehabilitation and up-gradation of NH-544E from Km 56/803 to Km 99/179 of Madakasira to Sira section (till AP/Knt border) to two lane with paved shoulder in the State of Andhra Pradesh under on EPC mode NIT 16/2020-21 23/10/2020 20/10/2020 21/12/2020
Time 15:0Hrs
317 Independent Engineer (IE) services during O & M phase of 4 laned Vadape - Gonde (Km 539.500 - Km 440) section of NH-3 (New NH-848) in the State of Maharashtra. NHAI/RO MUM/NSK/VG/IE/2020-21/9 23/10/2020 19/10/2020 16/12/2020
Time 11:0Hrs
-
318 Independent Engineering services Four Laning of existing 2-lane section from Malout via Abohar to Sadhuwali Design Length of 65 Km in the State of Punjab under Bharatmala Pariyojana on Hybrid Annuity Mode 2020-NHAI-60207-1 11/11/2020 19/10/2020 07/01/2021
Time 11:0Hrs
319 Consultancy Services for Supervision of Special repair of NH 202 Mokukchung-Tuensang Road (from Km 0 to 95 Km) (Total Length - 95 Km) in the state of Nagaland for the FY 2020-21 2020-NHIDC-591440-1 17/10/2020 17/10/2020 17/11/2020
Time 15:0Hrs
320 Consultancy service for Authority’s Engineer for supervision of Construction of Major Bridge at Km 180.865 across river Krishna on NH-167 Hagari to Jadacherla section in the state of Karnataka on EPC mode (Job No. NH-167/KNT (13)/2016-17-009-SR (B) EE/NHD/CTA/AE5/Job009/6thcall/694 17/10/2020 17/10/2020 25/11/2020
Time 17:0Hrs
321 Independent Engineer (IE) Services for operation and maintenance stage under BOT mode of existing four lanes Jetpur-Gondal-Rajkot section from 117/600 to 185/000 on NH-8B in the state of Gujarat NHAI/PIU-Rajkot /O and M/ IE / 29/12/2020 17/10/2020 11/01/2021
Time 11:0Hrs
322 CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF Four laning of NH-52 from end of Biswanath Chariali by-pass (Km 208.00) to Gohpur (Km 265.00) (Total Length 57.500 Km) in the state of Assam NHIDCL/Assam/NH-52/AE/ STUP/B-G/2015 27/10/2020 16/10/2020 02/12/2020
Time 15:30Hrs
323 Supervision Consultancy Services (SC) for Operation and Maintenance of NH-30 (old NH-221) from Ibrahimpatnam Circle (Km.0.000) to AP/Telangana Border (Km.71.200) (Pkg-I Ibrahimpatnam Circle - Chandragudem And Pkg-II Chandragudem - AP/Telangana Border) Section of two lanes with paved shoulders in the State of Andhra Pradesh NHAI/ROVJA/ Vijayawada/2020-21 19/10/2020 15/10/2020 01/12/2020
Time 11:0Hrs
324 Consultancy Services for Authority’s Engineer for Supervision of (i) Construction of two lane with paved shoulder of Kohima-Bypass Road Pkg 4 from km 32.00 to km 43.454 in the state of Nagaland (ii) Upgradation of existing road to 2-Lane with Paved Shoulder from Kohima to Mao from Km 185.540 to Km 211.709 (Design length – 26.249) NHIDCL/Nagaland/AE/KB&KM/2020 05/10/2020 14/10/2020 05/11/2020
Time 15:0Hrs
325 Consultancy Services for supervision of Special Repair of NH 702-D Mokokchung - Mariani Road (from Km 0 to 63 Km) (Total length - 63 km) in the state of Nagaland for the FY 2020-21 2020-NHIDC-590069-1 17/10/2020 12/10/2020 11/11/2020
Time 15:0Hrs
326 Independent Engineer Services during Operation & Maintenance stage of the Project Construction of Bridges across Dibang and Lohit river systems including approach roads between Chowkham-Digaru and Bomjur-Meka in the state of Arunachal Pradesh on DBFOT Annuity basis under Arunachal Pradesh Package of SARDP-NE. 052/Ar.Pkg/BOT/DL-IE/2020-21 20/10/2020 12/10/2020 02/11/2020
Time 11:0Hrs
327 2nd call for CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF Improvement Upgradation of existing 2 Lane Road to 4 Lane Divided Highway for Pkg 4A, Pkg 4B, Pkg 5A and Pkg 5B of Imphal-Kohima road (NH -39) in the state of Manipur on EPC Mode NHIDCL/Manipur/AE/IK (Pkg- 4 and 5)/NH-39/2020 12/10/2020 09/10/2020 17/11/2020
Time 14:30Hrs
328 Independent Engineer services for Construction Operation and Maintenance of Z-Morh tunnel including approaches on National Highways No-1 (Srinagar Sonamarg Gumri Road) in the UT of J and K on Design Build Finance Operate and Transfer (DBFOT) Annuity basis (Project) 2020-NHIDC-589152-1 08/10/2020 08/10/2020 26/11/2020
Time 11:0Hrs
329 CONSULTANCY SERVICES FOR AE of (i) Construction and upgradation of 4 lane of existing 2 lane with paved shoulder from Hapachara to Tulungia in Assam (ii) Widening/Improvement to 4 Lane with Paved Shoulder of Jogighopa Bridge Section Pckg-6 in Assam NHIDCL/Assam/AE/ HAP-TUL/2020 08/10/2020 08/10/2020 28/10/2020
Time 14:30Hrs
330 Independent Engineer Services during Operation & Maintenance Period for Two Laning of Raebareli to Jaunpur section of NH-31 (Old NH-231) from Km 0.000 to Km 166.400 in the State of Uttar Pradesh under NHDP Phase-IVA on BOT (Annuity) on DBFOT pattern NHAI/PIU-RBLY/NH-31(RBL-JPR)/IE/O&M/2020-21 01/11/2020 08/10/2020 03/12/2020
Time 12:0Hrs
331 Supervision Consultancy Services during Maintenance of Two-Lane with Paved Shoulders of Tanda- Raebareli section of NH-128 (Total Design length-162.050 km including 13.060 km of NH-330) on EPC mode under NHDP Phase-IVB in the state of Uttar Pradesh. NHAI/PIU-RBLY/NH-128/SC/OM/2020-21 01/11/2020 08/10/2020 03/12/2020
Time 12:0Hrs
332 Consultancy Services for Authority’s Engineer for Supervision of Construction of 2 laning with Hard shoulder of Peren- Dimapur section on NH 129A from Design Km 109.494 to Km 126.775 (Length – 17.281 Km) in the state of Nagaland on EPC mode (Package I) under NH(O)- TSP) NHIDCL/Nagaland/AE/Peren Dimapur/Pkg 1/ 13/10/2020 07/10/2020 23/11/2020
Time 11:0Hrs
333 Supervision Consultancy Services for Periodical Repairs of Jalna, Sindhekhedraja, Sultanpur, Mehkar, Malegaon, Karanja, Pimpalgaon, Talegaon, Pulgaon Road Section of NH-753C from Design Ch.0.000 to Ch.285.450 (Jalna to Pulgaon) in the State of Maharashtra on Item Rate basis including Condition Survey of existing Structures- Consultancy Package No. SC-OMNH-753CNAG-02-2nd call NHAI/RO-NAG/TENDERS/2020-21/17 07/10/2020 05/10/2020 19/10/2020
Time 11:0Hrs
334 Consultancy services as Authoritys Engineer for Supervision of Construction of (i) Connecting road from Z-Morh Tunnel to Zojila Tunnel and (ii) 14-150 km long bi-directional tunnel across Zojila Pass on Sonamarg-Kargil section of NH-01 on EPC mode in the Union Territories of Jammu and Kashmir and Ladakh 2020-NHIDC-587333-1 30/09/2020 30/09/2020 26/11/2020
Time 11:0Hrs
335 Independent Engineer (IE) services during O & M phase of 4 laned Dhule – Pimpalgaon (Km 265 – Km 380) Section of NH 3 (New NH – 60) in the State of Maharashtra– Appointment of Independent Consultant for O&M Phase NHAI/RO/MUM/NSK/DP/IE/2020/08 30/09/2020 30/09/2020 26/11/2020
Time 11:0Hrs
336 Supervision Consultancy Services for construction supervision of the Rehabilitation and Reconstruction work and other incidental works of Deoli Kota section Section of New NH 52 In the state of Rajasthan 2020-NHAI-58655-1 05/11/2020 28/09/2020 11/11/2020
Time 11:0Hrs
337 CONSULTANCY Services FOR SUPERVISION OF AUTHORITY ENGINEER SERVICES FOR 4-Laning of Itanagar to Banderdewa section of NH-415 from km 40/430 to km 51/35 (Package-B) and Km 51/700 to Km 59/199 (Package-C) on EPC Mode in the state of Arunachal Pradesh 415/Ar P/2020-21/031/AE/RO-Ita 06/10/2020 25/09/2020 26/10/2020
Time 11:0Hrs
338 Consultancy Services for Authority’s Engineer for Supervision of “Construction of two lane with paved shoulder of Kohima-Bypass Road Pkg 1 Pkg 2 and Pkg 3 from Km 0.00 to Km 32.00 NHIDCL/Nagaland/AE/KB/123 23/09/2020 25/09/2020 05/11/2020
Time 15:0Hrs
339 Appointment of Safety Consultants for 3 projects (NH- 330A Jagdishpur-Ayodhya, NH-31 Raebareli-Jaunpur & NH- 30 Raebareli-Prayagraj) Length-332.52 km in PIU Raebareli NHAI PIU RBLY SAFETY CONSULTANT 08/10/2020 24/09/2020 24/10/2020
Time 12:0Hrs
340 Consultancy Services of Authority’s Engineer for Supervision of Project of four laning of Forbesganj to Jogbani section from km. 0.00 to km 9.260 (ICP at Jogbani) of NH-57A in the state of Bihar on EPC mode. 106/RO-PATNA/NHAI/2020-21 23/09/2020 23/09/2020 09/11/2020
Time 11:0Hrs
341 IE services during Operation and Maintenance Period for Rehabilitation, Strengthening and four laning of Chenani to Nashri section of NH 44 ( Old NH 1A) from km 9.00 to km 130.00 (New Alignment) in Jammu and Kashmir J K/IE/CNTL/2020-21/O and M/01 21/09/2020 22/09/2020 26/11/2020
Time 17:0Hrs
342 Independent Engineer services for 4 laning of NH 98 from Km 23.284 (Hariharganj) to Km 57.049 (Near Parwa More) in the State of Jharkhand on Hybrid Annuity Mode 2020-NHAI-58278-1 26/09/2020 21/09/2020 21/10/2020
Time 11:0Hrs
343 Independent Engineer services for Four laning from Km 196.870 (Sankha) to Km 219.600 (Khajuri) on NH-75 (Section-IV) (Rehla/Garhwa Bypass) in the state of Jharkhand on HAM 2020-NHAI-58276-1 26/09/2020 21/09/2020 21/10/2020
Time 11:0Hrs
344 Independent Engineer Services for supervision of Construction and upgradation of NH – 131A from Km 34-600 (design Ch 6-000) near Narenpur to Km 79-970 (design Ch 53-000) near Purnea to 4 lane standard and from Km 79-970 (design Ch 53-000) to Km 82-000 (design Ch 55-000) near Purnea to 2 lane with paved Shoulders standard in the State of Bihar on Hybrid Annuity Mode NHAI/BH/Manihari-Purnea/NH-131A/IE/Proc 13/10/2020 21/09/2020 10/11/2020
Time 11:0Hrs
345 Independent Engineer Services for supervision of (i) four laning of Rajauli-Bakhtiyarpur section of NH-31(New NH-20) (Package II) (ii) four laning of Rajauli- Bakhtiyarpur section of NH-31(New NH-20) (Package-III) on Hybrid Annuity Mode in the State of Bihar NH/Tech/BH/IE/RB/2020 23/09/2020 21/09/2020 18/11/2020
Time 11:0Hrs
346 1 Consultancy services for Authority’s Engineer for Supervision of Four laning of Arrah to Pararia section of NH-319(Old NH-30) in the State of Bihar under Bharatmala pariyojana Phase-I (Package I) on EPC Mode. 2 Consultancy services for Authority’s Engineer for Supervision of Four laning of Pararia to Mohania section of NH-319(Old NH-30) in the State of Bihar under Bharatmala pariyojana Phase-I (Package 2) NHAI/Tech/ BH/AE /Ara-Moh/2020 21/09/2020 18/09/2020 12/11/2020
Time 11:0Hrs
347 Consultancy services for Authority Engineer for Supervision of Construction/Widening of 2 laning to 6 laning of Patna Ring road from Kanhauli to Ramnagar (SH-78 new NH-131G) in the state of Bihar on EPC NHAI/Tech/BH/AE/ Kanhauli-Ramnagar /2020 21/09/2020 18/09/2020 12/11/2020
Time 11:0Hrs
348 Consultancy Services for Authority Engineer for Supervision of Construction and Upgradation of existing road to 2-lane with paved shoulder configuration of Rhenok - Menla Spur (NH-717B) on EPC mode under SARDP-NE Phase-A in the State of Sikkim between (i) Km 20/340 to km 27/200 (Package-IIA) (ii) Km 27/200 to km 37/600 (Package-IIB) (iii) Km 37/600 to km 52/000 (Package- IIC) (iv) km 52/000 to km 82/000 (Package- IIIA) (v) Km 83/900 to km 91/900 (Package- IIIB) NHIDCL/AE/Sikkim/Rolep-Menla /2020 21/09/2020 18/09/2020 27/10/2020
Time 15:0Hrs
349 Construction and Upgradationof existing road on NH-510 between Rabangla to Gyalshing to 2-lane with paved shoulder configuration in the State of Sikkim under SARDP-NE Phase A on EPC mode for (i) Km 32/500 to Km 33/600 (Package-III) (ii) (ii) Km 33/600 to Km 58/840 (Package-IV) (iii) (iii) Km 58/840 to Km 75/000 (Package-V) (iv) Km 75 to Km 90/210 (Package-VI) NHIDCL/AE/SIKKIM/NH-510/2020 18/09/2020 18/09/2020 03/11/2020
Time 15:0Hrs
350 Independent Engineer Services during Operation and Maintenance period for the work of 4-laning from Km 360.915 to Km 440.000 of Gorakhpur-Kotwa section of NH-28 in the State of Bihar. 97/RO-PATNA/NHAI/2020-21 23/09/2020 14/09/2020 20/10/2020
Time 11:0Hrs
351 Consultancy Service for Authority’s Engineer for Supervision of Balance Work of Construction of Two/Four Lane With Paved Shoulder From Km 54.370 To Km 101.400 (Bidar To Humnabad Section) of NH-50 In the State of Karnataka on EPC Basis (Job No NH-50-KNT-2020-21-907) NH-50-KNT-2020-21-AE 10/09/2020 08/09/2020 22/10/2020
Time 15:0Hrs
352 Consultancy Services for Preparation of DPR for 6 laning of Nagpur–Hyderabad Section of NH-44 from Jamtha -Km.14.585 to Ruikhairi -Km.29.000 junction of NH-361 and NH-44 in the State of Maharashtra NHAI/RO-NAG/TENDERS/2020-21/14 04/09/2020 04/09/2020 24/09/2020
Time 11:0Hrs
-
353 Independent Engineer services for Six Laning of Azhiyur to Vengalam section of NH-17 (New NH-66) from Des.Ch. 189.200 (Ex. km 188.000) to Des.Ch. 232.100 (Exkm 230.400) (except 6 laning of Paloli to Moorad section from Des. Ch. 203.000 (Ex. km 201.590) to Des.Ch 205.100 (Ex km 203.900)) in the State of Kerala on Hybrid Annuity Mode under Bharatmala Pariyojna NHAI/Tech/KL/Azhi-Veng/NH-17/IE/2020 21/09/2020 03/09/2020 26/10/2020
Time 11:0Hrs
354 CONSULTANCY SERVICES FOR AUTHORITY ENGINEER FOR SUPERVISION OF Improvement/Widening to 2 Lane with Earthen Shoulder of Ranikor-Maheshkola-Baghmara road section (i) Package-IV from Kanai to Rongara existing chainage from km 85/970 to km 102/345 (design Chainage from km 81/100 to km 96/000) design length-14/763 km and (ii) Package-V from Rongara-Panda existing chainage from km 102/345 to km 119/810 (design Chainage from km 96/000 to km 112/300) design length-16/300km on EPC Mode under SARDP-NE 2020-NHIDC-579944-1 01/09/2020 01/09/2020 30/09/2020
Time 17:0Hrs
355 Supervision Consultancy Services for Completion of Balance Works of Panikoili Rimuli Section of NH 215 New NH-20 from Km 0.00 to Km. 163.000 in the State of Odisha on Single Percentage Item Rate Basis. 2020 NHAI 56441 1 10/09/2020 31/08/2020 15/10/2020
Time 11:0Hrs
356 Consultancy Services of Authority Engineer for Improvement/Widening to 2 Laning with earthen shoulder of Stretch from Ranikor to Nongjri existing chainage 0/00km to 31/700km (Design length-33/250km) in the State of Meghalaya on EPC Mode under SARDP-NE 2020-NHIDC-579237-1 28/08/2020 28/08/2020 28/09/2020
Time 14:30Hrs
357 Supervision Consultancy services for Special Repair and Maintenance of Ghazipur Ballia UP Bihar section from km 405.030 to km 535.300 and Reconstruction of Major Bridge at km 412.130 and Rehabilitation of Major Bridge at km 533.00 on NH 31 in State of Uttar Pradesh. 56205 08/09/2020 27/08/2020 30/09/2020
Time 11:0Hrs
358 Consultancy Services for Authoritys Engineer for Supervision of CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF Widening/Improvement to 4 (Four) Lane with Paved Shoulder from km 66 to km 81 (Design Chainage 65-923 to 80-930) of Dokmoka – LoringThepi Section (Package-3) of NH-29 in the state of Assam under Bharatmala Pariyojna on EPC mode NHIDCL/Assam/AE/NH-29/Dab-Man/ Pkg-3/2020 25/08/2020 25/08/2020 24/09/2020
Time 14:30Hrs
359 CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF Improvement Upgradation of existing 2 Lane Road to 4 Lane Divided Highway for Pkg 4A, Pkg 4B, Pkg 5A and Pkg 5B of Imphal-Kohima road (NH -39) in the state of Manipur on EPC Mode NHIDCL/Manipur/AE/I-K (Pkg- 4 and 5)/NH-39/2020 20/08/2020 20/08/2020 05/10/2020
Time 14:30Hrs
360 Independent Engineer Services for O and M stage of 6 laning of Indore Dewas Section of NH3 from Km 577.550 to Km 610.00 and Km 0.000 to Km 12.600 (Approx. Length 45.05 Km) in the State of Madhya Pradesh under NHDP PhaseV to be executed as BOT (Toll) Project on DBFOT pattern 2020 NHAI 55335 1 31/08/2020 17/08/2020 16/09/2020
Time 11:0Hrs
361 IE for O and M for Design Construction Development Finance Operation and Maintenance of Km. 547.400 to km 624.480 on NH7 in MP on BOT(Annuity) Basis (Consultancy Package NS/1/IE/OM/MP 2 MP3) NHAI/MP/CHW/IE/NH7/MP-2/3/2020 24/08/2020 15/08/2020 21/09/2020
Time 11:0Hrs
362 Independent Engineer services during Operation and Maintenance Period for Tuljapur-Ausa including Tuljapur Bypass) Section of NH-361 from Km.0.000 to Km.55.835 under NHDP Phase-IV in the State of Maharashtra under Hybrid Annuity Mode - IE-OM-NH-361-NAG-13 NHAI/RO-NAG/TENDERS/2020-21/13 13/08/2020 14/08/2020 17/09/2020
Time 11:0Hrs
363 6 lane Urban Extension Road UER2 NH 344 M From NH 1 to Karala Kanjhawala Road Km -0.700 to 15.000 in the state of Delhi and 4 lane Road Spur NH 344P (from Km 0.000 to 29.600, 29.6 kms), starting from Bawana Industrial Area, Delhi (at Km 7.750 of NH-344M or UER-II) till Sonipat bypass of NH-352A at Village Barwasani, Sonipat in Haryana on EPC Basis 2020-NHAI-54819-1 17/08/2020 10/08/2020 22/09/2020
Time 11:0Hrs
364 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF 6-lane Urban Extension Road (UER) 2 NH 344 M From Karala-Kanjhawala Road, Km 150.000 to Dwarka Sector 24 Road, Km 38.111 in the state of Delhi and 4 lane Road Spur NH 344 N, starting from, NH 344 M, Delhi (at Km 26.135 of NH344M (UER-II) till Bahadurgarh bypass of NH-10 near Bahadurgarh in Haryana ON EPC Mode 2020-NHAI-54826-1 17/08/2020 10/08/2020 22/09/2020
Time 11:0Hrs
365 Consultancy services for AUHORITY ENGINEER PMC FOR SUPERVISION OF CONSTRUCTION OF TWO LANE ROBS WITH APPROACHES AT KM. 103 717 km. 103 907 and KM. 120 850 km. 120 985 EXISTING CHAINAGE ON NH 730 UNDER EPC MODE IN THE STATE OF UTTAR PRADESH 2674/631C-NH CIRCLE/2020 DATED 06.08.2020 11/08/2020 10/08/2020 15/09/2020
Time 11:0Hrs
366 CGFGF 5 07/08/2020 07/08/2020 11/09/2020
Time 15:0Hrs
-
367 DDFDF FDSF 07/08/2020 07/08/2020 20/08/2021
Time 15:0Hrs
368 Consultancy Services for Authoritys Engineer for Supervision of Construction of new link NH-133B from Km 0.200 in Jharkhand to Km 15.885 including Ganga Bridge and construction of Manihari Bypass from Km 0.000 to Km 5.500 and widening of NH-131A from Km 5.500 to Km 6.000 in the state of Bihar to 4 lane standard on EPC Mode 2020-NHAI-54710-1 15/08/2020 07/08/2020 14/09/2020
Time 11:0Hrs
369 Consultancy Services for Authority’s Engineer for Supervision of “Construction of Kohima Jessami (i) km 7.880 (near Chedama Junction) to existing km 30.474 (near Chakahabama) (Package-I) (ii) km 30.474 (near Kidwema road Chakahabama) to existing km 53.220 (near Kikruma Village) (Package II) (iii) km 53.220 (near Kikruma Village) to existing km 76.320 (near Mesulumi Village) (Package III) NHIDCL/Nagaland/AE/KJ/123-2 18/08/2020 06/08/2020 27/08/2020
Time 11:0Hrs
370 Supervision Consultant (SC) Services during O&M stage for Chandikhole (Km. 0.000) to Paradip (Km. 77.000) section of NH- 5A (New NH-53) in the state of Odisha NHAI/13012/45/RO/OD/1563/2020 06/08/2020 06/08/2020 07/09/2020
Time 11:0Hrs
371 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF (i) Construction of two lane with hard shoulders of Arrowa-Khupa-Hayuliang Section of NH-113 from Ch 68.550 Km to 91.633 in the state of Arunachal Pradesh on EPC Mode under NH(O)-NE. (ii) Construction of two lane with hard shoulders of Demwe-Brahmkund section of NH-13 from Ch 0.000 Km to 18.464 in the state of Arunachal Pradesh on EPC Mode under NH(O)-NE NHIDCL/AP/AE/D-B-A-K /2020 11/09/2020 05/08/2020 21/09/2020
Time 14:30Hrs
372 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF (i) MMLP Package-I (Roads and Utility Works) (ii) MMLP Package-II (Building and Infrastructure Works) & (iii) MMLP Package-III (Railway Sidings) - Second Call NHIDCL/MMPLP/AE/2020 26/08/2020 01/08/2020 14/09/2020
Time 15:0Hrs
373 Independent Engineer Services during Operation & Maintenance stage of Four laning of Rajsamand Bhilwara section of NH-758 in the State of Rajasthan under NHDP Phase IV on Design, Build, Finance, Operate and Transfer (Toll) Basis NHAI/12013/2020-ROJ/TENDER-IE-RB 28/07/2020 29/07/2020 17/09/2020
Time 11:0Hrs
374 CONSULTANCY SERVICES FOR AUTHORITY ENGINEER FOR SUPERVISION OF THE PROJECT DESIGN AND CONSTRUCTION/IMPROVEMENT OF ROAD RAJOURI-THANAMANDI-SURANKOT ON EPC MODE FROM EXISTING KM 3.900 TO KM 56.951 (DESIGN KM 3.900 TO KM 59.420) (DESIGN LENGTH-55.520 KM) FROM EXISTING IW/ CL-9 SPECIFICATIONS TO NHDL SPECIFICATIONS UNDER 31 BRTF AREA UNDER PROJECT SAMPARK IN JAMMU AND KASHMIR (UT) CE (P)/SPK/AE/01/2020-21 29/07/2020 29/07/2020 10/09/2020
Time 11:0Hrs
375 Supervision Consultancy Services during Maintenance of Two-Lane with Paved Shoulders of Tanda- Raebareli section of NH-128 (Total Design length-162.050 km including 13.060 km of NH-330) on EPC mode under NHDP Phase-IVB in the state of Uttar Pradesh. NHAI/PIU-RBLY/NH-128/SC/O&M/2020-21 28/07/2020 28/07/2020 14/09/2020
Time 12:0Hrs
376 Consultancy Services for Authoritys Engineer for Supervision of Upgradation and Construction to 2Lane with paved shoulders with Flexible Pavement on Khalghat to Sarwardewla Road NH 347C Design Length 79.59 Km in the State of Madhya Pradesh on EPC Mode 2020-MoRTH-573837-2 31/08/2020 28/07/2020 01/09/2020
Time 18:0Hrs
377 Consultancy Services for Authoritys Engineer for Supervision of Upgradation and Construction to 2Lane with paved shoulders with Flexible Pavement on Khalghat to Sarwardewla Road NH 347C Design Length 79.59 Km in the State of Madhya Pradesh on EPC Mode 2020-MoRTH-573837-1 13/08/2020 28/07/2020 26/08/2020
Time 17:30Hrs
378 CONSULTANCY SERVICES FOR AE FOR SUPERVISION OF (i) Construction and up gradation of 4 lane of existing 2 lane with paved shoulder from Hapachara to Tulungia road of NH-117 of existing km 0.00 to km 14.050 and (Dsgn km 0.00 to km 14.66), (Dsgn length – 14.66 km) on EPC mode in the state of Assam. (ii) Widening/Improvement to 4 Lane with Paved Shoulder from Ch. 75.33 to Ch.88.00 (Dsgn Ch.71.80 to Ch.84.10) of Jogighopa Bridge Approach (Near Pancharatna-Agia (Near Nichinta) NHIDCL/Assam/AE/HAP-TUL/2020/E-183829 27/07/2020 27/07/2020 09/09/2020
Time 15:0Hrs
379 Consultancy Services for Authority’s Engineer for Supervision of Construction of Eight Lane access-controlled expressway starting near Junction with NH-12 near village Ummedpura to Major Bridge over Takli River near Nayagaon Jageer Village (Ch. 419.000 – 427.300) section of Delhi - Vadodara Green Field Alignment (NH-148N) under Bharatmala Pariyojana in the state of Rajasthan on EPC Mode (Delhi-Vadodara/NH-148N/AE/Pkg10) NHAI/BM/Delhi-Vadodara/NH-148N/AE/Pkg10 21/08/2020 27/07/2020 17/09/2020
Time 11:0Hrs
380 Consultancy Services for Authority’s Engineer for Supervision of Construction of Eight Lane access-controlled expressway starting near Junction with NH-12 near village Ummedpura to Major Bridge over Takli River near Nayagaon Jageer Village (Ch. 419.000 – 427.300) section of Delhi - Vadodara Green Field Alignment (NH-148N) under Bharatmala Pariyojana in the state of Rajasthan on EPC Mode (Delhi- Vadodara/NH-148N/AE/Pkg10) NHAI/BM/Delhi-Vadodara/NH-148N/AE/ Pkg10 22/09/2020 27/07/2020 24/09/2020
Time 11:0Hrs
-
381 Consultancy Services for Authority’s Engineer for supervision of Improvement/Augmentation of Two lane with Paved Shoulders from Km 1.600 to Km 16.690 & Km.29.850 to Km.80.133 of Nagapattinam – Thanjavur Section of NH-67 (Old) (New NH-83) (Total Design Length 65.373 Km) in the State of Tamil Nadu on EPC Mode NHAI/Nag-Thn/AE/Bal/2020 25/07/2020 24/07/2020 08/09/2020
Time 15:0Hrs
382 Independent Engineer services during O&M period for 4 laning of Kagal-Satara section of NH-48(Old NH-4) from Km. 592.240 to Km. 725.000 in the state of Maharashtra under NHDP Phase –I on BOT basis NHAI/MUM/Kagal-Satara/IE/07 21/07/2020 21/07/2020 15/09/2020
Time 11:0Hrs
383 Improvement/Widening to 2 Laning with earthen shoulder of Stretch from Ranikor to Nongjri existing chainage 0.000km to 31.700km (Design length-33.250km) in the State of Meghalaya on EPC Mode under SARDP-NE 2020-NHIDC-571984-1 20/07/2020 20/07/2020 20/08/2020
Time 14:30Hrs
384 Supervision Consultancy (SC) Services for O&M stage of Two Laning with Paved Shoulder of Gulabpura to Uniara section of NH-148D from Km 69.267 (At junction of NH-79) to Km. 282.936 (at junction of NH-116) in the State of Rajasthan on EPC Basis under NHDP Phase -IV NHAI/12013/2020-ROJ/ Tender-GU/73 10/08/2020 20/07/2020 02/09/2020
Time 11:0Hrs
385 Independent Engineer Services during Operation & Maintenance stage of Four laning of Bewar Pali Pindwara of NH-14 (From Km 0.000 to Km 244.120) in the State of Rajasthan under NHDP Phase III on DBFOT (Toll) basis NHAI/12019/2020-ROJ/ Tender-IE-BPP/71 29/07/2020 18/07/2020 01/09/2020
Time 11:0Hrs
386 Independent Engineer Services during Operation & Maintenance stage including Supervision of Four laning of Reengus-Sikar Section From Km 298.075 Near Madhopura Junction to Km 341.047 (After Sikar Town) of NH-52 (Proposed Chainange Km 298.075 to Km 341.962) (Design Length 43.887) in the State of Rajasthan BOT (Annuity) on DBFOT pattern under NHDP Phase-III. NHAI/12019/2020-ROJ/Tender -IE-RS/70 28/07/2020 17/07/2020 31/08/2020
Time 11:0Hrs
387 Independent Engineer Services during Operation & Maintenance stage of 4/6 laning of Agra-Jaipur (Agra-Bharatpur section from Km 17.756 to Km. 62.295, Bharatpur-Mahua section from Km 62.295 to Km 119.695, Mahua- Jaipur section from km 119.695 to Km 228.000 ) of NH-11 (New NH-21) under NHPD – Phase – IIIA in the State of Rajasthan & Uttar Pradesh. NHAI/12018/2020-ROJ/Tender- IE-AJ/69 28/07/2020 17/07/2020 31/08/2020
Time 11:0Hrs
388 Consultancy services for Independent Engineer for supervision of Construction of Eight-lane Vadodara-Mumbai Expressway from Ch. 26.582 to Ch. 103.400 of Main Expressway and km 0.000 to 3.000 of Spur to JNPT (Shirsad to Talasari section) of Vadodara-Mumbai expressway in the state of Maharashtra on Hybrid Annuity Mode under Bharatmala Pariyojana. NHAI/PPPAC/VME/2016/IE-1 21/07/2020 17/07/2020 07/09/2020
Time 11:0Hrs
389 Independent Engineer services during Operation and Maintenance of BarmerSindari-Jalore of SH-16 and Ahore-Bali-Mundara (Sanderao to Mundara) Section ofSH-16 (Total Length 178 Km) under RSHIP Tranche-I, Package-02 on Annuity modeunder design, build, finance, operate and transfer (“DBFOT”) basis in the State of Rajasthan NIT-07/2020-21 22/07/2020 16/07/2020 14/08/2020
Time 11:0Hrs
390 CONSULTANCY SERVICES FOR AUTHORITY ENGINEER FOR SUPERVISION OF CIVIL CONSTRUCTION WORK OF NEW 4 LANE BRIDGE (PARALLEL TO THE EXISTING MG SETU) WITH ITS APPROACHES FROM KM 0/000 TO 14/500 ACROSS RIVER GANGA NH-19 AT PATNA IN THE STATE OF BIHAR ON EPC RW/NH--12014/95/2019/BR/Z-1 22/07/2020 16/07/2020 11/09/2020
Time 17:0Hrs
391 Independent Engineer services during Operation and Maintenance of Highways under RSHIP Tr-I, Package-03 in the State of Rajasthan under Annuity mode NIT-07/2020-21 S.No. 2 22/07/2020 16/07/2020 14/08/2020
Time 11:0Hrs
392 Package for Consultancy Services for Authority Engineer for Supervision Of Civil Construction works for (1) Rehabilitation and up-gradation of Chittoor – Kurnool road NH 18 (New NH-40) from 2- Lane to 4- Lane from Km 4/14 to 18/34 (excluding 3 Km ROB portion) Murukam battu Junction to Rangampet Cross in the State of Andhra Pradesh under EPC Mode (2) Construction of Proposed 4- Lane ROB at Railway Chainage Km 44/679 between Putalapattu and RVS Nagar Station of Katapadi- Pakala Section at KM Nit 11/2020 16/07/2020 16/07/2020 27/08/2020
Time 15:0Hrs
393 CONSULTANTS FOR ENGAGING AUTHORITY’S ENGINEER (AE) SERVICES FOR (I) “UPGRADATION TO TWO LANING WITH PAVED SHOULDERS OF AJMER-NAGAUR SECTION BY EXECUTING BALANCE WORK FROM KM 0.00 TO KM 148.25 ON NH-89 (NEW NH-58) [JOB NO. NH-89(58)-RJ-2019-20-735]” AND (II) “CONSTRUCTION OF UPGRADATION TO TWO LANING WITH PAVED SHOULDERS OF NAGAUR-BIKANER SECTION BY EXECUTING BALANCE WORK FROM KM 161.00 TO KM 269.26 ON NH-89 (NEW NH-62) ON EPC BASIS IN THE STATE OF RAJASTHAN [JOB NO. NH-89(62)-RJ-2019-20-734]”. NIT 05/2020-21 EE PWD NH DN. AJMER 15/07/2020 15/07/2020 25/08/2020
Time 18:0Hrs
394 Consultancy Services as Independent engineer during Operation & Maintenance and fee collection of 4 lane divided carriageway facility of Bijapur-Hungund Section of NH 13 New NH-50 from Km. 102.000 to km. 202.000 in the State of Karnataka under NHDP Phase III on DBFOT basis Second Call NIT No.17 NHAI RO-BNG 16017 Tender 2020 dated 13.07.2020 14/07/2020 13/07/2020 10/08/2020
Time 15:0Hrs
395 Independent Engineer Services during Operatio Maintenance stage of Six laning of Chilakaluripet Vijayawada section of NH5 New NH16 from Km.355.000 to Km.434.150 length 82.5 Km in the state of Andhra Pradesh executed as BOT Toll on DBFO Pattern NHAI/RO-VJA/PIU-AMA/NH-16/CPT 20/07/2020 13/07/2020 26/08/2020
Time 15:0Hrs
396 Independent Engineer Services during Operation and Maintenance of 4-laning of Meerut-Bulandshahar Section of NH-235 from Km. 8.800(Design Chainage Km. 8.800) to Km. 66.482 (Design Chainage Km.73.512) in the State of Uttar Pradesh on Hybrid Annuity Mode NHAI/PIU-MRT/Tender/2020/2 07/08/2020 13/07/2020 13/08/2020
Time 11:0Hrs
397 Independent Engineer services for Four laning of NH-363 from Repallewada (Design Km 42.000 /Existing Km 288.510) to Telangana/Maharashtra Border (Design Km 94.602/Existing Km 342.000) (Design Length = 52.602 Km) in the State of Telangana under NH (O) on Hybrid Annuity Mode NHAI/Tech/AP/NH-363/Rep-Border/IE/19-20/ 20/08/2020 13/07/2020 25/08/2020
Time 11:0Hrs
398 Independent Engineer Services during Operation & Maintenance of 4-laning of Meerut-Bulandshahar Section of NH-235 from Km. 8.800(Design Chainage Km. 8.800) to Km. 66.482 (Design Chainage Km.73.512) in the State of Uttar Pradesh on Hybrid Annuity Mode. NHAI/PIU-MRT/ Tender/2020/2 17/08/2020 13/07/2020 03/09/2020
Time 12:0Hrs
399 Independent Engineer services for Balance Work for Four laning of Kiratpur to Nerchowk section of NH-21 (from KM 12/750 to km 26/500, km 126/500 to km 158/500 including ACC link road from km 0/00 to km 2/003) Greenfield Alignment (Package-2) in the State of Himachal Pradesh on Hybrid Annuity Mode (HAM) NHAI/11016/9/2019/Balance Work K-N/Pkg-2/IE 13/07/2020 09/07/2020 27/08/2020
Time 11:0Hrs
400 Consultancy Services as Independent engineer during Operation & Maintenance of four laning of Maharashtra Karnataka border to Sangareddy Section of NH 09 New NH 65 From Km. 348.800 to Km 432.800 in the state of Karnataka and Km.428.800 to Km.493.000 in the state of Andhra Pradesh under NHDP Phase III DBFOT BOT basis NIT No. 16 NHAI RO-BNG 16018 Tender 2020 21 dated 09.07.2020 14/07/2020 09/07/2020 20/08/2020
Time 15:0Hrs
401 Supervision Consultancy Services for Periodical Repairs of Jalna, Sindhekhedraja, Sultanpur, Mehkar, Malegaon, Karanja, Pimpalgaon, Talegaon, Pulgaon Road Section of NH-753C from Design Ch.0.000 to Ch.285.450 (Jalna to Pulgaon) in the State of Maharashtra on Item Rate basis including Condition Survey of existing Structures NHAI/RO NAG/TENDERS/20201 21/08 06/08/2020 09/07/2020 10/08/2020
Time 11:0Hrs
-
402 Consultancy services for AE for supervision of construction of 4 lane signature bridge connecting missing link between Okha and Byet Dwarak includiing construction of approaches on new NH no 51 in gujarat RW/NH-12014/Gujarat(02)/2017-S&R(B)Part 26/06/2020 09/07/2020 24/07/2020
Time 11:0Hrs
403 Independent Engineer services for during Operation and Maintenance of Chomu- Chandwaji Highway Project section of SH-08 B from Km.0.00 to Km 15.450 and Hanumangarh to Abohar (upto Punjab Border) section of SH- 7A from Km 0.00 to km. 42.655 augmented to Two Lane/Two lane Plus on design, build, finance, operate and transfer (“DBFOT”) basis in the State of Rajasthan CEPWD-ACE(PPP)-NIT06/2020-21 09/07/2020 09/07/2020 29/07/2020
Time 11:0Hrs
404 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF CONSTRUCTION OF HIGH LEVEL BRIDGE ACROSS RIVER CHAMBAL INCLUDING APPROACHES AT MANDRAYAL ON SABALGARH MANDRAYAL KARAULI STATE HIGHWAY–22, DISTRICT KARAULI IN THE STATE OF RAJASTHAN ON EPC MODE NIT No. 02/2020-21 SE PWD Circle Karauli 28/07/2020 06/07/2020 10/08/2020
Time 18:0Hrs
405 C S FOR A E FOR SUPSVN works 1 Strength from Km 525.2 to Km 537.6 2 W and S to 2 lane with P S incl G I from Km 491.0 to 525.2 3 Con of Saluru Bypass 4 Con of app to the exst 2Lane ROB in lieu of LC No RV 324 NH km 515.2 of R V of NH26 Tender Notice No.SENHVJA/11/2020-21, dt.01.07.2020 16/07/2020 06/07/2020 06/08/2020
Time 17:0Hrs
406 Independent Engineer Services for O and M of Four laning of Biaora to Dewas Section from km 426.100 to km 566.450 of NH3 in the State of Madhya Pradesh under NHDP Phase IV in BOT (Toll) basis on DBFOT pattern 2020 NHAI 52210 1 27/07/2020 03/07/2020 10/08/2020
Time 11:0Hrs
407 Consultancy services for Authority’s Engineer for Supervision of Construction of New Six Lane Bridge including its approaches across River Ganga on NH-96 (New NH-330) at Phaphamau, Prayagraj in Uttar Pradesh on EPC mode CE-RO/LKO/NH-96(Phaphamau Bridge) /AE/Rev./2020-21 03/07/2020 03/07/2020 03/09/2020
Time 17:0Hrs
408 Consultancy Services as Independent Engineer during Operation, Maintenance and user fee collection of 4/6 lane divided carriageway facility of Nelamangala Junction on NH-4 with NH-48 to Devihalli i.e., from Km.28.20 to Km 110.00 of NH-48 in the state of Karnataka on DBFOT basis 15/NHAI/RO-BNG/23018/Tender/2020-21 dated 02.07.2020 03/07/2020 02/07/2020 13/08/2020
Time 15:0Hrs
409 Independent Engineer services for balance work for Four Laning of Amravati- Chikhli section of NH-6 [Package-1 from km 166.000 (Amravati) to km 220.000 (Near Kurankhed)] in the state of Maharashtra to be executed on Hybrid Annuity mode under Bharatmala Pariyojna NHAI/Tech/MH/IE/Amt-Chik/BW-1/ 2020 17/07/2020 02/07/2020 03/08/2020
Time 11:0Hrs
410 Independent Engineer services for Balance works for Four Laning of Amravati- Chikhli section of NH-6 [Package-II from km 220.000 (Near Kurankhed) to km 270.000 (Near Shelad)] in the state of Maharashtra to be executed on Hybrid Annuity mode under Bharatmala Pariyojna NHAI/Tech/MH/IE/Amt-Chik/BW-2/ 2020 17/07/2020 02/07/2020 03/08/2020
Time 11:0Hrs
411 Providing consultancy services for Authoritys Engineer for Supervision of Widening and Strengthening of existing intermediate lane/two lane to two lane with paved shoulders from km 678/555 to km 699/655 of Nirmal to Khanapur section of NH 61 Extended in the state of Telangana under NH(O) on EPC mode SE RandB NH HYD 07 2020-21 dt 01-06-2020 16/07/2020 02/07/2020 04/08/2020
Time 15:0Hrs
412 Consultancy Services for Authoritys Engineer for Supervision of Construction of new link NH-133B from Km 0.200 in Jharkhand to Km 15.885 including Ganga Bridge and construction of Manihari Bypass from Km 0.000 to Km 5.500 and widening of NH-131A from Km 5.500 to Km 6.000 in the state of Bihar to 4 lane standard on EPC Mode 2020-NHAI-52053-1 11/07/2020 02/07/2020 30/07/2020
Time 11:0Hrs
413 Independent Engineer services for Balance works for Four Laning of Amravati- Chikhli section of NH-6 [Package-III from km 270.000 (Near Shelad) to km 315.000 (Near Nandura)] in the state of Maharashtra to be executed on Hybrid Annuity mode under Bharatmala Pariyojna NHAI/Tech/MH/IE/Amt-Chik/BW-3/ 2020 23/07/2020 02/07/2020 03/08/2020
Time 11:0Hrs
414 Independent Engineer services for balance works for Four Laning of Amravati- Chikhli section of NH-6 [Package-IV from km 315.000 (Near Nandura) to km 360.000 (Near Chikhli)] in the state of Maharashtra to be executed on Hybrid Annuity mode under Bharatmala Pariyojna NHAI/Tech/MH/IE/Amt-Chik/BW-4/ 2020 23/07/2020 02/07/2020 03/08/2020
Time 11:0Hrs
415 Independent Engineer services for Improvement and Construction of Ahmednagar bypass (Design Ch. km 0.000 to km 40.600) (Existing Ch. 163.400 of Sinnar - Shirdi - Ahmednagar (NH-160) road to km 228.700 of NH-222 (new NH- 61) in the State of Maharashtra on Hybrid Annuity Mode NHAI/Tech/MH/IE/Ahmednagar Bypass/ 2020 23/07/2020 02/07/2020 03/08/2020
Time 11:0Hrs
416 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF CONSTRUCTION OF HIGH LEVEL BRIDGE ACROSS RIVER CHAMBAL INCLUDING APPROACHES AT MANDRAYAL ON SABALGARH MANDRAYAL KARAULI STATE HIGHWAY–22, DISTRICT KARAULI IN THE STATE OF RAJASTHAN ON EPC MODE NIT 02/2020-21 SE PWD Circle Karauli 06/07/2020 29/06/2020 28/07/2020
Time 11:0Hrs
417 Independent Engineer Services during Operation and Maintenance stageincluding Supervision of Balance work of Six laning Gurgaon Kotputli Jaipur Section of NH 48 (Old NH 8) From Km. 42.700 to Km. 273.000 (Length 225.600 Km) NHAI/12019/3/2019/IE-GKJ /68 15/07/2020 27/06/2020 10/08/2020
Time 11:0Hrs
418 Independent Engineer Services for Four-Laning of Viluppuram – Puducherry section of NH 45A (New NH 332) from Km 0.000 to Km 29.000 (Design Chainage) under Bharatmala Pariyojana Phase I (Residual NHDP IV works) on HAM in the State of Tamil Nadu and Union Territory of Puducherry NHAI/NHDP-IV/11013/NH-45A/HAM/2019 16/07/2020 26/06/2020 10/08/2020
Time 11:0Hrs
419 Consultancy services for Independent Engineer for supervision of Construction of Six Lane access controlled Highway from DND Maharani Bagh to Junction with Jaitpur-Pushta Road Section of NH-148NA (Design Ch. 0.000 to 9.000) in the National Capital Territory of Delhi on Hybrid Annuity Mode under Bharatmala Pariyojana NHAI/BM/DND-KMP/NH-148NA/IE-I 24/06/2020 26/06/2020 20/08/2020
Time 11:0Hrs
420 Independent Engineer services of Four laning of Meerut - Nazibabad section from Km 11/500 (Design Chainage 11/500 Meerut) to Km 39/240 (Design Chainage 39/250 Behsuma) and from Km 86/590 (Design Chainages 79/500 Bijnor) to Km 112/545 (Design Chainage 105/700 Jalalabad) (Design Length 53/950 Km) of NH-119 (New NH-34) in the state of Uttar Pradesh under Bharatmala Pariyojana on Hybrid Annuity Mode NHAI/UP/Meerut-Nazibabad/IE/NH-119/2018 25/06/2020 25/06/2020 02/07/2020
Time 11:0Hrs
421 Independent Engineer services for construction of Four laning of Harda-Betul section of NH-47 from Chicholi Existing Ch. Km 235.800/ Design Ch. Km 81.000 to Betul existing chainage km 275.000/Design Ch. Km 121.248 (length 40.248 km) in the State of MP NHAI/HQ/MP/BRTML/Chicholi-Betul/IE/2020 24/06/2020 24/06/2020 17/08/2020
Time 11:0Hrs
422 Independent Engineer services for construction of 4-laning of Dhangaon – Boregaon section of NH-347BG & 753L (Indore to Boregaon- Pkg IV) Design Ch. 81.000 to 139.000 (Length 58.000 Km) under Bharatmala Pariyojana Phase-I in the State of Madhya Pradesh on Hybrid Annuity. NHAI/MP/IE/ Dhangaon – Borgaon /HAM/01/2020 24/06/2020 24/06/2020 17/08/2020
Time 11:0Hrs
423 Independent Engineer services for construction of Four laning of Nanasa to Pidgaon section of NH-47 (Old NH-59A) (Indore-Harda, Pkg-III) (Length-47.445 km) Design Ch. 95.000 Km to 142.445 km under Bharatmala Pariyojana Phase-I (Economic Corridor) in the State of Madhya Pradesh on HAM Mode. NHAI/MP/IE/Nanasa-Pidgaon/PKG-III/2020 24/06/2020 24/06/2020 17/08/2020
Time 15:0Hrs
424 Independent Engineer services for construction of 4-laning of Dewas Ujjain section of Old SH-18 from Design Ch. 0.000 to 19.733 & Construction of 4-lane Ujjain Bypass from Design Ch. 19.733 to 26.900 (Part-I) and construction of 4-lane Dewas Bypass from Design Ch. 0.000 to 14.520 (Part-II) with a total design length of 41.42 km in the State of Madhya Pradesh on HAM Mode. NHAI/MP/IE/Dewas-Ujjain/Proc/01/2020 24/06/2020 24/06/2020 17/08/2020
Time 11:0Hrs
425 Independent Engineer services for construction of Four laning of Harda to Temagav section from (Design Ch. 0.000/Existing Ch. 141.750) to (Design Ch. 30.000/Existing Ch.180.500) section of NH-47(Old NH-59A) (Design Length 30.000km) in the State of MP NHAI//HQ/MP/BRTML/Harda-Temgav/IE/2020 24/06/2020 23/06/2020 17/08/2020
Time 11:0Hrs
426 Independent Engineer services for Development of Sinnar to Nashik section of NH-60(50) from Km 177/00 to 201/350 to four lane on PPP following DBFOT (Toll) in the State of Maharashtra EENHNSK/AB/TENDER/1398/2020 17/07/2020 20/06/2020 24/08/2020
Time 17:30Hrs
427 Authority s Engineer for Supervision of Rehabilitation and upgradation for 4 Lanning of Saha to Sahabad Section from Km 14 840 to Km 31 760 of NH 444A Total Length 16 920 km under Bharatmala Pariyojna in the State of Haryana on EPC Basis 2020 NHAI 51033 1 15/07/2020 19/06/2020 20/07/2020
Time 11:0Hrs
428 Consultancy Services for Preparation of Detailed Project Report of the work of 4/6 laning new bridge across river Ganga Connecting Matihani-Shambo Village in Begusarai District in the state of Bihar. 84/RO-PATNA/NHAI/2019-20 18/06/2020 18/06/2020 20/07/2020
Time 11:0Hrs
429 Independent Engineer Services during Operation and Maintenance period for six laning of Hosur- Krishnagiri section of NH-44 (Old NH-7) from km.33/130 to km.93/000 in the State of Tamil Nadu Under NHDP Phase-V executed as BOT (Toll) under DBFO Pattern. NHAI/RO Chennai/IE/O&M/2020/28 17/06/2020 17/06/2020 09/07/2020
Time 15:0Hrs
430 Consultancy services for Independent Engineer for supervision of Construction of Six Lane access controlled Highway from Junction with Jaitpur-Pushta Road to Junction near KMP Expressway with NH-148N (Delhi-Vadodara Expressway) Section of NH-148NA (Design Ch. 9.000 to 59.063) including spur from Design Ch. 13.200 to Junction of Faridabad-Ballabhgarh Bypass with NH-19 near Badarpur Border in the state of Haryana under Bharatmala Pariyojana NHAI/BM/DND-KMP/NH-148NA/IE-II 17/06/2020 17/06/2020 06/08/2020
Time 11:0Hrs
431 Consultancy services for Independent Engineer for supervision of Construction of Eight lane access controlled Expressway from Km 190.00 to Km 254.430 of Vadodara Mumbai Expressway (Gandeva to Kim Section) in the State of Gujarat on Hybrid Annuity Mode under Bharatmala Pariyojana. NHAI/BM/VME/Phase 1B/2018/IE-1 17/06/2020 17/06/2020 06/08/2020
Time 11:0Hrs
432 Consultancy Services for Authority’s Engineer for Supervision of Construction of Eight Lane access-controlled expressway starting near Major Bridge on Mej River to Rajasthan/MP Border (from Ch. 331.030 to Ch. 419.000 and from Ch. 427.300 to Ch. 452.425) section of Delhi-Vadodara Greenfield Alignment (NH-148N) on EPC Mode under Bharatmala Pariyojana in the State of Rajasthan [Delhi-Vadodara/NH-148N/AE/Pkg9] NHAI/BM/Delhi-Vadodara/NH-148N/AE/Pkg9 10/07/2020 12/06/2020 30/07/2020
Time 11:0Hrs
433 Independent Engineer Services for the Operation & Maintenance of Muzaffarpur Darbhanga-Purnea section of NH-57 (Km. 0.00 to Km. 148.550 and Km. 159.357 to Km. 287.860) (Total length 277.053 Km.) and Toll Revenue collection at Toll Plaza Km. 150.390 (BOT Annuity section) of NH-57 on OMT basis in the State of Bihar (OMT Package No. 20). 82/RO-PATNA/NHAI/2019-20 09/06/2020 10/06/2020 17/07/2020
Time 11:0Hrs
434 Independent Engineer services for Six Laning of Thalapady to Chengala section of NH-17 (New NH-66) from Ch. 17.200 (ex. km 17.200) to Ch. 56.200 (ex. Km 57.200) under Bharatmala Pariyojna in the state of Kerala on Hybrid Annuity Mode NHAI/Tech/KL/Thala-Chenga/NH-17/IE/2020 18/06/2020 04/06/2020 30/07/2020
Time 11:0Hrs
435 Independent Engineer services for Six Laning of Chengala to Neeleshwaram section of NH-17 (New NH-66) from Ch. 56.200 (existing km 57.200) to Ch. 93.468 (existing km 95.650) under Bharatmala Pariyojna in the state of Kerala on Hybrid Annuity Mode NHAI/Tech/KL/ Chenga-Neelesh /NH-17/IE/2020 20/06/2020 04/06/2020 30/07/2020
Time 11:0Hrs
436 Independent Engineer services for Six Laning of Neeleshwaram to Thaliparambha section of NH17 (New NH-66) from Ch. 94.540 (ex. km 96.450) to Ch. 134.650 (ex. Km 137.900) under Bharatmala Pariyojna in the state of Kerala on Hybrid Annuity Mode NHAI/Tech/KL/ Neelesh-Thali/NH-17/IE/2020 20/06/2020 04/06/2020 30/07/2020
Time 11:0Hrs
437 Independent Engineer services for Six Laning of Thaliparambha- Muzhapilangad section from Km 137.900 to Km. 170.600 of NH-17 (New NH-66) under Bharatmala Pariyojna in the state of Kerala on Hybrid Annuity Mode NHAI/Tech/KL/ Thali-Muzha /NH-17/IE/2020 20/06/2020 04/06/2020 30/07/2020
Time 11:0Hrs
438 Consultancy Services for Authority’s Engineer for Supervision of Balance works of 4-laning of Fagne to Mah-Guj Border section of NH-6 in the State of Maharashtra from km 510.000 to km 650.794 (design length 140.794 km) to be executed on Engineering Procurement and Construction (EPC) Mode under Bharatmala Pariyojna NHAI/Tech/MH/AE/Bal Work/ Fagne – MH GJ Boder/2020 20/06/2020 04/06/2020 03/07/2020
Time 11:0Hrs
439 Consultancy Services for Authority’s Engineer for Supervision of 4 – Laning of Akola to Medshi from Km 0.000 to Km 47.700 (Design Chainage) of NH-161 including Bypasses at Patur and Medshi in the state of Maharashtra on Engineering, Procurement & Construction (EPC) Mode NHAI/Tech/MH/AE/Akola Medshi/2020 20/06/2020 04/06/2020 03/07/2020
Time 11:0Hrs
440 AE services for BW for 4 laning of Khed Sinner Section of NH-50 (New NH-60) Comprising of the Stretches (a) under Phase-I Khed Bypass, Peth, Manchar Bypass and Linear Length of Eklahre (total length -14.137 km) (b) under Phase-II Kalamb Bypass, Linear length of Bhatkalwadi and Alephata bypass (Total length- 8.634 Km) of Pune District in the State of Maharashtra on EPC Mode NHAI/Tech/MH/AE/Khed Sinnar Bal Work/2020 20/06/2020 04/06/2020 03/07/2020
Time 11:0Hrs
441 Consultancy Services of Supervision Consultant (SC) for Operation and Maintenance from Km 13/800 to Km 37/000 of Maduravoyal to Sriperumbudur Section of NH 48 (Old NH 4) and Operation and maintenance from Km 28/000 to Km 121/000 of Tambaram to Tindivanam section of NH 32 (Old NH 45) in the State of Tamil Nadu. NHAI/RO Chennai/SC/2020-21/27 03/06/2020 03/06/2020 09/07/2020
Time 17:0Hrs
442 Consultancy services for Authority’s Engineer for supervision of Two Laning with paved shoulder from km. 0.000 to km. 45.878 of Aurad - Bidar Section of NH-161A on EPC Mode under Bharatmala Pariyojna in the state of Karnataka 2020-NHAI-49623-1 04/06/2020 02/06/2020 17/07/2020
Time 17:0Hrs
443 Independent Engineer services during Operation and Maintenance Period for four laned Srinagar Banihal Section from Km 220.700 to Km 286.110 on BOT (Annuity) in Jammu and Kashmir under NHDP Phase II J K/IE/SB/2020-21/O and M/01 02/06/2020 02/06/2020 15/07/2020
Time 17:0Hrs
444 Consultancy Services for Authority’s Engineer for supervision of 4 laning of Channarayanapatna Bypass from km. 140/449 to km 149/596 and Hassan Bypass from km 175/935 to km 185/684 and providing Grade Separator Structures, Service Road and other safety measures in Devihalli km 108/486 to Hassan (km. 185/684) section of NH-75 old NH-48 on EPC basis in the state of Karnatak NHAI/KNT/NH-75/Channarayanpatna & Hassan Bypass/AE/2020/152965 dated 02.06.2020 02/06/2020 02/06/2020 21/07/2020
Time 11:0Hrs
-
445 Consultancy services for Independent Engineer for supervision of 4 Laning from km 0.00 to km 42.00 of Dobaspet to Dodaballapur Bypass section of NH-648 ( Old NH-207) on Hybrid Annuity Mode under Bharatmala Pariyojna, in the state of Karnataka (Package-I). NHAI/KNT/NH-207/Dobaspet Bypass/IE/2020 152964 DATED 02.06.2020 02/06/2020 02/06/2020 21/07/2020
Time 11:0Hrs
-
446 Consultancy services for Independent Engineer for supervision of 4 laning from km. 42.000 to km. 80.00 of Dodaballapur Bypass to Hoskote section of NH-648 (Old NH-207) on Hybrid Annuity Mode under Bharatmala Pariyojna, in the state of Karnataka (Package-II NHAI/KNT/NH-207/Dodaballapur Bypass/IE/2020 / 152960 dated 02.06.2020 02/06/2020 02/06/2020 21/07/2020
Time 11:0Hrs
447 Independent Engineer services for 4-laning of Bilaspur-Urga section of NH-130A from design Ch 000 to Ch 70200 under Bharatmala Pariyojna (Raipur-Dhanbad Economic Corridor) in the State of Chhattisgarh on Hybrid Annuity mode 2020/NHAI/49515/1 08/06/2020 02/06/2020 02/07/2020
Time 11:0Hrs
448 Independent Engineer services for 6–Laning of National Corridor NH-19 from Panagarh to Plasit from Km-521-120 to Km-588-870 in the State of West Bengal under Bharatmala Pariyojna on BOT(Toll) basis 2020-NHAI-49605-1 30/06/2020 02/06/2020 07/07/2020
Time 11:0Hrs
449 Independent Engineer services for 6–Laning of National Corridor NH-19 from Palsit to Dankuni from Km-588-870 to Km-652-700 in the State of West Bengal under Bharatmala Pariyojna on BOT(Toll) basis 2020-NHAI-49613-1 30/06/2020 02/06/2020 07/07/2020
Time 11:0Hrs
450 Consultancy Services for Independent Engineer for Supervision of 4–Lane with Paved shoulder configuration of Pathrapali- Katghora Section of NH- 111 (New NH-130) from Km 53300 (Design Chainage) to Km 92600 (Design Chainage) in the State of Chhattisgarh under Bharatmala on Hybrid Annuity Mode 2020/NHAI/49312/1 08/06/2020 29/05/2020 01/07/2020
Time 11:0Hrs
451 Consultancy services for Independent Engineer for supervision of Six-Laning of NH-71 from Renigunta (Start at junction of NH-71- NH-18A- NH-205 MDR of Renigunta) (Design Km 0.000/Existing Km 124.600 of NH-71) to Naidupeta (End on NH-16) (Design Km 57.046/Existing Km 183.400 of NH-71) (Design Length 57.046 Km) on Hybrid Annuity Mode in the State of Andhra Pradesh under Bharatmala Pariyojna. NHAI/Tech/AP/NH-71/Reni-Nai/IE/2020-21 09/06/2020 29/05/2020 29/06/2020
Time 11:0Hrs
452 Independent Engineer services single consultancy package) for (i) Construction of proposed Rewari Bypass (NH-11) as Feeder Route in Rewari district in the state of Haryana (Design length - 14.40 km) on Hybrid Annuity Mode (HAM)- Package-IV (ii) Construction of Gurgaon-Pataudi-Rewari section of NH-352W (design length 46.110 km) as Feeder route in the state of Haryana on Hybrid Annuity Mode 2020-NHAI-48876-1 09/06/2020 26/05/2020 25/06/2020
Time 11:0Hrs
453 Independent Engineer services single consultancy package) for (i) Construction of proposed Rewari Bypass (NH-11) as Feeder Route in Rewari district in the state of Haryana (Design length - 14.40 km) on Hybrid Annuity Mode (HAM)- Package-IV (ii) Construction of Gurgaon-Pataudi-Rewari section of NH-352W (design length 46.110 km) as Feeder route in the state of Haryana on Hybrid Annuity Mode 2020-NHAI-48876-1- 01/07/2020 26/05/2020 06/07/2020
Time 11:0Hrs
454 Independent Engineer services for Up gradation of Mandi Dabwali Haryana Punjab Border Sangaria road section from Proposed Mandi Dabwali Bypass Design Ch. 27 400 to Chautala Km 62 200 of NH 54 design length 34 800 to six lane configuration in the state of Haryana on HAM Mode 2020-NHAI-49057-1 03/06/2020 26/05/2020 01/10/2020
Time 11:0Hrs
455 Consultancy Services as Independent Engineer during Operation & Maintenance for two lane with paved shoulders/four lane for Kerala Border to Kollegala section of NH-212 from Km.136.600 to Km.268.475 in the State of Karnataka under NHDP Phase-IV (A) NIT No. 04/NHAI/RO-BNG/22026/Tender/2020-21 dated 26.05.2020 27/05/2020 26/05/2020 09/07/2020
Time 15:0Hrs
456 Consultancy Services as Independent Engineer during Operation & Maintenance for Four laning of Goa-Karnataka Border to Kundapur section of NH-66 (formerly NH-17) from Km. 93.700 to Km. 283.300 in the State of Karnataka on DBFOT basis under NHDP-IV NIT No. 03/NHAI/RO-BNG/15017/Tender/2020-21 dated 22.05.2020 22/05/2020 22/05/2020 02/07/2020
Time 15:0Hrs
457 Engagement for Authority Engineer for Supervision of Up-gradation to intermediate lane of NH-301 Kargil Zanskar Road from Km 87 to Km 98.524 and Km 98.524 to km 117.180 in the UT of Ladakh (Formaly in the state of JnK NH-301/01/S2020-21 21/05/2020 21/05/2020 22/06/2020
Time 17:0Hrs
458 Independent Engineer services for supervision of Four Laning of Dhrol – Bhadra Patiya section of NH-151A (Between Ex Km 5 700 to Km 13 600 of SH25) and Bhadra Patiya Pipaliya Section of NH151A (Between Ex Km 73 000 to Km 44 800 and Ex Km 38 350 to 24000 of CSH 6) in Gujarat through Public Private Partnership (PPP) on Hybrid Annuity mode NHAI/Guj/Dhrol-Patiya/IE/Proc/2020 21/05/2020 21/05/2020 07/07/2020
Time 15:0Hrs
459 Independent Engineer Services during Operation and Maintenance period for the work of 2-laning of Muzaffarpur-Barauni Section of NH 28 (from km 519.600 to 627.000 (Total Length = 107.400 Km) of NH in the State of Bihar on DBFOT Toll Basis. 75/RO-PATNA/NHAI/2019-20 18/05/2020 18/05/2020 25/06/2020
Time 11:0Hrs
460 Independent Engineer Services during Operation and Maintenance period for 4 -lane Bridge across river Kosi and including its Approaches and Guide Bund and Afflux Bund from Km 148.550 to Km 159.185 on NH-57 in the State of Bihar on Annuity Basis. 74/RO-PATNA/NHAI/2019-20 16/05/2020 16/05/2020 02/07/2020
Time 11:0Hrs
461 CONSULTANTS FOR ENGAGING AUTHORITY’S ENGINEER (AE) FOR CONSTRUCTION OF UPGRADATION TO TWO LANING WITH PAVED SHOULDER OF NAGAUR-BIKANER SECTION BY EXECUTING BALANCE WORK FROM KM 161.000 TO KM 269.260 ON NH-89 (NEW NH-62) IN THE STATE OF RAJASTHAN ON EPC MODE. 01/2020-21 06/06/2020 15/05/2020 27/06/2020
Time 11:0Hrs
462 Consultancy Services for Authority’s Engineer for Supervision of Construction of 6-lane access controlled Greenfield highway from km 4.888 to km 67.000 of Rajasthan/Gujarat Border to Santalpur section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Gujarat on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/Construction Supervision/Package-9) NHAI/BM/EC/ AJ/Construction Supervision/Package-9 15/05/2020 14/05/2020 22/06/2020
Time 11:0Hrs
463 Consultancy Services for Authority’s Engineer for Supervision of Construction of 6-lane access controlled Greenfield highway from km 67.000 to km 130.073 of Rajasthan/Gujarat Border to Santalpur section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Gujarat on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/Construction Supervision/Package-10) NHAI/BM/EC/ AJ/Construction Supervision/Package-10 15/05/2020 14/05/2020 22/06/2020
Time 11:0Hrs
464 Consultancy services for Authority Engineer for supervision of Construction of Four Lane Expressway from Vejalka Village to start of DSIR Zone of Ahmedabad District from km 48 520 to km 71 060 section of Ahmedabad Dholera Greenfield Alignment NH751 on EPC Mode Under Bharatmala Pariyojana in the State of Gujarat Package III NHAI/Guj/ Ahd-Dholera/Pkg-III/AE/2020 14/05/2020 08/05/2020 23/06/2020
Time 15:0Hrs
465 Consultancy services for Authority Engineer for supervision of Construction of Four Lane Expressway from start of DSIR Zone of Ahmedabad District to Adhelai Village of Bhavnagar district Ch 71 060 to Ch 109 019 section of Ahmedabad Dholera Greenfield Alignment NH 751 on EPC mode in the State of Gujarat PackageIV NHAI/Guj/ Ahd.-Dholera/Pkg-IV/AE/2020 14/05/2020 08/05/2020 23/06/2020
Time 15:0Hrs
466 Consultancy services for Authority s Engineer for supervision of construction of Four Lane Expressway from Sardar Patel ring road to Sindhrej Village of Ahmedabad District Ch 0 to 22 000 section of Ahmedabad Dholera Greenfield Alignment NH 751 on EPC Mode in the State of Gujarat PackageI NHAI/Guj/ Ahd-Dholera/Pkg-I/AE/2020 12/05/2020 08/05/2020 23/06/2020
Time 15:0Hrs
467 Consultancy services for Authoritys Engineer for supervision of Construction of Four Lane Expressway from Sindhrej Village to Vejalka village of Ahmedabad District (Ch 22000 to 48520) section of Ahmedabad-Dholera Greenfield Alignment (NH-751) on EPC Mode under Bharatmala Pariyojana Pariyojana (Package-II) NHAI/Guj/ Ahd-Dholera/Pkg-II/AE/2020 12/05/2020 08/05/2020 23/06/2020
Time 15:0Hrs
468 Engagement for Authority’s Engineer for Supervision of Up-gradation NH-301/01/2020-21 06/05/2020 06/05/2020 20/05/2020
Time 17:0Hrs
469 ENGAGEMENT OF AUTHORITYS ENGINEER FOR SUPERVISION OF THE WORK UP-GRADATION TO INTERMEDIATE LANE OF NH-301 KARGIL-ZANSKAR ROAD FROM KM 117.180 TO KM 148.320 IN THE UT OF LADAKH (FORMERLY PART OF STATE OF JnK) NH-301/02/2020-21 06/05/2020 06/05/2020 10/07/2020
Time 17:0Hrs
470 ENGAGEMENT OF AUTHORITYS ENGINEER FOR SUPERVISION OF THE WORK UP-GRADATION TO INTERMEDIATE LANE OF NH-301 KARGIL-ZANSKAR ROAD FROM KM 148.320 TO KM 196.250 IN THE UT OF LADAKH FORMERLY PART OF STATE OF JnK NH-301/2020-21/03 06/05/2020 06/05/2020 10/07/2020
Time 17:0Hrs
471 Consultancy services for Independent Engineer services for Four laning of Jagdishpur Faizabad Section from km 47.930 Design Chainage km 47.800 to km 107.680 Design Chainage km 108.020 of NH 330A in the State of Uttar Pradesh under on Hybrid Annuity mode under NH O. 47585 14/05/2020 04/05/2020 09/07/2020
Time 11:0Hrs
472 Independent Consulting Services during Operation and Maintenance Stage for Routine Maintenance/Incident Management/Toll Operation/Special Repairs / Periodical Renewals / Civil Works Contract from Design km 0.000 to 125.300 (Except Madhav National Park Stretch From km 100.757 to Km 107.350) on Four Lane of Gwalior-Shivpuri Section of NH-46 (OLD NH-3) in the state of Madhya Pradesh 2020 NHAI 47521 1 15/05/2020 02/05/2020 09/06/2020
Time 11:0Hrs
-
473 Consultancy services for Authority’s Engineer for Supervision of Construction of New Six lane Bridge including its approaches across River Ganga on NH-96 (New NH-330) at Phaphamau, Prayagraj in Uttar Pradesh on EPC Basis CE-RO/LKO/NH-96(Phaphamau bridge)/AE/2019-20 01/05/2020 01/05/2020 01/06/2020
Time 17:0Hrs
474 Consultancy services for AE for supervision of Widening /Improvement to 2 (Two) Lane with Earthen Shoulder of Yaingangpokpi-Finch Corner Section (Km 0.00 to Km 16.900 & Km 16.900 to Km 30.97) of NH 202 in the State of Manipur on EPC mode 2020/NHIDC/556694/1 19/05/2020 27/04/2020 10/06/2020
Time 14:30Hrs
475 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF “2-laning of Longding - Tissa - Khonsa road (NH-215)(Km 0.00 to Km 42.50) on EPC mode in the State of Arunachal Pradesh 215/Ar.P/2019-20/028/AE/RO-Ita 21/05/2020 24/04/2020 19/06/2020
Time 11:0Hrs
476 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF 2-laning of Lalpul – Manmao - Changlang road (NH-215) (Km 0.00 to Km 68.30) on EPC mode in the State of Arunachal Prades 215/Ar.P/2019-20/027/AE/RO-ita 24/05/2020 24/04/2020 19/06/2020
Time 11:0Hrs
477 Consultancy Services for Authority’s Engineer for Supervision of Construction of Eight Lane access-controlled expressway starting at Bawadi village (near Shivgarh) of Ratlam district to (Ch. 627.420 to Ch. 696.920) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under Bharatmala Pariyojana in the State of Madhya Pradesh (Delhi-Vadodara/NH - 148N/AE/Pkg7) NHAI/BM/Delhi-Vadodara/NH - 148N/AE/Pkg7 12/05/2020 24/04/2020 28/05/2020
Time 11:0Hrs
478 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF (i) MMLP Package-I (Roads and Utility Works) (ii) MMLP Package-II (Building and Infrastructure Works) & (iii) MMLP Package-III (Railway Sidings) NHIDCL/AE/ASSAM/MMLP 16/06/2020 23/04/2020 28/07/2020
Time 15:0Hrs
479 Consultancy services for AE for supervision of Widening to Two Lane with Hard Shoulder of Churachandpur to Tuivai section of NH 102B for Pkg 1A, Pkg 1B, Pkg 2A, Pkg 2B, Pkg 4A & Pkg 4B on EPC Mode in the State of Manipur 2020/NHIDC/556276/1 23/04/2020 23/04/2020 08/06/2020
Time 14:30Hrs
480 Consultancy Services for AE for Supervision of Cons. of 1. 2 lane with hard shoulder of Kohima-Jessami Road from km 76.320 to km 98.380 Pkg IV (ii) from km 98.380 to km 120.367 (Nagaland/Manipur Border) in the state of Nagaland Pkg V NHIDCL/Nagaland/AE/KJ/45 14/05/2020 22/04/2020 22/06/2020
Time 11:0Hrs
481 Consultancy Services for AE for Supervision of Cons.of 1. Construction of two lane with hard shoulder of Kohima-Jessami Road From km 7.880 to km 30.474 Pkg1(ii) From km 30.474 to km 53.220 pkg2 (iii) from km 53.220 to km 76.320 pkg3 in Nagaland NHIDCL/Nagaland/AE/KJ/123 14/05/2020 22/04/2020 22/06/2020
Time 11:0Hrs
482 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF CONSTRUCTION AND UP GRADATION OF 4 LANE OF EXISTING 2 LANE WITH PAVED SHOULDER FROM HAPACHARA TO TULUNGIA ROAD OF NH-117 OF EXISTING KM 0.00 TO KM 14.050 AND (DESIGN KM 0.000 TO KM 14.660), (DESIGN LENGTH – 14.660 KM) ON EPC BASIS IN THE STATE OF ASSAM UNDER BHARATMALA PARIYOJANA IN ECONOMIC CORRIDORS NHIDCL/Assam/AE/HAP-TUL/2020 22/04/2020 21/04/2020 04/06/2020
Time 14:0Hrs
483 CS FOR AE FOR SUPERVISION OF (i) Rehabilitation and up-gradation of road from design km 6.50 to km 45.300 (Package-I,II,III)of Agartala-Khowai section on NH108B to 2lanes with PS 2.Khayerpur-Amtali Section from km 0 to km 12.900 of NH8 in Tripura 2020-NHIDC-555596-1 22/04/2020 20/04/2020 27/05/2020
Time 14:30Hrs
484 CS FOR AE FOR SUPERVISION OF (i) Rehabilitation and up-gradation of road from design km 0 to km 16.290 of Manu-Lalchara section on NH 44A to 2lane with paved shoulder. 2 .Km 46.597 to km 66.845 of Kanchanpur- Vaghmun section on NH-44A in Tripura 2020-NHIDC-555673-1 22/04/2020 20/04/2020 27/05/2020
Time 14:30Hrs
485 CS FOR AE FOR SUPERVISION OF 1.Improvement and Widening to 2 lanes with PS of Jolaibari-Belonia (from km 0 to km 21.412) section of NH108A 2.Strengthening of Churabari-Agartala section with paved shoulder of NH08 (74.856km) in Tripura on EPC Mode 2020-NHIDC-555585-1 22/04/2020 20/04/2020 27/05/2020
Time 14:30Hrs
486 CS FOR AE FOR SUPERVISION OF 1.Rehabilitation and up-gradation of road from design km 0 to km 36.460 (Pkg-I,II,III) of Kailashahar-Kurti Bridge.(II)Km 0 to km 18.600 of Kumarghat-Kailashahar section on NH208 to 2 lane with paved shoulder in Tripura 2020-NHIDC-555591-1 22/04/2020 20/04/2020 27/05/2020
Time 14:30Hrs
487 Independent Engineer Services for Four Laning of Mugaiyur to Marakkanam section of NH-332A from Km 31.000 to Km. 62.000 (Design Chainage) under Bharatmala Pariyojana Phase-I (Feeder Routes) on HAM in the State of Tamil Nadu (Package-II of Mahabalipuram Puducherry). NHAI/11022/HAM/MM/TN/P2/IE/2020 03/04/2020 20/04/2020 16/02/2021
Time 11:0Hrs
488 Consultancy Services For Authority Engineer For Supervision of (i) Cons./up-gradation of existing road to 2-lane with Paved shoulder from km 40 to km 61.100 of the Kafer to Reshi border PKG-VA (ii) construction and upgradation of existing road to 2 lane with paved shoulder including geometric improvement of section from start of Pedong bypass to Reshi border of NH-717A from km 79.700 to km 96.254 on EPC basis on SARDP-NE Phase-A in the State of West Bengal (PKG-VB) NHIDCL/AE/W.Bengal/VA and VB/2020 27/04/2020 20/04/2020 04/06/2020
Time 15:0Hrs
489 Consultancy services for Authority Engineer for supervision of construction of Major Bridge across Krishna river at Km.180.865 of NH-167 EE/NHD/CTA/AE2/5thcall/Job009/ 14/04/2020 14/04/2020 20/05/2020
Time 17:0Hrs
490 Consultancy services as Authority’s Engineer for Supervision of Construction of 2-laning with hard shoulder configuration from Design Chainage Km 0/000 to Km 80/638 for Lunglei-Tlabung section of NH302 in the state of Mizoram under Bharatmala Pariyojana on EPC Mode 2020-NHIDC-555332-1 11/04/2020 11/04/2020 28/09/2020
Time 11:0Hrs
491 Supervision Consultancy services for the construction of balance works of Two laning with paved shoulders of Sitarganj-Bareilly section of NH-74 from Km 254.820 to Km 329.280 in the state of Uttar Pradesh & Uttarakhand 45012/3/2020-UP(W) 11/04/2020 09/04/2020 22/07/2020
Time 11:0Hrs
492 Consultancy services for Independent Engineer for supervision of Six laning of Vijayawada bypass from Chinna Autupalli (Design Ch. 0.000) to Gollapudi (Design Ch. 30.000) in Vijayawada- Gundugolanu section of NH 16 in the state of Andhra Pradesh under Bharatmala Pariyojana on Hybrid Annuity Mode (Package-III) NHAI/Tech/AP/NH-16/Chin Av-Golla(VG P-3)/IE/2019-20 27/04/2020 23/03/2020 02/06/2020
Time 11:0Hrs
493 Consultancy services for Independent Engineer for supervision of Six laning of Vijaywada Bypass from Gollapudi (Design Ch. 30.000) to Chinnakakani (design Ch. 47.881) including major bridge across river Krishna in Vijayawada Gundugolanu section of NH-16 in the state of Andhra Pradesh under Bharatmala Pariyojana on Hybrid Annuity Mode (Package-IV). NHAI/Tech/AP/NH-16/Golla - Chinnaka(VG P-4)/IE/2019-20 27/04/2020 23/03/2020 02/06/2020
Time 11:0Hrs
494 CONSULTANTS FOR ENGAGING AUTHORITITY’S ENGINEER (AE) FOR CONSTRUCTION OF 14/2019-20 24/04/2020 20/03/2020 17/05/2020
Time 11:0Hrs
495 Independent Engineer services for six laning of Jodhpur Romana (Bathinda) - Mandi Dabwali (Punjab/Haryana Border) section of NH-54 from Design Ch. 0.000 to Design Ch. 27.400 (Design length 27.4 Km) in the state of Punjab on Hybrid Annuity Mode NHAI/30044/1/2020/PB/JR-MD 13/04/2020 20/03/2020 14/10/2020
Time 11:0Hrs
496 Independent Engineer Services during Operation and Maintenance period for the work of 4-laning from Km 360.915 to Km 402.000 of Gorakhpur-Gopalganj section of NH-28 in the State of Bihar Civil Package No – LMNHP-EW-II (WB) – Package – 9. 61/RO-PATNA/NHAI/2019-20 19/03/2020 20/03/2020 11/05/2020
Time 11:0Hrs
497 Independent Engineer Services during Operation and Maintenance period for the work of 4-laning of Kotwa – Mehsi- Muzaffarpur Section from km 440.00 to km 520.00 (Total Length 80.00 Km) of NH 28 in the State of Bihar. 62/RO-PATNA/NHAI/2019-20 19/03/2020 20/03/2020 11/05/2020
Time 11:0Hrs
498 Consultancy Services as Independent Engineer during Operation & Maintenance for Four laning of Kundapur-Surathkal section (Km.283.300 to Km.358.080) (Section-1) Mangalore to Kerala Border (Km.375.300 to Km.376.700) (i.e. Nantoor circle to Mahaveer Circle) and Mahaveer Circle to Kerala Border (Km.3.700 to Km.17.200) (Section-2) of NH-66 (Old NH-17) in the State of Karnataka on DBFOT basis under NHDP-III (Package No.KAR/Phase-III/IC-3/2010) NIT No.20/NHAI/RO-BNG/15017/Tender/2019-20 dated 16.03.2020 20/03/2020 16/03/2020 26/05/2020
Time 15:0Hrs
499 Independent Engineer Services for Four laning of Mamallapuram to Mugaiyur Section of NH-332A from Km.0.000 to Km 31.000 (Design Chainage) under Bharatmala Pariyojana Phase-I (Feeder Routes) on Hybrid Annuity Mode in the State of Tamil Nadu. NHAI/11021/HAM/MM/TN/P1/IE/2020 03/04/2020 13/03/2020 18/06/2020
Time 11:0Hrs
500 Independent Engineer Services for Four laning of Thorapalli Agraharam – Jittandahalli Section of NH-844 from Km 23.350 to Km 60.100 (Design Chainage) under Bharatmala Pariyojana Phase-I (National Corridor) on Hybrid Annuity Mode in the State of Tamil Nadu (Package-II of Hosur Dharmapuri Section). NHAI/11025/TJ/HAM/P2/IE/2020 03/04/2020 13/03/2020 18/06/2020
Time 11:0Hrs
501 Independent Engineer Services for Four laning of Jittandahalli –Dharmapuri Section of NH-844 from Km 60.100 to Km 94.460 (Design Chainage) under Bharatmala Pariyojana Phase-I (National Corridor) on Hybrid Annuity Mode in the State of Tamil Nadu NHAI/11026/JD/HAM/TN/P3/IE/2020 03/04/2020 13/03/2020 18/06/2020
Time 11:0Hrs
502 Authority’s Engineer for Supervision of Four Laning of Banihal Bypass from Km 187.000 to Km 189.350 section of NH-1A in Jammu & Kashmir on Engineering Procurement and Construction (EPC) Basis 2020/NHAI/45802/1 16/03/2020 13/03/2020 08/06/2020
Time 11:0Hrs
503 CONSULTANTS FOR ENGAGING AUTHORITITY’S ENGINEER (AE) FOR CONSTRUCTION OF 12/2019-20 07/03/2020 08/03/2020 18/04/2020
Time 11:0Hrs
504 CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF CIVIL CONSTRUCTION WORK OF NEW 4 LANE BRIDGE (PARALLEL TO THE EXISTING MG SETU) WITH ITS APPROACHES FROM KM 0/000 TO 14/500 ACROSS RIVER GANGA NH-19 AT PATNA IN THE STATE OF BIHAR ON EPC RW/NH-12014/95/2019/BR/Z-1 16/03/2020 06/03/2020 20/04/2020
Time 11:0Hrs
505 Independent Engineer services for 4 laning of Palma to Gumla Section of NH 23 from Km 26 00 to Km 89 170 in the State of Jharkhand on HAM 2020-NHAI-44676-1 02/03/2020 28/02/2020 15/07/2020
Time 11:0Hrs
506 Independent Engineer services for four laning of Dhillon Nagar (Moga) to Bajakhana (Lambwali) section of NH-105B (Greenfield Alignment) from design chainage Km 0.000 to Km 43.319 under Bharatmala Pariyojana in the state of Punjab on Hybrid Annuity Mode 2020-NHAI-44171-1 26/02/2020 24/02/2020 17/08/2021
Time 11:0Hrs
507 Consultancy Services for Authority ENgineer for supervision of construction of major Brisge across river Krishna on NH 167 Hagari Jadcherla section EE/NHD/CTA/AE5/Job009/5thcall/1677 18/02/2020 18/02/2020 16/03/2020
Time 17:0Hrs
508 Consultancy services for Authority’s Engineer for Supervision of (i) Widening and Improvement of Imphal-Moreh section from Km 395.680 to Km 425.411 to Two (2) lane with paved shoulders on NH-39 in the State of Manipur (Package-3) on EPC mode under ADB (SASEC) loan under Tranche-3. (ii) Construction of Moreh Bypass to Two Lane with paved shoulder from Km 421.950 to Km 425.411 (Length = 2.52 Km) on NH-39 near Indo-Myanmar border in the State of Manipur on EPC mode. (iii) Widening/Strengthening to NHIDCL/Manipur/AE/I-M/P-3/NH-37/2020 20/02/2020 18/02/2020 14/05/2020
Time 15:0Hrs
509 Supervison Consultant (SC) Services during operation & Maintenance Period for Two lane with paved shoulder of Padhi-Dahod section of NH-113 (New NH-56) from Km.180.00 to Km. 267.00 (Design length 85.588 km.) under NHDP Phase-IV in the state of Rajasthan and Gujarat on EPC Mode. NH/PIU/GODHRA/113 17/02/2020 17/02/2020 08/06/2020
Time 11:0Hrs
510 Consultancy Services for Authority s Engineer for Up gradation of newly declared NH-341 to two-lane with Paved shoulder configuration between Km. 65.478 to Km 162.209 Bhuj Airport Jn - Khavda - India Bridge to Dharmshala section in the State of Gujarat 04AE of 2019-20 Re Invite) 25/02/2020 15/02/2020 16/03/2020
Time 14:0Hrs
511 Consultancy services for Authoritys Engineer for Supervision of 4 laning of Barhi Koderma Section of NH 31 from Km 0 000 to Km 27 500 in the State of Jharkhand under NHDP Phase IV on EPC Mode 2020 NHAI 42474 1 02/03/2020 07/02/2020 16/03/2020
Time 15:0Hrs
512 Independent Engineering services for four laning of Pune Solapur section of NH 9 from Km. 144.400 to Km. 249.000 in the State of Maharashtra under NHDP Phase III Pkg. II on DBFOT basis NHAIMUMPUNESOLAPURIE11 06/02/2020 07/02/2020 15/06/2020
Time 11:0Hrs
513 Independent Engineer services for Operation & Maintenance of four laning of Solapur to Yedshi Section of NH 211 from Km. 0.000 to 100.000 (Design Length 98.717 Km.) in the State of Maharashtra executed on DBFOT mode under NHDP Phase I NHAIROMUMSolapurYedshiIE12 10/02/2020 07/02/2020 15/06/2020
Time 11:0Hrs
514 Consultancy Services for Authority Engineer for Supervision of Construction of (i) 2 laning of existing Hunli- Anini road km 92 50 to km 106 2 (ii) 2 laning of existing Hunli-Anini road from km 106.20 to km 120.00 (iii) 2 laning of existing Hunli-Anini road km120 00 to km 131 920 in the state of Arunachal Pradesh NHIDCL/AE/Hunli-Anini/Km 21 5-Km131 92/2016 07/02/2020 06/02/2020 06/03/2020
Time 15:0Hrs
515 Consultancy services for Authority’s Engineer “For Supervision of Four laning from Biswanath Chariali to Gohpur section of NH-15 (old NH-52) from km 208.000 to 264.100 in the State of Assam Under SARDP-NE Phase-A Project on EPC basis NHIDCL/Assam/AE/BC-Goh/NH-15/2020 07/02/2020 05/02/2020 23/03/2020
Time 15:0Hrs
516 Independent Engineer Services during Operation and Maintenance period for 2 laning of Muzaffarpur Sonbarsa Section of NH77 from Km 2.800 to Km 89.000 in the State of Bihar constructed under NHDPIII on DBFOT (Annuity) basis. NIT No- 56/RO-PATNA/NHAI/2019-20 04/02/2020 05/02/2020 11/05/2020
Time 11:0Hrs
517 Consultancy Service for Authority Engineer for 1 Construction upgradation of existing road to 2 lane with paved shoulder including geometric improvement from Ranipool to Pakyong from Km 0 to Km 16.167 of NH 717 A on EPC basis under SARDP-NE Phase A and 2 Construction of 48m Bridge over Chuba Khola from km 75.300 to km 75.800 on NH 10 on EPC Basis in the state of Sikkim NHIDCL/AE/Sikkim Works/2020 20/02/2020 05/02/2020 25/02/2020
Time 15:0Hrs
518 Independent Engineer Services for 2 laning with paved shoulder during O and M Period of Salasar Nagaur Section of NH 65 (New NH 58) in the State of Rajasthan Design chainage from km 151.141 to design chainage km 270.735 on Hybrid Annuity Mode NHAI/12019/3/2020-ROJ/ Tech/IE-SN/ 11/02/2020 04/02/2020 25/02/2020
Time 11:0Hrs
519 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION of Balance Work of construction of 4-laning from Ch.165.400 to Ch. 190.587 Jatinga to Harangajao Section of NH-54 in the state of Assam, Civil Contract Package, EW-II AS-21(Bal.) Maintenance work of 2-lane in the proposed road as well as Existing road NH-54E in the state of Assam on EPC N Supervision Consultant of Operation and Maintenance Km. 140.70 to Km 164.08 Narimbanglo to Jatinga AS-22 Section and Km 126.45 to Km. 140.70 and Km NHAI/PIU/HFG/SC/01 17/02/2020 03/02/2020 23/03/2020
Time 17:0Hrs
-
520 Consultancy Services for Authority Engineer for Supervision of Balance Work for construction of 4-laning of Barasat-Krishnagar section of NH-34 from km. 48.553 to km. 115.272 length 66.72 km on EPC Mode in Nadia District in West Bengal on EPC Mode. NHAI/WB/Tech/2020/AE/Pkg-1 11/03/2020 30/01/2020 14/05/2020
Time 11:0Hrs
521 Consultancy services as Authority Engineer for Supervision of Rehabilitation and Up-gradation to 2 lane with paved shoulders of Seling-Dulte section (Economic Corridor) of NH-6 from Existing chainage Km 0/000 to Km 69/015 (Design Chainage Km 0/000 to Km 62/200) in the State of Mizoram under Bharatmala Pariyojna on EPC mode 2020-NHIDC-540344-1 30/01/2020 30/01/2020 16/03/2020
Time 11:0Hrs
522 Consultants for Consultancy Services for Authority Engineer for i 2 laning of Akajan Likabali Bame Road from km 12.000 to km 33.000 State Road ii 2 laning of Akajan Likabali Bame road from km 33.00 to km 65.810 State Road in the state of Arunachal Pradesh under SARDP NE NHIDCL/Ar. Pr./A-L-B(12.00 to 65.810/AE/2020 28/01/2020 28/01/2020 25/02/2020
Time 15:0Hrs
523 Consultancy Services for Authority Engineer for Supervision of Construction of (i) 2Lane with hard shoulders of Changtongya Longleng Road on EPC basis from existing Km 0.0 to Km 16.592 (Design Km 0.000 to Km 18.779) (Design Length 18.779 Km) in the state of Nagaland under NH (O) Plan (ii) 2 Lane with hard shoulders of Changtongya Longleng Road on EPC basis from existing Km 16.530 to Km 29.530 (Design Km 18.779 to Km 33.428) (Design Length 14.649 Km) in Nagaland NHIDCL/Nagaland/AE/CL(0-33)/2019 28/01/2020 27/01/2020 06/03/2020
Time 11:0Hrs
-
524 Consultancy Services of Supervision Consultant (SC) for Operation & Maintenance from Km. 0.000 to Km. 67.400 of Bhubaneswar- Puri Section of NH-203 (New NH-316) in the State of Odisha NHAI/13012/36/RO-OD/2020 28/01/2020 25/01/2020 25/02/2020
Time 11:0Hrs
525 Consultancy Services for Authority’s Engineer for Supervision of Construction of Eight Lane access-controlled expressway starting from Junction with NH-47 near Bhamaiya village and ending at junction with NE-1 near Dodka village of Vadodara District (Ch. 780.920 to Ch. 844.382) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under Bharatmala Pariyojana in the State of Gujarat (Delhi-Vadodara/NH-148N/AE/Pkg8) NHAI/BM/Delhi-Vadodara/NH-148N/AE/Pkg8 05/02/2020 22/01/2020 25/06/2020
Time 11:0Hrs
526 Independent Engineer Services during Operation and Maintenance stage including Supervision of Balance work of 6 laning Gurgaon Kotputli Jaipur Section of NH 48 (Old NH 8) From Km. 42.700 to Km. 273.000 (Length 225.600 Km) in the Haryana and Rajasthan NHAI/12019/3/2019/IE-GKJ /58 18/02/2020 21/01/2020 24/02/2020
Time 11:0Hrs
527 Consultancy Services for i) Collection of inventory data using MBIU, ii) Analysis of bridge condition and assessment of distress condition, iii) Preparing RFP bid document including estimate for remedial measures wherever necessary with the corresponding methods and technique for repair and rehabilitation of the Bridges, Flyovers, ROBs, VUPs on Gurgaon-Kotputli-Jaipur section of NH-8 from Km 42.700 to Km 273.000 in the state of Haryana and Rajasthan 23086/NHAI/JPR/PCEPL/str-1/ GKJ/01 25/02/2020 17/01/2020 03/02/2020
Time 11:0Hrs
528 Consultancy Services for i) Collection of inventory data using MBIU, ii) Analysis of bridge condition and assessment of distress condition, iii) Preparing RFP bid document including estimate for remedial measures wherever necessary with the corresponding methods and technique for repair and rehabilitation of the Bridges, Flyovers, ROBs, VUPs on Gurgaon-Kotputli-Jaipur section of NH-8 from Km 42.700 to Km 273.000 in the state of Haryana and Rajasthan 23086/NHAI/JPR/PCEPL/str-1/ GKJ/ 25/02/2020 17/01/2020 03/03/2020
Time 11:0Hrs
529 Independent Engineer Services during Operation and Maintenance period for 4 laning of Patna-Bakhtiyarpur Section of NH-30 from Km 181.300 to Km 231.950 in the State of Bihar constructed under NHDP-III on BOT (Annuity) on DBFOT basis (2nd Call). 55/RO-PATNA/NHAI/2019-20 16/01/2020 17/01/2020 11/03/2020
Time 11:0Hrs
530 Consultancy services for Authority’s Engineer for Supervision of Balance work of Construction of Ring Road for Raebareli City on eastern side of NH-24B (Phase-I) in the state of Uttar Pradesh on EPC Basis. CE-RO/LKO/NH-24B (Raebareli Ring Road)/AE/2019-20 17/01/2020 17/01/2020 17/02/2020
Time 15:0Hrs
-
531 Independent Engineer Services during Operation and Maintenance stage of 6 laning of Jaipur-Kishangarh section of NH-8 (From Km. 273.500 to Km. 363.885 ) under BOT projects in the State of Rajasthan NHAI/12019/3/2019/IE -JP-Kishangarh/57 17/02/2020 08/01/2020 24/02/2020
Time 11:0Hrs
532 Independent Engineer Services during Operation and Maintenance stage of Four laning of Gomati Chauraha Udaipur of NH 8 (From Km. 177.000 to Km. 260.100 ) in the State of Rajasthan under NHDP Phase IV on DBFOT (Toll) basis NHAI/12019/3/2019/IE-GC-Uda/55 15/01/2020 08/01/2020 24/02/2020
Time 11:0Hrs
533 Independent Engineer Services during Operation & Maintenance stage of Jaipur-Tonk-Deoli section of NH-12 (Km. 18700 to 165.000) in the State of Rajasthan under NHDP Phase III on DBFOT basis NHAI/12019/3/2019/IE -JP-Deoli/56 19/02/2020 08/01/2020 24/02/2020
Time 11:0Hrs
534 Consultancy services for Authority Engineer for Supervision of REHABILITATION AND UPGRADATION TO 2 LANE WITH PAVED SHOULDER FROM EXISTING KM. 195.175 TO KM. 220.000 (DESIGN CHAINAGE KM. 71.300 TO KM. 95.947) EXCLUDING EXISTING CHAINAGE KM 200.300 TO KM 202.400 (DESIGN CHAINAGE KM 76.400 TO KM 78.400) ON DHARASU TO YAMUNOTRI ROAD OF NH- 134 (OLD NH-94) IN THE STATE OF UTTARAKHAND ON EPC MODE UNDER IMPROVEMENT TO NH CONNECTIVITY TO CHARDHAM . NH-134-UR-2017-18-524-AE 07/01/2020 07/01/2020 13/02/2020
Time 11:0Hrs
535 Consultancy Services of Supervision Consultant (SC) for Operation & Maintenance from Km 11/000 to Km 21/400 of Chennai – Tada Section of NH – 5 in the State of Tamil Nadu. NHAI/RO Chennai/SC/2019-20/22 30/01/2020 06/01/2020 10/02/2020
Time 17:0Hrs
536 Consultancy Services as Independent Engineer during Operation & Maintenance of 4- laned divided carriageway from Km 22.300 (Thondupally) to Km 211 (Kurnool) of Package Nos. NS-2/BOT/AP-3, AP-4 & AP-5 on Hyderabad – Bangalore Section of NH-44 (Old NH-7) in the State of Telangana & Andhra Pradesh on BOT (Toll/Annuity) basis under North –South Corridor (NHDP Phase-II) NHAI/Tech/IC/AP-3 4 5/2019 28/01/2020 03/01/2020 04/02/2020
Time 11:0Hrs
537 consultancy Services for Authoritys Engineer for supervision of construction of Major Bridge at Km 180.865 across river Krishna on NH167 Hagari-jadcherla section in the state of Karnataka on EPC mode EE/NHD/CTA/AE5/Job009/2019-20/1352 02/01/2020 02/01/2020 27/01/2020
Time 15:0Hrs
538 Independent Engineer Services during Operation and Maintenance stage of Two Laning with Paved Shoulder of Raebareli to Prayagraj section Km 82.700 to Km 188.600 of NH30 Old NH24B in the State of Uttar Pradesh under NHDP IVA on BOT Toll basis NHAI PIU RBLY NH30 RBL PRG IE 02/01/2020 02/01/2020 25/02/2020
Time 11:0Hrs
539 Supervision Consultancy Services during Maintenance of Raebareli Banda Section of NH 232 from km 148.993 to km 285.818 in the State of Uttar Pradesh under NHDP IVB on EPC mode. NHAI PIU RBLY NH-232 RBL Banda SC 02/01/2020 02/01/2020 25/02/2020
Time 12:0Hrs
540 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR i) Construction of 1000m length Viaduct at Rangpo between Km 51.1 0 to Km 53.90 ii) Construction of upgradation of existing road to 2-lane with paved shoulder including geometric improvement of Rhenok-Rorathang-Pakyong of NH-717A, Singtam-Tarku & Tarku Rabongla NHIDCL/AE/Sikkim Works/2019 30/12/2019 30/12/2019 06/02/2020
Time 15:0Hrs
541 Independent Engineer Services during Operation & Maintenance Period for Four laning of Sambalpur- Bargarh- Odisha / Chhattisgarh Border Section of NH-06 from Km.0.000 to Km.88.000 in the State of Odisha executed on DBFOT (Toll) pattern under NHDP Phase III NHAI/13012/30/RO/OD/2019 08/01/2020 30/12/2019 06/02/2020
Time 11:0Hrs
542 Supervision Consultancy Services during Maintenance of Two-Lane with Paved Shoulders of Tanda- Raebareli section of NH-232 (New NH-128) [Total Design length = 162.050 km including 13.060 km of NH-330] on EPC mode under NHDP Phase-IV in the state of Uttar Pradesh. NHAI/PIU-RBLY/NH-232(RBL-TANDA)/SC/O&M/2019-20 30/12/2019 30/12/2019 10/02/2020
Time 12:0Hrs
543 Consultancy Services for Independent Engineer during Operation & Maintenance Stage for Delhi - Meerut Expressway a) Package- I from existing Km 0.000 to existing Km 8-360 in the State of Delhi and b) Package-III from existing Km 27-740 to existing Km 49-346 in the state of Uttar Pradesh on Hybrid Annuity Mode NHAI/DME/O&M/IE/2019 26/12/2019 26/12/2019 20/01/2020
Time 11:0Hrs
544 Consultancy Services for Authority Engineer for Supervision of Construction of (i) 2-Lane with hard shoulders of Changtongya Longleng Road on EPC basis from existing Km 0.0 to Km 16.592 (Design Km. 0.000 to Km. 18.779) (Design Length – 18.779 Km) in the state of Nagaland (Pkg-1) under NH (O) Plan (ii) 2-Lane with hard shoulders of Changtongya – Longleng Road on EPC basis from existing Km 16.530 to Km 29.530 (Design Km. 18.779 to Km. 33.428) (Design Length –14.649 Km) in the state of Nagaland NHIDCL/Nagaland/AE/CL( 0-33)/2019 30/12/2019 24/12/2019 27/01/2020
Time 11:0Hrs
545 Independent Consulting Services during Operation and Maintenance Stage for 4-laning of Khalghat-MP/Maharashtra border section of NH-52 (Old NH-3) from km 84.700 to km 167.500 in the state of Madhya Pradesh 2019 NHAI 38630 1 30/12/2019 20/12/2019 20/01/2020
Time 11:0Hrs
546 Independent Engineer services during O and M period for the project of Design, Construction, Development, Finance, Operation and Maintenance of the work of construction of New Four Lane Gwalior Bypass of the length 42.033 Km from Km. 103.00 of NH 3 to Km 16.00 on NH 75 (New NH-44) in the State of Madhya Pradesh on BOT (Annuity) basis. 2019 NHAI 38623 1 23/01/2020 20/12/2019 24/02/2020
Time 11:0Hrs
547 Independent Engineer Services during O and M Period of Kishangarh Ajmer Beawar section 6 lanning of the existing road from Km. 364.125 to Km. 396.000 and from Km. 0.000 to Km. 58.245 of NH 8 on NHDP Phase III on DBFOT basis NHAI/12018/2/2019-ROJ/ SC-Tender-KAB/53 01/01/2020 19/12/2019 10/02/2020
Time 15:0Hrs
548 Consultancy Services for Authority’s Engineer for Supervision of Construction of 6-lane access controlled Greenfield highway from km 150.000 to km 207.100 of Deogarh (near Dhandhaniya) to Rajasthan/Gujarat Border section of NH-754K as a part of Amritsar- Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I)-AJ/Construction Supervision/Package-8 NHAI/BM/EC/AJ/Construction Supervision/Package-8 09/01/2020 17/12/2019 20/01/2020
Time 11:0Hrs
549 Authority Engineer for Supervision of balance Work for Four Laning of Rohtak-Jind Section from Km 307 to Km 347800 of NH-71 and connecting link from Km 347800 of NH-71 to Km 9400 of NH-71A on EPC Mode under Bharatmala (left out in NHDP) in the State of Haryana NHAI/11012/NH-71/2019/Balance Work R-J/AE 18/12/2019 13/12/2019 27/01/2020
Time 11:0Hrs
550 Consultancy Services for Authority’s Engineer for Supervision of Construction of 8-lane access controlled Greenfield Delhi – Vadodara Expressway (NH-148N) starting at Junction with MDR-1 (Baonli-Jhalai road) to Major Bridge on Mej River (Ch. 247.310 to Ch. 331.030) in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Delhi-Vadodara/NH-148N/AE/Pkg4) NHAI/BM/Delhi-Vadodara/NH-148N/AE/Pkg4 05/02/2020 13/12/2019 16/03/2020
Time 11:0Hrs
551 Independent Engineer Services during Operation and Maintenance period for 6 laned section of Ahmedabad Vadodara Section of NH-8 from km. 6.400 to Km. 108.700(Length 102.300 kms.) in the State of Gujarat and Improvement of Ahmedabad Vadodara Expressway from km. 0.000 to Km. 93.302 in the State of Gujarat Length (93.302 km). under NHDP Phase-V on DBFOT Toll Basis NHAI/PIU-Ahmedabad/OM/IE/01/2019 19/12/2019 09/12/2019 21/01/2020
Time 15:0Hrs
552 Independent Engineer services for Four laning of NH-161 from Kandi (Design Km 0.000) (Km 498.250 of NH-65) to Ramsanpalle (Design Km 39.980/Existing Km 44.757) (Design Length = 39.980 Km) in the State of Telangana under Bharatmala Pariyojna on Hybrid Annuity Mode NHAI/Tech/AP/NH-161/San-Nan/Pkg-I/IE/17-18 20/12/2019 09/12/2019 23/01/2020
Time 11:0Hrs
553 Consultancy Services for Authoritys Engineer for Supervision of Construction of 6 lane access controlled Greenfield highway from km 72 000 to km 150 000 of Deogarh (near Dhandhaniya) to Rajasthan/Gujarat Border section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) AJ/Construction Supervision/Package-7 NHAI/BM/EC/AJ/Construction Supervision/Package-7 09/12/2019 09/12/2019 13/01/2020
Time 11:0Hrs
-
554 Independent Consulting Services during Operation and Maintenance state for 4 laning of Indore Khalghat Section of NH52 (Old NH3) from km 12.600 to km 84.700 in the state of Madhya Pradesh 2019 NHAI 36888 1 20/12/2019 28/11/2019 30/12/2019
Time 11:0Hrs
555 SC Services for O and M stage of 2 lane with paved shoulder of Nimbi Jodha (Near Ladnu) Degana Merta City section of NH 458 from Km. 0.000 (Existing chainage Km. 0.000) to Km. 139.900 on EPC Basis under NHDP-Phase IV NHAI/12058/2/SC-Tender-NJDM/52 23/12/2019 28/11/2019 13/01/2020
Time 11:0Hrs
556 Project Management Consultancy Services for “Rehabilitation and Up-gradation of Kulpahar-Mahoba section (km 133.520 to 158.040) of NH-76 & NH-86 (5.360km) with to two lane with paved shoulder in the State of Uttar Pradesh on EPC Mode (Job No. 6&86-UP-2016-17-545 Dated 27.12.2016)” 2200M/13M-NHCK/18 dated 27.11.2019 29/11/2019 27/11/2019 19/12/2019
Time 12:0Hrs
557 Consultancy Service for Authority’s Engineer for supervision of “Widening and Improvement of Imphal-Moreh section from Km 395.680 to Km 425.411 to Two (2) lane with paved shoulders on NH-39 in the State of Manipur (Package-3) on EPC mode under ADB (SASEC) loan under Tranche- 3”. NHIDCL/Manipur/AE/I-M/P-3/NH-37/2019 26/11/2019 26/11/2019 24/01/2020
Time 15:0Hrs
558 Independent Engineer Services during Operation & Maintenance stage of four laning of Cuddappah – Kurnool section of NH-18 (New NH-40) from Km.167.750 to Km.356.502 in the state of Andhra Pradesh on BOT (Toll) project under NHDP Phase-III NHAI/RO-VJA/IE Services 27/11/2019 26/11/2019 09/01/2020
Time 11:0Hrs
-
559 Independent Engineer Services during Operation & Maintenance stage of four laning of Cuddappah – Kurnool section of NH-18 (New NH-40) from Km.167.750 to Km.356.502 in the state of Andhra Pradesh on BOT (Toll) project under NHDP Phase-III NHAI/RO-VJA/IE Services/1 16/01/2020 26/11/2019 24/01/2020
Time 11:0Hrs
560 Consultancy services for Authority’s Engineer for Supervision of Construction of New Twin tube 6-lane tunnel at Khambatki Ghat section of NH-4 and its approaches from existing km. 771.730 to existing km. 782.000 in the state of Maharashtra under NHDP Phase-V on EPC Mode 2019-NHAI-36658-1 28/11/2019 25/11/2019 13/01/2020
Time 11:0Hrs
561 Selection of AE for Widening to Two lane with Geometric Improvements of Tura Dalu road from Km 85 to 95 and 101 to 145 to 2 lanes with paved shoulder of Tura Dalu section of NH 51 in the state of Meghalaya on EPC mode with JICA loan Assistance 2019 NHIDC 521633 1 25/11/2019 25/11/2019 09/01/2020
Time 15:0Hrs
562 IE Services during O and M Period of Design Construction Development Finance Operation and Maintenance of Km. 596.750 to Km. 653.225 on NH 7 in the State of MP 2019/NHAI/36410/1 06/12/2019 21/11/2019 23/12/2019
Time 11:0Hrs
563 Independent Engineer Services during Operation & Maintenance for 4-laning from Pondicherry to Tindivanam Section of NH-66 from km 0/000 to Km 37/920 in the State of Tamil Nadu and 4- laning from Salem to Ulundurpet of NH-68 from Km 0/313 to Km 136/670 in the State of Tamil Nadu NHAI/RO Chennai/IE/2019-20/14 15/11/2019 15/11/2019 19/12/2019
Time 11:0Hrs
564 Consultancy Services For Authority Engineer For Supervision of Four laning of Katni Bypass of National Highway – 7 (old) from km 359.500 to km 378.500 (length 20 km) in the State of Madhya Pradesh on EPC Mode NHAI/HQ/MP/KTN-30/Katni Bypass/AE/2019 20/11/2019 13/11/2019 30/12/2019
Time 11:0Hrs
565 Consultancy services for Authoritys Engineer for Supervision of Widening and Strengthening Reconstruction of existing pavement to 4 lane with PS from Km 266.348 to Km 283.000 of Mahabubnagar Jadcherla section of NH 167 in Telangana on EPC Basis SE R and B.NH.HYD.18.2019 20, dt. 24.10.2019 11/11/2019 11/11/2019 27/11/2019
Time 15:0Hrs
566 Independent Engineer services for Rehabilitation & Upgradation from 2 lane to 4 lane of NH stretch under Bharatmala Pariyojana for Unnao-Lalganj section of NH-232A on Hybrid Annuity Mode in the state of Uttar Pradesh & Design Chainage Km 0.000 to 70.000 45017/3/2019-UP(W) 22/11/2019 04/11/2019 02/01/2020
Time 11:0Hrs
-
567 Construction Supervision of 1.Saptagram-Tribeni-Kalna-Katwa STKK Rd 33.88To83km,Burdwan South Hway Divn,2.Bolgona-Guskara-Mankar Rd,5to18.15km,21.40To29.50Km,w and s,Burdwan North Hway Divn,3.STKK Rd 83To102.34km,Burdwan North Hway Divn.Govt of W.B. WBPW(R)D/NIB- 04 of SE/WHC-I/2019-2020 01/11/2019 01/11/2019 09/12/2019
Time 15:0Hrs
568 Consultancy services for Independent Engineer for supervision of four laning of Tumkur-Shivamogga section from Ch 170/415 Km to Ch 226/750 Km (Design Length-56-335 Km) Bettadahali-Shivamogga of NH-206 (Package-IV) in the state of Karnataka under Bharatmala Pariyojana on Hybrid Annuity Mode NHAI/IE/Tumkur-Shimoga/Pkg-IV/KNT/2019/2nd Call 01/11/2019 31/10/2019 16/12/2019
Time 11:0Hrs
569 Independent Engineer Services during Operation and Maintenance period for 4 laning of Patna-Bakhtiyarpur Section of NH-30 from Km 181.300 to Km 231.950 in the State of Bihar constructed under NHDP-III on BOT (Annuity) on DBFOT basis. 51/RO-PATNA/NHAI/2019-20 13/12/2019 31/10/2019 14/01/2020
Time 11:0Hrs
570 Independent Engineer (IE) services during Operation and Maintenance period of Six lanned section of Surat - Dahisar from Km 263.00 to Km 502.00 of NH-48 (old NH-8) in the state of Gujarat and Maharashtra on BOT Toll basis on DBFO Pattern NHAI/PIU SURAT EXPRESSWAY/SDM-10 25/10/2019 25/10/2019 19/02/2020
Time 11:0Hrs
-
571 SC for Supervision of Routine Maintenance IM Toll Operation SR PR of Chhindwara Amarwara Narsinghpur from Km87.10 to Km210.00 total lgth121.00km of NH547under O and M in the state of MP 2019 NHAI 34357 1 06/11/2019 22/10/2019 27/11/2019
Time 11:0Hrs
572 SC for Supervision of Routine Maintenance Incident Management/Toll Operation/SR/PR/Civil Works of Multai Chhindwara Seoni from Km 0/00 to Km 152/351 (total length 152.351km) of NH 347 under O and M in the state of MP 2019/NHAI/34361/1 06/11/2019 22/10/2019 27/11/2019
Time 11:0Hrs
573 SC for Supervision of Routine Maintenance IM Toll Operation SR PR ofSaoner Chhindwara from Km.0.00 to Km87.10 and Chhindwara Ring Road from Km0.00 to Km57.07 lgth 144.17km of NH547 under OandM in MP 2019/NHAI/34355/1 06/11/2019 22/10/2019 27/11/2019
Time 11:0Hrs
574 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF “Construction of 2-lane road of Potin to Pangin section of NH-13 (Package-A, Design chainage from Km 0.000 to Km 117.560) on EPC Mode in the State of Arunachal Pradesh under Arunachal Pradesh Package of Roads and Highways of SARDP-NE.” RW/NH/P-P/AE/01/2019-20/RO-lta 28/10/2019 18/10/2019 18/11/2019
Time 11:0Hrs
575 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF “Construction of 2-lane road of Potin to Pangin section of NH-13 (Package-B, Design chainage from Km 117.560 to Km 247.050) on EPC Mode in the State of Arunachal Pradesh under Arunachal Pradesh Package of Roads and Highways of SARDP-NE.” RW/NH/P-P/AE/02/2019-20/RO-lta 28/10/2019 18/10/2019 18/11/2019
Time 11:0Hrs
576 Consultancy Services for Authority’s Engineer for Supervision of Four Laning of existing 2 laning stretch from (a) Mohol at km 0.000 to Wakhri at km 44.700 (Design Length 44.700 km) (Pkg-I) (b) Wakhri at km 44.700 to Khudus at km 77.800 (Design Length 33.100 Km) (Pkg–II) and (c) Khudus at km 77.800 to Dharampuri at km 117.000 (Design Length 39.200 Km) (Pkg–III) sections of NH 965 (Mohol – Alandi Section) in the State of Maharashtra on EPC Mode NHAI/Tech/MH/AE/Moh-Wak-Khu-Dha/2019 28/10/2019 18/10/2019 18/11/2019
Time 11:0Hrs
-
577 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF “Construction of 2-lane road of Potin to Pangin section of NH-13 (Package-C, Design chainage from Km 247.050 to Km 351.383) on EPC Mode in the State of Arunachal Pradesh under Arunachal Pradesh Package of Roads and Highways of SARDP-NE.” RW/NH/P-P/AE/03/2019-20/RO-lta 28/10/2019 18/10/2019 18/11/2019
Time 11:0Hrs
578 Supervision Consultancy services for the construction of balance works of Bareilly-Sitapur section of NH-24 from Km 262.000 to Km 413.200 including balance works of ROB at Km 290.445 along with approaches in the state of Uttar Pradesh 45017/2/2019-UP(W) 18/10/2019 17/10/2019 23/12/2019
Time 11:0Hrs
579 Consultancy Services for Authority’s Engineer for Supervision of “Construction of (i) 2 laning of existing Hunli-Anini road on EPC basis from design km 21.5 to km 37.5 (ii) 2 laning of existing Hunli-Anini road on EPC basis from design km 37.5 to km 53.5 and (iii) 2 laning of existing Hunli-Anini road on EPC basis from design km 53.50 to km 92.500 in the state of Arunachal Pradesh under SARDP-NE.” NHIDCL/Ar. Pr./ Hunli -Anini (21.5 to 92.5)/AE/2019 21/10/2019 16/10/2019 05/11/2019
Time 15:0Hrs
580 Consultancy Services as Independent engineer during Operation & Maintenance and fee collection of 4 lane divided carriageway facility of Bijapur-Hungund Section of NH-13 (New NH-50) from Km. 102.000 to km. 202.000 in the State of Karnataka under NHDP Phase-III on DBFOT basis NIT No.07/NHAI/RO-BNG/16017/Tender/2019 dated 16.10.2019 18/10/2019 16/10/2019 28/11/2019
Time 15:0Hrs
581 CS for AE for 1 Ranipool to Pakyong from Km.0 to Km.16.167 of NH717 A 2. Chisopani Traffic Tunnel of Length 250 m from Km 67.08 to Km 67.5 on NH10 3. 48m Bridge over Chuba Khola from km 75.3 to km 75.8 on NH-10 on EPC Basis NHIDCL/AE/Sikkim/2019-20 16/10/2019 11/10/2019 20/11/2019
Time 15:0Hrs
582 Consultancy services for assisting Authoritys Engineer for Supervision of Widening and Strengthening Reconstruction of existing pavement to 4 lane with PS from Km 266.348 to 283.000 of Mahabubnagar Jadcherla section of NH167 in state of Telangana SE R and B.NH.HYD.15.2019-20 Dt 01.10.2019 15/10/2019 04/10/2019 19/10/2019
Time 15:0Hrs
583 Consultancy services for Authoritys Engi. (PMC) for Supervision of Rehabilitation and Up-gradation of Khutar-Lakhimpur Section Km82.000toKm140.000 of NH730 in District LakhimpurKheri in the state of UP on EPC Basis (Job No. NH-730-UP-2016-17-542). 4531/624C-NH Circle/19 (Vol-ii) Dated 23.09.2019 26/09/2019 30/09/2019 15/10/2019
Time 11:0Hrs
-
584 Consultancy services for Authority’s Engineer for Supervision of REHABILITATION AND UPGRADATION TO 2 LANE WITH PAVED SHOULDER FROM EXISTING KM. 195.175 TO KM. 220.000 (DESIGN CHAINAGE KM. 71.300 TO KM. 95.947) EXCLUDING EXISTING CHAINAGE KM 200.300 TO KM 202.400 (DESIGN CHAINAGE KM 76.400 TO KM 78.400) ON DHARASU TO YAMUNOTRI ROAD OF NH- 134 (OLD NH-94) IN THE STATE OF UTTARAKHAND ON EPC MODE NH-134-UR-2017-18-324(AE) dated 27.09.19 30/09/2019 30/09/2019 31/10/2019
Time 11:0Hrs
585 Consultancy services for Project Management Consultant for supervision of the work of Improvement of NH 60 from Km 330.00 to Km 350.00 & from Km 360.00 to Km 374.00 except the stretches from Km 337.703 to Km 339.046 (for Suri ROB) by way of strengthening of existing carriageway and laying of wearing course from Km 355.00 to Km 360.00 in the district of Birbhum, West Bengal under EPC mode (Job No. 060-WB-2018-19-433). 2/2019-20 of SENHC-II 25/09/2019 30/09/2019 13/11/2019
Time 17:0Hrs
586 Appointment of Independent Engineer Services during O&M period for 4 laning of Kurali-Kiratpur Section of NH-21 (New NH-205) from Km 28.6000 to Km 71.500 in the state of Punjab on DBFOT Basis under NHDP – Phase-III PD-MHL/KUR-KIR/NH-205/O&M/IE/RFP 22/10/2019 23/09/2019 07/11/2019
Time 11:0Hrs
-
587 Consultancy Services for Authority Engineer for Supervision of Construction of Flyover Rotary and Underpass at Tribune Chowk on NH 05 in the UT of Chandigarh on EPC Mode. CP1/2019/RFP-1/A.E. 26/09/2019 19/09/2019 15/10/2019
Time 11:0Hrs
588 Consultancy services for Authority Engineer for Supervision 4 laning and up-gradation of Bathinda at design Ch. 0 (existing Km 123) to Malout intersection at design Ch.38 (existing Km 84) section of NH-07 in the state of Punjab under Bharatmala Pariyojana on EPC mode 2019-NHAI-32497-1 23/09/2019 19/09/2019 31/10/2019
Time 11:0Hrs
589 Construction of Amethi bypass on NH-931 from Design Chainage 0 000 km Existing km 30 050 to Design Chainage 6 346 km Existing km 35 650) of Amethi City in the State of Uttar Pradesh on EPC basis (Job No. NH-931-UP-2018-19-568,dated 27.02.2019) 4233/1 YATA-NH CIRCLE/2019 19/09/2019 19/09/2019 28/09/2019
Time 11:0Hrs
590 Authority Engineer for supervision of Balance Work for Four laning of Kiratpur to Nerchowk section of NH-21 (from Km 0 to Km 12.750 & Km 158.500 to Km 182.215 excluding Sunder Nagar Bypass) (Pkg-1) in the State of Punjab & Himachal Pradesh NHAI/11016/9/2019/Balance Work K-N/AE/Pkg-1 20/09/2019 19/09/2019 04/11/2019
Time 11:0Hrs
591 Consultancy Services as Independent Engineer during Operation & Maintenance of four lane divided carriageway facility of Belgaum-Maharashtra Border section from Km.515.000 to Km.592.240 of NH-4 in the State of Karnataka on BOT (Annuity) basis through a Concessionaire NIT No.05/NHAI/RO-BNG/14022/Tender/2019 dated 18.09.2019 20/09/2019 18/09/2019 04/11/2019
Time 15:0Hrs
592 SC for Balance work Km 0.00 to 3.00 3.00 to 100.370 100.370 to 100.757 107.350 to 125.300 with OM of PCOD Sec 3.00 to 100.37 incl Civil Works SR PR Routine Maintenance Incident Management Toll Operation on 4 Lane of Gwalior Shivpuri sec of NH3 in MP NHAI/ROMP/SC/GwlShiv./2019 26/09/2019 17/09/2019 24/10/2019
Time 11:0Hrs
593 Appointment of Independent Engineer Services during Operation & Maintenance stage of 4 Laning of Rohtak-Panipat section of NH-71A from km. 0.000 (km 63.300 of NH-10) to km. 80.858 (km. 83.500 of NH-1) in the state of Haryana under NHDP Phase-III on DBFOT basis NHAI/RO/CHD/11011/PD-RTK/RTK-PANI/IE/RFP-2nd call 12/09/2019 12/09/2019 30/10/2019
Time 11:0Hrs
594 Engagement of Road Safety Expert (RSE) for NHAI NHAI/RSC/2019/Road Safety Expert 15/10/2019 11/09/2019 04/11/2019
Time 11:0Hrs
595 Independent Engineer Services during Operation & Maintenance period for six laning of Krishnagiri – Walajahpet section of NH-48 (Old NH-46) from km.0/000 to km.148/300 in the State of Tamil Nadu Under NHDP Phase-V executed as BOT (Toll) under DBFO Pattern. NHAI/RO Chennai/SC/2019-20/09 19/09/2019 10/09/2019 10/10/2019
Time 11:0Hrs
596 Supervision Consultancy Services for Balance work of Four laning of Muzaffarnagar-Haridwar section of NH-58. 11021/NHAI/TECH/UKD/SC/MH-2019 12/09/2019 09/09/2019 09/10/2019
Time 11:0Hrs
597 Independent Engineer Services during Operation and Maintenance period for Four laning of Lucknow Sultanpur Section of NH-56 (New NH-731) from Km. 11.500 (Design Chainage Km.11.500) to Km.134.700 (Design Chainage Km. 138.925) NHDP Phase-IV on Hybrid Annuity Mode in the State of UP NHAI/RO-UP(E)/NH-56/IE/2019-20/04 05/09/2019 05/09/2019 19/09/2019
Time 11:0Hrs
598 Independent Engineer Services during Operation and Maintenance Period of Bikaner Phalodi section Four Lane from Km. 7.200 to Km. 55.250 and 2 lane with paved shoulders from Km. 55.250 to km. 163.500 of NH 15 on BOT (Toll) basis in the State of Rajasthan NHAI/12026/3/2019-Tender /IE-BP/39 01/10/2019 04/09/2019 05/11/2019
Time 11:0Hrs
599 Appointment of Independent Engineer Services during operation & maintenance stage of four laning Zirakpur-Parwanoo Section of NH-5 (Old NH-22) 2nd call NHAI/RO/CHD/11011/PD-CHD/ZRK-PAR/NH-22 /IE/RFP 03/09/2019 03/09/2019 21/10/2019
Time 11:0Hrs
600 Independent Engineer Services during Operation & Maintenance period for “4 laned Rohtak-Bawal Section of NH-71 from Km.363.300 (Design Km.363.000) to Km.450.800 (Design Km.445.853) under NHDP III in the state of Haryana on Design, Build, Finance, Operate and Transfer (DBFOT) basis. NHAI/RO/CHD/11011/PD-RTK/RTK-BWL/NH-71/RFP 02/09/2019 02/09/2019 17/10/2019
Time 11:0Hrs
601 Consultancy Services of Supervision Consultant (SC) for Operation & Maintenance of Ennore Expressway, Manali Oil Refinery Road, Thiruvottiyur – Ponneri - Panchetty Road and Inner Ring Road in the State of Tamil Nadu CEPRCL/RO Chennai/SC/2019-20/06 03/09/2019 30/08/2019 24/09/2019
Time 11:0Hrs
602 Independent Engineer Services during Operation & Maintenance stage of 4-laned divided carriageway from Km.175.000 (Maharashtra / Telangana Border) to Km.308.000 (Armur) (Contract Package Nos.NS-2/BOT/AP-6, AP-7 & AP-8) on Nagpur – Hyderabad Section of NH-44 (Old NH-7) in the State of Telangana on BOT (Annuity) Basis under North – South Corridor (NHDP Phase-II). 31172 23/09/2019 29/08/2019 23/11/2019
Time 11:0Hrs
603 JHANSI-LALITPUR SECTION NHAI/PIU/JHANSI/IC/18-19/575 28/08/2019 27/08/2019 05/11/2019
Time 11:0Hrs
604 Independent Engineer Services during Operation & Maintenance period for Karur – Dindigul section of NH-7 from Km. 292.000 to Km.373.725 and Dindigul – Samayanallur section of NH-7 from Km. 373.725 to Km. 426.775 in the State of Tamil Nadu NHAI/17012/02/05/2019/ROMadurai 17/09/2019 23/08/2019 09/10/2019
Time 12:0Hrs
605 Supervision Consultancy (SC) Services for O and M stage of Two lane with paved shoulder of Karauli Dholpur section of NH 11B from Km. 83.960 to km. 184.460 (total length 100.900 km) on EPC mode in the State of Rajasthan NHAI/12019/3/2019/SC-KD /31 05/09/2019 20/08/2019 07/11/2019
Time 11:0Hrs
606 Supervision Consultancy Services for O and M stage of 2 lane with paved shoulder of Bheem Parasoli Gulabpura section of NH 148D from Km. 0.000 to km. 69.267 (Length 69.267 km) (including Bheem and Parasoli bypass) and Lambia Raipur section of NH 458 NHAI/12012/3/Tech/tender-AE/27 14/08/2019 16/08/2019 03/10/2019
Time 11:0Hrs
607 Independent Engineer Services during Operation and maintenance stage of 4/6 laning of Agra -Bhartpur BOT project from km 17.756 to km 62.295 of NH -11(New NH-21) under NHDP phase –III A in the state of Uttar Pradesh & Rajasthan. NHAI/12019/3/2018-ROJ/Tech/IE-AB/23 09/08/2019 10/08/2019 25/09/2019
Time 11:0Hrs
608 Independent Engineer Services during Operation and maintenance stage of 4/6 laning of Bharatpur- Mahua Section BOT project from km 63.000 to Km 120.000 of NH -11 (New NH-21) under NHDP phase –III A in the state of Rajasthan. NHAI/12019/3/2018-ROJ/Tech/IE-BM/22 09/08/2019 10/08/2019 25/09/2019
Time 11:0Hrs
609 Independent Engineer Services during Operation & maintenance stage of 4/6 laning of Mahua-Jaipur Section BOT project from km 120.000 to km 228 of NH of NH -11(New NH-21) under NHDP phase under NHDP phase –III A in the state of Rajasthan NHAI/12019/3/2018-ROJ/Tech/IE-MJ/24 09/08/2019 10/08/2019 25/09/2019
Time 11:0Hrs
610 Consultancy Services for Authority’s Engineer for Supervision of “Improvement/Widening to 2 Laning of Stretch from Khongsang to Tamenglong (Design Length=37.97 Km) of NH-137 in the State of Manipur on EPC Mode under SARDP-NE” NHIDCL/Manipur/AE/K-T (NH-137)/2018-2019 14/08/2019 09/08/2019 09/10/2019
Time 15:0Hrs
611 Independent Engineer Services during Operation and Maintenance Period of 4 or 6 laning of Jaipur Reengus BOT Project from Km. 246.300 to Km. 298.075 ofNH 11 (New NH52) in the State of Rajasthan NHAI/12019/3/2019/IE/JR/21 09/08/2019 09/08/2019 25/09/2019
Time 11:0Hrs
612 Consultancy services for Authority’s Engineer for supervision of Design and Construction of Flyover and junction development at Tatibandh Chowk at km 281.700 on Raipur-Aurang section of NH-06 (New NH-53) in the State of Chhattisgarh as a standalone project on EPC Mode 2019-NHAI-30176-1 04/09/2019 09/08/2019 30/09/2019
Time 11:0Hrs
-
613 Consultancy Services as Independent Engineer Services during Operation & Maintenance Period for Two laning with paved shoulders of Kanpur to Kabrai Section of NH-86 from Km.7.430 to Km.130.100 in the State of Uttar Pradesh on Design, Build, Finance, Operate and Transfer (DBFOT) on Toll Basis under NHDP-Phase-IV-A 01/NHAI/RO-LKO(West)/17017/NH-86/Tender/2019 20/08/2019 08/08/2019 24/09/2019
Time 13:0Hrs
614 Consultancy Services for Authority’s Engineer for Supervision of “Construction of (i) 2 laning of existing Hunli-Anini road on EPC basis from design km 21.50 to km 37.50 (ii) 2 laning of existing Hunli-Anini road on EPC basis from design km 37.50 to km 53.50 and (iii) 2 laning of existing Hunli-Anini road on EPC basis from design km 53.50 to km 92.500 in the state of Arunachal Pradesh under SARDP-NE.” NHIDCL/Ar. Pr./Hunli-Anini(21.5 to 92.50)/AE/2019 08/08/2019 07/08/2019 28/08/2019
Time 15:0Hrs
615 AE for Rehabilitation and upgradation of R-D rd NH-94 from design chainage (DC) km 107.347 to km 129.208 and km 133.878 to km 138.570 including land slide treatment at DC km 134.970 and Chinyalisour bypass of length 4.316 km on Rishikesh - Dharasu road in Uttarakhand 85008/AE/Km 110-142 and Chinyalisour Bypass/EPC 10/07/2019 06/08/2019 20/08/2019
Time 15:0Hrs
616 Consultancy Services for Authority Engineer for Supervision of Construction of Flyover Rotary and Underpass at Tribune Chowk on NH 05 in the UT of Chandigarh on EPC Mode. CP1/019/RFP-1/A.E. 05/08/2019 05/08/2019 17/09/2019
Time 11:0Hrs
617 Supervision Consultancy Services for construction supervision of Balance work of 4 laning of Patna Gaya Dobhi Section from km 0.000 to km 127.217 of NH 83 in the State of Bihar under Japanese ODA Loans. NHAI/BH/ NH-83/ JICA /Proc./ SC 31/07/2019 30/07/2019 19/11/2019
Time 11:0Hrs
618 Sample Nhai/Sample 22/07/2019 24/07/2019 26/08/2019
Time 11:0Hrs
-
619 Consultancy services for Authoritys Engineer for supervision of Rehabilitation and up gradation to 4-Lane with Paved Shoulder for Ambala to Saha Section from km.0.000 to km.14.840 of NH-444 A in the state of Haryana (Package-1) under Bharatmala Pariyojna on EPC Basis. NHAI/RO/CHD/11091/PD-AMB/AMABALA-SAHA/PKG-1 01/08/2019 23/07/2019 26/09/2019
Time 16:0Hrs
620 Independent Engineer Services during Operation & Maintenance stage of Four laning of Panikoili-Keonjhar-Rimuli section of NH-20 (old NH-215) from Km.0.000 to Km. 163.000 (Design Chainage Km 0.000 to Km166.173) BOT project under NHDP Phase-III in the State of Odisha 13012/11/RO-OD/2019 09/08/2019 23/07/2019 03/09/2019
Time 11:0Hrs
621 Consultancy Services for Supervision Consultant (SC) Services for Operation and Maintenance of Km 040.000 to Km127.000 of Udali to Maibong section of NH-27 (NH-54 E) & Consultancy services to AS-25 package under DLP in the State of Assam NHAI/Tender/NGN/2019/GrpI 19/08/2019 23/07/2019 11/09/2019
Time 11:0Hrs
-
622 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF CONSTRUCTION OF 4 LANE SIGNATURE BRIDGE (900M LONG CENTRAL CABLE STAYED MODULE) CONNECTING MISSING LINK BETWEEN OKHA AND BEYT DWARKA INCLUDING CONSTRUCTION OF APPROACHES ON NEW NATIONAL HIGHWAY NO.NH -51IN THE STATE OF GUJARATON EPC. RW/NH/2014/Gujarat(02)/2017/S and R(B) Part-1 24/05/2019 22/07/2019 05/08/2019
Time 11:0Hrs
623 Consultancy Services for Supervision Consultant (SC) Services for Operation and Maintenance of Km 5.500 to Km 37.970 & Km. 0.000 to Km. 40.000 of Nagaon to Udali section of NH-27 (Old NH-36,Old NH-54,Old NH-54E) in the State of Assam NHAI/Tender/NGN/2019/GrpII 19/08/2019 19/07/2019 11/09/2019
Time 11:0Hrs
-
624 Consultancy Services for Supervision Consultant (SC) Services for Operation and Maintenance of Km 205.000 to Km 278.685 of Jagiroad to Nagaon section of NH-27 (Old NH-37) in the State of Assam NHAI/Tender/NGN/2019/GrpIII 19/08/2019 19/07/2019 11/09/2019
Time 11:0Hrs
-
625 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF CONSTRUCTION OF 4 LANE FLYOVER AT AMBERPET X ROAD IN HYDERABAD ON NH 163 OLD NO 202 AND CONSTRUCTION OF SIX LANE UPPAL ELEVATED CORRIDOR FROM KM 7.950 TO KM 14.200 OF NH 163 TO DE CONGEST IN THE URBAN LIMITS OF HYDERABAD TO BHOPALPATNAM SECTION IN THE STATE OF TELANGANA ON EPC BASIS CONTRACT RW/NH-12014/06/2017-TS/P7 22/07/2019 17/07/2019 03/09/2019
Time 16:0Hrs
626 Independent Engineer Services during Operation & Maintenance period for 4 laned dual carriageway from Km.407.100 to Km.456.100 of NH-1 (Jalandhar-Amritsar Section) in the state of Punjab on Build, Operate and Transfer (BOT) basis NHAI/RO/CHD/11011/PD-JAL/JAL-ASR/NH-1 02/08/2019 16/07/2019 03/09/2019
Time 11:0Hrs
627 Construction and up-gradation of existing road to 2-lane with paved shoulders from existing chainage Km 491.600 to Km 504.371 (design chainage from Km 473.675 to Km 486.060) excluding Govindghat-II landslide location (design chainage Km 479.925 to Km 480.075 and Govindghat-III landslide location (design chainage Km 481.788 to Km 481.938 And from existing chainage Km 509.725 to Km 528.000 (design chainage Km 490.550 to Km 507.850) of NH-58 (new NH-07) in EPC mode in Uttarakhand 85027/RJM Rd/Auth Engg/5B 5D/EPC Cell 15/06/2019 10/07/2019 30/07/2019
Time 13:0Hrs
628 Title Independent Engineer Services during Operation and maintenance state of 4 or 6 laning of Bharatpur Mahua BOT project from km 63.000 to km 120.00 of NH 21 (old NH 11) under NHDP phase III A in the state of Rajasthan 23011/19/PIU/DAU/DSL /IE-BM/02 05/07/2019 06/07/2019 05/08/2019
Time 11:0Hrs
629 Independent Engineer Services for the work of Operation & Maintenance stage of 4/6 laning of Mahua- Jaipur BOT project from km. 120 to km.228 of NH21(OLD NH-11) under NHDP Phase –IIIA in the state of Rajasthan. 23011/19/PIU/DAU/DSL /IE-JM/03 27/07/2019 06/07/2019 05/08/2019
Time 11:0Hrs
630 Independent Engineer Services during Operation and maintenance state of 4/6 laning of Agra Bhartpur BOT project from km 17.756 to km 62.295 of NH -21 old 11 under NHDP phase III A in the state of Rajasthan 23011/19/PIU/DAU/DSL /IE-AB/01 31/07/2019 06/07/2019 05/08/2019
Time 11:0Hrs
631 Authority Engineer Services during Operation and Maintenance two lane with paved shoulder of Karauli Dholpur section of NH 11B from Km 83.960 to Km 184.460 in the State of Rajasthan under NHDP Phase IV on EPC Mode 23011/19/PIU/DAU/DSL /IE-KD/04 31/07/2019 06/07/2019 05/08/2019
Time 11:0Hrs
632 Independent Engineer Services during Operation & Maintenance stage of 4-laned Ambala-Chandigarh Section (i) from km. 5.735 to km. 39.960 of NH-22 & (ii) from Km. 0.000 to Km. 0.871of NH-21 in the State of Haryana & Punjab on BOT basis under NHDP-Phase-III-RFP NHAI/RO/CHD/11011/PD-MHL/AMB-ZKP/NH-22&21/RFP 02/08/2019 01/07/2019 09/09/2019
Time 17:0Hrs
633 Consultancy services for Authority’s Engineer/Project Management Consultancy (PMC) for Supervision of Rehabilitation and Up-gradation of Khutar-Lakhimpur Section Km 82.000 to Km 140.000 of NH-730 in District Lakhimpur-Kheri in the state of Uttar Pradesh on EPC Basis 2960/624C NH CIRCLE/19 (vol ii) DATED 21/06/2019 29/06/2019 22/06/2019 23/07/2019
Time 11:0Hrs
634 Consultancy services for Authoritys Engineer/Project Management Consultancy (PMC) for Supervision of Rehabilitation and Up-gradation of Khutar-Lakhimpur Section Km 82.000 to Km 140.000 of NH-730 in District Lakhimpur-Kheri in the state of Uttar Pradesh on EPC Basis 2960/624C NHCIRCLE/19(vol ii) DATED 21/06/2019 22/06/2019 22/06/2019 23/06/2019
Time 11:0Hrs
635 Consultancy Services as Independent Engineer during Operation and Maintenance Period for Six laning of Belgaum-Dharwad Section of NH-4 from Km. 433.00 to Km. 515.00 (Length – 79.36 Km.) in the State of Karnataka to be executed as BOT (Toll) on DBFO Pattern under NHDP Phase-V NIT No. 02/ NHAI/RO-BNG/14021/Tender/2019 Dated 18.06.2019 19/06/2019 18/06/2019 30/07/2019
Time 15:0Hrs
636 Consultancy Services for Authority s Engineer for Up gradation of newly declared NH-341 to two-lane with Paved shoulder configuration between Km. 65.478 to Km 162.209 Bhuj Airport Jn - Khavda - India Bridge to Dharmshala section in the State of Gujarat 04AE of 2019-20 26/06/2019 17/06/2019 08/08/2019
Time 14:0Hrs
637 Consultancy services for Authority’s Engineer for Supervision of Construction of Grade Separated 4 lane U-Turns on NH-8 near Ambience Mall at Km 24 and 3 lane U Turn near DLF Phase-II, at Km 26.120 in Gurugram in the State of Haryana on EPC Basis. NHAI/Tech/Del/U Turn/2019 20/06/2019 14/06/2019 15/07/2019
Time 11:0Hrs
638 Consultancy Services for Authoritys Engineer for Four laning with paved shoulder from Meerut to after bridge over river Yamuna, Haryana via Shamli from km 0000 to 88476 of NH 709A (0 at Meerut on ch. 67550 of NH 58) in the State of Uttar Pradesh on EPC mode NHAI/UP/2018-19/709A/MK /AE 12/06/2019 12/06/2019 25/06/2019
Time 11:0Hrs
639 Consultancy Services for Authority’s Engineer (AE) for the work of “Widening and Strengthening from (i) 2-lane to 2lane with paved shoulder from km 0/550-1/100, 5/700-21/070, 21/500-34/200 and 34/870-38/000 and (ii) Strengthening of existing 4lane from Km 0/000-0/550, 1/100-1/780, 2/420-5/700, 21/070-21/500, 34/200-34/870 and 2 lane from km 1/780- 2/420 (Dindigul- Natham section) of NH383 in the State of Tamil Nadu” EPC mode TN No. 01/2019/DO/NH/ dated 04.06.2019 11/06/2019 04/06/2019 21/06/2019
Time 15:0Hrs
640 Supervision Consultancy Services for construction of Balance work of 4 laning of Haridwar –Dehradun section of NH 58 from km 211 to km 218.20 and of NH72 from km 165 to km 196.825 in the State of Uttarakhand under NHDP Phase III. NHAI/H-D/Sup.Con/1/UKD/2019 07/06/2019 01/06/2019 09/07/2019
Time 11:0Hrs
641 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF CONSTRUCTION OF EMERGENCY LANDING FACILITY FROM KM 246.200 TO KM 249.700 (DESIGN LENGTH 3.5 KM) ON SRINAGAR-BANIHAL SECTION OF NH 1A (NEW NH-44) IN THE STATE OF JAMMU - KASHMIR ON EPC MODE. NHAI/2019/AE(Srinagar-Banihal) 31/05/2019 30/05/2019 19/09/2019
Time 11:0Hrs
642 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF UPGRADATION TO 2 LANE WITH PAVED SHOULDER ALONG WITH SERVICE ROAD (IN PART LENGTH) FROM KM 92/400 TO KM 127/350 OFNH-248-A (ALWAR - NUH SECTION) IN THE STATE OF RAJASTHAN ON EPC MODE NIT 01/2019-20 EE PWD NH Dn-I, Jaipur 18/06/2019 30/05/2019 16/07/2019
Time 11:0Hrs
643 Independent Engineer Services during Operation & Maintenance (O&M ) for Conversion of Delhi- Gurgaon section of NH-8 into an Access Controlled Eight/Six lane Highway from km 14.300 (Rao Tula Ram Marg) to km. 42.00 Gurgaon ) in the state of delhi & haryana. NHAI/GM(T)/Del-Gur/NH-8/IC/79/2019 13/06/2019 29/05/2019 03/07/2019
Time 11:0Hrs
644 Independent Engineer (IE) services during Operation and Maintenance (O & M) period for four laning of Pune – Solapur section of NH-65 from Km 40.000 to Km. 150.050 in the State of Maharashtra under NHDP Phase - III on DBFOT basis NHAI/RO/MUm/PUNE/PkgI/IE/01 29/05/2019 29/05/2019 26/07/2019
Time 11:0Hrs
645 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF Construction of Dwarka Expressway Package-I, from Shiv Murti Intersection at Km 20 of NH 8 till Road under Bridge (RuB) NEAR Dwarka Sector 21 (from km -0.800 to 5.3) in the state of Delhi ON EPC NHAI/Tech/DE/Package-I/AE/2019 29/05/2019 28/05/2019 29/07/2019
Time 11:0Hrs
646 Consultancy Services for Authority Engineer for Supervision of Construction of missing links in Lakhpat gaduli Hajipur Odma Khavda Dholavira Mauvana Gadkabet Santalpur in the State of Gujarat on EPC RW/GNR/WORKS/554/GJ/2018/2 27/05/2019 27/05/2019 16/07/2019
Time 11:0Hrs
647 Independent Engineer Services during Operation & Maintenance stage of 4-laned divided carriageway from Km.367.000 (Adloor Yellareddy) to Km.464.000 (Gundla Pochanpalli) (Contract Package No.NS-2/BOT/AP-2) on Nagpur – Hyderabad Section of NH-44 (Old NH-7) in the State of Telangana on BOT (Annuity) Basis under North – South Corridor (NHDP Phase-II) and additional highway from Km.464.000 (Gundla Pochanpalli) to Km.474.000 (Bowenpalli)-AP-2 26561 27/06/2019 25/05/2019 09/07/2019
Time 10:0Hrs
648 CONSULTANCY SERVICES FOR AE FOR SUPERVISION OF Approaches to Rail Cum road Bridge across River Ganga at Munger Ghat from Km 0.00 (km 74.7 of NH-80) to km 9.394 and km 0.075 to km 5.198 (km 262.8 of NH-31) in Bihar on EPC Mode NHAI/BH/ Munger Ghat/AE/2019 24/05/2019 24/05/2019 15/07/2019
Time 11:0Hrs
-
649 Re-Tender (Third Call) for Consultancy Services for Authority’s Engineer for Supervision of Construction of Two Tunnels of Length 0.475 km and 1.79 km at Sela Pass along with Approach Roads of Length 9.775 km on Balipara-Chardwar-Tawang (BCT) road of NHDL Specifications in West Kameng and Tawang Districts of Arunachal Pradesh under Project Vartak on Engineering, Procurement &Construction (EPC) mode CE (P) VTK-14 of 2018-19 (Third Call) 22/05/2019 24/05/2019 20/06/2019
Time 17:0Hrs
650 abc nhai//20 23/05/2019 24/05/2019 18/06/2019
Time 15:0Hrs
651 Rehabilitation and Upgradation to two lane with paved shoulder of Moga-Makhu & Harike to Khalra from Km. 0.00 to 33.611 & 44.680 to 86.236 including construction of ROBs on NH 703-B on EPC mode in the State of Punjab. 96/EE/CWD/FZR 24/05/2019 23/05/2019 10/07/2019
Time 11:30Hrs
-
652 Consultancy Services as Independent Engineer during Operation and Maintenance Period for Four laning of Mulbagal-AP/KNT Border Section of NH-75 (old No. NH-4) from Km. 216.912 to Km. 239.100 in the State of Karnataka on DBFOT Pattern under NHDP Phase-III NIT No. 01/ NHAI/RO-BNG/11023/Tender/2019 Dated 21.05.2019 29/05/2019 21/05/2019 04/07/2019
Time 15:0Hrs
653 Independent Engineer Services during Operation & Maintenance period for Madurai – Aruppukottai-Thoothukudi section of NH-45B from Km 138/800 to Km 266/865 in the State of Tamil Nadu under NHDP Phase-IIIA NHAI/17011/02/04/ROMadurai 09/05/2019 09/05/2019 07/06/2019
Time 17:0Hrs
654 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR (i) CONSTRUCTION OF HIGH LEVEL RCC MAJOR BRIDGE AT KM. 89 (AKLERA) ON PARWAN ALONG WITH APPROACHES AND OTHER STRUCTURE ON NH-752 BARAN-AKLERA ROAD IN THE STATE OF RAJASTHAN. (II) CONSTRUCTION OF HIGH LEVEL BRIDGE ACROSS RIVER LAHASI IN KM. 63 INCLUDING APPROACHES ON NH-752 BARAN-AKLERA ROAD IN THE STATE OF RAJASTHAN ON EPC MODE NITNO-10-2018-19 02/06/2019 08/05/2019 02/07/2019
Time 11:0Hrs
655 Independent Engineer services for Four Laning of Sinnar to Shirdi section of NH 160 from Design Ch km 0/000 to km 50/943 (including Sinnar Bypass) in the State of Maharashtra on Hybrid Annuity Mode NHAI/Tech/MH/IE/Sinnar – Shirdi/ 2019 20/05/2019 30/04/2019 29/05/2019
Time 11:0Hrs
656 Consultancy services for AUHORITY ENGINEER / PMC for Supervision of construction of four lane flyover including RE wall, service lane, at grade road and improvement of junctions at km. 2.500 on NH-24A in the state of Uttar Pradesh on EPC Basis 2099/710/C(1)-NH CIRCLE/19 DATE 29.04.2019 30/04/2019 30/04/2019 30/05/2019
Time 11:0Hrs
657 Supervision Consultancy Services for construction supervision of Balance work of 4 -laning of Ranchi –Rargaon –Mahulia section from km 114.000 to km 277.500 of NH-33 in the State of Jharkhand. NHAI/JH/SC/RRJ/NH-33/2019 25/05/2019 30/04/2019 20/06/2019
Time 11:0Hrs
658 Independent Engineer Services during Operation and Maintenance of Edappally-Vyttila-Aroor Section of NH-66 from Ch Km 342.000 to Ch Km 358.750 on OMT basis in the State of Kerala (Package OMT 23)-2nd call PIUCHNOMTIE2019-20/01 26/04/2019 26/04/2019 27/05/2019
Time 11:0Hrs
-
659 Consultancy services for Authoritys Engineer for Supervision of Four Laning of (a) Medshi to Washim Section (Package- II) from Km 47.700 to Km 92.200 (Design Chainage) (b) Washim to Pangare Section (Package- III) from Km 92.200 to Km 134.500 (Design Chainage) of NH-161 in the State of Maharashtra ON EPC Basis NHAI/Tech/MH/AE/Med –Wash - Pang/2018(3rd call) 10/04/2019 15/03/2019 29/04/2019
Time 11:0Hrs
660 CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF Four Laning of (a) Warora Wani section of NH – 930 from km 313.850 to km 332.160 (b) Nagpur-Umred section from km 7.300 to km 48.400 (package-1) of NH-353D and (c) Saoner - Dhapewada –Kalmeshwar - Gondkhairi, NH-547E, package – II from km 4.700 to km 33.575 in the state of Maharashtra on EPC Basis NHAI/Tech/MH/AE/ WW NU SDKG/2019 10/04/2019 15/03/2019 29/04/2019
Time 11:0Hrs
661 Consultancy services for Authority Engineer for Improvement and upgradation to two lane with paved shoulder/four lane configuration of National Highway No. 321 – G section from Agra to Jalesar design chainage from Km 0.00 to 36.00 in the state of Uttar Pradesh on Engineering, Procurement & Construction mode NHAI/UP/2018- 19/709A/AJ/AE 18/03/2019 09/03/2019 18/02/2020
Time 11:0Hrs
662 Independent Engineer Services during Operation & Maintenance period for Madurai – Aruppukottai-Thoothukudi section of NH-45B from Km 138/800 to Km 266/865 in the State of Tamil Nadu under NHDP Phase-IIIA NHAI/17011/02/03/ROMadurai 09/03/2019 09/03/2019 22/04/2019
Time 17:0Hrs
663 Consultancy Services for Authority’s Engineer for Widening and Strengthening for improvement and upgradation of NH709A Garhmukteshwar (Chainage-83.200 of NH24) to Meerut (Chainage 9.860 of NH-235) including connector to NH-119 Package XII in Uttar Pradesh NHAI/UP/2018-19/709A/GM/AE 13/03/2019 09/03/2019 02/01/2020
Time 11:0Hrs
664 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF CONSTRUCTION OF EXTRA-DOSED MAJOR BRIDGE ACROSS SHARAVATHI BACKWATERS AND APPROACHES BETWEEN AMBARGODU AND KALASAVALLI OF NH-369E IN THE STATE OF KARNATAKA (JOB NO. NH-369E-KNT-2018-19-895) ON EPC MODE NH-369E-KNT-2018-19-895-AE 24/04/2019 09/03/2019 24/06/2019
Time 15:0Hrs
665 4-laning of Jind - Gohana (Pkg-1) Section (Greenfield Alignment) from km 0.000 to km 40.601 (Length 40.601 km) of NH-352A in the State of Haryana under Bharatmala Pariyojna under NH(O) on Hybrid Annuity Mode NHAI/11012/NH-352A/JG(GFA)/HR/IE/2019 08/05/2019 08/03/2019 10/06/2019
Time 11:0Hrs
-
666 4-laning of Gohana–Sonepat (Pkg-2) Section from km 40.601 to km 78.837(length 38.236 km) of NH-352A in the state of Haryana under Bharatmala Pariyojana under NH(O) to be implemented on Hybrid Annuity Mode (HAM) NHAI/11012/NH-352A/GS/HR/IE/2019 08/05/2019 08/03/2019 30/05/2019
Time 11:0Hrs
-
667 Consultancy Services for Authority Engineer for Supervision of 2 laning from Potin to Pangin(Package-A, Km 0.000 to Km 117.560) on NH-13 in Arunachal Pradesh on EPC mode. RW/NH/P-P/AE/01/2018-19/RO-Ita 08/03/2019 08/03/2019 06/05/2019
Time 11:0Hrs
668 Consultancy Services for Independent Engineer services for Six laning of Proposed Chilakaluripet Bypass on NH 16 (Old NH 05) from Km 357.400 to Km 371.920 (Bypass Length – 16.384 Kms) on Hybrid Annuity Mode in the State of Andhra Pradesh under Bharatmala Pariyojna NHAI/Tech/AP/NH-16/Chlkpt Bypass/2018-19 08/03/2019 08/03/2019 23/04/2019
Time 15:0Hrs
-
669 Supervision Consultancy Services for construction supervision of Balance work of Two Laning with paved shoulder of Tindivanam Krishnagiri Section of NH-66 from Km 37.600 to Km 219.782 under NHDP Phase-III in the State of Tamil Nadu on Item Rate Contract NHAI/11019/T K/IR/2018 16/04/2019 08/03/2019 13/05/2019
Time 11:0Hrs
670 Consultancy Services for Authority Engineer for Supervision of 2 laning from Potin to Pangin(Package-B, Km 117.560 to Km 247.050) on NH-13 in Arunachal Pradesh on EPC mode. RW/NH/P-P/AE/02/2018-19/RO-Ita 14/03/2019 08/03/2019 06/05/2019
Time 11:0Hrs
671 Consultancy Services for Authority Engineer for Supervision of 2 laning from Potin to Pangin(Package-C, Km 247.050 to Km 351.383) on NH-13 in Arunachal Pradesh on EPC mode. RW/NH/P-P/AE/03/2018-19/RO-Ita 14/03/2019 08/03/2019 06/05/2019
Time 11:0Hrs
672 Independent Engineer Services for Four laning of Mamallapuram to Mugaiyur Section of NH-332A from Km.0.000 to Km 31.000 (Design Chainage) under BharatmalaPariyojana Phase-I (Feeder Routes) on Hybrid Annuity Mode in the State of Tamil Nadu. NHAI/11021/HAM/MM/TN/P1/IE 26/03/2019 08/03/2019 22/03/2019
Time 11:0Hrs
673 Independent Engineer Services for Four Laning of Neraluru - Thorapalli Agraharam section of NH-844 from Km 0.000 to Km 23.350 (Design Chainage) under Bharatmala Pariyojana, Phase I (National Corridor) on Hybrid Annuity Mode in the States of Karnataka & Tamil Nadu (Package-I of Hosur-Dharmapuri Section). NHAI/11024/NT/HAM/P1/IE 26/03/2019 08/03/2019 06/12/2021
Time 11:0Hrs
674 Supervision Consultancy Services for construction supervision of Balance work of Two laning with paved shoulder of Dindigul – Theni section from Km 2.750 to Km 73.400 of NH-45 (Extn.) and Theni - Kumili section of NH-220 from Km 215.500 to Km 273.600 in the State of Tamil Nadu under item rate contract NHAI/11012/DTK/SC/03/2019 29/03/2019 07/03/2019 27/05/2019
Time 11:0Hrs
675 Independent Engineer services (i) 4-laning of Aligarh-Kanpur section from Km 289.000 (Design chainage 302.108) to Km 356.000 (Design chainage 373.085) (Package-IV from Naviganj - Mitrasen) of NH-91 in the State of Uttar Pradesh on Hybrid Annuity mode under Bharatmala Pariyojana (ii) 4 laning of Aligarh-Kanpur section from Km 356.000 (Design chainage 373.085) to Km 414.000 (Design chainage 433.728 (Package-V from Mitrasen-Kanpur) of NH-91 in the state of Uttar Pradesh on Hybrid Annuity mode under NHAI/UP/11017/1/2009/NHDP-IV/AK91/PKG-IV&V/IE 18/03/2019 07/03/2019 26/12/2019
Time 11:0Hrs
676 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF CONSTRUCTION OF EMERGENCY LANDING FACILITY FROM KM 246.200 TO KM 249.700 (DESIGN LENGTH 3.5 KM) ON SRINAGAR-BANIHAL SECTION OF NH 1A (NEW NH-44) IN THE STATE OF JAMMU - KASHMIR ON EPC MODE. NHAI/11001/11/2019/AE(Srinagar-Banihal) 13/03/2019 07/03/2019 22/04/2019
Time 15:0Hrs
677 Consultancy Services for Authority’s Engineer for Supervision of (i)Improvement and Upgradation of Highway starting from junction with NH-44 at Panipat connecting Kairana, Shamli, Muzaffarnagar, Mairanpur, Bijnor and terminating at its junction with Nh-74 at Kotawali to Two/four lane with paved shoulder configuration– Panipat to Shamli pkg.-I of NH-709AD in the State of Uttar Pradesh under NHDP Phase-VII on EPC Mode (ii) Improvement and Upgradation of Highway starting from junction with NH-44 a NHAI/UP/2019/Panipat-Kotwali/NH709AD/PKGI&II/AE 13/03/2019 07/03/2019 26/06/2019
Time 11:0Hrs
678 Consultancy Services for Authority’s Engineer for Supervision of (i)Improvement and Upgradation of Highway starting from junction with NH-44 at Panipat connecting Kairana, Shamli, Muzaffarnagar, Mairanpur, Bijnor and terminating at its junction with Nh-74 at Kotawali to Two/four lane with paved shoulder configuration– Muzaffarnagar to Miranpur pkg.-III of NH-709AD in the State of Uttar Pradesh under NHDP Phase-VII on EPC Mode (ii) Improvement and Upgradation of Highway starting from junction wi NHAI/UP/2019/Panipat-Kotwali/NH709AD/PKGIII&IV/AE 13/03/2019 07/03/2019 25/08/2020
Time 11:0Hrs
679 Consultancy Services for Authority’s Engineer for Improvement and upgradation of NH-334B from Meerut to Haryana Border via Baghpat Ch. 0.000 km to 48.260 km in the State of Uttar Pradesh under EPC Mode NHAI/UP/2018-19/334B/MB/AE 13/03/2019 07/03/2019 26/06/2019
Time 15:0Hrs
680 Consultancy services as Authority’s Engineer for Supervision of Construction, Operation and Maintenance of 2-Lane bi-directional Zojila Tunnel with Parallel Escape (Egress) Tunnel excluding approaches on Srinagar-Leh Section connecting NH-1 at km 95.00 and at km 118.00 in the State of Jammu &Kashmir on EPC Mode. NHIDCL/J&K/NH1/Zojila/AE-R2/2019 06/03/2019 06/03/2019 09/05/2019
Time 15:0Hrs
681 Independent Engineer Services during Operation and Maintenance of Edappally-Vyttila-Aroor Section of NH-66 from Ch Km 342.000 to Ch Km 358.750 on OMT basis in the State of Kerala (Package OMT 23) PIUCHNOMTIE201903 06/03/2019 06/03/2019 22/04/2019
Time 11:0Hrs
682 Supervision Consultancy Services for O&M stage of Two-lane with paved of Ladnu-Nimbi Jodha-Degana-Merta City section of NH-458 from Km. 0.000 (Existing chainage Km. 0.000) to Km. 139.900 (Exisiting chainage Km. 144.377) (length 139.900 Km.) on EPC Basis under NHDP-Phase-IV NHAI/PIU-AJM/NIT/2018-19/03 04/04/2019 06/03/2019 03/06/2019
Time 11:0Hrs
683 Independent Engineer services for Construction of Proposed Narnaul Bypass (Designed Length 24.0 km ) as an Economic Corridor & Ateli Mandi to Narnaul Section of NH 11 from Km 43.445 to 56.900 ( Designed Length 14.0 km ) as a Feeder Route in the state of Haryana on Hybrid Annuity Mode NHAI/Tech/Delhi/PIU-Rewari/Pkg.II/25/IE/2018-19 19/03/2019 01/03/2019 15/04/2019
Time 11:0Hrs
684 Consultancy Services for Authority’s Engineer for Supervision of Construction of 8-lane access controlled Greenfield Delhi – Vadodara Expressway (NH-148N) starting at Sohna-Gurugram Road (NH-248A) near Alipur village to Haryana-Rajasthan Border (Ch. 0.000 to Ch. 78.800) in the State of Haryana on EPC mode under Bharatmala Pariyojana [Delhi-Vadodara/NH-148N/AE/Pkg1] NHAI/BM/Delhi-Vadodara/NH-148N/AE/Pkg1 26/03/2019 01/03/2019 07/06/2019
Time 11:0Hrs
-
685 Consultancy Services for Authority’s Engineer for Supervision of Construction of 8-lane access controlled Greenfield Delhi – Vadodara Expressway (NH-148N) starting at Haryana-Rajasthan Border to Junction with Keshopura Road (Ch. 78.800 to Ch. 151.840) in the State of Rajasthan on EPC mode under Bharatmala Pariyojana [Delhi-Vadodara/NH-148N/AE/Pkg2] NHAI/BM/Delhi-Vadodara/NH-148N/AE/Pkg2 26/03/2019 01/03/2019 07/06/2019
Time 11:0Hrs
686 Consultancy Services for Authority’s Engineer for Supervision of Construction of 8-lane access controlled Greenfield Delhi – Vadodara Expressway (NH-148N) starting at Junction with Keshopura Road to Junction with MDR-1 (Baonli-Jhalai road) (Ch. 151.840 to Ch. 247.310) in the State of Rajasthan on EPC mode under Bharatmala Pariyojana [Delhi-Vadodara/NH-148N/AE/Pkg3] NHAI/BM/Delhi-Vadodara/NH-148N/AE/Pkg3 26/03/2019 01/03/2019 07/06/2019
Time 11:0Hrs
687 Consultancy Services for Authority’s Engineer for Supervision of Construction of 8-lane access controlled Greenfield Delhi – Vadodara Expressway (NH-148N) starting at Rajasthan/MP Border to Bardawadi village of Mandsaur district (Ch. 452.420 to Ch. 546.920) in the State of Madhya Pradesh on EPC mode under Bharatmala Pariyojana [Delhi-Vadodara/NH-148N/AE/Pkg5] NHAI/BM/Delhi-Vadodara/NH-148N/AE/Pkg5 26/03/2019 01/03/2019 26/09/2019
Time 11:0Hrs
688 Consultancy Services for Authority’s Engineer for Supervision of Construction of 8-lane access controlled Greenfield Delhi – Vadodara Expressway (NH-148N) starting at Bardawadi village of Mandsaur district to Bawadi village (near Shivgarh) of Ratlam district (Ch. 546.920 to Ch. 627.420) in the State of Madhya Pradesh on EPC mode under Bharatmala Pariyojana [Delhi-Vadodara/NH-148N/AE/Pkg6] NHAI/BM/Delhi-Vadodara/NH-148N/AE/Pkg6 26/03/2019 01/03/2019 07/06/2019
Time 11:0Hrs
689 Consultancy Services for Authority’s Engineer for Supervision of Construction of 8-lane access controlled Greenfield Delhi – Vadodara Expressway (NH-148N) starting at Bawadi village (near Shivgarh) of Ratlam district to (Ch. 627.420 to Ch. 696.920) in the State of Madhya Pradesh on EPC mode under Bharatmala Pariyojana [Delhi-Vadodara/NH-148N/AE/Pkg7] NHAI/BM/Delhi-Vadodara/NH-148N/AE/Pkg7 26/03/2019 01/03/2019 26/09/2019
Time 11:0Hrs
690 Consultancy Services as Independent Engineer during Operation and Maintenance Period for 4/6 laning of Hungund-Hospet Section from Km. 202.000 to Km. 299.000 of NH-13 in the State of Karnataka under Phase-III on Design, Build, Finance, Operate and Transfer (DBFOT) Toll Basis. NIT No.31/NHAI/RO-BNG/17016/Tender/2019 dt. 28.02.2019 29/03/2019 28/02/2019 11/04/2019
Time 15:0Hrs
691 Consultancy Services as Independent Engineer during Operation and Maintenance and Fee collection of Elevated Highway Project from Silk Board Junction to Electronic City Junction (Km. 8.765 to 18.750) and Six laning from Electronic City to Attibele (Karnataka/Tamil Nadu Border) (Km. 18.750 to Km. 33.130 on Bangalore-Hosur section of NH-7 on Build, Operate and Transfer (BOT) basis through a Concessionaire NIT No.28/ NHAI/RO-BNG/22018/Tender/2019 Dated 22.02.2019 25/02/2019 22/02/2019 04/04/2019
Time 15:0Hrs
692 Consultancy Services for Authority Engineer for Supervision of Construction of 6-lane access controlled Greenfield highway from Ismailabad on NH-152 to Junction with Jind-Safidon road (SH-14) near Kheri village (Ch. 0.000 to Ch. 80.000 length 80 km) in the State of Haryana on EPC mode under Bharatmala Pariyojana (Ismailabad-Narnaul/NH-152D/AE/Pkg1) NHAI/BM/Ismailabad-Narnaul/NH-152D/AE/Pkg1 12/03/2019 20/02/2019 29/08/2019
Time 11:0Hrs
693 Consultancy Services for Authority Engineer for Supervision of Construction of 6-lane access controlled Greenfield highway from Junction with Jind-Safidon road (SH- 14) near Kheri village to Junction with NH-334B (Charkhi Dadri-Jhajjar section) near Charkhi Dadri (Ch. 80.000 to Ch. 165.000 length 85 km) in the State of Haryana on EPC mode under Bharatmala Pariyojana (Ismailabad-Narnaul/NH-152D/AE/Pkg2) NHAI/BM/Ismailabad-Narnaul/NH-152D/AE/Pkg2 12/03/2019 20/02/2019 14/05/2019
Time 11:0Hrs
694 Consultancy Services for Authority Engineer for Supervision of Construction of 6-lane access controlled Greenfield highway from Junction with NH-334B (Charkhi Dadri-Jhajjar section) near Charkhi Dadri to Narnaul (Ch. 165.000 to Ch. 227.020 length 62.02 km) in the State of Haryana on EPC mode under Bharatmala Pariyojana (Ismailabad-Narnaul/NH-152D/AE/Pkg3) NHAI/BM/Ismailabad-Narnaul/NH-152D/AE/Pkg3 12/03/2019 20/02/2019 14/05/2019
Time 11:0Hrs
695 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF Construction of Emergency Landing Facility on National Highways – Development of emergency landing facility on Balasore-Kharagpur section from km.83.400 to km.88.400 (total 5 km.) of NH-60 (New NH-16) in the State of West Bengal on EPC mode NHAI/11001/11/2019/AE(Balasore-Kharagpur) 13/03/2019 13/02/2019 28/03/2019
Time 11:0Hrs
696 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF Construction of Emergency Landing Facility on National Highways – Development of emergency landing facility on Balasore-Kharagpur section from km.83.400 to km.88.400 (total 5 km.) of NH-60 (New NH-16) in the State of West Bengal on EPC mode NHAI/11001/11/2016/AE(Balasore-Kharagpur) 20/06/2019 13/02/2019 28/11/2019
Time 11:0Hrs
697 Consultancy Services for Authority’s Engineer for Supervision of “Up gradation of newly declared NH-341 to two-lane with Paved shoulder configuration between Km. 65.478 to Km 162.209 ( Bhuj Airport Jn - Khavda - India Bridge to Dharmshala section) in the State of Gujarat” on EPC mode RW/GNR/WORKS/535/GJ/2018 26/02/2019 13/02/2019 15/04/2019
Time 11:0Hrs
698 Consultancy services for Authoritys Engineer for Supervision of Construction of 6-lane access controlled Greenfield highway from km (-) 0.300 to km 88.000 of Sangariya (near Chautala)-Rasisar (near Bikaner) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Haryana and Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I)-AJ/SR/Supervision/Package-1 NHAI/BM/EC/AJ/Supervision/Package-1 18/02/2019 13/02/2019 15/04/2019
Time 11:0Hrs
699 Consultancy services for Authority’s Engineer for Supervision of Construction of 6-lane access controlled Greenfield highway from km 88.000 to km 170.000 of Sangariya (near Chautala)-Rasisar (near Bikaner) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Haryana and Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) -AJ/Construction Supervision/Package-2 NHAI/BM/EC/AJ/Supervision/Package-2 18/02/2019 13/02/2019 15/04/2019
Time 11:0Hrs
700 Consultancy services for Authority’s Engineer for Supervision of Construction of 6-lane access controlled Greenfield highway from km 170.000 to km 252.500 of Sangariya (near Chautala)-Rasisar (near Bikaner) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Haryana and Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) AJ/Construction Supervision/Package-3 NHAI/BM/EC/AJ/Supervision/Package-3 18/02/2019 13/02/2019 15/04/2019
Time 11:0Hrs
701 Consultancy services for Authority’s Engineer for Supervision of Construction of 6-lane access controlled Greenfield highway from km 1.900 to km 90.000 of Rasisar (near Bikaner)-Deogarh (near Dhandhaniya) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) -AJ/Construction Supervision/Package-4 NHAI/BM/EC/AJ/Supervision/Package-4 18/02/2019 13/02/2019 15/04/2019
Time 11:0Hrs
702 Consultancy services for Authority’s Engineer for Supervision of Construction of 6-lane access controlled Greenfield highway from km 90.000 to km 177.658 of Rasisar (near Bikaner)-Deogarh (near Dhandhaniya) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) -AJ/Construction Supervision/Package-5 NHAI/BM/EC/AJ/Construction Supervision/Package-5 18/02/2019 13/02/2019 15/04/2019
Time 11:0Hrs
703 Consultancy services for Authority’s Engineer for Supervision of Construction of 6-lane access controlled Greenfield highway from km (-) 1.142 to km 72.000 of Deogarh (near Dhandhaniya) to Rajasthan/Gujarat Border section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) -AJ/Construction Supervision/Package-6 NHAI/BM/EC/AJ/Supervision/Package-6 18/02/2019 13/02/2019 15/04/2019
Time 11:0Hrs
704 Consultancy services for AE for construction of missing link in lakhpat ganduli hajipur khavda santalpur on NH754K in Gujarat RW/GNR/WORKS/554/GJ/2018 26/02/2019 11/02/2019 27/02/2019
Time 11:0Hrs
705 Consultancy services for AE for construction of missing link in lakhpat ganduli hajipur khavda santalpur on NH754K in Gujarat RW/GNR/WORKS/554/GJ/2018/1 05/03/2019 11/02/2019 09/04/2019
Time 17:0Hrs
706 Consultancy Services for Authoritys Engineer for Supervision of Construction of 2 Lane Bridge across River Kosi along with approach road from Bheja to Bakaur section of NH-527 A (Design Chainage Km 0.000 to Km 13.300) under BRT scheme of Bharatmala Pariyojana Phase-I on EPC mode in the State of Bihar NHAI/BH/Bheja-Bakaur/BRT/AE/2019/Proc 25/02/2019 08/02/2019 24/04/2019
Time 11:0Hrs
-
707 Consultancy services for Independent Engineer for supervision of four laning of Tumkur-Shivamogga section from Ch 170-415 Km to Ch 226-750 Km (Design Length-56-335 Km) Bettadahali-Shivamogga of NH-206 (Package-IV) in the state of Karnataka under Bharatmala Pariyojana on Hybrid Annuity Mode NHAI/IE/Tumkur-Shimoga/Pkg-IV/KNT/2019 08/02/2019 08/02/2019 08/04/2019
Time 11:0Hrs
708 Re-Tender for Consultancy Services for Authority’s Engineer for supervision of Construction of two tunnels of length 0.475 km and 1.79 km at Sela Pass along with approach roads of length 9.775 km on Balipara-Chardwar-Tawang (BCT) road of NHDL specifications in West Kameng and Tawang Districts of Arunachal Pradesh under Project Vartak on Engineering, Procurement &Construction (EPC) mode No.CE/VTK/14(Re-Tender)/2018-19 08/02/2019 08/02/2019 28/02/2019
Time 15:0Hrs
709 Consultancy services for Authority Engineer for Package no- RSHIP-ADB-Tranche-II/EPC/02 and 03 23/2018-19 01/02/2019 07/02/2019 10/06/2019
Time 11:0Hrs
-
710 Consultancy Service for Authority s Engineer for supervision of Pkg I Construction of 4 lane Flyover at Amberpet X road Hyderabad and Pkg II Constn of Uppal Six lane Elevated Corridor from Km 7.95 to Km 14.20 of NH 163 of Hyd BP sec in Telangana RW/NH-12014/06/2017-TS/P7 Dated 05-02-2019 05/02/2019 05/02/2019 06/03/2019
Time 15:0Hrs
711 Consultancy services for Authority’s Engineer for Supervision of Four Laning of Natham Tuvarankurichi section of NH 785E from Design Chainage 36.690 to 61.115 (Length 24.425 Km) under Bharatmala Pariyojana Phase I (Feeder Route category) on EPC mode in the State of Tamil Nadu NHAI/11012/NT/EPC/AE/02/2019 01/02/2019 01/02/2019 09/04/2019
Time 11:0Hrs
712 IE services during O and M Period for Nagpur-Saoner-Betul Section of NH-69 from Km.3 to Km.59.300 in the State of Maharashtra and from Km.137 to Km.257.400 in the State of Madhya Pradesh on DBFOT(Annuity) Basis-Consultancy Package No.IE-OMNH-47NAG-12 NHAI/RO-NAG/2018-19/35 04/02/2019 31/01/2019 27/02/2019
Time 11:0Hrs
713 Consultancy Services for Authoritys Engineer for Six-laning of existing 4-lane road from Gundugolanu (Design Km 1023.280) To Chinna Avutupalli (Design Km 1076.480) (Pkg-I Gundugolanu - Kalaparru Section And Pkg-II Kalaparru-Chinna Avutupalli Section Including Hanuman Jn Bypass) of NH-16 (Total Design Length = 54.800 Km) in the State of Andhra Pradesh under NHDP Phase-V Under Bharatmala Pariyojana on EPC Mode NHAI/Tech/AP/NH-16/Gundu-Chi Avu/AE/Pkg-I&II/AE/18-19 21/02/2019 31/01/2019 28/02/2019
Time 11:0Hrs
-
714 Consultancy services for Authority’s Engineer for Supervision of Construction of New Twin tube 6-lane tunnel at Khambatki Ghat section of NH-4 and its approaches from existing km. 771.730 to existing km. 782.000 in the state of Maharashtra under NHDP Phase-V on EPC Mode NHAI/ Kham. Ghat/AE/2018 01/02/2019 29/01/2019 28/05/2019
Time 11:0Hrs
715 Consultancy services for Authority Engineer for Package no RSHIP-ADB-Tranche-II/EPC/01 and 04 22 of 2018-19 18/01/2019 29/01/2019 06/02/2019
Time 11:0Hrs
-
716 Consultancy Services for Authority’s Engineer for Supervision of “Improvcement/ Widening to 2 lane with earthen shoulder from Ranikor to Nongjri existing chainage km 0.000 to 31.700 (Design length- 33.250km) the state of Meghalaya under SARDP-NE” on EPC Basis. NHIDCL/Meghalaya/AE/R-M-B/Package-1 (R-N)/2018 28/01/2019 28/01/2019 08/03/2019
Time 14:30Hrs
717 IE Services during O and M Stage of 4laned divided carriageway from Km 308 Armur to Km 367 Adloor Yellareddy of Nagpur to Hyderabad Section of NH-44 in the State of Telangana on BOT(Toll)Basis under N to S Corridor(NHDP PhaseII)Package No.NS2/BOT/AP1 21554 28/02/2019 25/01/2019 11/03/2019
Time 11:0Hrs
718 Appointment of Safety Consultants for OMT, OM,BOT Projects under Regional Office, Kerala NHAI/RO-Kerala/SC/2018-19/02 28/01/2019 25/01/2019 25/02/2019
Time 12:0Hrs
719 Independent Engineer Services for Four laning of Jittandahalli –Dharmapuri Section of NH-844 from Km 61.100 to Km 94.460 (Design Chainage) under Bharatmala Pariyojana Phase-I (National Corridor) on Hybrid NHAI/11026/JD/HAM/TN/P3 /IE 13/02/2019 25/01/2019 28/02/2019
Time 11:0Hrs
720 Independent Engineer Services for Four Laning from km 358/500 to km 414/205 Challakere to Hariyur section of NH-150 A On Hybrid Annuity Mode under Bharatmala Pariyojna in the State of Karnataka NHAI/KNT/NH-150(A)/Pck-3/Challak-Harriyur/IE/2018 18/01/2019 18/01/2019 25/02/2019
Time 11:0Hrs
-
721 Independent Engineer for supervision of four laning of Dwarka Khambaliya Devariya section from km 203 500 to km 176 500 and from km 171 800 to km 125 000 of NH 151A under Bharatmala Pariyojna to be executed on Hybrid Annuity mode Package I in the state of Gujarat NHAI/Guj/Dwarka-Khambaliya/IE/2019 22/01/2019 17/01/2019 05/03/2019
Time 11:0Hrs
722 Consultancy Services for Authority’s Engineer for Supervision of “Improvement/Widening to 2 Laning of Stretch from Khongsang to Tamenglong (Design Length=37.97 Km) of NH-137 in the State of Manipur on EPC Mode under SARDP-NE” NHIDCL/Manipur/AE/K-T (NH-137)/2018-19 17/01/2019 17/01/2019 07/02/2019
Time 14:30Hrs
723 Consultancy services for Independent Engineer for supervision of four laning of NH-163 from Hyderabad (ORR Appa Junction) (Design Km 14.000/Existing Km 14.000) to Manneguda (Design Km 60.391/Existing Km 59.500) (Design Length = 46.391 Km) in the State of Telangana under NH (O) on Hybrid Annuity Mode NHAI/Tech/AP/NH-163/Hyd-Man/IE/2017-18 21/01/2019 16/01/2019 23/05/2019
Time 11:0Hrs
724 Consultancy services for Independent Engineer for supervision of Four Laning of the Suryapet (Design Ch.0.420/Existing Km. 128.500 of NH-65) to Khammam (Design Ch.59.046/Existing Km. 50.750 of old SH42) of NH-365BB (Old SH-42) (Design Length = 58.626 Km) in the state of Telangana under Bharatmala Pariyojana on Hybrid Annuity Mode NHAI/Tech/AP/NH-365BB/Sur-Khm/IE/2017-18 21/01/2019 16/01/2019 06/03/2019
Time 11:0Hrs
725 Independent Engineer services during Operation Maintenance Period for 4 laning of Hazaribag-Ranchi Section from Km. 40.500 to Km. 114.000 (length approx. 73.799 Km) including Ramgarh Kujju bypass of NH-33 in the State of Jharkhand under NHDP-III on BOT (Annuity) on DBFOT basis NHAI/RO/RNC/JH/2018-19/21 15/01/2019 14/01/2019 27/02/2019
Time 11:0Hrs
726 CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF CONSTRUCTION OF HIGH LEVEL BRIDGE ON MAHI RIVER AT SANGMESHWAR ON CHIKHLI-ANANDPURI ROAD DISTRICT DUNGARPUR IN THE STATE OF RAJASTHAN (EXTRA-DOSED RCC BOX BRIDGE) ON EPC MODE SEPWDCIRCLE/Dungarpur/Rajasthan/AE/2019 14/01/2019 14/01/2019 13/02/2019
Time 18:0Hrs
727 IE services during Operation and Maintenance Period for Chhattisgarh and Maharashtra Border – Wainganga Bridge section from Km.405.000 to Km.485.000 of NH-6 in the state of Maharashtra under NHDP Phase IIIA on BOT basis - IE-OM NH-53 NAG-9 NHAI/RO-NAG/2018-19/31 04/02/2019 14/01/2019 20/02/2019
Time 11:0Hrs
728 Independent Engineer services during Operation and Maintenance Period for Kondhali - Talegaon section of NH-6 from Km 50.000 to Km 100.000 in the State of Maharashtra under NHDP Phase-III on BOT basis - IE-OM NH-53 NAG-10 NHAI/RO-NAG/2018-19/32 04/02/2019 14/01/2019 20/02/2019
Time 11:0Hrs
729 IE services during OandM Period for MPMH Border Nagpur Sec.of NH7-Km.652toKM.729 including Const.of Kamptee-Kanhan and Nagpur Bypss and Maint.of already 4-laned Sec.from 14.585 to 36.600 on Nagpur-Hyderabad sec. in Maharashtra on DBFOT-IE-OMNH44NAG11 NHAI/RO-NAG/2018-19/33 04/02/2019 14/01/2019 20/02/2019
Time 11:0Hrs
730 Independent Engineer services during Operation & Maintenance Period for Nagpur-Wainganga Bridge Section of NH-53 (Old NH-6) from km 498.000 to km 544.200 in the State of Maharashtra basis under NHDP-III on BOT (Toll) under Design, Built, Finance, Operation and Transfer (DBFOT) Pattern - IE-OMNH-53NAG-8 NHAI/RO-NAG/2018-19/30 04/02/2019 14/01/2019 20/02/2019
Time 11:0Hrs
731 Consultancy Services for Authority’s Engineer for –Construction, Operation and Maintenance of 2-lane Bi-Directional Silkyara Bend –Barkot Tunnel with escape passage including approaches on Dharasu-Yamunotri section between Ch. 25.4 km and Ch. 51.0 km falling along NH-134 (old NH-94) in the State of Uttarakhand” on Engineering, Procurement and Construction (EPC) Mode. NHIDCL/Silkyara Tunnel/AE/2018.. 08/01/2019 08/01/2019 30/01/2019
Time 15:0Hrs
732 Consultancy Services for Authority’s Engineer for Supervision of (a) Construction of Flyover at Km.77.750 (Hinganghat-Nandgaon Junction) on NH-44 on EPC Mode [Package-I] and (b) Construction of Flyover at Butibori-MID T-Junction at Km.26.280 on NH-44 on EPC Mode [Package-II] in the State of Maharashtra NHAI/RO-NAG/2018-19/27 04/01/2019 04/01/2019 04/02/2019
Time 11:0Hrs
733 Independent Engineer Services during Operation and Maintenance Stage for 4 lane of Guna-Biaora section from Km 223/130 to km 316/630 of NH-46 (Old NH-3) (Package-II) in the State of Madhya Pradesh on BOT (Toll) on DBFOT pattern under NHDP Phase-IV 2018-NHAI-20153-1 15/01/2019 28/12/2018 26/02/2019
Time 12:0Hrs
734 Independent Engineer Services during Operation and Maintenance Stage for 4 lane of Shivpuri-Guna section from Km 125/430 to km 223/130 of NH-46 (Old NH-3) including Guna Bypass (Package-I) in the State of Madhya Pradesh on BOT (Toll) on DBFOT pattern under NHDP Phase-IV 2018-NHAI-20147-1 15/01/2019 28/12/2018 26/02/2019
Time 12:0Hrs
735 Independent engineer services for Up-gradation of four lane of Rewari -Ateli Mandi section of NH-11 from km 11.780 to Rewari to EX. Km 43.445 near ateli mandi (designed length 30.45 km) as feeder route in the state of haryana on Hybrid annuity Mode package III NHAI/Tech/Delhi Div. /Rewari/Pkg-III/23/IE/2018-19 01/01/2019 28/12/2018 14/02/2019
Time 11:0Hrs
736 Selection of AE for Widening to Two lane with Geometric Improvements of Tura Dalu road from Km 85 to 95 and 101 to 145 to 2-lanes with paved shoulder of Tura-Dalu section of NH 51 in the state of Meghalaya on EPC mode with JICA loan Assistance 2018-NHIDC-423719-1 26/12/2018 26/12/2018 28/02/2019
Time 11:0Hrs
737 Widening and upgradation to 2-lane with paved shoulder configuration and geometric improvements from km 8.000 to km 125.000 on Aizawl-Tuipang Section of NH-54 in the State of Mizoram on EPC mode with JICA loan assistance 2018-NHIDC-421575-1 20/12/2018 20/12/2018 28/02/2019
Time 11:0Hrs
738 Widening and upgradation to 2-lane with paved shoulder configuration and geometric improvements from km 125.000 to km 250.000 on Aizawl-Tuipang Section of NH-54 in the State of Mizoram on EPC mode with JICA loan assistance 2018-NHIDC-421617-1 20/12/2018 20/12/2018 28/02/2019
Time 11:0Hrs
739 Widening and upgradation to 2-lane with paved shoulder configuration and geometric improvements from km 250.000 to km 380.000 on Aizawl-Tuipang Section of NH-54 in the State of Mizoram on EPC mode with JICA loan assistance 2018-NHIDC-421627-1 20/12/2018 20/12/2018 28/02/2019
Time 11:0Hrs
740 Consultancy Services for Authority’s Engineer for Supervision of construction of two tunnels of length 0.475 km and 1.79 km at Sela Pass along with approach roads of length 9.775 km on Balipara-Chardwar-Tawang (BCT) road of NHDL specifications in West Kameng and Tawang Districts of Arunachal Pradesh und NIT NO CE/VTK/14/2018-19 17/12/2018 19/12/2018 25/01/2019
Time 17:0Hrs
741 xyz Test 19/12/2018 19/12/2018 25/12/2018
Time 15:0Hrs
742 Independent Engineer services for 4/6 laning of Narnaul Bypass crossing to Paniyala Mor (NH 148B) (at NH-48 junction) Nizampur Link Road & Narnaul Bypass crossing to Pacheri Kalan (NH 11) Package I in the state of Haryana under Bharatmala Pariyojana on Hybrid Annuity basis Package I NHAI/Tech/Delhi/PIU-Rewari/Pkg.I/22/IE/2018-19 27/12/2018 18/12/2018 11/02/2019
Time 11:0Hrs
743 Consultancy Services for Supervision of Routine Maintenance/Incident Management/Toll Operation/Special Repairs / Periodical Renewals / Civil Works Contract from Km 1184/322 to Km 1380/387 (Total Length 196.065 Km) on Four Lane of Baran-Shivpuri-Jhansi section of NH-27 in the state of Rajasthan Madhya Pradesh & Uttar Pradesh 2018 NHAI 19612 1 30/01/2019 18/12/2018 05/02/2019
Time 11:0Hrs
-
744 Independent Engineer Services for Four Laning of Kamalapuram to Oddanchatram section of NH 209 (New NH 83) from Design Km 0.000 to Km 35.822 (Total Length 36.505 Km) under Bharatmala Pariyojana Phase I under the category of Residual Works of NHDP on HAM in the State of Tamil Nadu NHAI/11012/KO/HAM/IE/18/2018 28/12/2018 17/12/2018 06/02/2019
Time 11:0Hrs
745 Independent Engineer Services for Four Laning of Oddanchatram Madathukulam section of NH 209 (New NH 83) from Design Km 29.000 to Km. 74.380 (Length 45.38 Km) under Bharatmala Pariyojana Phase I under the category of Residual Works of NHDP on HAM in the State of Tamil Nadu NHAI/11012/OM/HAM/IE/19/2018 28/12/2018 17/12/2018 06/02/2019
Time 11:0Hrs
746 Independent Engineer services for Four Laning of Madathukulam to Pollachi section of NH 209 (New NH 83) from Design Km 74.380 to Km. 116.950 (Length 50.078 Km) under Bharatmala Pariyojana Phase I under the category of Residual Works of NHDP on HAM in the State of Tamil Nadu NHAI/11012/MP/HAM/IE/20/2018 28/12/2018 17/12/2018 06/02/2019
Time 11:0Hrs
747 Authority Engineer for Rehabilitation and Up-gradation from KM. 133.520 to 158.040 of NH 76 & NH-86 (5.360 Km.) (Kulpahar-Mahoba Section) to two lane with paved shoulder on EPC Mode in the state of Uttar Pradesh. 2206M/13M-NHCK/18 dated 14.12.2018 14/12/2018 15/12/2018 02/01/2019
Time 17:0Hrs
748 Consultancy Services for Authority’s Engineer for Supervision of “Construction of Kohima Bypass of 4 lane pavement on EPC basis connecting NH-39 (New NH-02), NH-150 (New NH-02), NH-61 (New NH-29) and NH-39 (New NH-02)-(i) From design Km 0.00 to design Km 14.00 (Design length-13.45 km & Twin two lane Tunnel of length 0.55 km each), (ii) From design Km 14.00 to design Km 29.00 (Design length-15.00), (iii) From design Km 29.00 to design Km 44.525 (Design length-15.525) in the State of Nagaland und NHIDCL/Nagaland/Kohima Bypass (0 to 44.525)/AE/2018 12/12/2018 12/12/2018 21/02/2019
Time 15:0Hrs
749 Consultancy Services for Authority’s Engineer for Supervision of “Construction of two-Lane with hard shoulders of Changtongya Longleng Road on EPC basis from (i) existing Km 0.0 to Km 16.592 (Design Km. 0.000 to Km. 20.751) (Design Length – 20.751 Km) and (ii) existing Km 16.592 to Km 29.530 (Design Km. 20.751 to Km. 35.461) (Design Length – 14.710 Km) in the state of Nagaland under SARDP-NE Phase A NHIDCL/Nagaland/CL (0 to 35.461)/AE/2018 12/12/2018 12/12/2018 31/01/2019
Time 14:30Hrs
750 Consultancy Services for Supervision Consultant (SC) Services for Operation and Maintenance of Km 205.000 to Km 278.685 of Jagiroad to Nagaon section of NH-27 (Old NH-37) in the State of Assam NHAI/PIU-NGN/NIT/2018/3 18/06/2019 12/12/2018 25/06/2019
Time 11:0Hrs
-
751 Consultancy Services for Supervision Consultant (SC) Services for Operation and Maintenance of Km 5.500 to Km 37.970 & Km. 0.000 to Km. 40.000 of Nagaon to Udali section of NH-27 (Old NH-36,Old NH-54,Old NH-54E) in the State of Assam NHAI/PIU-NGN/NIT/2018/2 17/06/2019 12/12/2018 25/06/2019
Time 11:0Hrs
752 Consultancy Services of Authority‟s Engineer for supervision of “Improvement and up-gradation of existing carriageway to two lane with paved shoulder from km. 0.00 (Chhawani) to km.55.000 (near Chhapia village) of NH-227A in the state of Uttar Pradesh” on EPC mode. 5004/706 C-NH CIRCLE/18-19 Dated 07.12.2018 18/12/2018 10/12/2018 14/01/2019
Time 17:0Hrs
753 Consultancy services for Authoritys Engineer for supervision of Civil Construction work for Widening to 2 lane with paved shoulder including geometric improvement from km 318.00 to km 339.940 on Churaibari Agartala section of NH 44 in the State of Tripura on EPC mode under NH (O) Job No. 8(44)/TR/2016 17/06 F2(4)/PWD(NH)/SE/NH Circle/09 dated 05/12/2018 06/12/2018 08/12/2018 22/01/2019
Time 12:0Hrs
754 Consultancy Services for Authoritys Engineer for Supervision of 1) Construction Of Fob And Underpass With Carriageway At Mahavir Chowk, Opposite Police Line, Gurugram (Haryana) 2) Construction Of Underpass Flyover (Overpass) Fobs And Surface Roads Around The Huda City Centre Metro Station Gurugram Haryana 107337 09/12/2018 07/12/2018 31/12/2018
Time 17:0Hrs
755 Independent Engineer services during operation and maintenance period for four lanining of Godhra Gujarat MP boarder NH47 NHAI/PIU/Godhra 05/12/2018 05/12/2018 03/01/2019
Time 11:0Hrs
756 Supervision Consultant SC Services for Operation and Maintenance from km ch.961.500 to 1013.000 of Nalbari to Bijni section of NH31 and from km ch. 30.000 to 93.00 of Bijni to Assam West Bengal section of NH31C in Assam NITno-05/2018-19 31/12/2018 05/12/2018 07/01/2019
Time 11:0Hrs
757 Balance work of Two Lane with Paved Shoulder of Piprakothi-Motihari-Raxaul Section of NH-28A from km 0.650 to km 62.064 and construction of (2-Lane with Paved Shoulder from km 62.064 to 68.650 and 4-Lane with Paved Shoulder from km 68.650 to 69.241 ICP Raxaul) Link Road (7.177 km length) in the State of Bihar under NHDP Phase-III. NHAI/BH/Pip-Mot-Rax/Bal/SC/ 2018/Proc 20/12/2018 03/12/2018 01/01/2019
Time 11:0Hrs
758 Independent Engineer services for Six-laning of Kozhikode Bypass (Calicut Bypass) (i.e. Vengalam Jn. to Ramanattukara Jn.) section of NH-17 (new NH-66) from Design Chainage km 230.400 to Design Chainage km 258.800 (total length 28.400 km) in the State of Kerala under NHDP Phase-III on Hybrid Annuity Mode (2nd call) NHAI/Tech/KL/Kozhikode Bypass/NH-17/IE/2/2017-18 10/12/2018 03/12/2018 15/01/2019
Time 11:0Hrs
759 Consultancy Services for Supervision Consultant (SC) Services for Operation and Maintenance of Km 040.000 to Km127.000 of Udali to Maibong section of NH-27 (NH-54 E) & Consultancy services to AS-25 package under DLP in the State of Assam NHAI/PIU-NGN/NIT/2018/1 14/06/2019 01/12/2018 25/06/2019
Time 11:0Hrs
760 Consultancy Services for Supervision of Short Term Improvement and Routine Maintenance contract of Dalkhola-Islampur- Ghoshpukur section from km 447.000 to km 551.000 (excluding km 498.780 to km 507.000) of NH-31 and Salsalabari to West Bengal Assam Border from km 228.000 to km 254.500 section of NH-31C in the State of West Bengal 01/O and M/2018-19/3rd Call 30/11/2018 30/11/2018 27/12/2018
Time 12:0Hrs
761 Consultancy Services for AE for supervision of the work of Widening and Strengthening of existing 2 lane to 2 lane with paved shoulders from km 159.0 to 165.4 and 186.0 to 215.0 of NH 163 on EPC mode in state of Telangana under NHO Annual Plan2017-18 SE( R & B) NH /KMNR/ 13/ 2018- 19 Dated 29-11-2018 30/11/2018 30/11/2018 15/12/2018
Time 15:0Hrs
762 Consultancy Services for AE for supervision of the work of Rehabilitation and upgradation from km 121.000 to 154.000 of Nakrekal to Mallampalli section of NH365 to two lane with paved shoulder in the State of Telangana under EPC mode SE( R & B) NH /KMNR/ 14/ 2018- 19 Dated 29-11-2018 30/11/2018 30/11/2018 15/12/2018
Time 15:0Hrs
763 CONSULTANCY SERVICES FOR AE FOR SUPERVISION OF Widening and Strengthening of Existing 2 lane to 2 lane with paved shoulders from km 25.0 to 59.2 Mahadevpur to Bhupalpalli of NH-353C old NH-363 in the state of Telangana under EPC SE( R & B) NH /KMNR/ 15/ 2018- 19 Dated 29-11-2018 30/11/2018 30/11/2018 15/12/2018
Time 15:0Hrs
764 Independent Engineer during Operation & Maintenance Period for 2 Lane with Paved Shoulders of Agra to Aligarh Section of NH-93 from Km. 0.00 to Km. 79.00 in the State of Uttar Pradesh on Design, Build, Finance, Operate and Transfer (DBFOT) on Toll Basis under NHDP Phase–IVA NHAI/PIU/AGRA/MISC/2018-19/05 03/12/2018 30/11/2018 01/02/2019
Time 11:0Hrs
765 IE Services during O and M period for 4-laning of Lucknow-Raebareli Section of NH-24B (New NH-30) from km. 12.700 to km. 82.700 on DBFOT (Annuity) under NHDP Phase-IVA in the State of U.P. NHAI/PIU-Lucknow/IE/NH-24B/2018/12 26/11/2018 26/11/2018 01/01/2019
Time 17:0Hrs
766 Supervision Consultancy Services for Operation Maintenance of the section from Jetpur-Somnath Section of NH-8D from (Km. 0.000 to Km 123.454) of Old NH-8D (New NH 151) in the state of Gujarat including existing Junagadh Bypass NHAI-NHAI-18256-1 10/12/2018 20/11/2018 19/12/2018
Time 11:0Hrs
767 Supervision Consultancy Services for Operation & Maintenance of the section from Jetpur-Somnath Section of NH-8D from (Km. 0.000 to Km 123.454) of Old NH-8D ( New NH 151) in the state of Gujarat including existing Junagadh Bypass 2018-NHAI-18256-1 02/01/2019 20/11/2018 07/01/2019
Time 11:0Hrs
768 SamakhiyaliGandhidhamRoadSection NHAI/PIU Gandhidham/2018/05 17/11/2018 17/11/2018 27/11/2018
Time 11:0Hrs
769 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF REHABILITATION AND UPGRADATION OF NH 167 FROM DESIGN CHAINAGE KM 157.707 (ALINAGAR) TO KM 187.723 (MIRYALAGUDA) TO TWO LANE WITH PAVED SHOULDERS IN THE STATE OF TELANGANA ON EPC MODE . SE (R&B) NH/KMNR/11/2018-19 12-11-2018 16/11/2018 16/11/2018 10/12/2018
Time 15:0Hrs
770 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF REHABILITATION AND UP GRADATION OF NH-167 FROM DESIGN KM. 187.723 (MIRYALAGUDA) TO KM. 234.434 (KODAD) TO TWO LANE WITH PAVED SHOULDERS IN THE STATE OF TELANGANA ON ENGINEERING, PROCUREMENT & CONSTRUCTION (EPC) BASIS CONTRACT SE (R&B) NH/KMNR/12/2018-19 12-11-2018 16/11/2018 16/11/2018 10/12/2018
Time 15:0Hrs
771 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF REHABILITATION AND UP GRADATION OF NH 167 FROM DESIGN KM 113.900 (MALLEPALLY) TO 154.479 (HALIYA) TO TWO LANE WITH PAVED SHOULDERS IN THE STATE OF TELANGANA ON EPC BASIS CONTRACT SE(R&B)NH/Hyd/20/2018-19,dt14-11-2018 15/11/2018 15/11/2018 06/12/2018
Time 15:0Hrs
772 Supervision Consultant (SC) Services for Operation and Maintenance of the stretch Kharwandi Kasar to Junction of NH-211 (Km 284 – Km 337) 2L with Paved Shoulders section of NH-61 (Old NH-222) in the State of Maharashtra Appointment of SC for O&M of Kharwandi Kasar to Junction of NH-211- 13 17/11/2018 13/11/2018 27/12/2018
Time 11:0Hrs
773 Operation and Maintenance of the stretches Malshej Ghat to Ane Ghat (Km 101 - Km 161.570) and Ane Ghat to start of Ahmednagar Bypass (Km 161.570 – Km 211) 2L with Paved Shoulders sections of NH-61 (Old NH-222) in the State of Maharashtra NHAI/RO/MUM/Ahmednagar/SC/2018-19/12 05/11/2018 05/11/2018 19/12/2018
Time 11:0Hrs
774 IE services for Rehabilitation and Upgradation by 4-Laning of Singhara to Binjhabahal Section from km 311.000-Km 414.000 (Design Ch. from Km 310.806-Km 414.982) of NH-6 (New NH-49) in Odisha under NHDP Ph-IV on HAM Mode NHAI/NHDP IV/OR/07/2016/IE 26/11/2018 31/10/2018 29/11/2018
Time 11:0Hrs
-
775 Independent Engineer Services for O&M stage for four lanning section from Gujarat / Maharashtra border to Surat Hazira Port section of NH-6 Project on BOT basis NHAI/PIU Surat (Expressway)/41-IE/2018 30/10/2018 30/10/2018 29/11/2018
Time 11:0Hrs
-
776 CONSTRUCTION/IMPROVEMENT OF BALIPARA-CHARDUAR-TAWANG ROAD FROM KM 70.00 TO KM 88.00 (NEW LOCATION FROM KM 69.90 TO KM 87.54) FROM EXISTING CL-9 SPECIFICATIONS TO NH DOUBLE LANE SPECIFICATIONS (FORMATION, PERMANENT AND SURFACING WORKS INCLUDING PERMANENT BRIDGES) IN THE STATE OF ARUNACHAL PRADESH ON ENGINEERING PROCUREMENT AND CONSTRUCTION (EPC) MODE NIT No CE/VTK/12/2018-19 26/10/2018 27/10/2018 24/11/2018
Time 17:0Hrs
777 Consultancy Services of Authority’s Engineer for supervision of Rehabilitation and up-gradation of Khutar-Lakhimpur Section Km. 82.000 to 140.000 of NH-730 two-lane with paved shoulders in District Lakhimpur-kheri in the State of Uttar Pradesh on EPC mode. 4291/605C-NH CIRCLE/18 DATED 17.10.2018 13/11/2018 25/10/2018 26/11/2018
Time 17:0Hrs
778 Consultancy services of Authority’s Engineer for supervision of Widening the existing lane to 2 lane with paved shoulder from Km.239/900 to 294/300 km (Nayagarh to Khurda) excluding Khurda bypass of NH-57 on EPC mode in the state of Odisha. (Bid Ref No-07 CENH of 2018-19) 26/10/2018 25/10/2018 10/12/2018
Time 17:0Hrs
779 Consultancy services of Authority’s Engineer for supervision of Widening and strengthening Two lane to Two lane with paved shoulder from Km.173/370 to 229/400 km of NH-59(Baliguda-Daringbadi section) on EPC mode in the state of Odisha Bid Ref No-8 CENH of 2018-19 19/11/2018 25/10/2018 10/12/2018
Time 17:0Hrs
780 Consultancy services of Authority’s Engineer for supervision of Widening and strengthening Two lane to Two lane with paved shoulder from Km.269/300 to 328/200 km of NH-49(Jharsuguda to Bhojpur) on EPC mode in the state of Odisha. Bid Ref No-9 CENH of 2018-19 19/11/2018 25/10/2018 10/12/2018
Time 17:0Hrs
781 Consultancy Services of Authoritys Engineer for Supervision of Rehabilitation and Up-gradation of Barhani Kataya Chowk near Shohratgarh Section(Km.385 000toKm.420 000)ofNH730to two lane with paved shoulder under EPC mode in the State of Uttar Pradesh. 4296/357Yata-NH Circle/18dated17.10.2018 21/10/2018 22/10/2018 12/11/2018
Time 17:0Hrs
782 Consultancy Services of Authoritys Engineer for Super.ofRehabi. and Upgradation of NH730 from Km.484.000toKm.505.120 (RamnagartoSiswa Babu)to 2 lane with paved Shoulders(Rural Area)and Two Lane Paved Shoulders with Service Road(Urban Area)underEPCMode intheStateofUP 4296/357Yata-NH Circle/18 dated17.10.2018 21/10/2018 22/10/2018 24/01/2019
Time 12:0Hrs
783 Consultancy Services of Authoritys Engi.forSuper.of Rehabili. andUpgradation of NH730fromKm.537000 to Km.564 750(KaptanganjtoPadrauna) to twolane with paved Shoulders (Rural Area)and FourLane Divided Carriageway with Service Road (Urban Area)underEPC Mode intheState of U.P. 4296/357Yata-NH Circlev /18dated17.10.2018 21/10/2018 22/10/2018 12/11/2018
Time 17:0Hrs
784 Consultancy Services of Authoritys Engineer for Supervision of Four lane Widening and Strengthening of NH29E from Km.81 420(Jungle Kaudiya)to Km.98 935 (Mohaddipur Chowk Road)in the State of Uttar Pradesh. 4296/357Yata-NH Circle/ 18dated17.10.2018 21/10/2018 22/10/2018 12/11/2018
Time 17:0Hrs
785 Independent Engineer Services during Operation and Maintenance period for Four laning of Godhra to Gujarat Madhya Pradesh Border section of NH47(Old NH-59) from km129.300 to km 215.900 in the State of Gujarat on DBFOT basis NHAI/PIU Ahmedaad/2018 18/10/2018 22/10/2018 19/11/2018
Time 11:0Hrs
-
786 Consultancy Services of Authority’s Engineer for supervision of Rehabilitation and Up-gradation from KM. 133.520 to 158.040 (Kulpahar – Mahoba Section) of NH-76 & NH-86 (5.360 km) two lane with paved shoulder on EPC mode in state of Uttar Pradesh 1871M/13M-NHCK/18 Dt. 15.10.2018 27/10/2018 18/10/2018 10/11/2018
Time 17:0Hrs
787 Consultancy Services of Authority’s Engineer for supervision of Rehabilitation and up-gradation of Sultanpur-Pratapgarh Section of NH-96 km. 60.000 to 90.000 (Design CH. 60.000 To 90.865) to two-lane with paved shoulders in the State of Uttar Pradesh on EPC mode 4119/139YATA NH CIRCLE /18 18/10/2018 18/10/2018 29/10/2018
Time 17:0Hrs
788 Supervision Consultancy Services for Operation and Maintenance of the stretch from Km.23.000 to Km.108.800 of Hyderabad to Dindi Section of NH-765 in the State of Telangana. 16682 16/10/2018 16/10/2018 10/12/2018
Time 12:0Hrs
789 Consultancy Services for Authority’s Engineer for Supervision of (a) 4-Laning of Old NH-6 from Km. 296.000 to Km. 304.000 in Khamgaon City in Maharashtra on EPC (Package-I) (b) Improvement of Old NH-6- Akola City–Shivar-PKV Square-Nehru Park Square – Dakshata Nagar Square-Nimwadi Chowk–Washim Bypass–Ridhora Bypass road in Maharashtra on EPC Mode Package-II) (c) Construction of Flyovers in Akola City in Maharashtra on EPC Mode (Package-III) NHAI/RO-NAG/2018-19/19 11/10/2018 12/10/2018 26/11/2018
Time 11:0Hrs
790 Consultancy Services for Supervision of Short Term Improvement and Routine Maintenance contract of Dalkhola-Islampur- Ghoshpukur section from km 447.000 to km 551.000 (excluding km 498.780 to km 507.000) of NH-31 and Salsalabari to West Bengal Assam Border from km 228.000 to km 254.500 section of NH-31C in the State of West Bengal 01/OandM/2018-19 (2nd Call) 11/10/2018 11/10/2018 12/11/2018
Time 17:0Hrs
791 Independent Engineer Services for O&M Phase for Construction of 6 lane Cable Stayed 2nd Vivekananda Bridge over River Hooghly along with its approaches as BOT (Toll) Project 02/OandM/2018-19 11/10/2018 11/10/2018 12/11/2018
Time 17:0Hrs
792 Consultancy Services for Authoritys Engineer For Rehabilitation and upgradation of Kashedi Ghat section of NH-17 (New NH No. 66) to four-lanes with paved shoulders from existing km 148/0 to km 161/600 (Design km 149/510 to km 158/467) including construction of twin-tube six-lane tunnel through an Engineering, Procurement and Construction (EPC ) Contract under NHDP-IV in the state of Maharashtra RO/MUM/AE/NHDPIV-02/2017-18 (2nd Call) 15/10/2018 11/10/2018 26/11/2018
Time 17:0Hrs
793 Consultancy services for Authoritys Engineer for supervision of Package-RSHIP-ADB-Tranche-II/EPC/01 & 04 16/2018-19 08/10/2018 11/10/2018 04/01/2019
Time 11:0Hrs
-
794 Independent Engineer services for O and M Phase for Construction of 6-lane Cable Stayed 2nd Vivekananda Bridge over River Hooghly along with its approaches as BOT (Toll) Project 02/o and m/2018-19 13/11/2018 11/10/2018 05/03/2019
Time 12:0Hrs
795 Reconstruction of 4-Lane Majerhat Bridge (ROB) adjacent to Majerhat Railway Station at 5.8Km on Diamond Harbour Road (NH-117) Kolkata West Bengal 03/2018-19 of SE/SHC 10/10/2018 10/10/2018 25/10/2018
Time 15:0Hrs
796 Consultancy Services of Authoritys Engineer for supervision of Rehabilitation and up gradation of Lakhimpur Sisiya Section Km.140.00to188.800 of NH730 two lane with paved shoulders in the State of Uttar Pradesh on EPC mode. 4164/605C-NH CIRCLE/18 Dt 09/10/2018 18/10/2018 09/10/2018 12/11/2018
Time 17:0Hrs
797 Independent Engineer Services during Operation & Maintenance stage of 4-laned divided carriageway from Km.135.469 (End of Kothakota Bypass) to Km.211.000 (Kurnool) of Hyderabad- Bangalore section of NH-44(Old No.7) in the state of Telangana on BOT (Annuity) basis under North – South Corridor (NHDP Phase-II) Package No.NS2/BOT/AP-5. 16215 09/10/2018 08/10/2018 22/11/2018
Time 11:0Hrs
798 Samakhiyali Gandhidham road section NHAI/PIU Gandhidham/2018/04 12/10/2018 06/10/2018 16/11/2018
Time 11:0Hrs
799 Consultancy services for Authority’s Engineer for Supervision of Construction, Operation and Maintenance of 2-lane Bi-Directional Silkyara Bend –Barkot Tunnel with escape passage including approaches on Dharasu-Yamunotri section between Ch. 25.4 km and Ch. 51.0 km falling along NH-134 (old NH-94) in the State of Uttarakhand” on Engineering, Procurement and Construction (EPC) Mode NHIDCL/Silkyara Tunnel/AE/2018. 11/10/2018 05/10/2018 25/10/2018
Time 15:0Hrs
800 Authority’s Engineer for Supervision of Construction of Stand-alone Ring Road / Bypass around Jammu City in the state of J&K (4 Lane, Length-58.2Km) on Engineering Procurement and Construction (EPC) Basis NHAI/12011/Jammu Bypass/EPC/AE/2017 08/10/2018 05/10/2018 19/11/2018
Time 11:0Hrs
-
801 Independent Engineer Services during Operation & Maintenance stage of 4-laned divided carriageway from Km.278.000 (Kadtal) to Km.308.000 (Armur) of Nagpur - Hyderabad section of NH-44 (Old No.7) in the state of Telangana on BOT (Annuity) basis under North – South Corridor (NHDP Phase-II) Packages No.NS2/BOT/AP-8. 16108 04/10/2018 04/10/2018 19/11/2018
Time 11:0Hrs
802 Supervision Consultant (SC)Services during O&M stageforChandikhole (Km. 0.000) to Paradip (Km. 76.588) section of NH- 5A in the state of Odisha) NHAI/11011/16/RO/OD/2411/2018 05/10/2018 04/10/2018 26/11/2018
Time 11:0Hrs
803 IE Services during O and M stage of 4Laned divided carriageway from Km.230.000(Islam Nagar)to Km.278.000(Kadtal)of Nagpur-Hyd section of NH-44(Old No.7)in the state of Telangana on BOT(Annuity)basis under North-South Corridor(NHDP Phase-II) AP-7. 16001 04/10/2018 04/10/2018 19/11/2018
Time 11:0Hrs
804 Consultancy Services for Authority’s Engineer for Supervision of “(i) Up-gradation to 4-lane with Paved Shoulder of Jammu-Akhnoor road section of NH-144A from Canal head (Km 0.800) to Ganesh Vihar (Km 6.000) of 5.2 Km length (ii) Up-gradation to 4-lane with Paved Shoulder of Jammu-Akhnoor road section of NH-144A from Ganesh Vihar (Km 6.000) to Hanuman Chowk (Km 30.000) of 24 Km length in the state of Jammu and Kashmir to be executed on EPC basis. (iii) Widening and Up-gradation to 2 lane with pa NHIDCL/J&K/NH-144A & 244/J-A & C-S /AE/(R)/2017-18 03/10/2018 03/10/2018 19/11/2018
Time 15:0Hrs
805 Kandla Mundra road section NHAI/PIU Gandhidham/2018/03 04/10/2018 01/10/2018 13/11/2018
Time 11:0Hrs
806 IE Services during operation and maintenance stage of 4 laned divided carriageway from km 175.00 ( MAH/TS border) to km 230.00 ( Islam Nagar) of Nagpur- Hyderabad section of NH-44 (Old.No7) in the state of Telangana on BOT (Annuity) basis under AP-06 15818 01/10/2018 28/09/2018 19/11/2018
Time 11:0Hrs
807 Independent engineer Services during operation and maintenance stage of 4 laned divided carriageway from km 80.050 ( Jadcherla ) to km 135.469 ( end of Kothakota bypass) of Hyderabad- banglore section of NH 44 ( old No.7) in the state of Telangana on BOT ( Toll) - AP4 15803 01/10/2018 27/09/2018 26/11/2018
Time 11:0Hrs
808 Package for Consultancy services for Authoritys Engineer supervision of Civil Construction work for proposed 4lane ROBs and its approaches in existing Level Crossings (i) in lieu of LC No.67at Km 133.200 of NH 205 (ii) in lieu of LC No.75 at Km 145.200 of NH 205 (iii) in lieu of LC No-88 at Km.56/100 of NH-340 (iv) in lieu of 17 at Km 563/200 of NH-67 & (v) Widening and Strengthening of 2 lane with paved shoulders road to 4 Lane road from Km 563/0 to Km 572/0 of Hubli Krishnapatnam Road of SE R and NIT NO.11/2018-19 27/09/2018 27/09/2018 27/11/2018
Time 15:0Hrs
809 Package for Consultancy services for Authoritys Engineer for supervision of Civil Construction works for proposed 4-lane ROBs and its approaches in existing Level Crossings (i) lieu of 23/SPL Class at Km 3.600 on NH-18 (ii) 18A/SPL class at Km 7.800 on NH-18 (iii) lieu of 95/SPL/3E at Km 272.600 on NH 205 (iv) lieu of 102/3E at Km 281.200 on NH-205 in the State of Andhra Pradesh second call. SE R and NIT NO.10/2018-19 27/09/2018 27/09/2018 27/11/2018
Time 15:0Hrs
810 Package for Consultancy services for Authoritys Engineer for supervision of Civil Construction work for proposed 4-lane ROBs and its approaches in existing Level Crossings (i) lieu of 124E/SPL3 at Km 1/8 (ii) 30/E at Km 64/800 (iii) lieu of 45 C- Class at Km 93/400 (iv) lieu of 48E/C at Km 96/800 on NH-205 in the State of Andhra Pradesh (under EPC Mode)( 2nd call) SE NH ATP NIT No 12 2018 19 27/09/2018 27/09/2018 27/11/2018
Time 15:0Hrs
811 Independent Engineer services during Operation and Maintenance stage of 4 Laned divided carriageway from Km.22.300 (Thondupalli) to Km.80.306 (Jadcherla) of Hyderabad- Bangalore section of NH-44 (Old NH No.7) in the state of Telangana on BOT (Toll) basis under North - South Corridor (NHDP Phase - II) Package No.NS2/BOT/AP-3. 15719 28/09/2018 26/09/2018 19/11/2018
Time 11:0Hrs
812 Consultancy Services For Authority’s Engineer for Supervision of four laning of NH-709B from km 92.200(near shamli) to km 155.025 (near Saharanpur) design km 61.409 to km 124.181, length 62.772 km) in the state of uttar pradesh (package-II) under Bharatmala Pariyojana NHAI/BM/EC/Del-Saharanpur/ Stage-1/Pkg-2/AE 03/10/2018 25/09/2018 28/11/2018
Time 11:0Hrs
-
813 Consultancy Services for Authority Engineer services for Supervision of Rehabilitation/ Up gradation to 2 lane with paved shoulders / 4 lane Standards of Naitoanl Highway (I) Section from design chainage Km 0/000 to Km 55/937 of NH-752E from Paithan to Shirur & (II) Section from design chainage Km 55/937 Km to 114/486 Km of NH-752E from Shirur to Kharda on EPC Mode CENH/MAH/Aur-05/2018-19 03/11/2018 25/09/2018 27/11/2018
Time 17:30Hrs
814 Independent Engineer for supervision of upgradation to 4 lane with paved shoulder of Bhimasar Junction of NH-41 to Anjar- Bhuj up to Airport Junction from km 0.000 to km 65.478 of NH-341 to be executed on Hybrid Annuity Mode in the state of Gujarat NHAI/Guj/AnjarBhuj/IE/2018 26/09/2018 24/09/2018 22/10/2018
Time 11:0Hrs
815 CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF Rehabilitation and Upgradation of two lanes with paved shoulder from Moga (Design Ch 0-000) to Makhu (Design Ch 33-611) & Harike (Design Ch 44-680) to Khalra (Design Ch 86-236) including construction of ROB at 81S/2-E at km 32-240 and ROB at LC No B-53/E-2 at km 59-007 (Project Length 75-167 kms) of NH-703- B in the state of Punjab on EPC Mode 86/EE/CWD/FZR dated 20.09.2018 16/10/2018 20/09/2018 12/11/2018
Time 15:0Hrs
-
816 CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF Rehabilitation and Upgradation of Makhu Town at Design Ch 0-000 Existing Km (0-000) to Arifke at Design Ch 24-600 (Existing Km 24-740) including construction of proposed ROB at LC No 93-B1/2-E near village Padhri at Design Ch 4-070 and LC No 102-S/2-E near village Sudhara at Design Ch 12-280 via Mallanwala to two lane with paved shoulders of NH 703 A(Project Length 24-600Km) in the State of Punjab on EPC Mode 86 dated 20.09.2018 16/10/2018 20/09/2018 12/11/2018
Time 15:0Hrs
-
817 Supervision Consultancy Services for Operation & Maintenance of the section from Jarwal to Bahraich Bypass (Pkg-2) (Km.42.546 to Km.93.037) and Bahraich Bypass to Rupadiha Section (Pkg-3) (Km.99.000 to Km.152.847) on NH-28C (New NH- 927) with 2-lane paved shoulders in the State of Uttar Pradesh 10/RO-UP (East),VNS/SC/NH28C/NHAI/2018-19 20/09/2018 20/09/2018 27/10/2018
Time 12:30Hrs
-
818 Supervision Consultancy (SC) Services for O and M stage of Chittorgarh Kota Section of NH 27 from Km. 891.929 to Km. 1052.429 (total length 160.50 km) (Old NH 76 from KM. 199.929 to Km. 360.429) in the State of Rajasthan NHAI/12019/3/Tech- ROJ/ SC-CK/31 05/09/2019 20/09/2018 07/11/2019
Time 11:0Hrs
819 Consultancy services for Authoritys Engineer for Supervision of Construction, Operation and Maintenance of 2-Lane bi-directional Zojila Tunnel with Parallel Escape (Egress) Tunnel excluding approaches on Srinagar Leh Section connecting NH 1 at km 95 and at km 118 in the State of Jammu and Kashmir on EPC Basis 2018 NHIDC 385433 18/09/2018 18/09/2018 17/12/2018
Time 11:0Hrs
820 Consultancy Services for Authoritys Engineer for Supervision of Upgradation of Bilaspur –Mungeli section NH-130A Package – I from existing Ch 07-750 to 26-542 and from Ch 32-093 to 44-186 (Design Ch 0-000 to Ch 18-700 and from Ch 25-900 to Ch 38-000) to two lane with paved shoulder in the State of Chhattisgarh under Corridor Approach through Engineering Procurement & Construction (EPC) mode contract 2018-MoRTH-384211-1 23/10/2018 14/09/2018 13/12/2018
Time 17:0Hrs
821 Consultancy for AE for supervision of construction of new 4-lane bridge92x12.5m wide twin 2 lane structure) over river Ganga at downstream of Farakka Barrage including approaches connecting Farakka-Raiganj section of NH-34 in West Bengal in EPC NHAI/EPC/WB/2018/Farakka/418B/AE 26/09/2018 12/09/2018 17/10/2018
Time 11:0Hrs
822 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF FOUR LANING OF NH – 709B FROM EPE CROSSING (EXISTING CHAINAGE 30.790, DESIGN CHAINAGE 0.000) TO START OF SHAMLI BYPASS (EXISTING CHAINAGE 92.200, DESIGN CHAINAGE 61.409) IN THE STATE OF UTTAR PRADESH UNDER BHARATMALA PARIYOJANA ON EPC MODE 2018-NHAI-13990-1 14/09/2018 10/09/2018 25/09/2018
Time 11:0Hrs
823 Consultancy services for Authority Engineer for supervision of construction of emergency Landing facility on the stretch from Km.1274.000 to 1277.600 on Chilakaluripet- Nellore section of Nh-16 in the state of Andhra Pradesh on EPC mode. nhai/11011/11/2016/elf/chilakaluripet-nellore(1274-1277.600)AE 12/09/2018 10/09/2018 25/10/2018
Time 11:0Hrs
824 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF Construction of highways facilities (Emergency landing Strip) between existing km.171.800 to km 176.500 (near Datrana & Juvanpur Villages) of NH-151A in the State of Gujarat on EPC mode NHAI/11001/11/2018-Datrana-Juvanpur/AE 12/09/2018 10/09/2018 25/10/2018
Time 15:0Hrs
825 Independent Engineer Services during Operation Maintenance stage of Six/ Four lanning of Km 198.00 to Km 263.00, Bharuch - Surat section of NH-48 in the State of Gujarat NHAI/PIU Surat (Expressway)/10-F/2018 07/09/2018 07/09/2018 23/10/2018
Time 11:0Hrs
826 Independent Engineer Services during Operation and Maintenance stage of Six lanned section of Km 108.700 to Km 192.000 Vadodara to Bharuch section of NH 48 on BOT basis in the state of Gujarat NHAI/PIU Surat (Expressway)/10-E/2018 07/09/2018 07/09/2018 23/10/2018
Time 11:0Hrs
827 Consultancy Services for Authority’s Engineer for Construction of six lane elevated structure at Gondal Chowkdi at Ch Km 175 on existing 4 lane Jetpur-Gondal-Rajkot Section from km 117 to 185 on NH-27 old NH-8B in the state of Gujarat NHAI/Gujarat/Gondal Chowkdi/EPC/AE/2018 07/09/2018 06/09/2018 13/11/2018
Time 11:0Hrs
828 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF Construction of Emergency Landing Facility on Pondicherry to Tindivanam section from Km. 13.900 to 18.900 of NH-66 in the State of Tamil Nadu on EPC Mode NHAI/11001/11/2018-Pondicherry-TindivanamDatrana-/AE 13/09/2018 06/09/2018 22/10/2018
Time 15:0Hrs
829 Consultancy Service for AE for (i)Construction/upgradation of existing road to 2L with PS including geometric improvement from Ranipool to Pakyong from Km 0.0 to 16.167 of NH-717-A on EPC under SARDP-NE Phase Á (ii)Improvement & Rehabilitation(I&R) of existing Indira By-Pass from Km 0.0 to 10.117 on NH-10 (iii) I & R of Kapur more at Km 70.0 on NH-10 (iv)Special Repair work between Ranipool to Zero point from km 80.0 to 93.0 of NH-10 in Sikkim (v) PR for Rangpo-Gangtok section for Km 52.0 to 8 NHIDCL/AE/Sikkim/2018 05/09/2018 06/09/2018 09/10/2018
Time 15:0Hrs
830 Supervision Consultancy Services for O and M stage of Bheem Parasoli Gulabpura section of NH 148D (including Bheem Parasoli bypass) and Lambia Raipur section of NH 458 for total length 124.03 km. on EPC mode under NHDP Phase IV NHAI/12012/03/2018-ROJ/SC/28 05/09/2018 05/09/2018 09/10/2018
Time 11:0Hrs
831 Consultancy Services for Authority’s Engineer for Supervision of “Construction of (i) 2 laning of existing Hunli-Anini road on EPC basis from design km 21.50 to km 37.50 (ii) 2 laning of existing Hunli-Anini road on EPC basis from design km 37.50 to km 53.50 and (iii) 2 laning of existing Hunli-Anini road on EPC basis from design km 53.50 to km 92.500 in the state of Arunachal Pradesh under SARDP-NE” NHIDCL/Ar. Pr./Hunli-Anini(21.5 to 92.50)/AE/2018 07/09/2018 04/09/2018 04/10/2018
Time 15:0Hrs
832 Consultancy Services as Independent Engineer during Operation and Maintenance for the project of Design, Engineering, Finance, Construction, Operation and Maintenance of access controlled highway project of Bangalore-Nelamangala section of NH-4 from Km. 10.000 to Km. 29.500 in the State of Karnataka on Build, Operate & Transfer (BOT) basis NIT No.21/ NHAI/RO-BNG/11018/Tender/2018 Dated 31.08.2018 07/09/2018 31/08/2018 11/10/2018
Time 15:0Hrs
833 Independent Engineer Services during Operation and Maintenance Period for the following Stretches in the State of Tamilnadu on BOT basis under NHDP Phase-III 1- From Km 333/300 (Trichy) to Km 412/273 (Dindigul) Section of Old NH45 (New NH83) 2- From Km.80/000 (Thanjavur) to Km 136/490 (Trichy) Section of Old NH67 (New NH83) NHAI/17011/02/2018-ROMadurai/01 05/10/2018 31/08/2018 01/11/2018
Time 15:0Hrs
834 Consultancy services for Authority Engineer for construction of a 4 lane elevated corridor in Deesa Town between km 565.850 to km 569.600 (Length 3.750km) on East West Corridor of NH27 Old NH-14 in Gujarat on EPC Mode NHAI/Guj/Deesa Flyover/EPC/Authority Engineer/2018 29/08/2018 29/08/2018 15/10/2018
Time 11:0Hrs
835 Consultancy Services For Authority’s Engineer For Up gradation to Two lane with paved shoulders configuration for the work Jalgaon Jamod- Nandura (Design Ch. Km. 0/000 to Km. 24/998) of (NH-161G) in the State of Maharashtra on EPC mode NH/MAH/PWD/Akola/AE/Pkg-1-2nd call 30/08/2018 27/08/2018 05/10/2018
Time 17:30Hrs
836 Consultancy Services For Authority’s Engineer For Up gradation to Two lane with paved shoulders configuration for the work Kharwandi - Rajuri [Design ch. Km 0/000 to 36/500] of NH-361F in the State of Maharashtra on EPC mode. NH/MAH/PWD/Aur-7/AE/Pkg-32 (Second Call) 30/08/2018 27/08/2018 05/10/2018
Time 17:30Hrs
837 Consultancy Services For Authority’s Engineer For Up gradation to Two lane with paved shoulders configuration for the work Naldurg - Akkalkot of NH-652 in the State of Maharashtra on EPC mode in the state of Maharashtra NH/MAH/PWD/Pune-7/AE/Pkg-29-2nd call 30/08/2018 27/08/2018 05/10/2018
Time 17:30Hrs
838 Consultancy Services For Authority’s Engineer For Up gradation to Two lane with paved shoulders configuration for the work Manglurpir - Mahan (Design Ch. Km. 75/000 to 107/500) (Ch. Km. 97/074 to 64/574) of NH-161A in the State of Maharashtra on EPC mode. NH/MAH/PWD/Akola/AE/Pkg-2-2nd call 30/08/2018 27/08/2018 05/10/2018
Time 17:30Hrs
839 Consultancy Services For Authority’s Engineer For Up gradation to Two lane with paved shoulders configuration for the work Rahuri - Sonai – Shani Shinganapur (Design Ch. Km. 0/000 to 26/143) of NH-160 C in the State of Maharashtra on EPC mode. EPC mode NH/MAH/PWD/Pune-8/AE/Pkg-30 (Second Call) 30/08/2018 27/08/2018 05/10/2018
Time 17:30Hrs
840 Independent Engineer Services for Four-Laning of Puducherry – Poondiyankuppam section of NH 45A (New NH 32) from Km 29.000 to Km 67.000 (Design Chainage) under Bharatmala Pariyojana Phase I (Residual NHDP IV works) on HAM in the State of Tamil Nadu and Union Territory of Puducherry (2nd Call). NHAI/Tech/TN/NH-32/Pudu-Poond/IE/2018 10/09/2018 27/08/2018 25/09/2018
Time 11:0Hrs
841 Consultancy services for Authority Engineer forsupervision of package no RSHIP-ADB-Tranche-II/EPC/01-04 6/2018-19 28/08/2018 27/08/2018 10/09/2018
Time 17:0Hrs
-
842 Consultancy Services for Supervision of Short Term Improvement and Routine Maintenance contract of Dalkhola-Islampur- Ghoshpukur section from km 447.000 to km 551.000 (excluding km 498.780 to km 507.000) of NH-31 and Salsalabari to West Bengal Assam Border from km 228.000 to km 254.500 section of NH-31C in the State of West Bengal 01/O and M/2018-19 23/08/2018 23/08/2018 20/09/2018
Time 17:0Hrs
843 Independent Engineer for supervision of widening of Pipli–Bhavnagar- Section Package 1 from km 136/025 to 169/328 (Design Chainage km 136/000 to km 169/308) Near Adhelai Village to Nari Junction to four laning from existing 10-Meter-wide in the State of Gujarat on Hybrid Annuity Mode NHAI/Guj/IE/NariPipli/2018 23/08/2018 23/08/2018 24/09/2018
Time 11:0Hrs
844 Consultancy Services for Authority’s Engineer for Supervision of Rehabilitaion/Maintenance of newly entrusted Churachandpur-Singhat-Sinzawl Tuivai road section from Km 103.1 to Km 161.48 on NH-102B and Churachandpur-Tipaimukh road from km 185.00 to Km 262.00 (Package-II) on EPC basis in the state of Manipur. NHIDCL/AE/Manipur/C-T/2018/2 17/08/2018 16/08/2018 25/10/2018
Time 15:0Hrs
845 Independent Engineer services for Four/Six Laning of Aunta-Simaria (Ganga Bridge with approach roads) section of NH-31 from Km 197.900 to Km 206.050 (Design Chainage) (Existing Chainage Km 204.741 to Km 209.945) [Total Design Length 8.15 Km] in the State of Bihar on Hybrid Annuity Mode. NHAI/BH/Aunta-Simaria/HAM/IE/2017/Proc/ 10/08/2018 08/08/2018 05/09/2018
Time 11:0Hrs
846 Consultancy services for Authority Engineer for supervision of construction of 4-laning from Itanagar to Banderdewa (Package A from 29.500 km to 40.40 km) in the state of Arunachal Pradesh on EPC mode. CEAP(HW)/W-24/IB/AE/2018-19 31/07/2018 03/08/2018 29/08/2018
Time 14:0Hrs
847 Consultancy Services for Independent Engineer services for construction of new link (NH-133B) from Km 0.000 (Km 200.87 of Sahibganj Bypass) in Jharkhand to Km 15.885 (Junction of NH-133B and 131A on Manihari Bypass) and construction of Manihari Bypass from Km 0.000 (Junction of NH-133B and 131A on Manihari Bypass) to Km 6.000 near Narenpur of NH-131A in Bihar including Ganga Bridge to 4 lane standard on Hybrid Annuity Mode NHAI/JH/IE/Sahibganj Bridge/2017 05/09/2018 03/08/2018 11/12/2018
Time 11:0Hrs
848 Consultancy Service for Authority’s Engineer for i Construction of alternative highway PackageIVA from 0.00 to 13.00 of Bagrakot Kafer section of NH-717A on EPC mode in state of West Bengal ii Construction of alternative highway Package IVB from 13.00 to 25.60 of Bagrakot Kafer section of NH717A on EPC mode in state of West Bengal iii Construction of alternative highway Package IVD from 26.10 to 40.00 of Bagrakot Kafer section of NH-717A on EPC mode in state of West Bengal iv Constructio NHIDCL/AE/West Bengal /2018 31/07/2018 02/08/2018 17/09/2018
Time 15:0Hrs
849 Supervision Consultant (SC) Services for Operation and Maintenance of i) Swaroopganj-Pindwara Section (Km.248.700 to Km. 264.000) of NH-14 and Pindwara-Udaipur Section (Km 0.000 to Km. 104.724) of NH-76 in the state of Rajasthan ii) Debari to Udaipur Section (Km. 118.500 to Km. 113.830) of NH-76, 11.20 Kms two lane existing Udaipur Bypass from Pratapnagar to Balicha and Udaipur to Kaya Section (Km. 278.000 to Km. 287.400) of NH-8 NHAI/2018/12022/3/25 03/08/2018 01/08/2018 12/09/2018
Time 11:0Hrs
850 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF “Construction of Dwarka expressway from shiv Murti Intersection at km 20 of NH 8 till Rail under Bridge (RuB) near Dwarka Sector 21, from km -0.800 to 5.300-Package-I in Delhi ” ON EPC mode. NHAI/Tech/DE/Package-I/ AE/2018 03/08/2018 01/08/2018 24/09/2018
Time 11:0Hrs
851 Appointment of Independent Engineer IE during O M period of 4 Lanning of Rohtak Panipat Section NH 71A from Km. 0 000 Km. 63 300 of NH 10 to Km. 80 858 Km 83 500 of NH 1 in the State of Haryana under NHDP Phase III on DBFOT basis NHAI RO CHD 11011 PD RTK RTK Pani O M IE RFP 09/08/2018 31/07/2018 13/09/2018
Time 11:0Hrs
852 Supervision Consultancy Services for construction supervision of the balance work of Rehabilitation and upgradation to four lanes from km 16.000 to km 96.127 of Gwalior – Jhansi Section of NH-75 in the State of UP and MP under North-South Corridor (NHDP Phase-II) on EPC Mode (Item Rate Basis). NHAI/MP/G-J/EPC-Item Rate/ SC/01/17 01/08/2018 30/07/2018 05/09/2018
Time 11:0Hrs
853 Consultancy Services for Authoritys Engineer Supervision Under package V for Rehabilitation and Up-gradation Amanganj Pawai section and Chandiaghat Katni section of NH 43 Ext Two lane with paved shoulder in the state of MP on EPC Mode. 1116/NNH/AE/pkg-V/EPC/2017-18 20/08/2018 27/07/2018 30/08/2018
Time 17:30Hrs
854 Consultancy Services for Authoritys Engineer Supervision for Balance work of Rehabilitation and Up- gradation Bameetha Satna section of NH 75 Two lane with paved shoulder in the state of MP on EPC Mode 115/B-SATNA/AE/EPC/2017-18 20/08/2018 27/07/2018 30/08/2018
Time 17:30Hrs
855 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF CONSTRUCTION OF GRADE SEPARATOR FROM H 7 AREA TO PORT CONNECTIVITY ROAD BY PASSING CONVENT JUNCTION IN THE STATE OF ANDHRA PRADESH ON EPC MODE 2ND CALL 11011/1/2018/VPRCL/Convent Junction/AE/2nd Call 27/07/2018 25/07/2018 27/08/2018
Time 11:0Hrs
856 STRENGTHENING WITH PAVED SHOULDERS FROM KM 30/0 TO KM 46/0, KM 54/0 TO KM 61/0, KM 69/0 TO KM 80/0, KM 80/0 TO KM 96/0 OF NH 39 INCLUDING TOLL PLAZA UNDER GOLAGHAT NH DIVISION UNDER EPC MODE IN THE STATE OF ASSAM 2/AE/APWD 25/07/2018 25/07/2018 01/09/2018
Time 15:0Hrs
857 Appointment of Safety Consultants for Four Laning of Gundugolanu – Devarapalli – Kovvuru Section of NH-16 from Km. 15.320 (Existing Km. 15.700) to Km. 85.204 (Existing Km. 81.400) (Design Length=69.884 Kms.) in the State of Andhra Pradesh under Bharatmala Pariyojana on Hybrid Annuity Mode NHAI/RO-VJA/12004/SC-EGK/1725 25/07/2018 25/07/2018 24/08/2018
Time 11:0Hrs
858 Appointment of Safety Consultants for Four lane connectivity to Visakhapatnam Port Road from Km 0.000 to Km 12.700 (Design Length = 12.70 Km) in the State of Andhra Pradesh under Bharatmala Pariyojana on Hybrid Annuity Mode NHAI/RO-VJA/11009/SC-VPR/1723 25/07/2018 25/07/2018 24/08/2018
Time 11:0Hrs
859 Appointment of Safety Consultants for Six laning of Anandapuram – Pendurthi – Anakapalli Section of NH-5 (new NH-16) from Km 681.000 (Existing Km 681.000) to Km 731.780 (Existing Km 742.400) (Design Length = 50.78 Km) in the State of Andhra Pradesh under Bharatmala Pariyojana on Hybrid Annuity Mode NHAI/RO-VJA/11009/SC-APA/1724 25/07/2018 25/07/2018 24/08/2018
Time 11:0Hrs
860 Consultancy services for posting of AE for Rehabilitation and up gradation of 2 lane/ 2 lane with paved shoulder from existing km. 172.900 to km. 194.150 (Design Chainage km. 49.300 to Km. 70.300) on Dharasu to Yamunotri Road of NH- 134 (old NH-94) in the state of Uttarakhand through an Engineering, Procurement and Construction (EPC) Contract. 3076/13yata-NH-10/2018 dated 23.07.18 25/07/2018 25/07/2018 08/10/2018
Time 15:0Hrs
861 Consultancy services for posting of Authority Engineer for Construction of Kund Bypass from Existing Km 33.130 to Km 41.260 (existing length 8.130 km) design chainage km 35.130 to km 47.700(design length 12.570 km) on NH-109 (New No. 107) in the State of Uttarakhand under EPC Mode under improvement to NH Connectivity to Chardham 3076/ 13 yata - Nh-10/2018 25/07/2018 25/07/2018 08/10/2018
Time 15:0Hrs
862 Appointment of Safety Consultants for Six laning of Narasannapeta - Ranasthalam section of NH-16 from design Km 580.671 (Existing Km 580.700) to design Km 632.861 (Existing Km 634.000) (Design Length – 54.19 Km) in the State of Andhra Pradesh under NHDP Phase V on Hybrid Annuity Mode NHAI/RO-VJA/11050/8/SC-NR/2nd Call 24/07/2018 24/07/2018 23/08/2018
Time 11:0Hrs
863 Consultancy Services as Independent Engineer during Operation & Maintenance of 4-laning of Devihalli – Hassan Section from Km. 110.000 to Km. 189.500 of NH-48 (New NH No. 75) including a new 2-lane with Paved Shoulder Bypass for Channarayapatna Town and widening of existing Hassan Bypass to 2-lane with Paved Shoulders on DBFOT Basis in the State of Karnataka NIT No.13/NHAI/RO-BNG/23019/Tender/2018 dt. 24.07.2018 27/07/2018 24/07/2018 06/09/2018
Time 15:0Hrs
864 Independent Engineer services during Operation and Maintenance Period for Talegaon - Amravati section of NH-6 (New NH-53) from Km 100.000 to Km 166.725 in the State of Maharashtra under NHDP Phase-III on Build, Operate and Transfer (BOT) basis NHAI/RO-NAG/2018-19/10 23/07/2018 23/07/2018 17/09/2018
Time 11:0Hrs
865 Consultancy services for Authority’s Engineer for Supervision of (i) Rehabilitation and Up-gradation from 2 lane to 4 lane on NH Stretch under NHDP-IVB for Varanasi-Dagamagpur (Pkg-1) Section of NH-7 and Design Chainage Km 15.100 to Km. 49.100. Length 34 Km. (Package- 1) (ii) Rehabilitation and Up-gradation from 2 lane to 4 lane on NH Stretch under NHDP-IVB for Dagamagpur-Lalganj Section of NH-7 (Pkg-2) and Design Chainage Km 49.100 to Km. 96.800. Length 47.7Km. (Package-2) (iii) Rehabilitation NHAI/NHDP-IV/Varanasi-Hanumanha/EPC/AE/RFP/2018 24/07/2018 23/07/2018 29/08/2018
Time 11:0Hrs
-
866 Independent Engineer for Operation and Maintenance of Agra Gwalior section from Km 8.0 to Km 103.0 of NH 3 Length 95.00 Km and Operation of Toll Plaza at Km 32.607 Km 00.00 to Km 42.033 of Gwalior Bypass in the State of Uttar Pradesh, Rajasthan and Madhya Pradesh on Operate, Maintain and Transfer OMT Basis Pkg 22 NS and Authority Engineer for Construction of 4 lane Flyover at Km. 80.742 from Km. 79.780 to 81.200 Length 1.420 Km of NH-3 at Morena Town in the State of Madhya Pradesh on EPC mode NHAI/RO-MP/Gwl/IE/AE/2018 dated 19.07.2018 26/07/2018 19/07/2018 04/09/2018
Time 11:0Hrs
867 CONSULTANCY SERVICE FOR SUPERVISION OF REHABILITATION AND UPGRADATION OF EXISTING HIGHWAY OF 2 LANE WITH PAVED SHOULDER OF DAHEGAON KUHI UMRED SECTION OF NH 247 IN THE STATE OF MAHARASHTRA EENH/TENDER/AE/2018-19/2756 27/07/2018 16/07/2018 30/07/2018
Time 17:0Hrs
868 Consultancy Services for Supervision of Short Term Improvement and routine maintenance contract of Kotwa-Mehsi-Muzaffarpur Section from km 440.00 to km 520.00 (Total Length 80.00 Km) of NH-28 in the State of Bihar (3rd Call). 33/RO-PATNA/NHAI/2017-18 17/07/2018 13/07/2018 11/09/2018
Time 12:30Hrs
869 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF construction of Emergency Landing Facility on the stretch from km.1210.000 to km.1215.000 on Chilakaluripet-Nellore section of NH-16 in the State of Andhra Pradesh on EPC mode – under BHARATMALA PARIYOJANA PHASE I. nhai/11011/11/2016/2018/elf/ae/chilakuripet-nellore 20/07/2018 12/07/2018 06/09/2018
Time 11:0Hrs
-
870 Consultancy Services of Authority s Engineer for Supervision of Const. of two-lane with paved shoulder Bahraich bypass from Km.92.547toKm.99.000 of NH-28C in the State of UttarPradesh on EPC mode under NHDP IV. Job no.28C-UP-NHDPIV-2017-18-01. 3001/162-Yata- NH Circle/2018 Dated 05.07.2018 12/07/2018 12/07/2018 26/07/2018
Time 17:0Hrs
871 Independent Engineer services for Operation and Maintenance Four laning of End of Durg Bypss-Chhattisgarh/Maharashtra Border section from Km. 322.000 to Km. 405.000 of NH-6 (New NH-53) in the State of Chhattisgarh executed as BOT (Toll) on DBFOT pattern under NHDP Phase-III 11052/RO-Raipur/Tender/09 20/07/2018 11/07/2018 25/09/2018
Time 14:30Hrs
872 Authority Engineer for Rehabilitation and Up-gradation from KM. 133.520 to 158.040 of NH 76 and NH-86 (5.360 Km.) (Kulpahar-Mahoba Section) to two lane with paved shoulder on EPC Mode in the state of Uttar Pradesh. 1311M/13M-NHCK/18 06/07/2018 09/07/2018 30/07/2018
Time 17:0Hrs
873 Appointment Safety Consultants for Rehabilitation and Upgradation of Giddalur – Vinukonda section of NH-544D from Design km.212.983 (existing km.213.000) to Design km.322.800 (existing km.322.840) (Design length 112.797km) in the State of Andhra Pradesh under NH(O) on Hybrid Annuity Mode NHAI/RO-VJA/GV/18-19/1601 24/07/2018 06/07/2018 06/08/2018
Time 11:0Hrs
874 for supervision for O&M and Periodic Renewal works (PR-I & PR-II) of 6-Laned Pimpalgaon-Nashik-Gonde (Km 380 to Km 440), Section of NH-3 in the State of Maharashtra NHAI/RO/MUM/NSK/PNG/SC/2017-18/8 09/07/2018 05/07/2018 02/08/2018
Time 11:0Hrs
875 Consultancy services for Authority Engineer for Supervision of Four-lane divided highway from Melur (Design Km 0.000/Existing Km 99.920 of NH-38) to Karaikudi (Design Km 45.860/Existing Km 12.900 of NH-383 Ext.) (Design Length = 45.860 Km) in the State of Tamil Nadu under Bharatmala Pariyojana on EPC Mode NHAI/11012/Mel-Kar/EPC/AE/03/2018 13/07/2018 03/07/2018 03/01/2019
Time 11:0Hrs
876 Consultancy Services For Authority’s Engineer For Supervision of Four Lane divided carriageway from Vadipatti (Design Chainage 0) to Chittampatti (Design Chainage 29 960) Stretch of Madurai Ring Road Section of NH 744A on EPC mode under Bharatmala Pariyojana Phase I in the state of Tamil Nadu NHAI/11012/MRR/EPC/AE/14/2018 05/07/2018 02/07/2018 13/12/2018
Time 11:0Hrs
-
877 Consultancy services for Authority Engineer for Supervision of Six Lanning of Sriperumbudur to Karaipettai from km 37.000 to 71.015(34.015 km) of NH-4 (New NH-48) in the state of Tamil Nadu under residual NHDP (Phase-V) under Bharatmala Pariyojana on EPC Mode NHAI /11012/Sri-Kar/EPC/AE/01/2018 NHAI /11012/Sri-Kar/EPC/AE/01/2018 12/07/2018 02/07/2018 26/11/2018
Time 11:0Hrs
878 Consultancy services for Authority Engineer for Supervision of Six Lanning of Karaipettai to Walajapet from Km 71.015 to 107.091 (36.076 km) of NH-4 (New NH-48) in the state of Tamil Nadu under residual NHDP (Phase-V) under Bharatmala Pariyojana on EPC Mode NHAI /11012/Kar-Wal/EPC/AE/02/2018 12/07/2018 02/07/2018 04/10/2018
Time 11:0Hrs
879 Independent Engineer services for Operation and Maintenance of Four Laning of Durg bypass from km.308.600 to km.323.600 of NH-6 (New-53) and Raipur-Aurang from km. 239.00 to km. 282.000 of NH-6 (New-53) in the State of Chhattisgarh executed as BOT (Toll) on DBFOT pattern under NHDP Phase-IV 11052/RO-Raipur/Tender/08 20/07/2018 30/06/2018 01/08/2018
Time 14:30Hrs
880 Independent Engineer services for Four Laning of Chengala to Neleshwaram town (Pallikara Railway Gate) section of NH-17 (New NH-66) from km 57.200 (Design km 56.200) to km 95.650 (Design km 93.468) (total length 37.268 km) in the State of Kerala under NHDP Phase-III on Hybrid Annuity Mode NHAI/Tech/KL/Chengala-Neleshwaram/NH-17/IE/2017-18 09/08/2018 27/06/2018 10/09/2019
Time 11:0Hrs
881 Consultancy Services For Authoritys Engineer for Supervision of Balance work of Four-laning of Raiganj-Dalkhola section of NH-34 from km 398.00 to km 452.750 (Package-V) under NHDP Phase-III in the State of West Bengal on EPC NHAI/EPC/ WB/NH34/2018/PK05/419/AE 10/07/2018 26/06/2018 23/08/2018
Time 11:0Hrs
882 Consultancy Services for Authority s Engineer for Up gradation of newly declared NH-341 to two-lane with Paved shoulder configuration between Km. 65.478 to Km 162.209 Bhuj Airport Jn - Khavda - India Bridge to Dharmshala section in the State of Gujarat 8 of 2017-18 2nd Attempt 22/06/2018 22/06/2018 16/07/2018
Time 15:0Hrs
883 Consultancy Services for Authoritys Engineer for Construction of proposed 4-Lane R.O.B and its approaches in replacement of existing old and narrow ROB LC No. 149A at Ch 39.885 on NH 168A near Dhanera EPC Mode Upgradation of new N. H. No. 168 to two lane with paved side shoulder configuration between Km 0/0 to 41/300 and Km 43.250 to 68.174 Dhanera Panthawada section 2 lane PSS in the State of Gujarat. Project Length 66.224 Km 1.120 Km On EPC Mode 09 of 2017-18 3rd Attempt 22/06/2018 22/06/2018 07/07/2018
Time 15:0Hrs
884 (i) Consultancy Services for Authority’s Engineer for Supervision of Construction of 2nd Flyover (LCW) in Kishanganj Town starting from km 472.300 to km 475.480 of NH-31(Total Length - 3.180 km) in the State of Bihar on EPC Mode. (ii) Consultancy Services for Supervision Consultant for O & M of Km 410.70 to Km 447.00 (Purnea – Dalkhola Section) of NH-31(iii) Supervision Consultancy Services for supervision of restoration work in Km 410.7to Km 447.000 of NH-31 NHAI/BH/Kishanganj/NH-31/AE/2018(2nd Call) 22/06/2018 22/06/2018 31/07/2018
Time 11:0Hrs
885 Independent Engineer services for O and M of Four laning of Orissa Border Aurang section from Km 88 to Km 239 of NH 6 in the State of Chhattisgarh executed as BOT Toll on DBFOT pattern under NHDP Phase IV 11052/RO-Raipur/Tender/07 06/07/2018 21/06/2018 23/07/2018
Time 14:30Hrs
886 Independent Engineer Services for supervision of Six Laning of Shamlaji to Motachiloda from km 401.200 to km 494.410 (Length 93.210 km) section of NH-8 in the state of Gujarat under NHDP phase-V (Package-VI) on HAM NHAI/Guj/Shamlaji-Motachiloda/IE/2018 02/07/2018 20/06/2018 23/08/2018
Time 11:0Hrs
887 4-laning of Aligarh-Kanpur section from Km 229/000 (Design chainage 240/897) to Km 289/000 (Design chainage 302/108) (Package-III form Kalyanpur- Naviganj) of NH-91 in the state of Uttar Pradesh on HAM Mode under Bhartamala Pariyojana- Appointment of Independent Engineer. NHAI/UP/11017/1/2009/NHDP-IV/AK91/PKG-III/IE 18/06/2018 18/06/2018 07/08/2018
Time 11:0Hrs
888 Six Laning of Hapur bypass to Moradabad Section including Hapur bypass from km 50.000 (design chainage 50.000) to km 148.277 (design chainage 149.867) of NH-24 (New NH 9) in the State of Uttar Pradesh-Appointment of Independent Engineer. 11011/5/2017-HM-I/UP/IE 18/06/2018 18/06/2018 09/08/2018
Time 11:0Hrs
889 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF FOLLOWING PROJECTS “(i) Construction of Proposed 4 lane ROB and its approaches in lieu of existing level crossing No. 328A at Km 0.500 on Barmer-Gadra-Munabao Railway line of NH-25E in District Barmer” “(ii) Construction of proposed 2 lane ROB and its approaches in lieu of existing level crossing No. C-293 & A-292 at Km 233/038 & 233/435 on NH-112 on Jodhpur to Barmer Road at Balotra” & “(iii) Up-gradation to two lane with paved s 02/2018-19 (SE NH Corcle Jodhpur) 28/06/2018 17/06/2018 16/07/2018
Time 18:0Hrs
890 Independent Engineer Services for Supervision of Redesigning, Rehabilitation and Upgradation to Four Lane configuration & Strengthening of UP/Haryana Border to Rohna Section from km 0.000 to km. 44.800 of NH-334B in the State of Haryana on HAM Mode (Package-I) NHAI/Tech/Haryana/NH-334B/UP/HR Border-Rohna/IE/2018 18/06/2018 15/06/2018 05/11/2018
Time 11:0Hrs
891 Consultancy services for posting of Authority Engineer for Construction of 2-lane with paved shoulders configuration & strengthening of NH-58 from km 338.00 to 350.00 and 350.00 to 368.00 on NH-58 in the State of Uttarakhand on EPC Mode 1959/13yata-NH-10/2018 dated 02.06.2018 15/06/2018 15/06/2018 19/07/2018
Time 17:0Hrs
892 Consultancy service for Authority’s Engineer for supervision of Construction of 4-lane ROB and its approaches in lieu of existing Level Crossing No.48/E at km.66.900 on NH-50(Railway Chainage 96/6-7) Near Naubad in the state of Karnataka on EPC Mode (Job No.NH-50-KNT(14)/17-S&R(B)-013 EE/NHD/KLB/NH-50/Job-013/PB-2/NIT/2018-19/250 15/06/2018 15/06/2018 30/07/2018
Time 17:0Hrs
893 Consultancy service for Authority Engineer for supervision of Strengthening of existing two lane pavement including paved shoulders on NH-39 (new NH-02) Mao- Imphal Section (SH - Mao-Senapati and R– Koubru leikha section from km 212.325 to km 260.000 and km 260.000 to km 287.000 respectively) on EPC mode (4th Call) RW/GHT/MN/DP(O)/2016-17/18-19/AE 13/06/2018 15/06/2018 24/07/2018
Time 11:0Hrs
894 Supervision Consultant (SC) Services for Operation and Maintenance of i) Swaroopganj-Pindwara Section (Km.248.700 to Km. 264.000) of NH-14 and Pindwara-Udaipur Section (Km 0.000 to Km. 104.724) of NH-76 in the state of Rajasthan ii) Debari to Udaipur Section (Km. 118.500 to Km. 113.830) of NH-76, 11.20 Kms two lane existing Udaipur Bypass from Pratapnagar to Balicha and Udaipur to Kaya Section (Km. 278.000 to Km. 287.400) of NH-8 NHAI/2018/12022/3/24 13/06/2018 14/06/2018 23/07/2018
Time 11:0Hrs
895 test project do not apply test project do not apply 14/06/2018 14/06/2018 15/06/2018
Time 15:0Hrs
896 test project do not apply2 test project do not apply2 14/06/2018 14/06/2018 15/06/2018
Time 15:0Hrs
897 Consultancy Services for Supervision Consultant (SC) for Operation and Maintenance of km 1065 to 1119 of Nalbari to Ghy section of NH-31 and km 146.172 to 163.895 of ghy Bypass of NH 37 in the state of Assam 2nd Call SC/OM/02 14/06/2018 13/06/2018 03/07/2018
Time 11:0Hrs
-
898 Consultancy service for Authority’s Engineer for supervision of Strengthening and Widening to two lane with paved shoulder of NH-61 from km 40.00 to km 72.40 (Package-I) and from km 168.00 to km 183.00 (Package-II) in the State of Nagaland under EPC mode RW/GHT/NG/DP(O)/2016-17/NH-61/AE 08/06/2018 11/06/2018 24/07/2018
Time 11:0Hrs
899 Consultancy Services for Authority’s Engineer for –Construction, Operation and Maintenance of 2-lane Bi-Directional Silkyara Bend –Barkot Tunnel with escape passage including approaches on Dharasu-Yamunotri section between Ch. 25.4 km and Ch. 51.0 km falling along NH-134 (old NH-94) in the State of Uttarakhand” on Engineering, Procurement and Construction (EPC) Mode. NHIDCL/Silkyara Tunnel/AE/2018 08/06/2018 08/06/2018 05/09/2018
Time 15:0Hrs
900 Independent Engineer services for 4-laning of NH-80 section of Mirza Chauki to Farkka from km. 215.00 to km. 260.00 in the State of Jharkhand (Package-I) on Hybrid Annuity Mode. NHAI/11012/JH/IE/NH-80/Pkg-I/2018 08/06/2018 08/06/2018 07/02/2019
Time 11:0Hrs
901 Independent Engineer services for Construction of Churhat bypass including Tunnel on Rewa Sidhi section of NH 75E from chainage 33.200 to chainage 55.400 (design length 15.350 km.) in the state of MP on “hybrid annuity mode”. NHAI/HQ/MP/Churhat Bypass/IE/2016 11/06/2018 08/06/2018 02/08/2018
Time 11:0Hrs
902 Independent Engineer Services during Operation and Maintenance Period for Four laned Jammu-Udhampur section from km 15.00 Jammu Bypass to km 67.00 on BOT Annuity in Jammu and Kashmir under NHDP-Phase II NHAI/2015/OM/11074/IE/01 07/06/2018 08/06/2018 30/07/2018
Time 11:0Hrs
903 (i) 4 Lanning of Aligarh-Kanpur Section from km. 140/200 (Design Chainage 140/200) to km 186/000 (Design Chainage 195/733) [Package-I from Aligarh-Bhadwas] of NH-91 in the state of Uttar Pradesh on Hybrid Annuity Mode under Economic Corridor of Bhartamala Pariyojana. (ii) 4-laning of Aligarh-Kanpur section from Km 186/000 (Design chainage 195/733) to Km 229/000 (Design chainage 240/897) (Package-II from Bhadwas - Kalyanpur) of NH-91 in the State of Uttar Pradesh on Hybrid Annuity Mode under Econ NHAI/UP/11017/1/2009/NHDP-IV/AK91/IE 08/06/2018 08/06/2018 07/08/2018
Time 11:0Hrs
-
904 Consultancy Services of Authoritys Engineer for supervision of Four lane widening and strengthening of NH29E from Km. 81.420 (Jungle Kaudiya) to Km. 98.945 Mohaddipur Chowk Road)Design Km. 81.420 to Km.98.935 in the State of Uttar Pradesh. 1609 /357Yata-NH Circle/18 Dated 08.05.2018 07/06/2018 07/06/2018 03/07/2018
Time 12:0Hrs
905 Appointment of Independent Engineer (IE) during O M period of widening 6 laning from 86 Km to 96 Km covering Panipat City on NH-1 in Haryana including elevated structure covering Gohana Road, Sanulai Road, Assandh Road crossing, City Bus stand and Skylark Tourist Complex, peripheral lane and service road etc 11011/PD-AMB/ Panipat Elevated/O&M/RFP 06/06/2018 06/06/2018 18/07/2018
Time 11:0Hrs
906 Consultancy Services for Authority’s Engineer for Supervision of “Two lane with hard shoulders of Chakabama-Zunheboto Road from (i) Design Km 0.000 to Km 25.000 (Existing Km 0.000 to Km 25.760) (ii) Design Km 25.000 to Km 50.000 (Existing Km 25.760 to Km 52.370)” in the state of Nagaland under SARDP-NE on EPC Mode. NHIDCL/Nagaland/ Chakabama-Zunheboto (0 to 50.000)/AE/2018 13/06/2018 06/06/2018 23/07/2018
Time 16:30Hrs
907 Consultancy Services for Authority’s Engineer for Supervision of “Two lane with hard shoulders of Chakabama-Zunheboto Road from (i) Design Km 50.000 to Km 75.000 (Existing Km 52.370 to Km 79.040) (ii) Design Km 75.000 to Km 95.000 (Existing Km 79.040 to Km 100.345) (iii) Design Km 95.000 to Km 115.534 (Existing Km 100.345 to Km 122.250)” in the state of Nagaland under SARDP-NE on EPC Mode. NHIDCL/Nagaland/ Chakabama-Zunheboto (50.00 to 115.534)/AE/2018 13/06/2018 06/06/2018 23/07/2018
Time 16:30Hrs
908 Consultancy Services for Authority’s Engineer and Engineer In- Charge as Applicable for Km 0.00 To Km 330.70 of Andaman Trunk Road in the Union Territory of Andaman & Nicobar Islands for EPC Contracts Packages (Total Length= 90 Km) and Item Rates Contracts (Total Length= 64.40 Km) respectively. NHIDCL/AE/A&N/Middle/Pkg III-VI/2018 06/06/2018 05/06/2018 21/08/2018
Time 15:0Hrs
909 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF “Construction of Dwarka expressway from shiv Murti Intersection at km 20 of NH 8 till Rail under Bridge (RuB) near Dwarka Sector 21, from km -0.800 to 5.300 –Package-I in Delhi ” ON EPC mode. NHAI/Tech/DE/Package-I/AE/2018 04/06/2018 04/06/2018 11/07/2018
Time 11:0Hrs
910 Consultancy services for Authority’s Engineer for Supervision of Four Laning of (a) Medshi to Washim Section (Package- II) from Km 47/700 to Km 92/200 (Design Chainage) (b) Washim to Pangare Section (Package- III) from Km 92/200 to Km 134/500 (Design Chainage) of NH-161 in the State of Maharashtra on EPC mode(2nd Call) NHAI/Tech/MH/AE/Med –Wash - Pang/2018-2nd 12/06/2018 01/06/2018 02/07/2018
Time 11:0Hrs
911 Independent Engineer services for six laning &strengthening of NH248A from existing km 2.740 (Rajiv chowk) to km 11.682 in Gurugram under NHDP Phase IV on Hybrid Annuity Mode in the State of Haryana PackageI NHAI/Tech/Gur/IE/PkgI/2018 06/06/2018 31/05/2018 02/07/2018
Time 11:0Hrs
912 Independent Engineer services for six laning &strengthening of new NH 248A from existing km 11.682 to km 24.400 (design ch. 9.282 to km 22.000) under NHDP Phase IV on Hybrid Annuity Mode in the State of Haryana PackageII NHAI/Tech/Gur/IE/PkgII/2018 06/06/2018 31/05/2018 02/07/2018
Time 11:0Hrs
913 Consultancy Service for Authority s Engineer for supervision of Pkg I Construction of 4 lane Flyover at Amberpet X road Hyderabad and Pkg II Constn of Uppal Six lane Elevated Corridor from Km 7.95 to Km 14.20 of NH 163 of Hyd BP sec in Telangana RW/NH-12014/06/2017-TS/P7Dated 24.05.18 31/05/2018 31/05/2018 16/08/2018
Time 15:0Hrs
914 Consultancy services of Authority’s Engineer for supervision of Widening the existing lane to 2 lane with paved shoulder from Km.239/900 to 294/300 km (Nayagarh to Khurda) excluding Khurda bypass of NH-57 on EPC mode in the state of Odisha 05 CE NH 2018-19 28/05/2018 29/05/2018 19/07/2018
Time 17:0Hrs
915 Independent Engineer services for Six Laning of Chakeri to Allahabad Section of NH-2 from km 483.687 to km 628.753 (Design Length – 145.066 km) on Hybrid Annuity mode under Bharatmala Pariyojana in the State of Uttar Pradesh Chakeri-Allahabad/ NH-2/HAM/IE/2018 28/05/2018 24/05/2018 09/07/2018
Time 11:0Hrs
916 Package for Consultancy services for Authority Engineer supervision of Civil Construction work for proposed 4lane ROBs and its approaches in existing Level Crossings (i) in lieu of LC No.67at Km 133.200 of NH 205 (ii) in lieu of LC No.75 at Km 145.200 of NH 205 (iii) in lieu of LC No 88 at Km.56/100 of NH340 (iv) in lieu of 17 at Km 563/200 of NH67 & (v) Widening and Strengthening of 2 lane with paved shoulders road to 4 Lane road from Km 563/0 to Km 572/0 of (Proddutur Bye Pass Road) Hubli SE R and B NIt no.64/2018-18 23/05/2018 24/05/2018 09/07/2018
Time 15:0Hrs
917 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF 1) WORK OF CONSTRUCTION OF FLYOVER AND UNDERPASS WITH SERVICE ROADS AT ATUL KATARIA CHOWK ON OLD DELHI-JAIPUR ROAD IN GURUGRAM (HARYANA) & 2) WORK OF CONSTRUCTION OF ARTERIAL ROAD FROM UMANG BHARDWAJ ROAD TO NPR IN GURUGRAM (HARYANA) ON Engineering, Procurement & Construction (EPC) Mode 84420 22/05/2018 22/05/2018 02/07/2018
Time 15:0Hrs
918 Independent Engineer Services for 4-Laning of Sangli-Solapur (Package I- Sangli-Borgaon) section of NH-166 from existing km 182.195 (Design Chainage km 182.556) to existing km 219.956 (Design Chainage km 224.000) (length=41.444 km) under NH (O) in the state of Maharashtra on Hybrid Annuity mode NHAI/GM(T)/IE/San-Bor/Mah/2018 23/05/2018 22/05/2018 21/06/2018
Time 11:0Hrs
919 Independent Engineer Services for 4-Laning of Sangli-Solapur (Package II- Borgaon-Watambare) section of NH-166 from existing km 219.956 (Design Chainage km 224.000) to existing km 272.394 (Design Chainage km 276.000) (length=52.000 km) under NH (O) in the state of Maharashtra on Hybrid Annuity mode NHAI/GM(T)/IE/Bor-Wat/Mah/2018 23/05/2018 22/05/2018 21/06/2018
Time 11:0Hrs
920 Independent Engineer Services for 4-Laning of Sangli-Solapur (Package III- Watambare to Mangalwedha) section of NH-166 from existing km 272.394 (Design Chainage km 276.000) to existing km 314.396 (Design Chainage km 321.600) (length=45.600 km) under NH(O) in the state of Maharashtra on Hybrid Annuity mode. NHAI/GM(T)/IE/Wat-Man/Mah/2018 23/05/2018 22/05/2018 21/06/2018
Time 11:0Hrs
921 Independent Engineer Services for 4-Laning of Sangli-Solapur (Package IV- Mangalwedha to Solapur) section of NH-166 from existing km 314.969 (Design Chainage km 321.600) to existing km 370.452 (Design Chainage km 378.100) (length=56.500 km) under NH(O) in the state of Maharashtra on Hybrid Annuity mode. NHAI/GM(T)/IE/Man-Sol/Mah/2018 23/05/2018 22/05/2018 21/06/2018
Time 11:0Hrs
922 Appointment of Independent Engineer Services during O&M period for “4 Laning of Kurali – Kiratpur Section of NH-21 (New NH-205) from Km 28.600 to Km 71.500 in the state of Punjab on DBFOT Basis under NHDP- Phase-III”- RFP NHAI/RO/CHD//11011/PD-MHL/KUR-KIR/NH-205/O&M//IE/RFP 21/05/2018 21/05/2018 12/07/2018
Time 11:0Hrs
923 Independent Engineer Services for Development and Operation /Maintenance of Sikar-Bikaner section of NH-11 from Km. 340.188 of NH-11 to Km. 557.775 of NH-11 via Sikar Bypass and Bikaner Bypass from Km.553.869 of NH-11 to Km. 267.325 of NH-89 by 2 laning with paved shoulder in the State of Rajasthan through Public Private Partnership (“PPP”) on Design, Build, Finance, Operation and Transfer “DBFOT” basis. 01/2018-19 21/05/2018 21/05/2018 16/07/2018
Time 11:0Hrs
924 Consultancy Services for Authority’s Engineer for Supervision of Construction of new 4-lane Elevated Highway (2x10.50m wide twin two lane structures) including approaches & service roads connecting Kazhakuttam Junction & Technopark Junction of NH-47 (New NH-66) from Km. 547.080 to Km. 549.801 in the State of Kerala under NHDP Phase-III on EPC mode NHAI/Tech/KL/Kazha. Jn.-Technopark Jn./NH-17/AE/2017-18 04/06/2018 21/05/2018 09/07/2018
Time 11:0Hrs
925 Consultancy Services for Authority’s Engineer for Supervision of construction of Four-Lane ROB in the section of National Highway 17 (new NH-66) from Km 93.468 (Existing km 95.650) to km 94.248 (Existing Km 96.450) as per approved GAD and its approaches & allied works on approaches of ROB near Neleshwaram town (Pallikara Railway Gate) Kasargad district in the State of Kerala under NHDP phase III on EPC mode. 3rd Call NHAI/Tech/KL/Nileshwar ROB/NH-17/AE /2017-18 28/05/2018 18/05/2018 02/07/2018
Time 11:0Hrs
926 Independent Engineer Services for 4-Laning of Akkalkot-Solapur section of NH-150E with paved shoulders from design Chainage km 99.400 to km 138.352/ existing chainage from km. 102.819 to km. 141.800 (design length=38.952 km) including Akkalkot bypass (design length 7.350 km.) in the state of Maharashtra on Hybrid Annuity mode. NHAI/GM(T)/IE/Akk-Sol/Mah/2018 18/05/2018 18/05/2018 18/06/2018
Time 11:0Hrs
927 Independent Engineer Services for Construction of 6/8 laning of existing 4 lane Vadape to Thane from km 539.202 to km 563.000 section of NH-3 (new NH-848) under Bharatmala Pariyojna in the State of Maharashtra to be executed on Hybrid Annuity Mode NHAI/GM(T)/IE/Vad-Tha/Mah/2018 18/05/2018 18/05/2018 02/07/2018
Time 11:0Hrs
928 Appointment of Independent Engineer Services during Operation & Maintenance stage of four laning of Zirakpur-Parwanoo Section of NH-5 (Old NH-22) RFP NHAI/RO/CHD/11011/PD-CHD/ZKP-PAR/IE/RFP 21/05/2018 18/05/2018 13/07/2018
Time 11:0Hrs
929 Authority’s Engineer for Supervision OF Rehabilitation and Up-gradation of Allahabad Bypass Road Junction to Allahabad City section of NH-96 from existing km 135/230 to km 153/000 [Design Ch. 135.500 to Ch. 153.330](excluding existing Ch. 148.600 to Ch. 149.400) to Four Lane with paved shoulders under EPC mode in the state of Uttar Pradesh. 843/107comB-18/18 28/05/2018 16/05/2018 17/05/2018
Time 17:0Hrs
-
930 Authority’s Engineer for Supervision OF Rehabilitation and Up-gradation of Allahabad Bypass Road Junction to Allahabad City section of NH-96 from existing km 135/230 to km 153/000 [Design Ch. 135.500 to Ch. 153.330](excluding existing Ch. 148.600 to Ch. 149.400) to Four Lane with paved shoulders under EPC mode in the state of Uttar Pradesh. 843/107 comB - 18/18 28/05/2018 16/05/2018 11/07/2018
Time 17:0Hrs
-
931 IE O & M for kagal satara works NHAI/RO/MUM/KLP/IE/K-S/2018-19/05 15/05/2018 15/05/2018 14/06/2018
Time 11:0Hrs
932 Authoritys Engineer for Supervision of Reh. and upgrad. of existing pavement to 2 lane with paved shoulder from ch. 323.745tokm 351.000(Balrampur to Tulsipur sec.) in the state of UP on EPC mode 1281/162/Yata NH Circle/18 Dated12.04.2018 15/05/2018 15/05/2018 29/05/2018
Time 17:0Hrs
933 Consultancy Services for Authority Engineer for Supervision of Rehabilitation And Upgradation to 2 lane with Paved Shoulders of Punjab Haryana Border to Moonak Jakhal Budhlada Bhikhi from km 236600 to 239400 and km. 244750 to km 287710 section of nh148b falling in the State of Punjab on Engineering Procurement and Construction EPC mode 03 dated 14.05.2018 18/05/2018 15/05/2018 28/05/2018
Time 16:0Hrs
934 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF “Construction of Dwarka expressway from Rail under Bridge (RuB) near Sector 21 Dwarka to Delhi Haryana Border (Km 5.300 to Km 9.500) –Package 2 in state of Delhi” ON EPC NHAI/Tech/DE/Pkg II/AE/2018 15/05/2018 14/05/2018 13/06/2018
Time 11:0Hrs
935 Independent Engineer Services during Operation and Maintenance stage of 4 laning of Thrissur to Edapally section from Km 270/000 to Km 342/000 of NH-544 design length 64.94 kms in the State of Kerala under NHDP Phase II executed on BOT(Toll) on DBFOT basis PIUPKDKL-01IE2018-1901 11/05/2018 11/05/2018 12/06/2018
Time 17:0Hrs
936 Consultancy services for Authority Engineers for supervision of the work construction of bridge over river Bidya connecting Godkhali to Gosaba bazar in the district of South 24Paragans under South 24Paragans Hwy Division under WB WBPWRD/RFP-03/SE/SHC/2017-18 02/07/2018 10/05/2018 17/08/2018
Time 14:0Hrs
937 Consultancy Services for Independent Engineer for Supervision of 4-lane with paved shoulder configuration of Bilaspur-Pathrapali (Km. 0.000 to Km. 53.300) section of NH-111 (New NH-130) in the State of Chhattisgarh under BharatMala on Hybrid Annuity Mode NHAI/11012/CG/Bilaspur Pathrapali/IE/2018 31/05/2018 09/05/2018 25/06/2018
Time 11:0Hrs
938 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR Construction and Upgradation of existing road to 2-lane with paved shoulder from Km. 368.000 to Km. 468.000 of Lameri to Paini (Excluding Km 420.250 to 420.500, Km 423.300 to Km 423.650, Km 437.625 to Km 437.775 and 464.425 to Km 464.525) of NH-07 under Chardham Pariyojna on EPC basis in the State of Uttarakhand. NHIDCL/AE/ R-J/2018 09/05/2018 09/05/2018 05/07/2018
Time 15:0Hrs
939 Rehabilitation and Upgradation of Rishikesh–Dharasu road with 2-lane paved shoulder from design Chainage from km 74.733 to 107.347(32.614km) including construction of Kamand re-alignment(length 2513m) and land slide treatment work bet design chainage Km 73.8 to Km 74 AND From design Chainage km 58.603 to 58.853 and Km 61.63 to 63.95 and construction of 2-lane with paved shoulder Chamba Bypass of design length 2.035 Km including 440m long tunnel(Design length–4.605 Km) on EPC Mode in Uttarakhand 85007/Auth Engg/Km 76-110 & Chamba Bypass 08/05/2018 08/05/2018 02/07/2018
Time 15:0Hrs
940 Package for Consultancy services for Authoritys Engineer supervision of Civil Construction work for proposed 4-lane ROBs and its approaches in existing Level Crossings (i) lieu of 124E/SPL3 at Km 1.8 (ii) 30/E at Km 64.800 (iii) lieu of 45 C- Class at Km 93.400 (ii) lieu of 48E/C at Km 96.800 on NH-205 in the State of Andhra Pradesh (under EPC Mode) SE NH ATP NIT No 65 10/05/2018 07/05/2018 21/06/2018
Time 15:0Hrs
941 Independent Engineer Services during Operation & Maintenance stage of Four Laning of Hyderabad-Yadgiri Section of NH-163 (Old NH No.202) from Km.18.600 to Km.54.000 in the State of Telangana under NHDP Phase-III on Design, Build, Finance, Operate and Transfer (DBFOT) Toll Basis Package No.NHDP-III/BOT/AP-04 (2nd call). 10423 08/05/2018 07/05/2018 13/06/2018
Time 11:0Hrs
942 Construction of 4 Nos. Grade Separator between km. 281.000 to Km. 307.600. of NH 53 (Old NH-06) Raipur-Durg 4- lane in the State of Chhattisgarh in EPC Mode under NH(O) Annual Plan 17-18 1.Km. 286.400 Kumhari length 600m 2.Km. 299.000 Transport Nagar length 580m 3.Km. 302.000 Power House length 1210m 4.Km. 304.000 Chandra-Mourya Chowk to Km. 305.000 Supela length 1569m 01/AE/RO/2018/330845 03/05/2018 04/05/2018 02/07/2018
Time 17:0Hrs
943 CONSULTANCY SERVICES FOR AUTHORITY ENGINEER FOR SUPERVISION OFUP-GRADATION OF CHANDRAPUR- BALLARPUR - KOTHARI- GONDPIPRI- AASTI ROAD TO 2 LANE WITH PAVED SHOULDER CONFIGURATIONIN THE STATE OF MAHARASHTRA PACKAG 2 FROM KM 242-150 TO KM 284-400 IN THE STATE OF MAHARASHTRA ( PKG NO PWD/2 ) ON EPC MODE (SECOND CALL) 279339/2 04/05/2018 04/05/2018 02/06/2018
Time 17:30Hrs
944 Independent Engineer services for Four Lanning from km 253/600 to km 308/550 of Bellary to Byrapura Section of NH-150(A) on Hybrid Annuity Mode under Bharatmala Pariyojana in the State of Karnataka NHAI/KNT-NH-150(A)/Pkg-1/ Bellary-Byrapura/ IE/2018/117177 04/05/2018 04/05/2018 04/07/2018
Time 11:0Hrs
945 Independent Engineer services for Four laning from km 308/550 to km 358/500 Byrapura to Challakere section of NH-150 A on Hybrid Annuity Mode under Bharatmala Pariyojna in the State of Karnataka NHAI/KNT-NH-150(A)/Pkg-2/ IE/2018/117178 04/05/2018 04/05/2018 04/07/2018
Time 11:0Hrs
946 Independent Engineer Services for Four laning from km 358/500 to km 414/205 challakere to hariyur section of NH-150 A on Hybrid Annuity Mode under Bharatmala Pariyojna in the State of Karnataka NHAI/KNT/NH-150(A)/Pck-3/ Challak-Harriyur/ IE/2018 /117179 04/05/2018 04/05/2018 04/07/2018
Time 11:0Hrs
947 CONSULTANCY SERVICES FOR AUTHORITY ENGINEER FOR SUPERVISION OFUP-GRADATION OF CHANDRAPUR- BALLARPUR - KOTHARI- GONDPIPRI- AASTI ROAD TO 2 LANE WITH PAVED SHOULDER CONFIGURATIONIN THE STATE OF MAHARASHTRA PACKAG 2 FROM KM 242-150 TO KM 284-400 IN THE STATE OF MAHARASHTRA ( PKG NO PWD/2 ) ON EPC MODE (SECOND CALL) 02/2018-19 04/06/2018 04/05/2018 06/06/2018
Time 17:30Hrs
948 Rehabilitation and upgradation to 2 lane / 2 lane with paved shoulder configuration for design chainage km 107.347 to km 129.208 & km 133.878 to km 138.570 (existing chainage km 110.000 to km 133.020 & km 137.330 to km 142.028) and land slide treatment at existing km 138.500 (Design chainage km 134.970) of NH -94 on EPC mode (Design Length = 26.553 Km) AND (ii) Chinyalisour bypass from existing chainage Km 133.020 to Km 137.330 of NH-94 (old) on EPC mode in Uttarakhand 85008/Auth Engg/Km 110-142 and Chinyalisour Bypass 21/05/2018 04/05/2018 05/07/2018
Time 15:0Hrs
949 Consultancy services for authority engineer for supervision of the work Rehabilitation and upgradation of NH75 (Old NH234) from Km 506 to Km 508 and Km 518 to Km 534 (Design Ch Km 506 to 508 and 518 to 534) Mangalore to Thiruvannamalai Road to two lane with paved shoulders on EPC Basis in the State of Andhra Pradesh (3 rd call) SE R and B NH ATP NIt NO 04/2018-19 01/05/2018 02/05/2018 14/06/2018
Time 15:0Hrs
950 Consultancy Services for Authoritys Engineer (AE) for the work of Widening existing 2 lane to 2-lane with 1.5m paved shoulders from km 0/000-23/100 and 29/250-47/400 and Strengthening existing carriageway from km 23/100-29/250 (Gudiyatham bypass) and from km 47/400-56/00 (Vellore bypass) of NH234 in Tamil Nadu TN 02 HDO NH NH234 AE 27/04/2018 27/04/2018 12/06/2018
Time 11:0Hrs
951 Consultancy services for Authority’s Engineer for supervision of Rehabilitation and upgradation of NH-340C from Atmakur (Design Km 65.800/Existing Km 72.980) to Dornala (Design Km 124.150/Existing Km 131.230) to Two lane with paved shoulders (Design Length = 58.350 Km) in the State of Andhra Pradesh under NH (O) on EPC Mode NHAI/Tech/AP/NH-340C/Atm-Dor/AE/2017-18 27/04/2018 27/04/2018 23/05/2019
Time 11:0Hrs
952 Consultancy Services for Authority Engineer for Supervision of Rehabilitation and Up gradation to 2 Lane with paved Shoulders of Abohar- Sito Gunno -Dabwali Road from Km.0.00 to Km.50.885 of NH-354E including construction of one High Level Major Steel Bridge on EPC Mode in the State of Punjab 1/EE/CWD/PWD/ABOHAR 27/04/2018 27/04/2018 29/05/2018
Time 15:0Hrs
953 Independent Engineer services for Operation Maintenance of Allahabad Bypass (including Ganga Bridge Pkg. ABP- 1) from Km. 158.00 to Km. 242.708 section of NH-2 in the State of U.P under OMT Pkg. 32 11015/NHAI/PIU/ALD/OMT/21350 27/04/2018 27/04/2018 28/05/2018
Time 11:0Hrs
954 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR THE BALANCE WORK OF FOUR –LANING OF DHALKOLA BYPASS(LENGTH 5.5 KM ) INCLUDING ROB ON NH-34 ON EPC MODE IN THE STATE OF WEST BENGAL NHAI/NH34/Balwork/Dkhl.Bypass/2018/AE 04/05/2018 26/04/2018 11/06/2018
Time 15:0Hrs
955 Consultancy services for Authority’s Engineer for supervision of the work of Upgradation of NH-81 with a minimum of 2-Lane with paved shoulder configuration starting from km 19.205 to km 46.550 in the District of Malda, on EPC mode in the State of West Bengal under Annual Plan 2017-2018 .(Job No. 081-WB-2017-18/421)-2nd Call 2/2018-19 of SE, National Highway Circle No. II 24/04/2018 25/04/2018 28/05/2018
Time 14:0Hrs
956 Consultancy Services for Authoritys Engineer for Construction of proposed 4-Lane R.O.B and its approaches in replacement of existing old and narrow ROB LC No. 149A at Ch 39.885 on NH 168A near Dhanera EPC Mode Upgradation of new N. H. No. 168 to two lane with paved side shoulder configuration between Km 0/0 to 41/300 and Km 43.250 to 68.174 Dhanera Panthawada section 2 lane PSS in the State of Gujarat. Project Length 66.224 Km 1.120 Km On EPC Mode 09 of 2017-18 2nd Attempt Gandhidham 25/04/2018 25/04/2018 19/05/2018
Time 18:10Hrs
957 Consultancy services for Authority’s Engineer for supervision of the work of Upgradation for NH-512 with a minimum of 2-Lane with paved shoulder configuration starting from Ch 82.4 km to 99.5 km and minimum of 4-Lane configuration from Ch 104.2 km to Ch 106.607 km on EPC mode in the State of West Bengal under Annual Plan 2017-2018, Job No. 51-WB-2017-18/422.-2nd Call. 3/2018-19 of SE National Highway Circle No.-II 26/04/2018 25/04/2018 28/05/2018
Time 14:0Hrs
958 ConsultancyServicesofAuthorityEngineer 12/NH-GAYA/2017-18 21/04/2018 23/04/2018 17/05/2018
Time 17:0Hrs
959 Independent Engineer Services during Operation & Maintenance stage of Four laning of Jorabat Shillong (Barapani) section of NH-40 from 0.000 to km 61.800 in the state of Assam and Meghalaya on DBFOT pattern under SRDP-NE in BOT (Annuity) project in the State of Meghalaya NHAI/PIU/SHL/TENDER/JB/IE/2018 19/04/2018 20/04/2018 28/05/2018
Time 11:0Hrs
960 Independent Engineer Services during Operation & Maintenance stage of 2-lane Shillong Bypass connecting NH-40 &NH-44 from Km 61.800 of NH-40 to Km 34.850 of NH-44, in the State of Meghalaya under SARDP –NE on BOT(Annuity) basis – project NHAI/PIU/SHL/TENDER/SB/IE/2018 19/04/2018 20/04/2018 28/05/2018
Time 11:0Hrs
961 CONSULTANCY SERVICES FOR AUTHORITYs ENGINEER FOR Rehabilitation and up gradation of NH 326A from km 0/0 to 41/979 (excluding km 2/255 to 3/372 and km 36/820 to 38/275) to two lane with paved Shoulders including the ROBs at km 2/100 & 33/100 along with approaches in the state of Andhra Pradesh under NH(O) on EPC Mode S.E/R&B/NH VJA NIT No 02/SE/TO/EPC/2018-19 01/05/2018 20/04/2018 04/06/2018
Time 17:0Hrs
962 Independent Engineer Services for 4-Laning of Ausa – Chakur Section of NH-361 from km 55.835 to km 114.345(design length 58.510km) under Bharatmala Pariyojna in the state of Maharashtra on Hybrid Annuity Mode NHAI/GM(T)/IE/Aus-Cha/Mah/2018 01/05/2018 20/04/2018 28/05/2018
Time 11:0Hrs
963 Independent Engineer Services for 4- Laning of Chakur – Loha Section of NH-361 from km 114.600 to km 187.800 (design length 73.345 km) under Bharatmala Pariyojna in the State of Maharashtra on Hybrid Annuity Mode. NHAI/GM(T)/IE/Cha-Loh/Mah/2018 01/05/2018 20/04/2018 28/05/2018
Time 11:0Hrs
964 Independent Engineer services for 4-Laning of Loha- Waranga section of NH-361 from km 187.800 to km 244.369 (design length 56.569km) under Bharatmala Pariyojna in the state of Maharashtra on Hybrid Annuity Mode. NHAI/GM(T)/IE/Loh-War/Mah/2018 01/05/2018 20/04/2018 28/05/2018
Time 11:0Hrs
965 Independent Engineer Services for Supervision of Redesigning, Rehabilitation and Upgradation to Four Lane configuration & Strengthening of Rohna/Hassangarh to Jhajjar Section from Km 44.800 to km 80.250 (Design Chainage) (Length 35.450km) of NH-334B in the State of Haryana on HAM basis under NH (O) (Package-2) NHAI/Tech/Haryana/NH-334B/Rohna-Jhajjar/IE/2018 15/05/2018 19/04/2018 21/05/2018
Time 11:0Hrs
966 Consultancy Services For Authority’s Engineer For Rehabilitation and upgradation of existing road to 2-lane with paved shoulders configuration in Purulia (Jhr Border)-Chandil (Junction with NH-33) section of NH-32[from Km 70.524 (Jhr/WB Border) to Km 84.000 (near Sainik School, Purulia) and from Km 94.300 (near Simulia Junction, Purulia) to Km 153.705 (near Chandil, Junction with NH-33 in the State of Jharkhand) in the States of West Bengal and Jharkhand under NHDP Phase-IVB on EPC Mode NHAI/EPC/PHIVB/NH32/2018/AE 04/05/2018 18/04/2018 18/06/2018
Time 11:0Hrs
967 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF Rehabilitation and Upgradation of two lanes with paved shoulder from Moga-Makhu-Harike-Khalra including construction of 2 nos ROB (Project Length=75.167 kms) of NH-703- B in the state of Punjab on EPC Mode and Rehabilitation and Upgradation of Makhu to Arifke including construction of 2 nos ROB to two lane with paved shoulders of NH 703 A (Project Length = 24.600 km) in the state of Punjab on EPC Mode 75/EE/CWD/FZR dated 18-04-2018 24/04/2018 18/04/2018 13/06/2018
Time 16:0Hrs
968 Consultancy services for Independent Engineer for supervision of Rehabilitation and Upgradation of Giddalur – Vinukonda section of NH-544D from Design km 212.983 (existing km 213.000) to Design km 322.800 (existing km 322.840) (Design length 112.797 km) in the State of Andhra Pradesh to two lane with paved shoulder under NH(O) on Hybrid Annuity Mode NHAI/Tech/AP/NH-544D/Gid-Vinu/IE/2017-18 27/04/2018 18/04/2018 05/06/2018
Time 11:0Hrs
969 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR REHABILITATION AND UP GRADATION TO FOUR LANING OF NH-31D FROM KM 113.200 TO KM 154.854 (PACKAGE-II A) GHOSHPUKURSALSALABARI SECTION IN THE STATE OF WEST BENGAL ON EPC MODE NHAI/WB/NH-31D(pckg-2A)/2018/440(C)/AE 24/04/2018 17/04/2018 18/06/2018
Time 11:0Hrs
970 Consultancy Services for Authority’s Engineer for the work of Development of Four-lane Islampur Bypass of 10.31 Km length from Km.0.00 (Ex.Ch. 498.500) to Km. 10.310 (Ex. Ch. 506.950) of NH-31 in the State of West Bengal under NHDP Phase II on Engineering, Procurement and Construction (EPC) Mode. NHAI/11015/WB-7/8/2018/AE/105(C) 19/04/2018 17/04/2018 18/06/2018
Time 11:0Hrs
971 Supervision Consultancy Services for O and M stage of Bheem Parasoli Gulabpura section of NH 148D (including Bheem Parasoli bypass) and Lambia Raipur section of NH 458 for total length 124.03 km. on EPC mode under NHDP Phase IV NHAI/12012/03/2018-ROJ/SC/20 07/05/2018 17/04/2018 25/05/2018
Time 11:0Hrs
972 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF (i) Construction of NH-24, 4-lane bypass starting from km 479.500 of NH 24 and terminating at km 17.600 of MDR-77C (bypass chainage from km 64.900/64.380 to km 79.516/79.000 length 14.618 km Pkg. – 3A (ii) Construction of NH-24 Extension 4-lane bypass starting from Behta Road and terminating at Sitapur Road Chainage 479.500 (Bypass chainage from km 32.000 / 31.490 to km 64.900 / 64.380 average length 32.895 km) -Package – 2 and (ii NHAI/NHDP-VII/Lucknow Bypass/EPC/AE/RFP/2018 17/04/2018 16/04/2018 23/05/2018
Time 11:0Hrs
973 CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF Construction of Flyover in (a) Sakoli town (b) Lakhani town and (c) Construction of ROB and PUP including Slip Road Median RCC Drain footpath etc from km 441/970 to km 443/560 at Saundad on NH-53 (Old NH - 6) in the State of Maharashtra on EPC Mode NHAI/MH/Tech/AE/Lakhani Sakoli/2018 19/04/2018 16/04/2018 15/05/2018
Time 11:0Hrs
974 CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF Four Laning of (a) Medshi to Washim Section (Package- II) from Km 47.700 to Km 92.200 (Design Chainage) (b) Washim to Pangare Section (Package- III) from Km 92.200 to Km 134.500 (Design Chainage) of NH-161 in the State of Maharashtra on EPC mode NHAI/Tech/MH/AE/Med –Wash - Pang/2018 19/04/2018 16/04/2018 15/05/2018
Time 11:0Hrs
975 Consultancy Services as Independent Engineer during Operation, Maintenance and Fee collection of 4- lane divided carriageway facility of Nelamangala – Tumkur section from Km. 29.5 to Km. 62.00 (32.5 Kms) on (BOT) basis through Concessionaire and Six lane of Tumkur bypass from Km. 62.00 to Km. 75.00 (13 Kms) on EPC through O&M Contractor of NH-4 (New NH-48) in the state of Karnataka (Second Call) 01/NHAI/RO-BNG/13020/Tender/2018 dated 16/04/2018 24/04/2018 16/04/2018 30/05/2018
Time 15:0Hrs
976 Consultancy services for Supervision Consultant for Short Term Improvement and Routine Maintenance of Two laning with paved shoulders of Jhalawar – Rajasthan/ M.P. Border section of NH-12 (New NH-52) from Km. 346.540 to Km. 408.700 in the state of Rajasthan NHAI/2018/3/SC/Tender/17 26/04/2018 16/04/2018 29/05/2018
Time 11:0Hrs
977 Consultancy services for Authority’s Engineer for supervision of Development of NH 31 to 4 lane configuration from km 551.36 to km 563.260 Ghoshpukur to Bihar More Bagdogra in Darjeeling District West Bengal under EPC Mode ( Project length 11.90 Km.) under Annual Plan 2017-18 e-RFP No. 01 OF 2018-19 OF SUPERINTEDING ENGINEER, PIU-II, SILIGURI 17/04/2018 15/04/2018 21/05/2018
Time 14:0Hrs
978 Consultancy services for Auth Engr supervision of Civil Construction of 4 Lane Signature Bridge (900m long central cable stayed Module) connecting missing link between Okha and Beyt Dwarka on EPC Mode including Construction of Approaches on New NH-51 01 of 2018-19 (Rajkot) 19/04/2018 13/04/2018 07/06/2018
Time 17:0Hrs
979 TEST 12 12/04/2018 13/04/2018 14/04/2018
Time 15:0Hrs
-
980 CONSULTANCY SERVICES FOR AUTHORITY ENGINEER FOR SUPERVISION OF FOUR LANING OF MADURAI CHETTIKULAM SECTION OF NH 785 FROM MADURAI (KM 0.000) TO CHETTIKULAM (7.300) UNDER BHARATMALA PARIYOJNA PHASE I IN THE STATE OF TAMIL NADU ON EPC MODE NHAI/11012/MC/EPC/AE/9/2018 12/04/2018 12/04/2018 14/05/2018
Time 11:0Hrs
981 Independent Engineer Services for Four laning of Sattanathapuram to Nagapattinam (Design Ch Km 123.800 to Km 179.555) section of NH 45A (New NH 332) in the State of Tamil Nadu under NHDP Phase IV on Hybrid Annuity Mode NHAI/11012/SN/HAM/IE/10/2018 12/04/2018 12/04/2018 14/05/2018
Time 11:0Hrs
982 Consultancy Service for Authority s Engineer for Supervision km 159 0 165 4 AND 186 0 215 0 of NH 163 from km 25 0 59 2 Mahadevpur Bhupalapalli) of NH-353C old NH 363 km 121.000 to 154.000 of Nakrekal - Mallampalli section of NH365 In TS NIT No. SE (R&B) NH/KMNR/41/2017-18 17-03-2018 12/04/2018 11/04/2018 11/05/2018
Time 15:0Hrs
983 CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF WORKS Rehabilitation and Upgradation Morena Porsa and Porsa Bhind section of NH 552 Ext Two lane with paved shoulder through Engineering Procurement and Construction in the state of MP MPRDC/NNH/AE /pkg VII/01/2018/672 03/05/2018 11/04/2018 11/05/2018
Time 17:30Hrs
984 Consultancy Services of Authority’s Engineer for supervision of Rehabilitation and Up-gradation of NH-730 from Km. 484.000 to Km. 505.120 (Ramnagar to Siswa Babu) to two lane with paved Shoulders (Rural Area) & Two Lane Paved Shoulders with Service Road (Urban Area) under EPC Mode in the State of Uttar Pradesh. 967/357Yata-NH Circle/18 Dated 17-03-2018 11/04/2018 11/04/2018 21/05/2018
Time 17:0Hrs
985 Consultancy Services of Authority’s Engineer for supervision of Rehabilitation and Up-gradation of NH-730 from Km. 537.000 to Km. 564.750 (Kaptanganj to Radrauna) to two lane with paved Shoulders (Rural Area) & Four Lane Divided Carriageway with Service Road (Urban Area) under EPC Mode in the State of Uttar Pradesh. 967/357Yata NH Circle/18 Dated 17-03-2018 11/04/2018 11/04/2018 21/05/2018
Time 17:0Hrs
986 Consultancy Services for Supervision Consultant (SC) for Supervision of Two - laning with paved shoulder of Bhilwara - Ladpura section of NH-758 from km. 87.250 to km. 155.000 [length 67.750 km] in the state of Rajasthan on EPC mode under NHDP Phase-IV. NHAI/12013/03/2018-ROJ/AE/20 08/05/2018 10/04/2018 25/05/2018
Time 11:0Hrs
987 consultancy services for authority engineer for supervision of construction of six laning of dedicated port road to krishnapatnam port (package-i) km 0.000 to km18.000 on epc mode in the state of andhra pradesh under bharatmala pariyojana phase I NHAI/PC/Sagarmala/2018/PC 01 /Pkg I/AE 10/04/2018 09/04/2018 23/05/2018
Time 11:0Hrs
-
988 CONSULTANCY SERVICES FOR AUTHORITY ENGINEER FOR SUPERVISION OF UPGRADATION TO TWO LANE WITH PAVED SHOULDERS OF BELAKERI PORT TO KUMTA –SIRSI ROAD FROM KM. 0.000 TO KM. 4.265 OF BELEKERI PORT LINK ROAD AND FROM KM. 4.965 TO KM. 60.000 OF SH-69 (EXCLUDING STRETCH OF NH-66) IN KARNATAKA STATE ON EPC MODE (PACKAGE - I) UNDER BHARATMALA PARIYOJANA PHASE I. NHAI/PC/Sagarmala/2018/SM 04/Pkg I/AE 10/04/2018 09/04/2018 23/05/2018
Time 11:0Hrs
989 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF Rehabilitation and upgradation to 2 lane with paved shoulders of Mudki to Jawahar Singh Wala section of NH-254 from km 0.00 to 38.00 in the State of Punjab on EPC Mode. CW-2/BTI/02 dated 06.04.2018 06/04/2018 07/04/2018 07/05/2018
Time 17:0Hrs
990 Package for Consultancy services for Authority Engineer for supervision of Civil Construction works for proposed 4 lane ROBs and its approaches in existing Level Crossings in lieu of 23SPL Class at Km 3.600 on NH 18 and in lieu of 18ASPL class at Km 7.800 on NH-18 and in lieu of 95SPL3E at Km 272.600 on NH -205 and lieu of 102 E at Km 281.200 on NH-205 in the State of Andhra Pradesh SE R and B NIt no.63 07/04/2018 07/04/2018 17/05/2018
Time 15:0Hrs
991 Independent Engineer services for development and construction of selected road stretches on Hybrid Annuity Mode (HAM) projects under Bharatmala Pariyojna in Rajasthan-KHAJUWALA-POOGAL-BAP NHAI/11012/Raj/Poogal-Bap/BM/IE 01/05/2018 05/04/2018 07/05/2018
Time 11:0Hrs
992 Independent Engineer services for development and construction of selected road stretches on Hybrid Annuity Mode (HAM) projects under Bharatmala Pariyojna in Rajasthan-Munabao-Tanot NHAI/11012/Raj/Poogal-Bap/BM/IE-II 02/05/2018 05/04/2018 07/05/2018
Time 11:0Hrs
993 Independent Engineer services for Construction of Eight lane Vadodara Kim Expressway from km. 355.000 to km. 378.740 (Package I i.e. Padra to Vadodara section), from km. 323.000 to km. 355.000 (Package II i.e. Sanpa to Padra section) & from km. 292.000 to km. 323.000 (Package III i.e. Manubar to Sanpa section) in the State of Gujarat under Bharatmala Pariyojna on Hybrid Annuity Mode NHAI/VME Phase IA/IE-I 26/04/2018 05/04/2018 07/05/2018
Time 11:0Hrs
994 Independent Engineer services for Construction of Eight lane Vadodara Kim Expressway from Km 279.00 to Km 292.00 (Package IV i.e. Ankleshwar to Manubar Section) & from Km 254.430 to Km 279.00 (Package V i.e. Kim to Ankleshwar Section) in the State of Gujarat under Bharatmala Pariyojna on Hybrid Annuity Mode NHAI/VME Phase IA/IE-II 26/04/2018 05/04/2018 07/05/2018
Time 11:0Hrs
995 Consultancy Services For Authority Engineer For Supervision of Four Laning of Chettikulam to Natham Section of NH 785 from Chettikulam (Km 7.300) to Natham (Km.36.690) on EPC Mode under Bharatmala Pariyojna Phase I in the State of Tamil Nadu NHAI/11012/CN/EPC/AE/8/2018 10/04/2018 04/04/2018 03/05/2018
Time 11:0Hrs
996 Consultancy Services for Independent Engineer services for Six Lanning of Bangalore – Nidigatta Section Km 18/000 to Km 74/200 of NH-275 in state of Karnataka to be executed on Hybrid Annuity Mode NHAI/ KNT/ NH-275/Bng-Nid/IE/2018/115615 dated 3.04.2018 03/04/2018 03/04/2018 29/05/2018
Time 11:0Hrs
-
997 Consultancy Services for Independent Engineer for Six Laning of Nidagatta-Mysore Section, km 74/20 to km 135/304 of NH-275 in the State of Karnataka to be executed on Hybrid Annuity Mode NHAI/ KNT/ NH-275/NID-MSY/IE/2018/115616 dated 3/04/2018 03/04/2018 03/04/2018 29/05/2018
Time 11:0Hrs
998 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR CONSTRUCTION OF, (i) CONSTRUCTION OF PROPOSED 4-LANE ROB AND ITES APPROACHES IN LIUE OF EXISTING LEVEL CROSSING NO. 328A AT KM. 0.500 ON BARMER – GADRA – MUNBAO RAILWAY LINE OF NH-25E IN DISTRICT BARMER (ii) CONSTRUCTION OF PROPOSED 2-LANE ROB AND ITS APPROACHES IN LIEU OF EXISTING LEVEL CROSSING NO. C-293 & A-292 AT KM 233/038 & 233/435 ON NH-112. ON JODHPUR TO BARMER ROAD AT BALOTRA IN THE STATE OF RAJASTHAN. 14/2017-18 13/05/2018 02/04/2018 23/05/2018
Time 18:0Hrs
999 . Construction of proposed 4 Lane R.O.B and its approaches in replacement of existing old and narrow ROB LC No. 149A at Ch 39.885 on NH 168A near Dhanera on EPC Mode 09 of 2017-18 Gandhidham 02/04/2018 31/03/2018 23/04/2018
Time 15:0Hrs
1000 Consultancy services of Authority’s Engineer for supervision of Widening and strengthening Two lane to Two lane with paved shoulder from Km.173/370 to 229/400 km of NH-59(Baliguda-Daringbadi section) on EPC mode in the state of Odisha. 15 CENH 2017-18 31/03/2018 29/03/2018 02/06/2018
Time 17:0Hrs
1001 Consultancy services of Authority’s Engineer for supervision of Widening and strengthening Two lane to Two lane with paved shoulder from Km.269/300 to 328/200 km of NH-49(Jharsuguda to Bhojpur) on EPC mode in the state of Odisha. (Bid Ref No-16 CENH of 2017-18) 16 CE NH 2017-18 31/03/2018 29/03/2018 02/06/2018
Time 17:0Hrs
1002 Consultancy services for Independent Engineer for supervision of four laning of NH-161 from Ramsanpalle (Design Km 39.980/Existing Km 44.757) to Mangloor (Design Km 86.788/Existing Km 91.350) (Design Length =46.808 Km) in the State of Telangana under Bharatmala Pariyojana on Hybrid Annuity Mode NHAI/Tech/AP/NH-161/San-Nan/Pkg-II/IE/17-18/ 29/03/2018 28/03/2018 10/05/2018
Time 11:0Hrs
1003 Consultancy services for Independent Engineer for supervision of four laning of NH-161 from Mangloor (Design Km 86.788/Existing Km 91.350) to Telangana/Maharashtra Border (Design Km 135.751/Existing Km 140.873) (Design Length =48.963 Km) in the State of Telangana under Bharatmala Pariyojana on Hybrid Annuity Mode NHAI/Tech/AP/NH-161/San-Nan/Pkg-III/IE/17-18/ 29/03/2018 28/03/2018 10/05/2018
Time 11:0Hrs
1004 Consultancy services for Independent Engineer for supervision of Six laning of NH-140 from Chittor (Design Km 0.000/Existing Km 158.000 of NH-4) to Mallavaram (Design Km 61.128/Existing Km 41.800 of NH-140) (Design Length = 61.128 Km) in the State of Andhra Pradesh under Bharatmala Pariyojna on Hybrid Annuity Mode NHAI/Tech/AP/NH-140/Cht-Mal/IE/2017-18/ 29/03/2018 28/03/2018 10/05/2018
Time 11:0Hrs
1005 Consultancy services for Independent Engineer for supervision of Six laning of Anandapuram–Pendurthi-Anakapalli section of NH-5 (new NH-16) from Km.681.000 (Existing Km.681.000) to Km.731.780 (Existing Km.742.400) (Design Length=50.78 Km) in the State of Andhra Pradesh under Bharatmala Pariyojana on Hybrid Annuity Mode NHAI/Tech/AP/APA/IE/2017-18 27/04/2018 28/03/2018 14/05/2018
Time 11:0Hrs
1006 Consultancy services for Independent Engineer for Supervision of Four lane connectivity to Visakhapatnam Port Road from Km.0.000 to Km.12.700 (Design Length=12.70 Km) in Andhra Pradesh under Port Connectivity under Bharatmala Pariyojana on Hybrid Annuity Mode NHAI/Tech/AP/Vizag Port Connectivity/IE/2017-18 27/04/2018 28/03/2018 14/05/2018
Time 11:0Hrs
1007 Consultancy services for Independent Engineer for Supervision of Four laning of Gundugolanu-Devarapalli-Kovvuru section of NH-16 from Km 15.320 (Existing Km 15.700) to Km 85.204 (existing Km 81.400) (Design Length=69.884 Km) in the State of Andhra Pradesh under Bharatmala Pariyojana on Hybrid Annuity mode NHAI/AP/NH-16/GDK/IE/2017-18 27/04/2018 28/03/2018 14/05/2018
Time 11:0Hrs
1008 Consultancy Services for Authority’s Engineer for Supervision of Jhajjar-Loharu Section from km 130.770 to km 228.630 (Design Chainage km 0.000 to km 97.864) of NH-334B in the State of Haryana on EPC basis under NH (O)-Part-1 as 2-lane with paved shoulder NHAI/Tech/Haryana/NH-334B/Jhajjar-Loharu/AE/2017-18 17/04/2018 27/03/2018 26/04/2018
Time 11:0Hrs
-
1009 Consultancy Services for Authority’s Engineer for Supervision of 2-lane with paved shoulder from Jind-Gohana Road from Design Chainage km 0.000 to km 50.505 (Length-50.505 km) of NH-352A on EPC mode under NH (O) in the State of Haryana NHAI/Tech/Haryana/NH-352A/Jind-Gohana/AE/2017-18 17/04/2018 27/03/2018 26/04/2018
Time 11:0Hrs
-
1010 Consultancy Services for Authority’s Engineer for Supervision of 2-Lane with Paved Shoulder for Bhiwani-Mundal-Jind road from design chainage Km 6.875 to Km 68.857 (Length-61.982 Km) of NH-709A in The State of Haryana Under NH (O) on EPC Mode (Package-I) NHAI/Tech/Haryana/NH-709A/Bhiwani-Mundal-Jind/AE/17-18 17/04/2018 27/03/2018 26/04/2018
Time 11:0Hrs
-
1011 Consultancy Services for Authority’s Engineer for Supervision of 2-lane with paved shoulder for Jind-Karnal Section from existing km 68.660 (Design km 68.857) i.e. Junction with Narwana road (NH-352) at Subhash Chowk and ends at km 153.700 (Design km 154.219) at ITI Chowk which is intersection with NH-1 of NH-709 A in the State of Haryana under NH (O) on EPC mode (Package-II) NHAI/Tech/Haryana/NH-709A/Jind-Karnal/AE/17-18 17/04/2018 27/03/2018 26/04/2018
Time 11:0Hrs
-
1012 CONSULTANCY SERVICES FOR AUTHORITY ENGINEER FOR SUPERVISION OF REHABILITATION AND UP GRADATION TO 2 LANE WITH PAVED SHOULDERS OF PUNJAB HARYANA BORDER TO MOONAK JAKHAL BUDHLADA BHIKHI FROM KM 236.600 TO 239.400 AND KM 244.750 TO KM 287.710 SECTION OF NH 148B FALLING IN THE STATE OF PUNJAB ON ENGINEERING PROCUREMENT AND CONSTRUCTION EPC MODE 14 29/03/2018 27/03/2018 08/05/2018
Time 17:0Hrs
1013 Independent Engineer Services for Four laning of Tiruchirappalli (Km.000) to Kallagam (Km.38.700) Section of NH-227on Hybrid Annuity Mode under Bharatmala Pariyojana (Residual Projects under NHDP) in the State of Tamil Nadu. NHAI/11013/NHDP-IV/TN/TK/IE/2018 13/04/2018 26/03/2018 26/04/2018
Time 11:0Hrs
1014 Independent Engineer Services for Two laning with Paved Shoulder of Meensurutti (Km. 98.433) to Chidambarm (Km.129.965.) Section of NH-227 on Hybrid Annuity Mode under Bharatmala Pariyojna Phase-I (Residual Projects under NHDP) in the State of Tamil Nadu. NHAI/11014/NHDP-IV/TN/MC/IE/2018 13/04/2018 26/03/2018 26/04/2018
Time 11:0Hrs
1015 Independent Engineer Services for Four laning of Kallagam to Karuppur from km. 38.700 to km. 50.382 and two laning with paved shoulders from Karuppur to Meensurutti from km 50.382 to km 98.433 of NH-227 under Bharatmal Pariyojana (Residual Projects under NHDP Phase-IV) in the State of Tamil Nadu on Hybrid Annuity Mode NHAI/11015/NHDP-IV/TN/KM/IE/2018 13/04/2018 26/03/2018 26/04/2018
Time 11:0Hrs
1016 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF CIVIL CONSTRUCTION WORKS FOR REHABILITATION AND UP GRADATION OF NH 544E FROM KM 0 00 TO KM 59 100 DESIGN CH 0 00 TO 56 803 KODIKONDA JUNCTION TO MADAKASIRA SECTION TO TWO LANE WITH PS ON EPC MODE IN THE STATE OF AP RO VJA NH O 2017 18 668 Corr Dt 23 03 2018 22/03/2018 23/03/2018 07/05/2018
Time 15:0Hrs
1017 Independent Engineer services for 4 Laning of Belgaum – Khanapur Section (Km 0/000 – Km 30/800) (Design Chainage Km 0/000 to Km 30/000) of NH-4A in the State of Karnataka on Hybrid Annuity Mode NHAI/NHDP-III/IE/NH-4A/Bel-Khanapur/2018 / 115015 23/03/2018 23/03/2018 07/05/2018
Time 11:0Hrs
1018 Independent Engineer Services for Four laning of Villupuram Km 0.000 to Puducherry Km 29.000 Section of NH 45A (New NH 332) in the State of Tamil Nadu under NHDP Phase IV on Hybrid Annuity Mode NHAI/GM(T)/IE/ Villu Pudu/TN/2018 09/04/2018 23/03/2018 03/05/2018
Time 11:0Hrs
-
1019 Independent Engineer Services for Four laning of Puducherry Km 29.000 to Poondiyankuppam Km 67.000 section of NH45A (New NH332) in the State of Tamil Nadu under NHDP Phase IV on Hybrid Annuity Mode. NHAI/ Tech /TN/NH 332/ Pudu Poond/IE/2018 09/04/2018 23/03/2018 24/04/2018
Time 11:0Hrs
1020 Independent Engineer services for Four laning of Poondiankuppam to Sattanathapuram (Design Ch Km 67.000 to Km 123.800) section of NH 45A in the State of Tamil Nadu on HAM Project under NHDP Phase IV NHAI/11012/PS/HAM/IE/6/2018 09/04/2018 23/03/2018 24/04/2018
Time 11:0Hrs
1021 (i) Consultancy Services for Authority’s Engineer for Supervision of Construction of 2nd Flyover (LCW) in Kishanganj Town starting from km 472.300 to km 475.480 of NH-31 (Existing NH) (Total Length - 3.180 km) in the State of Bihar on EPC Mode. (ii) Consultancy Services for Supervision Consultant for Operation & Maintenance of Km 410.700 to Km 447.000 (EW-04 & EW-12 package) (Purnea – Dalkhola Section) of NH-31 in the State of Bihar. (iii) Supervision Consultancy Serv NHAI/BH/Kishanganj/NH-31/AE/2018 23/03/2018 22/03/2018 26/04/2018
Time 11:0Hrs
1022 Appointment of Safety Consultants for the stretches under NHAI, PIU, Karaikudi NHAI/RO Madurai/RSA/2018/06 22/03/2018 22/03/2018 12/04/2018
Time 15:0Hrs
1023 Appointment of Safety Consultants for the stretches under NHAI, PIU, Nagercoil and Dindigul NHAI/RO Madurai/RSA/2018/07 22/03/2018 22/03/2018 12/04/2018
Time 15:0Hrs
1024 Supervision Consultant services for Four Lane NH Connectivity to ICTT Vallarpadam from Kalamassery Ch Km 0/000 to Vallarpadam Ch Km 17/121 Section on NH 966A Old NH 47 C in the State of Kerala (2nd call) RO Kerala/PIU-CHN/ICTT/SC/2017-18/05 20/04/2018 21/03/2018 04/05/2018
Time 17:0Hrs
1025 Independent Engineer Services during Operation and Maintenance stage of 4 Laning of Walayar – Vadakkancherry from existing KM 182/250 to KM 240/000 (Design Length 54 Km) in the State of Kerala under NHDP-Phase-III executed on BOT (Toll) on DBFOT Basis(2nd call) RO KeralaPIU PKDKL-02IE2017-1802 20/04/2018 21/03/2018 04/05/2018
Time 17:0Hrs
1026 Independent Engineer Services for O and M Period for two lane with paved shoulder of Khagaria-Purnea section from km 270.00 to km 410 of NH-31 in the State of Bihar constructed under NHDP-III on DBFOT (Annuity) 29/RO-PATNA/NHAI/2017-18 01/05/2018 19/03/2018 17/05/2018
Time 11:0Hrs
1027 Consultancy Services for Authority s Engineer for Up gradation of newly declared NH-341 to two-lane with Paved shoulder configuration between Km. 65.478 to Km 162.209 Bhuj Airport Jn - Khavda - India Bridge to Dharmshala section in the State of Gujarat 08 of 2017-18 Gandhidham 28/03/2018 16/03/2018 30/04/2018
Time 15:0Hrs
1028 Consultancy Services for Authoritys Engineer for Supervision of (i) Up-gradation to 4-lane with Paved Shoulder of Jammu-Akhnoor road section of NH-144A from Canal head (Km 0.800) to Ganesh Vihar (Km 6.000) of 5.2 Km length (ii) Up-gradation to 4-lane with Paved Shoulder of Jammu-Akhnoor road section of NH-144A from Ganesh Vihar (Km 6.000) to Hanuman chowk (Km 30.000) of 24 Km length in the state of Jammu and Kashmir to be executed on EPC basis. (iii) Widening and Up-gradation to 2 lane with pave 2018/NHIDC/318569/1 15/03/2018 16/03/2018 01/05/2018
Time 15:0Hrs
1029 Appointment of Safety Consultants for the stretches under NHAI, PIU, Madurai NHAI/RO Madurai/RSA/2018/01 16/03/2018 16/03/2018 03/04/2018
Time 15:0Hrs
1030 Appointment of Safety Consultants for the stretches under NHAI, PIU, Madurai and Nagercoil NHAI/RO Madurai/RSA/2018/02 16/03/2018 16/03/2018 03/04/2018
Time 15:0Hrs
1031 Appointment of Safety Consultants for the stretches under NHAI, PIU, Thanjavur NHAI/RO Madurai/RSA/2018/03 16/03/2018 16/03/2018 03/04/2018
Time 15:0Hrs
1032 Appointment of Safety Consultants for the stretches under NHAI, PIU, Thanjavur and Trichy NHAI/RO Madurai/RSA/2018/04 16/03/2018 16/03/2018 03/04/2018
Time 15:0Hrs
1033 Appointment of Safety Consultants for the stretches under NHAI, PIU, Trichy NHAI/RO Madurai/RSA/2018/05 16/03/2018 16/03/2018 03/04/2018
Time 15:0Hrs
1034 Consultancy Services for Authority’s Engineer for supervision of the work “Six laning of Km 9.900 to Km 19.948 (Aramgarh section) of Hyderabad section of NH 44 under NH(O) in the state of Telangana SE(R&B)NH/Hyd/43/2017-18,dt26-02-2018 16/03/2018 16/03/2018 25/04/2018
Time 15:0Hrs
1035 Consultancy services for Authority s Engineer for supervision of a Rehabilitation and Up gradation of the stretch from Ch From Km 113.900 to 154.479 b 157.707 to 187.723 C 187.723 to 234.434 of NH-167 in the state of Telangana SE(R&B)NH/Hyd/44/2017-18,dt26-02-2018 16/03/2018 16/03/2018 25/04/2018
Time 15:0Hrs
1036 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF “Construction of 8 Lane Dwarka expressway from Delhi-Haryana Border to Start of Rail Over Bridge, Gurugram (Chainage from km. 9.500 to km. 19.700) in the state of Haryana (NH-248 BB) – Package III” ON EPC mode. NHAI/Tech/DE/Package-III/AE/2018 19/03/2018 15/03/2018 15/05/2018
Time 11:0Hrs
1037 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF “Construction of Dwarka expressway (NH-248 BB) Package – IV from Rail Over Bridge (ROB) Till end point km 40 NH-8-SPR Intersection near kherki Dula of 8.76 km length, from km 19.700 to km 28.460 in the State of Haryana” ON EPC mode. NHAI/Tech/DE/Package-IV/AE/2018 21/03/2018 15/03/2018 15/05/2018
Time 11:0Hrs
1038 Independent Engineer Services during Operation & Maintenance Period of Two lane with Paved Shoulder with Provision of Capacity Augmentation of Rajasthan Border – Fatehpur-Salasar Section of NH-65 in the State of Rajasthan on BOT basis under NHDP Phase-IV NHAI/12019/03/2018-ROJ/Tech./19 23/04/2018 15/03/2018 02/04/2018
Time 11:0Hrs
-
1039 Independent Engineer Services during Operationn and Maintenance Period of Two lane with Paved Shoulder with Provision of Capacity Augmentation of Rajasthan Border Fatehpur-Salasar Sect ion of NH 65 in the State of Rajasthan on BOT basis under NHDP Phase IV NHAI/12019/03/ 2018-ROJ/Tech./ 25/04/2018 15/03/2018 17/05/2018
Time 11:0Hrs
1040 Consultancy Services for Authoritys Engineer for Supervision of works for Rehabilitation and Upgradation Mihona to Daboh section and Daboh to U.P. Border section of NH 552 Ext. Two lane with paved shoulder in the state of Madhya Pradesh on EPC Mode 22047/MPRDC/NNH/AE/Pkg-IV/EPC/2017-18 22/03/2018 14/03/2018 09/04/2018
Time 17:30Hrs
1041 Rehabilitation and upgradation to 2 lane with paved shoulder from existing km 195.175 to km. 220.00 (Design Chainage km. 71.300 to km. 95.947) excluding existing chainage 199.800 to km 201.900 (design chainage 76.400 to km 78.400) on Dharasu toYamunotri Road of NH-134 (old NH – 94) in the State of Uttarakhand on EPC Mode under improvement to NH Connectivity to Chardham in the State of Uttarakhand 12014/5/2017/Chardham/AE 10/04/2018 14/03/2018 04/06/2018
Time 17:0Hrs
1042 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF (i) Construction of 4 Lane NH-56 bypass connecting NH-2 (Rakhauna Village km 782.546 of NH-2) with NH-56 (Vajidpur Village km 271.300 of NH-56) as part of Varanasi Ring Road, Design Chainage km 0.000 to km 16.400 (total length 16.980 km including Interchange loop at NH-2) under NHDP Phase – VII, on EPC Mode (Phase II Package 1) & (ii) Construction of 4 Lane NH-29 Bypass, Phase-II connecting NH-29 (near Sandaha Village km 11.70 of N NHAI/Tech/VRR/ Package-1and2/AE/UP(T)/2018 19/03/2018 14/03/2018 01/05/2018
Time 11:0Hrs
1043 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF Balance work of Rehabiltation and Up-gradation Bametha-Satna section of NH-75 from KM 57/160 to Km.15/00(Design Length 97.840 Km. )to Two lane with paved shoulders in the state of Madhya Pradesh 21889/B-Satna/AE/EPC/2017-18 06/04/2018 12/03/2018 11/04/2018
Time 17:30Hrs
1044 CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF WORKS Rehabilitation and Upgradation Rewa to Simour section of NH 135B and Pawai to Nagod of NH 943Ext. Total Length of 87.59 Km in the state of Madhya Pradesh on EPC Mode 21790/MPRDC/NNH/AE/Pkg-VI 22/03/2018 10/03/2018 05/04/2018
Time 17:30Hrs
1045 Rehabilitation and Up-gradation Amanganj - Pawai section of NH-43 Ext. and Chandiaghat - Katni section of NH-43 Ext to Two lane with paved shoulder in the state of Madhya Pradesh on EPC Mode 21789/MPRDC/NNH/AE/Pkg-V/EPC/2017-18 12/03/2018 10/03/2018 05/04/2018
Time 17:30Hrs
1046 (1) Strengthening & Widening to 2 lane with paved shoulder from Km 142.05 to 167.465 of NH-120 (Goh to Doudnagar) in the State of Bihar on EPC mode Under NH Division Gaya (2) Strengthening & Widening to 2 lane with paved shoulder from Km 0.000 to 10.800 of NH-219(Mohania-Bhabhua)intheStateofBiharonEPCmodeUnderNHDivisionAurgangabad&(3)ConstructionofRCCMinorBridgeinReplacementofExistingNarrowandOldDamagedBridgeinKm02/Km14/Km40&Km43ofNH-333intheStateofBiharonEPCModeUnderNHDivisionLakhisaraiAtMunger 11/NH-GAYA/2017-18 10/03/2018 09/03/2018 17/04/2018
Time 17:0Hrs
1047 Independent Engineer Services for O&M Period for two lane with paved shoulder of Mokama-Munger section from km 1.430 to km 70.00 (length) approx. 68.570 km) of NH-80 in the State of Bihar constructed under NHDP-III on BOT (Annuity) 28/RO-PATNA/NHAI/2017-18 03/05/2018 07/03/2018 15/05/2018
Time 11:0Hrs
1048 Independent Engineer for supervision of upgradation to 4 lane with paved shoulder of Bhimasar Junction of NH-41 to Anjar- Bhuj up to Airport Junction from km 0.000 to km 65.478 of NH-341 to be executed on Hybrid Annuity Mode in the state of Gujarat NHAI/Guj/Anjar-Bhuj/IE/2018 07/03/2018 06/03/2018 19/04/2018
Time 11:0Hrs
1049 Independent Engineer (IE) during Operation & Maintenance period on the basis of National Competitive Bidding for 4-Laning of Kagal - Satara Section of NH-48 (old NH-4) from Km 592.240 to Km 725.000 in the State of Maharashtra under NHDP Phase-I on BOT basis NHAI/RO/MUM/KLP/IE/K-S/2017-18/03-2 05/03/2018 05/03/2018 06/03/2018
Time 11:0Hrs
1050 Consultancy Services for Authority’s Engineer for (i) Protection works at Nalupani Landslide Zone (Ex.km 123.080 to km. 123.480, km 123.665 to km 123.740 and km 123.770 to km 123.970) Section of NH-34 in the State of Uttarakhand on EPC basis. (ii) Construction of Road, Bridge and Slope Protection works of Landslide at Bareti (Ex. Km. 100.300 to km 101.600 of Section NH-34 in the State of Uttarakhand on EPC basis. NHIDCL/AE/Nalupani-Bareti/UK/2017 06/03/2018 05/03/2018 27/03/2018
Time 15:0Hrs
1051 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF REHABILITATION AND AUGMENTATION OF NEW NH-354 (OLD-SH-25) OF SECTION RAMDAS TO GURDASPUR FROM DESIGN CHAINAGE KM 140.000 (EXISTING KM 46.320 OF SH) TO DESIGN CHAINAGE KM 187.492 (EXISTING KM 3.185 OF SH) FOR LENGTH OF 47.492 KM INTO TWO WITH PAVED SHOULDER /FOUR-LANE UNDER BHARATMALA SCHEME IN THE STATE OF PUNJAB ON EPC MODE (PACKAGE-V) NHAI/31044/1/ 2018/PB/ PKG-V 16/03/2018 05/03/2018 04/04/2018
Time 11:0Hrs
1052 IE SERVICES DURING O AND M PERIOD FOR PALANPUR TO SWAROOPGANJ SECTION (KM. 340.00 TO KM. 264.00) OF NH-14 CONSTRUCTED ON BOT (ANNUITY) MODE UNDER NHDP PHASE-III IN THE STATE OF GUJARAT AND RAJASTHAN FOR 36 MONTHS 03/2018 01/03/2018 03/03/2018 12/03/2018
Time 17:0Hrs
1053 Consultancy Services as Independent Engineer during Operation & Maintenance Period for the project Design, Construction, Development, Finance, Operation and Maintenance of Km. 463.600 (AP/Karnataka Border) to Km. 524.000 (Avathi Village) Covering 60.40 Kms. and improvement, Operation and Maintenance of Km. 524.000 (Avathi Village) to Km.534.72 (Devanahalli Village) on NH-7 in the State of Karnataka under North Corridor (NHDP Phase-II) on BOT (Annuity) basis (NS-2/BOT/KNT-1) 26/NHAI/RO-BNG/12016/TENDER/2018 DATED 02/03/2018 13/03/2018 02/03/2018 12/04/2018
Time 15:0Hrs
1054 Consultancy services for Authority’s Engineer for Supervision of Rehabilitation and augmentation of New NH-354 (old-SH-21) of section Khemkaran town to Start of Amritsar bypass from Design Chainage km 22.673 (existing km 65.477 of SH) to Design Chainage km 71.496 (existing km 16.351 of SH) for Length of 48.823 km into Two lane with paved shoulder /Four-Laning under Bharatmala scheme in the State of Punjab on EPC mode (Package-II) NHAI/31044/1/2018/PB/PKG-II 15/03/2018 01/03/2018 03/04/2018
Time 11:0Hrs
1055 4/2 lane with Paved Shoulder from Tanot-Ramgarh-Bhadasar-Jaisalmer and NH from Bhadasar (Mokal)-Sarkaritala up to Pakistan Border under Phase-I of Bharatmala Pariyojana NHAI/19038/BM-5, 6(P-II) & 8/EPC/AE/2018/1/ 28/02/2018 01/03/2018 17/04/2018
Time 11:0Hrs
-
1056 2-lane with Paved Shoulder of NH from Raisinghnagar- Pugal under Phase-I of Bharatmala Pariyojana (Package-2). NHAI/19038/BM-5, 6(P-II) & 8/EPC/AE/2018/1/RP/ 28/02/2018 01/03/2018 17/04/2018
Time 11:0Hrs
-
1057 4/2-lane with Paved Shoulder from Gagaria-Baori Kalan-Serwa-Bakhasar section of NH-925 and Sata-Gandhav Section of NH 925A under Bharatmala Pariyojna NHAI/19038/BM-5, 6(P-II) & 8/EPC/AE/2018/1/GB 28/02/2018 01/03/2018 17/04/2018
Time 11:0Hrs
-
1058 Consultancy Services for Authority’s Engineer for Supervision of Rehabilitation and up-gradation of Four/Six laning of NH 5 (New NH 16) from Puintola to Tangi (km. 284.000 to km. 355.000) (Pkg II) In the state of Odisha on EPC mode. NHAI/Odisha/EPC/PT/Pkg-II/AE/2018/113578 12/03/2018 28/02/2018 12/04/2018
Time 11:0Hrs
1059 Independent Engineer services for Rehabilitation & Upgration of four lane to Six Laning of Chandikhole – Bhadrak (km. 62.000 to Km. 136.500) Section of NH-5 in the State of Odisha to be executed on Hybrid (Annuity) Mode. NHAI/NHDP-V/Tech/OR/2017/ChB/IE/113580 23/03/2018 28/02/2018 02/04/2018
Time 11:0Hrs
-
1060 Independent Engineer services for Rehabilitation and Up-gradation of Six-laning of Bhadrak – Baleshwar section of NH-5 (New NH-16) from km. 136.500 to km. 199.141 in the State of Odisha to be executed on Hybrid Annuity Mode (HAM) Project under NHDP-Phase-V NHAI/NHDP-V/Tech/OR/2017/BB/IE/113587 26/03/2018 28/02/2018 02/04/2018
Time 11:0Hrs
1061 Consultancy service for Authoritys Engineer for supervision of Construction of Major Bridge at Km 180.865 across river Krishnaon NH 167 Hagari to Jadcherla section i the state of Karnataka on EPC mode EE/NHD/CTA/NH167/NIT/2017 18/1936 27/02/2018 27/02/2018 05/03/2018
Time 16:0Hrs
1062 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF “Construction of Dwarka expressway from Rail under Bridge (RuB) near Sector 21 Dwarka to Delhi Haryana Border (Km 5.300 to Km 9.500) –Package 2 in state of Delhi” ON EPC mode. NHAI/Tech/DE/Package- II/AE/2018 08/03/2018 26/02/2018 02/04/2018
Time 11:0Hrs
1063 Consultancy Services for Authority’s Engineer for Supervision of Rehabilitation and up-gradation of Six laning of Tangi to Bhubaneswar (km 355.0-km 414.0) section of NH 5 (New NH 16) Pkg III in the state of Odisha on EPC mode NHAI/Odisha/EPC/TB/Pkg-III/AE/2018/113430 12/03/2018 26/02/2018 10/04/2018
Time 11:0Hrs
1064 Consultancy Services for Authoritys Engineer for Supervision of Up-gradation of NH-130A from (design chainage 0.000 to 18.700 Km. And 25.900 to 38.000) (Bilaspur-Takhatpur-Mungeli-Pandariya-Pondi Package-I Section) to two lane with paved shoulders in the State of Chhattisgarh under Corridor Approach through Engineering Procurement & Construction (EPC) mode contract 15/CE/NH/TC/44-08/2017/287784 24/02/2018 25/02/2018 19/04/2018
Time 17:0Hrs
1065 Consultancy Services for Authority’s Engineer for Supervision of Rehabilitation/Maintenance of newly entrusted Churachandpur-Singhat-Sinzawl Tuivai road section from (i) Km 0.00 to km 34.5 (ii) Km 34.5 to Km 103.1 and (iii) Km 103.1 to Km 161.48 on NH-102B and Churachandpur-Tipaimukh road from km 185.00 to Km 262.00 (Package-II) on EPC basis in the state of Manipur NHIDCL/AE/Manipur/C-T/2018 21/02/2018 21/02/2018 09/05/2018
Time 15:0Hrs
1066 Consultancy services for Authority’s Engineer for supervision of the work of Upgradation of NH-81 with a minimum of 2-Lane with paved shoulder configuration starting from km 19.205 to km 46.550 in the District of Malda, on EPC mode in the State of West Bengal under Annual Plan 2017-2018.(Job No. 081-WB-2017-18/421). 11/2017-18 of SE, National Highway Circle No. Ii 20/02/2018 20/02/2018 09/04/2018
Time 14:0Hrs
1067 Consultancy Services for Authority’s Engineer for the work of Upgradation for NH-512 with a minimum of 2-Lane with paved shoulder configuration starting from Ch 82.4 km to 99.5 km and minimum of 4-Lane configuration from Ch 104.2 km to Ch 106.607 km on EPC mode in the State of West Bengal under Annual Plan 2017-2018, Job No. 51-WB-2017-18/422 12/2017-18 of SE, National Highway Circle No. II 20/02/2018 20/02/2018 09/04/2018
Time 14:0Hrs
1068 Consultancy Services for Supervision of Short Term Improvement and routine maintenance contract of Kotwa-Mehsi-Muzaffarpur Section from km 440.00 to km 520.00 (Total Length 80.00 Km) of NH-28 in the State of Bihar (2nd Call) 26/RO-PATNA/NHAI/2017-18 03/05/2018 20/02/2018 21/05/2018
Time 11:0Hrs
1069 Consultancy Services for Authoritys Engineer for Supervision of 2 Laning with Paved Shoulder from Km 30/800 to Km 70/800 and 2 Laning without Paved Shoulder from Km 70/800 to Karnataka/Goa Border (km 84/120) of NH-4A in the State of Karnataka on EPC Mode NHAI/NHDP-III/AE/NH-4A/Bel-Khanapur/2018 20/02/2018 20/02/2018 26/02/2018
Time 11:0Hrs
-
1070 Independent Engineer Services during Operation & Maintenance stage of Four Lane divided carriageway facility constructed on BOT (Annuity) of Panagarh – Palsit – Dankuni section from Km.517.000 to Km.645.600 on NH-2 in the state of West Bengal 04/O&M/2017-18 (2nd Call) 16/02/2018 19/02/2018 20/03/2018
Time 15:0Hrs
1071 CONSULTANCY SERVICES OF AUTHORITY’S ENGINEER FOR SUPERVISION OF CONSTRUCTION OF VIADUCT AND ITS APPROACHES TO ROB AT KM 426 OF NH-91 IN KANPUR CITY ON EPC MOD IN THE STATE OF UTTAR PRADSEH. 229M/13M-NHCK/17 dt. 13.02.2018 17/02/2018 17/02/2018 27/03/2018
Time 13:0Hrs
1072 Consultancy Services of Supervision Consultant (SC) for Operation & Maintenance including Overlaying of NH – 5 (New No.NH-16) from Km 11/000 to Km 21/400 for a period of 12 Months in the State of Tamil Nadu NHAI/RO Chennai/SC/2018/01 – 2nd Call 17/02/2018 17/02/2018 01/03/2018
Time 15:0Hrs
1073 CONSULTANCY SERVICES OF AUTHORITY’S ENGINEER FOR SUPERVISION OF REHABILITATION AND UP-GRADATION FROM KM 89.600 TO KM 133.520 (HARPALPUR-SUGIRA SECTION), ON EPC MODE IN THE STATE OF UTTAR PRADESH 230M/13M-NHCK/17 15/02/2018 17/02/2018 27/03/2018
Time 17:0Hrs
1074 CONSULTANCY SERVICES OF AUTHORITY’S ENGINEER FOR SUPERVISION OF REHABILITATION AND UP-GRADATION FROM KM. 133.520 TO KM 158.040 (KULPAHAR-MAHOBA SECTION), OF NH-76 & NH-86 (5.360 KM.) TO TWO LANE WITH PAVED SHOULDER ON EPC MODE IN THE STATE OF UTTAR PRADESH 230M / 13M-NHCK / 17 15/02/2018 17/02/2018 27/03/2018
Time 17:0Hrs
1075 Consultancy services for Authority’s Engineer for supervision of the work of Upgradation of NH-81 with a minimum of 2-Lane with paved shoulder configuration starting from km 19.205 to km 46.550 in the District of Malda, on EPC mode in the State of West Bengal under Annual Plan 2017-2018, (Job No. 081-WB-2017-18/421) 11/2017-18 of SE, NHC II 15/02/2018 16/02/2018 19/02/2018
Time 14:0Hrs
1076 Consultancy service for Authority’s Engineer for Development of NH - 147 (Old NH-8C) NH No 147) including 6-lanning with service road on either side in 4 packages (I) Km. 0.00 to 16.350 Package (II) km. 16.350 to 31.300 Package (III) Km. 31.300 to 35.480 Package (IV) Km. 35.480 to 44.040 in the state of Gujarat on EPC Mode. (Package No. I to IV) 01 of 2017-2018 16/02/2018 16/02/2018 20/03/2018
Time 15:0Hrs
1077 Consultancy Services for Authoritys Engineer (AE) for the work of Providing paved shoulders including improvements to existing carriageway from km 0/0-56/0 of NH234 (New NH 75) (Mangalore-Villupuram road) on EPC mode in the State of Tamil Nadu India TN 13 HDO 0-56 NH234 16/02/2018 16/02/2018 09/04/2018
Time 11:0Hrs
1078 Consultancy services for Authoritys engineer for supervision of civil construction works reconstruction with geometric improvement of single lane to 2 lane with paved shoulder configuration from existing km 163.000 to km 194.800 of NH -125 in the State of Uttarakhand on EPC Mode 581-12M-NH-2018 dt 12-02-2018 14/02/2018 14/02/2018 28/02/2018
Time 15:0Hrs
1079 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR UP GRADATION TO TWO LANE WITH PAVED SHOULDERS CONFIGURATION FOR THE SECTION (I) SHAHPUR -PATGAON SECTION I [DESIGN CH. KM 0.000-20.130] AND SECTION (II) SHAHPUR - PATGAON SECTION II DESIGN CH. KM 20.130- 48 783] OF NH-548A (PART SHAHAPUR-MURBAD-KARJAT-KHOPOLI) IN THE STATE OF MAHARASHTRA ON EPC MODE AE-2018/Mum/01 05/04/2018 12/02/2018 23/04/2018
Time 17:0Hrs
1080 CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR UP GRADATION TO TWO LANE WITH PAVED SHOULDERS CONFIGURATION FOR THE SECTION (I) PATGAON – KHOPOLI SECTION I DESIGN CH. KM 48.783 to 69.508 AND SECTION (II) PATGAON – KHOPOLI SECTION II DESIGN CH. KM 69.508 to 91.139 OF NH-548A (PART SHAHAPUR-MURBAD-KARJAT-KHOPOLI) IN THE STATE OF MAHARASHTRA ON EPC MODE AE-2018/Mum/02 05/04/2018 12/02/2018 23/04/2018
Time 17:0Hrs
1081 CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR UP GRADATION TO TWO LANE WITH PAVED SHOULDERS CONFIGURATION FOR THE SECTION OF PUNE/ RAIGAD DISTRICT BORDER TO MANGAON (Dist. Raigad) DESIGN CH. 69.000 TO 103.775 OF NH-753F (PART PUNE-PAUD-MULASHI-TAMHINI GHATMANGAON) IN THE STATE OF MAHARASHTRA ON EPC MODE AE-2018/Mum/03 05/04/2018 12/02/2018 23/04/2018
Time 17:0Hrs
1082 CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR UP GRADATION TO TWO LANE WITH PAVED SHOULDERS CONFIGURATION FOR THE SECTION OF RENAPUR TO ASTAMODE (Dist. Latur) DESIGN CH. 0.000 TO 24.030 OF NH-63 (PART OF RENAPUR -ASHTAMODE -UDGIR -DEGLUR-AADAMPUR PHATA KHATGAON -SGAROLI -BODHAN-NIZAMABAD) IN THE STATE OF MAHARASHTRA ON EPC MODE AE-2018/Abad/04 05/04/2018 12/02/2018 23/04/2018
Time 17:0Hrs
1083 IE SERVICES DURING O AND M PERIOD FOR PALANPUR TO SWAROOPGANJ SECTION (KM. 340.00 TO KM. 264.00) OF NH-14 CONSTRUCTED ON BOT (ANNUITY) MODE UNDER NHDP PHASE-III IN THE STATE OF GUJARAT AND RAJASTHAN FOR 36 MONTHS 2018/NHAI/6508/1 12/02/2018 12/02/2018 27/02/2018
Time 15:0Hrs
1084 Consultancy service for Authoritys Engineer for the work ““Rehabilitation and up-gradation of Hyderabad outer ring road to Medak section of NH-765 D from existing Km 15.970 (Design Km. 0.0) to existing Km 78.700 (Design Km. 62.92) to Two Lane with paved shoulders / Four Lane in the state of Telangana on EPC basis contract RW/NH-12014/06/2017-TS/P7Dated 09.02.2018 10/02/2018 10/02/2018 02/04/2018
Time 15:0Hrs
1085 Rehabilitation and up-gradation of NH-565 from existing km 361/330 (Dornala T Junction) to km 420/800 (Penchalakona Junction) to two lane with paved shoulder on EPC mode in the State of Andhra Pradesh RO/VJA/NHDPIV/2017-18/661/Corr 19/02/2018 08/02/2018 02/04/2018
Time 15:0Hrs
1086 Consultancy services for Authoritys Engineer for Supervision of Four/Six Laning of Aurangabad (km.290.200) to Karodi Village End (km 320.104) road section of NH-211 (new NH No. 52) (Existing Length 29.904 km Design Length 30.215 km) in the state of Maharashtra under NHDP Phase IV-B on EPC Mode NHAI/Tech/MH/AE/Aur-Kar/2018 08/02/2018 08/02/2018 09/03/2018
Time 11:0Hrs
1087 Consultancy services for Authoritys Engineer for Supervision of Four/Six Laning of Karodi (km 320.104) to Telwadi (km 375.000) road section of NH-211 (new NH No. 52) (Existing Length 54.896 km Design Length 55.610 km) in the state of Maharashtra under NHDP Phase IV-B on EPC Mode NHAI/Tech/MH/AE/Kar-Tel/2018 08/02/2018 08/02/2018 09/03/2018
Time 11:0Hrs
1088 Independent Engineer Services during Operation and Maintenance stage of Four laned section of Km 4.200 to Km 122.420 Ahmedabad Godhra section of NH 47 Old NH 59 in the State of Gujarat on DBFOT Basis under NHDP Phase III 2018/NHAI/7294/1 13/03/2018 08/02/2018 04/04/2018
Time 11:0Hrs
1089 CONSULTANCY SERVICES FOR AUTHORITY‟S ENGINEER FOR PACKAGE-1 UPGRADATION TO TWO LANE WITH PAVED SHOULDER FROM KUNDAL TO JHADOL (SECTION OF NH-58E) FROM CH. KM 0.000 TO KM 43.900 INCLUDING LEFT OUT PORTION IN THE STATE OF RAJASTHAN ON EPC MODE.PACKAGE-2 UPGRADATION TO TWO LANE WITH PAVED SHOULDER FROM JHADOL TO AMBHELLY (SECTION OF NH-58E) FROM CH. KM 43.900 TO KM 91.00 & CONSTRUCTION OF 4-LANE ROB AND ITS APPROACHES IN LIEU OF EXISTING LEVEL CROSSING NO.43 AT KM 13.00 ON MAVLI-CHITTORGARH ROAD OF 02/2017-18 20/02/2018 07/02/2018 10/04/2018
Time 11:0Hrs
1090 Independent Engineer Services for Operation and Maintenance Stage of 4 laning of Indore Gujarat/MP Border on BOT (Toll) basis from Km. 9.500 to Km. 171.000 of NH59 on DBFOT in the State of Madhya Pradesh under NHDP Phase III NHAI/RO-MP/IND/IE/2018 12/02/2018 07/02/2018 04/04/2018
Time 15:0Hrs
1091 Consultancy services for posting of AE for Rehabilitation and up gradation of 2 lane/ 2 lane with paved shoulder from existing km. 172.900 to km. 194.150 (Design Chainage km. 49.300 to Km. 70.300) on Dharasu to Yamunotri Road of NH- 134 (old NH-94) in the state of Uttarakhand through an Engineering, Procurement and Construction (EPC) Contract. 513/13yata-NH-10/2018 19/02/2018 06/02/2018 26/03/2018
Time 12:0Hrs
1092 Consultancy services for Authoritys Engineer for Supervision of Rehabilitation and Upgradation of 2 lane road with paved shoulders of section (i) Washim to Dastapur. (Ch.0.000 to Ch.29.074), section (ii) Dastapur to Karanja (Ch.29.074 to Ch.60.374 and Section (iii) Kherda to Nagzari (Ch.77.134 to Ch.106.374) of NH-166E in the state of Maharashtra. NH/MAH/MSRDC/AMT-1/AE/Pkg-6 12/02/2018 06/02/2018 25/04/2018
Time 17:0Hrs
1093 Consultancy services for Authoritys Engineer for Supervision of Rehabilitation and Upgradation of 2 lane road with paved shoulders of section (i) Khamgaon to Deulgaon Sakarsha (NH-548C from Existing Ch. 565.653 to Ch. 529.867) and section (ii) Deulgaon Sakarsha to Mehkar (NH-548C from Existing Ch.529.867 to Ch. 493.867) in the state of Maharashtra. NH/MAH/MSRDC/AMT-2/AE/Pkg-7 12/02/2018 06/02/2018 25/04/2018
Time 17:0Hrs
1094 Consultancy services for Authoritys Engineer for Supervision of Rehabilitation and Upgradation of 2 lane road with paved shoulders of section (i) Pune to Male Village (Shende Patilwada) NH-753F Ch.01.275 to Ch.31.400 and section (ii) Male Village (Shende Patil Wada) to Pune Raigarh District Border NH-753F Ch 31.400 to Ch.69.000 in the state of Maharashtra NH/MAH/MSRDC/MUM-1/AE/Pkg-8 12/02/2018 06/02/2018 25/04/2018
Time 17:0Hrs
1095 Consultancy services for Authoritys Engineer for Supervision of Rehabilitation and Upgradation of 2 lane road with paved shoulders of section (i) Sangola - Jath (Design Ch. Km. 0/000 to Km. 44/784) Ch. Km. 185/339 to Km. 230/123 of NH- 965G), section (ii) Karad-Vita section from (Design Ch. Km. 0/000 to Km. 47/000) of NH-166E and Section (iii) Vita - Nagaj Section (Design Ch. Km. 47/000 to Km. 94/261) of NH-166E in the state of Maharashtra. NH/MAH/PWD/PUNE-1/AE/Pkg-9 12/02/2018 06/02/2018 18/04/2018
Time 17:0Hrs
1096 Consultancy services for Authority’s Engineer for Supervision of Rehabilitation and Upgradation of 2 lane road with paved shoulders of section (i) Kusumba to Malegaon (Design Ch. Km 54.155 to Km. 95.500) of NH-160 H in the state of Maharashtra on EPC Mode. NH/MAH/PWD/PUNE-2/AE/Pkg-10 12/02/2018 06/02/2018 25/04/2018
Time 17:0Hrs
1097 Consultancy services for Authority’s Engineer for Supervision of Rehabilitation and Upgradation of 2 lane road with paved shoulders of section (i) Jalgaon – Pachora - Bhadgaon (Design Ch. Km 4.000 to Km. 56.200) Ch. Km 4.000 to Km. 56.200, section (ii) Bhadgaon - Chalisgaon (Design Ch. Km 56.200 to Km 103.000) Ch. Km 56.200 to Km 103.000 and Section (iii) Chalisgaon – Nandgaon (Design Ch. Km 103.00 to Km.146.000) Ch. Km 103.00 to Km.146.000 of NH-753J in the state of Maharashtra. NH/MAH/PWD/PUNE-3/AE/Pkg-11 12/02/2018 06/02/2018 18/04/2018
Time 17:0Hrs
1098 Consultancy services for Authority’s Engineer for Supervision of Rehabilitation and Upgradation of 2 lane road with paved shoulders of section (i) Jalgaon Jamod- Nandura NH/MAH/PWD/NGP-1/AE/Pkg-14 12/02/2018 06/02/2018 25/04/2018
Time 17:0Hrs
1099 Consultancy services for Authority’s Engineer for Supervision of Rehabilitation and Upgradation of 2 lane Manglurpir - Mahan (Design Ch. Km. 75/000 to 107/500) (Ch. Km. 97/074 to 64/574) section of NH-161A in the state of Maharashtra on EPC Mode. NH/MAH/PWD/NGP-2/AE/Pkg-15 12/02/2018 06/02/2018 25/04/2018
Time 17:0Hrs
1100 Consultancy services for Authority’s Engineer for Supervision of Rehabilitation and Upgradation of 2 lane (i) Malegaon to Risod (Design Ch. Km. 0/000 to 44/200) (ii) Risod to Hingoli (Design Ch. Km. 44/200 to 97/450)section of NH-461B in the state of Maharashtra on EPC Mode. NH/MAH/PWD/NGP-3/AE/Pkg-16 13/02/2018 06/02/2018 18/04/2018
Time 17:0Hrs
1101 Consultancy services for Authority’s Engineer for Supervision of Rehabilitation and Upgradation of 2 lane (i) Wardha - Hinganghat (Design Ch. Km 0/000 to Km. 36/850) Ch. Km.132/541 of (NH-347A) (ii) Seldoh to Pavnar (Design Ch. Km 39/200 to Km. 88/540) of NH-353I in the state of Maharashtra on EPC Mode. NH/MAH/PWD/NGP-5/AE/Pkg-18 13/02/2018 06/02/2018 18/04/2018
Time 15:0Hrs
1102 Consultancy services for Authority’s Engineer for Supervision of Rehabilitation and Upgradation of 2 lane (i) Salaikhurd - Tirora (Design Ch. Km. 44/000 to 87/000) (Ch. Km. 117/200 to 74/200) (ii) Mansar - Ramtek - Salaikhurd section of NH-753 from existing km 75.80 to 120.100 (Design Ch. From km 0.00 to 44.00) section of NH-753 in the state of Maharashtra on EPC Mode. NH/MAH/PWD/NGP-6/AE/Pkg-19 13/02/2018 06/02/2018 18/04/2018
Time 17:0Hrs
1103 Consultancy Services For Authority’s Engineer For Up gradation to Four lane with paved shoulders configuration for the work Chikali - Takarkhed [Design Chainage - 68.900- 108.500] of NH-753A in the State of Maharashtra on EPC mode. NH/MAH/PWD/NGP-7/AE/Pkg-20 13/02/2018 06/02/2018 18/04/2018
Time 17:0Hrs
1104 Consultancy services for Authority’s Engineer for Supervision of Rehabilitation and Upgradation of 2 lane (i) Shivur- Yeola (Design Ch. 44/900 to 74/000) from Km. 66/900 to 96/000) (ii) Phulambri - Khultabad (Design Ch. Km. 51.700 to Km. 78.268) section of NH-752H in the state of Maharashtra on EPC Mode. NH/MAH/PWD/AUR-1/AE/Pkg-21 13/02/2018 06/02/2018 18/04/2018
Time 17:0Hrs
1105 Consultancy services for Authority’s Engineer for Supervision of Rehabilitation and Upgradation of 2 lane (i) Dhad - Bhokardan (Design Ch. Km. 28/000 to 67/600) of NH-753M) &Bhokardhan - Sillod (Design Ch. Km. 12/500 to 0/000) of NH-753F) and (ii) Chikali - Dhad (Design Ch. Km. 0/000 to 28/000) ofNH-753M) in the state of Maharashtra on EPC Mode. PWD/AUR-2/AE/Pkg-22 13/02/2018 06/02/2018 18/04/2018
Time 17:0Hrs
1106 Consultancy services for Authority’s Engineer for Supervision of Rehabilitation and Upgradation of 2 lane (i) Wadigodri - Dhangripimpri and (ii) Dhangripimpri to Jalna and Ambad Chowk to Mantha Chowk section of NH-753H in the state of Maharashtra on EPC Mode. NH/MAH/PWD/AUR-3/AE/Pkg-23 13/02/2018 06/02/2018 18/04/2018
Time 17:0Hrs
1107 Consultancy services for Authority’s Engineer for Supervision of Rehabilitation and Upgradation of 2 lane road with paved shoulders of section (i) Omerga to Ausa (Design Ch. 0/00 to 47/800) From Km. 249/200 to 201/400 of NH- 548B, section (ii) Pangaon to Dharmapuri (Design Ch. Km. 106.200 to 118.850) Ch. Km. 38/200 to 25/550 of NH- 561H and Parali to Injegaon (Design Ch. Km. 144.400 to 156.500) From Km. 95/800 to 83/700 of NH-548B and Section (iii) Latur to Pangaon (Design Ch. Km. 64/250 to 10 NH/MAH/PWD/AUR-4/AE/Pkg-24 13/02/2018 06/02/2018 18/04/2018
Time 17:0Hrs
1108 Consultancy services for Authority’s Engineer for Supervision of Rehabilitation and Upgradation of 2 lane (i) Parbhani to Gangkhed (Design Ch. Km. 0/000 to Km 35/885) (Km 46/620 - 82/505 of NH-752K) in the state of Maharashtra on EPC Mode. NH/MAH/PWD/AUR-5/AE/Pkg-25 13/02/2018 06/02/2018 25/04/2018
Time 17:0Hrs
1109 Consultancy Services For Authority’s Engineer For Up gradation to two lane with paved shoulders configuration for the work Kothari - Dhanora Junction at NH 361 (Design Ch. Km. 90/000 to Km. 147/650) (Ch. 198/074 to 255/724 of NH- 161A ) in the State of Maharashtra on EPC mode. NH/MAH/PWD/AUR-6/AE/Pkg-26 13/02/2018 06/02/2018 18/04/2018
Time 17:0Hrs
1110 Consultancy services for Authority’s Engineer for Supervision of Rehabilitation and Upgradation of 2 lane (i) Mahad - Raigad Fort, Hirkaniwadi Connector & Jijaumata Samadhi Connector (a) (Design Ch Km 0/000 to Km 23/446) (b) (Design Ch Km 0/000 to Km 0/950) (c) (Design Ch Km 0/000 to Km 1/213) and (ii) Pacharal - Mandangarh with Ambadave connector (Birth place of Dr Bhimrao Ambedkar) of NH-965DD in the state of Maharashtra on EPC Mode. NH/MAH/PWD/MUM-1/AE/Pkg-27 13/02/2018 06/02/2018 18/04/2018
Time 17:0Hrs
1111 Consultancy Services For Authority’s Engineer For Up gradation to Two lane with paved shoulders configuration for the work Chiplun - Helwak (Design Ch. Km. 26/400 to 40/000 & 53/600 to 85/000) Ch. 26/400 to 40/000 & 53/600 to 85/000) of NH-166E in the State of Maharashtra on EPC mode. NH/MAH/PWD/Pune-6/AE/Pkg-28 13/02/2018 06/02/2018 18/04/2018
Time 17:0Hrs
1112 Consultancy Services For Authority’s Engineer For Up gradation to Two lane with paved shoulders configuration for the work Naldurg - Akkalkot of NH-652 in the State of Maharashtra on EPC mode. NH/MAH/PWD/Pune-7/AE/Pkg-29 13/02/2018 06/02/2018 18/04/2018
Time 17:0Hrs
1113 Consultancy Services For Authority’s Engineer For Up gradation to Two lane with paved shoulders configuration for the work Rahuri - Sonai – Shani Shinganapur (Design Ch. Km. 0/000 to 26/143) of NH-160 C in the State of Maharashtra on EPC mode. NH/MAH/PWD/Pune-8/AE/Pkg-30 13/02/2018 06/02/2018 18/04/2018
Time 17:0Hrs
1114 Consultancy Services For Authority’s Engineer For Up gradation to Two lane with paved shoulders configuration for the work Kharwandi - Rajuri [Design ch. Km 0/000 to 36/500] of NH-361F in the State of Maharashtra on EPC mode. NH/MAH/PWD/Aur-7/AE/Pkg-32 13/02/2018 06/02/2018 18/04/2018
Time 17:0Hrs
1115 Consultancy Services For Authority’s Engineer For Up gradation to Two lane with paved shoulders configuration for the work Nanded (NH - 161) Usmannagar - Kandhar - Jam - Jalkot (Jalkot - Togari section) (Design Ch. Km. 65/952 to 110/124) of NH-50 in the State of Maharashtra on EPC mode. NH/MAH/PWD/Aur-8/AE/Pkg-33 13/02/2018 06/02/2018 18/04/2018
Time 17:0Hrs
1116 Consultancy Services For Authority’s Engineer For Up gradation to Two lane with paved shoulders configuration for the work Pen - Khopli - Mahad (Ashtavinayaka) Road of NH-166D in the State of Maharashtra on EPC mode. NH/MAH/PWD/Mum-2/AE/Pkg-34 13/02/2018 06/02/2018 18/04/2018
Time 17:0Hrs
1117 Consultancy services for Authority’s Engineer for Supervision of Rehabilitation and Upgradation of 2 lane road with paved shoulders of section (i) Talegaon - Gonapur (Design Ch. Km. 0/000 to 60/703) (Ch. Km.0/000 to 60/703 of NH-347A), section (ii) Arvi - Talegaon (Design Ch. Km. 59/900 to 73/600) (Ch. Km. 60/703 to 74/403 of NH-347A) and Section (iii) Wardha - Arvi (Design Ch. Km 00/000 to Km 53/708) of NH-647 in the state of Maharashtra. NH/MAH/PWD/NGP-4/AE/Pkg-17 13/02/2018 06/02/2018 18/04/2018
Time 17:0Hrs
1118 Consultancy services for Authoritys Engineer for supervision of the works Construction of proposed ROB at Memari and ROB at Jougram-Masagram in the district of Burdwan and Construction of proposed ROB at Simlagarh in the district of Hooghly, All in the State of West Bengal. WBPW(R)D/RFP NO-08 of SE/WHC-I/2017-2018 19/01/2018 06/02/2018 19/02/2018
Time 14:0Hrs
1119 Construction of Kund Bypass from Existing Km 33.130 to Km 41.260 (existing length 8.130 km) design chainage km 35.130 to km 47.700(design length 12.570 km) on NH-109 (New No. 107) in the State of Uttarakhand under EPC Mode under improvement to NH Connectivity to Chardham 513/13yata-NH-10/2018 dated 06.02.18 28/02/2018 06/02/2018 09/04/2018
Time 17:0Hrs
1120 AppointmentofIEduringOandMperiodfor4/6laningofRohtak-HisarsectionofNH-10fromKm. 87.000 toKm.170.000 includingconnectinglinkfromKm. 87.000 (NH-10) to Km. 348.000 (NH-71) in the statesofHaryana -2ndcallofRFP NHAI/RO/CHD/11011/PD-RTK-HTK-HSR/NH-10/IE/RFP 26/02/2018 02/02/2018 05/03/2018
Time 11:0Hrs
1121 Consultancy services for Authority’s Engineer for supervision of the works Proposed Bridge over river Ajay, Construction, near Shibpur at Ch. 17.84 km of Muchipara-Shibpur road (district of PaschimBurdwan) connecting Jaydev-Kenduli-Khagra road at Ch. 1.05 km (district of Birbhum) under Asansol Highway Division, Public Works (Roads) Directorate, West Bengal. WBPW(R)D/RFP NO-07 of SE/WHC-I/2017-2018 19/01/2018 02/02/2018 16/02/2018
Time 14:0Hrs
1122 Consultancy services for Authority’s Engineer for supervision of Rehabilitation and up-gradation of existing 2-lane to four lane standards from Talchar to End of Kamakhyanagar Bypass Section of (Km. 8.844 – Km. 15.725) of NH 23 (New NH – 149) and (Km. 301.875 – Km. 335.946) of NH 200 (New NH 53) in the State of Odisha Under NHDP Phase – III on EPC Mode (Pkg-I). NHAI/EPC/11012/TKB/2017AE/Pkg-I./112364 12/02/2018 02/02/2018 12/03/2018
Time 11:0Hrs
-
1123 Consultancy services for Authority’s Engineer for supervision of Rehabilitation and Up gradation of existing 2-lane to 4-lane standards from Duburi to Chandikhole Section of NH 200 (New NH 53) from km. 388.376 to km 428.074 in the State of Odisha Under NHDP Phase - III on EPC Mode (Pkg- III). NHAI/EPC/11012/TKB/2017AE/Pkg-III/112371 12/02/2018 02/02/2018 12/03/2018
Time 11:0Hrs
1124 Rehabilitation and Up gradation of existing 2-lane to 4-lane standards to End of Kamakhyanagar Bypass – Duburi Section (km 335.946 – km 388.382) of NH-200 (New NH 53) in the State of Odisha Under NHDP Phase – III on EPC Mode (Pkg-II) NHAI/EPC/11012/TKB/2017/AE/Pkg-2/112370 12/02/2018 02/02/2018 12/03/2018
Time 11:0Hrs
1125 Consultancy Services for Supervision Consultant during Operation and Maintenance stage of Six lane of Km. 192.00 to Km 198.00 between Vadodara – Surat section of NH-48 (Old NH-8) including four lane Extra Dose Bridge across river Narmada (Total length 6.745 Km) and Old Narmada Bridges Constructed in the year 1977 and in the year 2000 on river Narmada in the state of Gujarat NHAI/PIU Surat (Expressway)/72/2018 02/02/2018 01/02/2018 20/03/2018
Time 11:0Hrs
1126 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF Development of newly declared NH-527C from Majhauli to Charout Section to 2 lane with paved shoulder National Highway Standard in the State of Bihar on Engineering Procurement & Construction (EPC) basis (Km 0.0 to Km 63.655) NHAI/BH/Majh-Char/AE/2018 06/02/2018 31/01/2018 03/04/2018
Time 11:0Hrs
1127 Consultancy services for authoritys Engineer for supervision of Strengthening of existing two lane pavement including paved shoulders on NH-39 new NH02 Mao Imphal section SH - Mao Senapati and Senapati - Koubru Leikha section from Km 212/325 to Km 260/00 and 260/00 to 287/00 respectively) on EPC mode (3rd call) RW/GHT/MN/DP(O)/2016-17/18&19/AE 30/01/2018 30/01/2018 28/02/2018
Time 15:0Hrs
1128 Consultancy services for Authority’s Engineer supervision of Civil Construction work for Rehabilitation and upgradation of NH42 from Km 76/0 to 102/130 (Design Chainage 76/00 to 99/971 excluding Km 77/3 to 78/350 ( Rapthadu – Bathapalli Section) to four lane in the state of Andhra Pradesh under corridor approach through EPC basis contract under NH(O) SE NH ATP NIT NO 55 31/01/2018 30/01/2018 28/03/2018
Time 15:0Hrs
1129 Consultancy services for Authority’s Engineer supervision of Civil Construction work for Rehabilitation and upgradation of new NH-544DD (Old SH-30) from design Chainage Km 0.000 to 56.000 (Ex. Km 0.460 to Ex. Km 58.344) of Ananthapuramu–Kalyandurg section to two lane with paved shoulders in the State of Andhra Pradesh under NH(O) on EPC mode SE NH ATP NIT No 56 31/01/2018 30/01/2018 27/03/2018
Time 15:0Hrs
1130 Consultancy services for Authority’s Engineer supervision of Civil Construction work for Rehabilitation and upgradation of new NH-544DD from design Chainage Km 56.00 to 102.20 of Kalyandurg-Molakalmuru section to two lane with paved shoulders in the State of Andhra Pradesh under NH(O) on EPC mode SE NH ATP NIT No 57 31/01/2018 30/01/2018 27/03/2018
Time 15:0Hrs
1131 Consultancy services for Authority Engineer for Supervision of “Construction of Integrated Structures along with Development of other allied structures on both sides of Chandani Chowk Junction (Ch. 842.580) of NH-4 in Pune city in the state of Maharashtra on EPC mode NHAI/Chandni Chowk/AE/Mah/2017 12/02/2018 29/01/2018 26/04/2018
Time 11:0Hrs
1132 Consultancy services for Authority’s Engineer for Supervision of Construction of proposed Srinagar bypass from Km 0.000 (Galander) to Km 42.100 (Crossing of Sumbel Road) in Srinagar in the State of J&K on EPC Basis NHAI/12011/Srinagar Bypass/EPC/AE/2018 23/02/2018 29/01/2018 07/03/2018
Time 11:0Hrs
1133 CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR WIDENING, STRENGTHENING AND RECONSTRUCTION OF SAWAI MADHOPUR TO SHEOPUR FROM KM 76/600 TO KM 112/000 SECTION OF NH-552 EXTN. IN THE STATE OF RAJASTHAN ON EPC MODE. (JOB NO. NH-552 EXT./RJ/2017-18/700) NIT NO. 07/2017-18 EE NH 25/01/2018 25/01/2018 25/02/2018
Time 18:0Hrs
1134 Appointment of Independent Engineer Services during Operation & Maintenance stage of four laning of Kaithal Rajasthan Border section of NH-152/65 from KM. 33.250 (Design Km. 0.500) to km. 241.580 (Design Km 165.759) in the States of Haryana under NHDP Phase IV through Public Private Partnership (PPP) on Design, Build, Finance, Operate & Transfer(“DBFOT”) Toll Basis- RFP NHAI/RO/CHD/11011/PD-Hisar/KAT-RAJ-BDR/IE/RFP 25/01/2018 24/01/2018 12/03/2018
Time 11:0Hrs
1135 Independent Engineer for supervision of widening of Pipli – Bhavnagar- Section Package 1 from km 136/025 to 169/328 (Design Chainage km 136/000 to km 169/308) Near Adhelai Village to Nari Junction to four laning from existing 10-Meter-wide in the State of Gujarat on Hybrid Annuity Mode NHAI/Guj/IE/Nari-Pipli/2018 05/03/2018 24/01/2018 12/03/2018
Time 11:0Hrs
1136 Independent Engineer services for Operation and Maintenance for Four Laning of Orissa Border-Aurang section from Km. 88.000 to Km. 293.000 of NH-6 (New NH-53) in the State of Chhattisgarh executed as BOT (Toll) on DBFOT pattern under NHDP Phase-IV 11052/RO-Raipur/Tender/04 14/03/2018 24/01/2018 11/06/2018
Time 14:30Hrs
1137 Independent Engineer services for Operation and Maintenance of Four Laning of Durg bypass from Km. 308.600 to Km. 323.600 of NH-6 New-53 in the State of Chhattisgarh executed as BOT Toll on DBFOT pattern under NHDP Phase-IV 11052/RO-Raipur/Tender/05 15/03/2018 24/01/2018 25/04/2018
Time 15:0Hrs
1138 Independent Engineer services for Operation and Maintenance of Four Laning of Durg-bypass from km.308.600 to km.323.600 of NH-6 (New-53) and Aurang-Raipur from km.239.00 to km.282.00 of NH-6 (New-53) in the State of Chhattisgarh executed as BOT Toll on DBFOT pattern under NHDP Phase-IV 11052/RO-Raipur/Tender/06 15/03/2018 24/01/2018 11/06/2018
Time 14:30Hrs
1139 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF THE WORK FOR Widening to Two Lane with Paved Shoulders from Km 0/970 to Km 40/410 of Jangaon – Thirumalgiri Section (erstwhile section of SH-16) of NH-365B on EPC mode under NH(O) in the State of Telangana NIT No. SE (R&B) NH/KMNR/37/2016-17 19-10-2016 23/01/2018 23/01/2018 15/02/2018
Time 15:0Hrs
1140 Consultancy for Authority Engineer services Construction of 2 Lane ROB and its approaches in lies of existing level crossing (LC No. C 61) at Nagaur City (Bikaner Phatak) km 165.550 on NH 89. (Job No. NH 89/RJ (3)/16-17/003-S and R(B). and Construction of 2 Lane ROB and its approaches in lies of existing level crossing (LC No. C 64) at Nagaur City (Manasar Phatak) at Km 172/990 on NH 65(Job No. NH 65/RJ /2017 18/703) in the State of Rajasthan on EPC Mode. NIT no 04 of 2017-18 SE NH Bikaner 22/01/2018 19/01/2018 05/03/2018
Time 18:0Hrs
1141 Consultancy for Authority Engineer services for the work of (i) Construction of Proposed 2- Lane ROB and its approaches in lieu of existing level crossing No. A-142 at Km 1.00 on NH-709 Extn. Near Sadulpur Railway Station in District Churu in the State of Rajasthan.(Job No. NH-709 Extn,/RJ(5)/17-S&R(B)-005) &(ii). Construction of two lane flexible pavement with paved shoulder from km 3.650 to km 58.325 of NH-709 Extn. (Rajgarh-Haryana Border) in the State of Rajasthan ON EPC under NH(O) during 04/2017-18 15/01/2018 19/01/2018 05/03/2018
Time 18:0Hrs
1142 Consultancy Services of Authority’s Engineer for supervision of Rehabilitation and Upgradation of Allahabad-Mirzapur section (km 450.000 to 486.775) of NH 76E/35 to two lane with paved shoulder under EPC Mode in the State of Uttar Pradesh. 2403/107COM B-18/17 DT 06/10/2017 18/01/2018 18/01/2018 05/02/2018
Time 15:0Hrs
1143 Independent Engineer services for Four laning of Tumkur-Shivamogga section from (i) km 12/310 (Design km 12/300) to Km 66/540 (Design Km 65/195) from Mallasandra to Karadi village (Pkg-I) (ii) Km 66/540 (Design Ch. 65/195) (Karadi) to Km 119/790 (Design Ch. 121/900) (Banwara) (Pkg –II) (iii) Km 119/790 (Design Km 121/900) to Km 166/100 (Design Km 170/415) from Banavara town to Bettadahalli village (Pkg –III) of NH-206 on Hybrid Annuity Mode under NHDP Phase – IV in the State of Karnataka NHAI/Tumkur-Shimoga-Honnavar/KNT/2018 18/01/2018 18/01/2018 16/04/2018
Time 11:0Hrs
-
1144 Independent Engineer service for Development, Operation and maintenance of Chittorgarh- Neemuch (MP Border) NH-79 Section (PWD Km. 183.000 to Km. 221.400) & Nimbahera- Partapgarh NH-113 Section (Km. 5.400 to Km. 80.000) In The State of Rajasthan Through Public Private Partnership (PPP) on Design, Built, Finance, Operate and Transfer (the “DBFOT”) Basis. SE NH PWD CIRCLE KOTA NITNO1-2017-18 17/01/2018 17/01/2018 27/01/2018
Time 11:0Hrs
1145 Consultancy Services for Supervision Consultant (SC) of Operation & Maintenance of 4 laning of Madurai – Tirunelveli – Panagudi – Kanniyakumari Section from Km 0/000 to Km 243/170 of NH-7 (New NH.44) including construction of Bridge at Narikulam Tank Portion at km 230/700 to Km 231/250 and Improvement of Approach Road to ROB at Km 0/600 at Samayanallur of NH-7(New NH.44) and Operation & Maintenance of Tuticorin – Tirunelveli Section from Km 0/000 to km 47/250 of NH-7A (New NH.138) in the State RO Madurai/SC/O&M/2017/Package-I (2ND Call) 17/01/2018 13/01/2018 15/02/2018
Time 12:0Hrs
1146 Consultancy services for Authoritys Engineer for Supervission of Rehabilitation and Upgradation Biaora Maksudangarh and Maksudangarh Sironjsection of NH 752B from Km3.150 to to Km.92.640 to Two lane with paved shoulder in the state of MP on EPC Mode CE-RO/BPL/NIT/09/AE/2017-18 09/02/2018 13/01/2018 05/03/2018
Time 17:30Hrs
1147 Consultancy services for Authority Engineer for Supervision of Rehabilitation and Up-gradation Khilchipur Jirapur section of NH 752B, Shujalpur Ashta section of NH 752C and Pachore Shujalpur section of NH 752C length 88.21 Km to Two lane in the MP CE-RO/BPL/NIT/10/AE/2017-18 09/02/2018 13/01/2018 05/03/2018
Time 17:30Hrs
1148 Consultancy Services for Authority’s Engineer for Supervision of Rehabilitation and up-gradation of existing 2-lane to four laning of Koida (Km 206.200) to Rajamunda (Km 259.453) section of NH-215 (New NH-520) in the state of Odisha (the “Project”) through an Engineering, Procurement and Construction (the “EPC”) Contract under NHDP Phase III, Package II NHAI/NHDP-III/EPC/Odisha/KR/AE/2018/111351 23/01/2018 12/01/2018 13/02/2018
Time 11:30Hrs
-
1149 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF REHABILITATION AND UP-GRADATION OF CUTTACK ANGUL SECTION OF NH -42 (NEW NH 55) TO 4-LANING FROM KM. 60.200 TO KM. 112.000) IN THE STATE OF ODISHA UNDER NHDP-III ON EPC MODE (PKG -I1) NHAI/NHDP-IV/OR/2017/CA/AE/Pkg-II/111275 23/01/2018 11/01/2018 13/02/2018
Time 11:30Hrs
1150 Authority Engineer services for Rehabilitation and Upgrading of Cuttack-Angul Section of NH-42 (New NH-55) to 4-Lane from km 0.400 to km. 60.200 in the State of Odisha under NDHP Phase III on EPC Mode (Pkg.-I) NHAI/NHDP-IV/OR/2017/CA/AE/Pkg-I/111237 23/01/2018 11/01/2018 13/02/2018
Time 11:30Hrs
-
1151 Consultancy Services for Authority’s Engineer for Supervision of Rehabilitation and up-gradation of existing 2-lane to 4-lane standards of Rimuli – Koida Section km 163.00 to km 206.200 of NH-215 (New NH-520) in the state of Odisha under NHDP Phase-III on EPC mode Package –I NHAI/EPC /11012/71/2017/RK-PK1/AE 23/01/2018 11/01/2018 13/02/2018
Time 11:30Hrs
1152 Consultancy Services as Independent Engineer during Operation & Maintenance for Six laning of Tumkur-Chitradurga (excluding Tumkur & Chitradurga bypasses) Section from Km.75.00 to Km.189.00 of NH-4 (114.00 Km.) in the State of Karnataka on DBFOT Pattern under NHDP Phase V 25/ NHAI/RO-BNG/13019/Tender/2018 Dated 11.01.2018 12/01/2018 11/01/2018 22/02/2018
Time 15:0Hrs
1153 Consultancy Services for Authority’s Engineer for Supervision of Rehabilitation and up-gradation of existing 2-lane to 4-lane standards of Rimuli – Koida Section km 163.00 to km 206.200 of NH-215 (New NH-520) in the state of Odisha under NHDP Phase-III on EPC mode Package –I NHAI/EPC /11012/71/2017/RK-PK1/AE/111236 12/01/2018 11/01/2018 13/02/2018
Time 11:30Hrs
1154 Appointment of Independent Engineer Services during Operation Maintenance stage of 4 laned Pathankot Amritsar Section of NH-15 from Km. 6.82 to Km. 108.502 in the State of Punjab-RFP PDJAL/NH-15/PAT ASR/IE/RFP 19/01/2018 10/01/2018 23/02/2018
Time 11:0Hrs
1155 Consultancy services for Authority’s Engineer for supervision of the works Proposed Bridge over river Ajay, Construction, near Shibpur at Ch. 17.84 km of Muchipara-Shibpur road (district of PaschimBurdwan) connecting Jaydev-Kenduli-Khagra road at Ch. 1.05 km (district of Birbhum) under Asansol Highway Division, Public Works (Roads) Directorate, West Bengal. WBPW(R)D/RFP NO-05 of SE/WHC-I/2017-2018 20/12/2017 05/01/2018 15/01/2018
Time 14:0Hrs
1156 Consultancy services for Authority engineer for supervision of Construction of High Level Thapra Bridge on Chordi Choraha-Kuba-Ananduri Road (MDR-83) in Km. 22 of Banswara District in the state of Rajasthan Under ISC on EPC Mode NIT 07/2017-18 PWD Dn Garhi Distt Banswara 04/01/2018 04/01/2018 22/01/2018
Time 11:0Hrs
1157 Consultancy Services for Supervision of Short Term Improvement and Routine Maintenance including the ongoing Contracts for completion of balance works on this stretch, work of Rehabilitation of Old Ganga Bridge, work of Construction of Madhya Ganga Canal on Hapur- Garhmukteshwar-Moradabad Section of NH-09 (Old NH-24) from Km 49.00 to Km 149.250 in the State of Uttar Pradesh NHAI/RO-W-UP/PIU-MBD/NH-09(24)/2017-18/02 02/01/2018 01/01/2018 15/01/2018
Time 11:0Hrs
1158 Independent Engineer Services during Operation and Maintenance stage of Six lanned section of Surat-Dahisar from Km 263.000 to Km 502.000 of NH-48 (old NH-8) in the state of Gujarat and Maharashtra on Build Operate and Transfer (BOT) Toll basis on DBFO basis under NHDP Phase – V NHAI/PIU Surat (Expressway)/SDM-10/2017 25/01/2018 30/12/2017 07/02/2018
Time 11:0Hrs
1159 Independent Engineer Services during Operation and Maintenance stage of Six lanned section of Km 108.700 to Km 192.000 Vadodara to Bharuch section of NH-48 (old NH-8) on BOT (Toll) basis in the state of Gujarat under Phase V NHAI/PIU Surat (Expressway)/10-E/2017 25/01/2018 30/12/2017 31/01/2018
Time 11:0Hrs
1160 Independent Engineer Services for National Highways stretches under Bundle-1 of Tolling, Operation, Maintenance & Transfer (TOT) Projects in the states of Andhra Pradesh & Gujrat-Package 1 2017-NHAI-5582-1 11/01/2018 29/12/2017 26/02/2018
Time 11:0Hrs
1161 Independent Engineer Services for National Highways stretches under Bundle-1 of Tolling, Operation, Maintenance & Transfer (TOT) Projects in the states of Andhra Pradesh & Gujrat-Package 2 2017-NHAI-5582-1 12/01/2018 29/12/2017 26/02/2018
Time 11:0Hrs
1162 Independent Engineer Services for National Highways stretches under Bundle-1 of Tolling, Operation, Maintenance & Transfer (TOT) Projects in the states of Andhra Pradesh & Gujrat-Package 3 2017-NHAI-5582-1 PKG-3 12/01/2018 29/12/2017 26/02/2018
Time 11:0Hrs
1163 Independent Engineer Services for National Highways stretches under Bundle-1 of Tolling, Operation, Maintenance & Transfer (TOT) Projects in the states of Andhra Pradesh & Gujrat-Package 4 2017-NHAI-5582-1 PKG-4 12/01/2018 29/12/2017 26/02/2018
Time 11:0Hrs
1164 Independent Engineer Services for National Highways stretches under Bundle-1 of Tolling, Operation, Maintenance & Transfer (TOT) Projects in the states of Andhra Pradesh & Gujrat-Package 5 2017-NHAI-5582-1PKG-5 12/01/2018 29/12/2017 26/02/2018
Time 11:0Hrs
1165 Appointment of Independent Engineer Services during operation & maintenance stage of four laned Amritsar to Wagha border section of NH-1 from km. 456.100 to km. 492.030 in the state of Punjab on BOT (Annuity) basis- RFP. NHAI/RO/CHD/11011/PD-JAL/NH-1/ASR-WSA/IE/RFP 05/01/2018 28/12/2017 19/02/2018
Time 11:0Hrs
-
1166 Consultancy Services for Authority’s Engineer for Supervision of “Two lane with hard shoulders of Chakabama-Zunheboto Road from (i) Design Km 0.000 to Km 25.000 (Existing Km 0.000 to Km 25.760) (ii) Design Km 25.000 to Km 50.000 (Existing Km 25.760 to Km 52.370) (iii) Design Km 50.000 to Km 75.000 (Existing Km 52.370 to Km 79.040) (iv) Design Km 75.000 to Km 95.000 (Existing Km 79.040 to Km 100.345) (v) Design Km 95.000 to Km 115.534 (Existing Km 100.345 to Km 122.250)” in the state of Nagaland NHIDCL/Nagaland/ Chakabama-Zunheboto (0 to 115.534)/AE/2017 12/01/2018 28/12/2017 08/05/2018
Time 16:0Hrs
1167 Consultancy Services for Authority’s Engineer for Supervision of “Two lane with hard shoulders of Merangkong-Tamlu-Mon Road from (i) Design Km 0.000 to Km 20.000 (Existing Km 0.000 to Km 20.456) (ii) Design Km 20.000 to Km 40.000 (Existing Km 20.456 to Km 41.065) (iii) Design Km 40.000 to Km 59.000 (Existing Km 41.065 to Km 60.345) (iv) Design Km 59.000 to Km 86.835 (Existing Km 60.345 to Km 98.065)” in the state of Nagaland under SARDP-NE on EPC Mode. NHIDCL/Nagaland/ Merangkong-Tamlu-Mon (0 to 86.835)/AE/2017 12/01/2018 28/12/2017 17/04/2018
Time 15:30Hrs
1168 Consultancy Services for Authority’s Engineer for Supervision of “Two lane with hard shoulders of Pfutsero- Phek Road from (i) Design km 0.000 to km 20.000 (Existing km 0.000 to km 19.900) (ii) Design km 20.000 to km 40.000 (Existing km 19.900 to km 40.090) (iii) Design km 40.000 to km 62.558 (Existing km 40.090 to km 65.300)” in the state of Nagaland under SARDP-NE on EPC Mode. NHIDCL/Nagaland/Pfutsero-Phek (0 to 62.558)/AE/2017 12/01/2018 28/12/2017 24/04/2018
Time 16:30Hrs
1169 Consultancy services for Authority’s Engineer for supervision of Rehabilitation and Upgradation of NH-544D from Bugga (Existing Km 74.45/Design Km 69.00) to Kaipa (Existing Km 134.28 /Design Km 126.40) to two lane with paved shoulders (Design length = 57.40 Km) in the State of Andhra Pradesh under Bharatmala Pariyojna on EPC Mode NHAI/Tech/AP/NH-544D/Bug-Kap/Pkg-III/AE/17-18 03/01/2018 26/12/2017 28/02/2019
Time 11:0Hrs
1170 Consultancy services for Authority’s Engineer for supervision of four laning of NH-161 from Kandi (Design Km 0.000) (Km 498.250 of NH-65) to Ramsanpalle (Design Km 39.980/Existing Km 44.757) (Design Length = 39.980 Km) in the State of Telangana under Bharatmala Pariyojna on EPC Mode NHAI/Tech/AP/NH-161/San-Nan/Pkg-I/AE/17-18 03/01/2018 26/12/2017 12/02/2018
Time 11:0Hrs
1171 Consultancy services for Authority engineer for supervision of construction of 4-laning from Itnagar to Banderdewa (pkg A from 29.500km to 40.40km) in the state of Arunachal Pradesh on EPC mode. CEAP(HW)WZ/W-24/IB/AE/2017-18 26/12/2017 26/12/2017 30/01/2018
Time 15:0Hrs
1172 Independent Engineer Services during Operation and Maintenance stage of Six/ Four lanning of Km 198.00 to Km 263.00 Bharuch - Surat section of NH-48 (old NH-8) in Gujarat on Build Operate and Transfer (BOT) basis Project Package II under Phase - V NHAI/PIU Surat (Expressway)/10-F/2017 25/01/2018 23/12/2017 31/01/2018
Time 11:0Hrs
1173 Widening to Two Lane with Paved Shoulders from Km 40/410 to km 84/037 of Thirumalagiri to Suryapet section of NH-365B (Erstwhile SH16) in the State of Telangana on EPC mode under NH(O) Annual Plan 2016-17 SE(R&B)NH/HYD/32/2017-18, Dt. 16.12.2017(2nd Call) 21/12/2017 21/12/2017 04/01/2018
Time 15:0Hrs
1174 Consultancy Services as Independent Engineer during Operation & Maintenance of Bengaluru-Hoskote-Mulbagal section from Km.237.700 to Km.318.000 of NH-4 in the State of Karnataka under NHDP Phase-IIIA on BOT basis. 19/ NHAI/RO-BNG/11019/Tender/2017 dated 20/12/2017 22/12/2017 20/12/2017 05/02/2018
Time 15:0Hrs
1175 Four laning of Panikoili-Keonjhar-Rimuli section of NH-20 (old NH-215) from Km.0.000 to Km. 163.000 (Design Chainage Km 0.000 to Km166.173) BOT project under NHDP Phase-III in the State of Odisha 11012/7/RO-OD/IE/2017 27/12/2017 15/12/2017 15/02/2018
Time 11:0Hrs
-
1176 Independent Engineer Services during Operation and Maintenance from Km 0 to Km 32.27 of Gorakhpur Bypass on NH-28 in the state of UP on BOT Annuity Basis NHAI/PIU-GKP/IE/2017-18/03 15/12/2017 15/12/2017 16/01/2018
Time 11:0Hrs
1177 Rehabilitation and Up-gradation Thikri-Anjad section of NH-347B from Km 0/000 to Km. 34/560 (Design Length 34.560 Km) to Two lane with paved shoulder through Engineering, Procurement and Construction in the state of Madhya Pradesh on EPC Mode 16576/ThikriAnjad/AE/EPC/2017 15/12/2017 14/12/2017 09/01/2018
Time 17:30Hrs
1178 Supervision Consultant (SC) services for Four Lane NH Connectivity to ICTT Vallarpadam from Kalamassery (Ch.Km 0/000) to Vallarpadam (Ch.Km 17/121) Section on NH 966A (Old NH 47 C) in the State of Kerala ROKerala/PIU-CHN/ICTT/SC/2017-18/05 14/12/2017 14/12/2017 08/02/2018
Time 11:0Hrs
1179 Independent Engineer (IE) during Operation & Maintenance period on the basis of National Competitive Bidding for 4-Laning of Kagal - Satara Section of NH-48 (old NH-4) from Km 592.240 to Km 725.000 in the State of Maharashtra under NHDP Phase-I on BOT basis NHAI/RO/MUM/KLP/IE/K-S/2017-18/03 13/12/2017 13/12/2017 11/12/2018
Time 10:59Hrs
1180 Consultancy Services forAE for supervision of upgradation of Chandrapur Ballarpur ashti road to 2 lane with paved shoulder in the state of Maharashtra from KM 242150 to 284400 15/2017-18 08/01/2018 13/12/2017 29/01/2018
Time 17:50Hrs
1181 Independent Engineer Services during Operation and Maintenance stage of 4 Laning of Walayar – Vadakkancherry from existing KM 182/250 to KM 240/000 (Design Length 54 Km) in the State of Kerala under NHDP-Phase-III executed on BOT (Toll) on DBFOT Basis PIU PKDKL-02IE2017-1802 12/12/2017 12/12/2017 08/02/2018
Time 11:0Hrs
1182 Independent Engineer services for Four/Six Laning of Aunta-Simaria (Ganga Bridge with approach roads) section of NH-31 from Km 197.900 to Km 206.050 (Design Chainage) (Existing Chainage Km 204.741 to Km 209.945) [Total Design Length 8.15 Km] in the State of Bihar on Hybrid Annuity Mode. NHAI/BH/Aunta-Simaria/HAM/IE/2017/Proc 14/12/2017 11/12/2017 05/04/2018
Time 11:0Hrs
1183 Consultancy Services of Authority s ngineer for supervision of Construction of High Level Bridge across River Sone at Chanchikala including its approaches on Kone Nakatwar Ranidih road in Sonebhadra District of Uttar Pradesh under LWE scheme on EPC 2751/12 NIVIDA SON CIRCLE /16-17 02/01/2018 11/12/2017 23/01/2018
Time 17:0Hrs
1184 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF WORK OF CONSTRUCTION OF ROAD FROM FARIDABAD-GREATER NOIDA VIA JASSANA-MANJHAWALI-ATTA GUJRAN INCLUDING BRIDGE OVER RIVER YAMUNA UNDER ISC SCHEME OF CRF (PHASE1 CONSTRUCTION OF MAJOR BRIDGE (630 M LONG) AND RIVER TRAINING/GUIDE BUND WORKS) IN THE STATE OF HARYANA ON EPC MODE. PWD/HR/PKL/AE/18 09/12/2017 09/12/2017 22/01/2018
Time 11:0Hrs
1185 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF WORK OF CONSTRUCTION OF 08 NOS ROBs AND THEIR APPROACHES IN THE STATE OF HARYANA ON EPC MODE UNDER SETU BHARATAM PROGRAMME. PWD/HR/PKL/AE/19 09/12/2017 09/12/2017 29/01/2018
Time 11:0Hrs
1186 Consultancy Services for Authority’s Engineer for Supervision of Construction of Grade Separator Structure at Khandagiri Chowk (Km. 412) on NH-5 (New NH-16) in the State of Odisha on EPC mode 11011/15/AE/Khandagiri/2017 11/12/2017 08/12/2017 30/01/2018
Time 11:0Hrs
-
1187 Consultancy Services For Authority’s Engineer For Up gradation to two lane with paved shoulders configuration for the work from Km. 109.790to Km 163.050 of Nilajphata to Bhandara section of NH-247 in the State of Maharashtra on EPC mode.(Length 53.26 kms) NH/MAH/PWD/NGP-1/AE-17-18/Pkg-1 09/12/2017 08/12/2017 22/01/2018
Time 17:0Hrs
1188 Consultancy services for Authoritys Engineer for Supervision of Rehabilitation and Upgradation of 2 lane road with paved shoulders of section (i) Arni to Naigaon Bandi (Design km. 0/000 to km. 40/000) and Poharadevi link (Design km 0/000 to 5/132) (Total Length - 45.817 Km) and section (ii) Naigaon Bandi - Mangrulpir (Design km. 40/000 to km. 75/000) (Total Length - 35 Km) section of NH -161A in the state of Maharashtra. NH/MAH/PWD/NGP-2/AE/Pkg-2 09/12/2017 08/12/2017 22/01/2018
Time 17:0Hrs
1189 Consultancy services for Authoritys Engineer for Supervision of Upgradation to two lane with paved shoulder configurations (Ardhapur-Himayatnagar-Fulsawani-Mahur Road of NH 752I, Section (i) Ardhapur to Himyatnagar of NH 752I from Km 350.900 to Km 415.600 (Design Chainage from Km 0/000 (Ardhapur) to Km 64/700 (Himayatnagr)) (64.700Km) Section (ii) Himyatnagar to Fulsawangi of NH 752I from Km 415.600 to Km 454.613 (Design Chainage from Km 64/700(Himayatnagr) to 103/713 (Fulsawangi) ) (L-39.013Km) NH/MAH/PWD/AUG-1/AE/Pkg-3 09/12/2017 08/12/2017 22/01/2018
Time 17:0Hrs
1190 Consultancy services for Authoritys Engineer for Supervision of Upgradation to two lane with paved shoulder configurations of Nanded- Osman Nagar- Halda- Mukhed-Wazar upto Maharashtra Border of NH 161A, Section (i) Kundral to Wazar of NH 161A from Km 472/709 to km 519.229 (Design Chainage from km 52/730 ( Kundral) to km 99.250 (Wazar)) Section (ii) Osman Nagar - Kundral section of (NH-161A) design Ch. from Km. 0.00 to Km. 52.730 in the state of Maharashtra on EPC Mode. NH/MAH/PWD/AUG-2/AE/PKG-4 09/12/2017 08/12/2017 22/01/2018
Time 17:0Hrs
1191 Consultancy Services For Authority’s Engineer for Up- gradation of Nanded to Jalkot section of NH -50 from Km 1/900 to km 67/852 to two Lanes configuration [ Nanded- Osman Nagar- Kandhar- Jalkot- Udgir- Bider- Gulbarga- Vijayapur- Hospot, Road design chainage from km 0/000 to (Nanded) to km 65/952 (Jalkot)] in the state of Maharashtra on Engineering Procurement and Construction (EPC) mode NH/MAH/PWD/AUG-3/AE/Pkg-5 09/12/2017 08/12/2017 22/01/2018
Time 17:0Hrs
1192 Consultancy Services for Supervision of Short Term Improvement and Routine Maintenance including the ongoing Contracts for completion of balance works on this stretch, work of Rehabilitation of Old Ganga Bridge, work of Construction of Madhya Ganga Canal on Hapur- Garhmukteshwar-Moradabad Section of NH-09 (Old NH-24) from Km 49.00 to Km 149.250 in the State of Uttar Pradesh NHAI/RO-W-UP/PIU-MBD/NH-09(24)/2017-18/01 dt 08.12.2017 09/12/2017 08/12/2017 28/12/2017
Time 11:0Hrs
1193 Consultancy Services for Authority Engineer for Supervision of Six laning of Aurangabad to Bihar/Jharkhand Border(Chordaha) Section from Km 180 to Km 249.525 of NH-2 in the State of Bihar under NHDP Phase V on EPC Mode NHAI/BH/Aur-Bihar Border/AE/2017/Proc 13/12/2017 08/12/2017 15/02/2018
Time 11:0Hrs
1194 Supervision Consultant (SC) Services for Operation and Maintenance of km 1065.000 to 1119.000 of Nalbari to Guwahati section of NH-31 and km 146.172 to 163.895 of Guwahati bypass of NH-37 in the State of Assam SC/OM/01 19/12/2017 08/12/2017 27/02/2018
Time 11:0Hrs
1195 Consultancy services for Independent Engineer for supervision of Four laning of NH-363 from Mancherial (Design Km 0.000 /Existing Km 251.900) to Repallewada (Design Km 42.000/Existing Km 288.510) (Design Length = 42.000 Km) in the State of Telangana under NHDP Phase-IV under Bharatmala Pariyojana on Hybrid Annuity Mode NHAI/Tech/AP/NH-363/Man-Rep/IE/17-18 03/01/2018 08/12/2017 25/02/2019
Time 11:0Hrs
1196 Consultancy services for posting of Authority Engineer for Construction of 2-lane with paved shoulders configuration & strengthening of NH-58 from km 338.00 to 350.00 and 350.00 to 368.00 on NH-58 in the State of Uttarakhand on EPC Mode 4049/13yata-NH-10/2017 dated 04.12.17 07/12/2017 07/12/2017 29/01/2018
Time 12:0Hrs
1197 CONSULTANCY SERVICES FOR AUTHORITY ENGINEER FOR SUPERVISION OF 4 LANING OF EXISTING TWO LANE WITH PAVED SHOULDER ROAD FROM TALWANDI BHAI TO FEROZEPUR NH 05 (OLD NH 95) FROM KM 170.380 TO KM 194.040 IN THE STATE OF PUNJAB ON EPC MODE NHAI/23044/1/2017/PB 08/12/2017 06/12/2017 08/01/2018
Time 11:0Hrs
1198 Consultancy Services for Independent Engineer services for Four laning of Thalapady to Chengala section of NH-17 (New NH-66) from Km. 17.200 (Design Chainage 17.200) to Km. 57.200 (Design Chainage 56.200) (total length 39.00 Km.) in the State of Kerala under NHDP Phase-III on Hybrid Annuity Mode. NHAI/Tech/KL/Thalapady-Chengala/NH-17/IE/2017-18 11/12/2017 06/12/2017 10/09/2019
Time 11:0Hrs
1199 Consultancy Services as Independent Engineer during Upgradation, Operation and Maintenance of Hyderabad-Bengaluru section of NH-7 from Km.534.720 to Km.556.840 in the State of Karnataka under NHDP Phase-VII (Package No.NS-2/BOT/KNT-2) on BOT basis (Modified). 15/NHAI/RO-BNG/12017/Tender/2017 dated 05.10.2017 11/10/2017 06/12/2017 04/01/2018
Time 15:0Hrs
1200 Consultancy Services for Supervision Consultant (SC) of Operation & Maintenance of 4 laning of Madurai – Tirunelveli – Panagudi – Kanniyakumari Section from Km 0/000 to Km 243/170 of NH-7 (New NH.44) including construction of Bridge at Narikulam Tank Portion at km 230/700 to Km 231/250 and Improvement of Approach Road to ROB at Km 0/600 at Samayanallur of NH-7(New NH.44) and Operation & Maintenance of Tuticorin – Tirunelveli Section from Km 0/000 to km 47/250 of NH-7A (New NH.138) in the State RO Chennai/SC/O&M/2017/Package-I 05/12/2017 05/12/2017 02/01/2018
Time 11:0Hrs
1201 Consultancy Services for Authoritys Engineer For Rehabilitation and upgradation of Kashedi Ghat section of NH-17 (New NH No. 66) to four-lanes with paved shoulders from existing km 148/0 to km 161/600 (Design km 149.510 to km 158.467) including construction of twin-tube six-lane tunnel through an Engineering, Procurement and Construction (EPC ) Contract under NHDP-IV in the state of Maharashtra. RO/MUM/AE/NHDPIV-02/2017-18 09/12/2017 05/12/2017 23/02/2018
Time 17:0Hrs
1202 consultancy Services for Authoritys Engineer for Supervision of construction of Four-Lane ROB in the section of NH-17 (new NH-66) from Km. 93.760 to Km. 94.540 as per approved GAD and its approaches & allied works on approaches of ROB near Nileshwaram town (Pallikara Railway Gate) Kasargad district in the State of Kerala under NHDP Phase-III on EPC mode. NHAI/Tech/KL/Nileshwar ROB/NH-17/AE/2017-18 08/12/2017 05/12/2017 22/02/2018
Time 11:0Hrs
1203 Independent Engineer services for Four Laning of Solapur- Bijapur Section of NH-13 (NEW NH NO 52) (Four Lane) from km 0.000 to km 110.542 (Design Length 109.08 km) in the states of Maharashtra and Karnataka to be executed under BOT (Toll) on Design, Build, Finance, Operate and Transfer (DBFOT) basis under NHDP Phase III. NHAI/GM(T)/IE/Sol-Bij/Mah./2017 07/12/2017 04/12/2017 01/02/2018
Time 11:0Hrs
1204 Consultancy services for Authoritys engineer for supervision of civil construction works Reconstruction with geometric improvement of existing Two lane intermediate lane to 2 lane with paved shoulders configuration from existing km. 126.730 to km 135.075 and existing Km 143.750 to Km 163.000 Tanakpur – Pithoragarh Project Road of NH-125 in the State of Uttarakhand on EPC Mode 3808/12 M-NH/2017 dt 29.11.2017 21/12/2017 04/12/2017 15/01/2018
Time 15:0Hrs
1205 Independent Engineer Services during Operation and Maintenance stage of Four Lane divided carriageway facility constructed on BOT (Annuity) of Panagarh Palsit Dankuni section from Km.517.000 to Km.645.600 on NH 2 in the state of West Bengal 04/O and M/2017-18 30/11/2017 30/11/2017 22/01/2018
Time 11:0Hrs
1206 Independent Engineer for Operation and Maintenance for Kolaghat - Haldia including the incomplete section of ROB Cum Flyover from Km 52.080 to 53.472 at the end of NH-41 on OMT basis in the state of West Bengal 02/O and M/2017-18 29/11/2017 29/11/2017 22/01/2018
Time 11:0Hrs
1207 Independent Engineer Services during Operation and Maintenance stage of 4-laning of Balasore-Kharagpur Section from Km. 0.000 to Km. 119.300 (length approx 119.300 Km) of NH-60 under NHDP-I executed as BOT (Toll) on DBFOT Pattern in the State of Odisha and West Bengal 01/O and M/2017-18 28/11/2017 28/11/2017 22/01/2018
Time 11:0Hrs
1208 Independent Engineer services for Four lanning of Hoskote – Dobbaspet section of NH207 from Km 58-300 to Km 138-320 in the State of Karnataka under NHDP Ph – IV to be executed on DBFOT (Toll) basis on DBFOT Basis under NHDP-Phase NHAI/NHDP-IV/DBFO/NH-207/IE/Hosk-Dobbas/108945 dt. 23.11.2017 23/11/2017 23/11/2017 23/01/2018
Time 11:0Hrs
-
1209 Consultancy Services for Authority’s Engineer for Supervision of Rehabilitation and Up-gradation to 4-laning of Rajamunda-Barkote Section of NH-23 (New NH no. 143) (km. 287.200 to km. 337.185) in the State of Odisha under NHDP-IV on EPC Mode NHAI/NHDP/IV/TECH/OR/2017/AE 21/11/2017 21/11/2017 20/12/2017
Time 11:0Hrs
1210 Consultancy services for INSTITUTIONAL SUPPORT CONSULTANT (ISC) of Four Laning of Imphal – Moreh Section of NH 39 from Km 330.000 to Km 350.000 (Contract Package I) and Two Laning of Imphal – Moreh Section of NH 39 from Km 350.000 to Km 395.680 in the State of Manipur (Contract Package II) under Engineering Procurement and Construction (EPC) Mode. NHIDCL/Manipur/Imphal-Moreh/ISC/2017 22/11/2017 21/11/2017 29/01/2018
Time 15:0Hrs
1211 Consultancy services for Authority’s Engineer for Supervision of Construction of four Lanning work from Hiran River to Sindoor River from km 64.00 to km 130 .00 section of NH-12 under NHDP Phase – III in the state of MP on EPC Basis NHAI/HQ/MP/NH-12/HIR–SIN/AE/2016 19/11/2017 17/11/2017 01/01/2018
Time 11:0Hrs
-
1212 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF Four laning of delinked stretch of Seoni – MP/MH Border of NH-7 from km 624.480 to km 653.225 under NHDP Phase-II on EPC Mode in the state of MP ON EPC NHAI /HQ/ MP / MP-3 DELINKED / AE/ / 2017 19/11/2017 17/11/2017 01/01/2018
Time 11:0Hrs
-
1213 Consultancy services for Authority’s Engineer for supervision of Four laning of NH-363 from Repallewada (Design Km 42.000 /Existing Km 288.510) to Telangana/Maharashtra Border (Design Km 94.602/Existing Km 342.000) (Design Length = 52.602 Km) in the State of Telangana on EPC mode NHAI/Tech/AP/NH-363/Rep-Border/AE/17-18 30/11/2017 15/11/2017 18/01/2018
Time 11:0Hrs
1214 Authority Engineer for Construction of Rock Fall Area Bypass on Lengpui Airport Road on NH-44A Via Lengte Road during 2016-17 in the State of Mizoram. RE-RE NIT No. 3/RFP/CE-HW/2017-18/AE 15/01/2018 08/11/2017 29/01/2018
Time 11:0Hrs
1215 Authority Engineer for Construction of 2-lane with paved shoulder of flexible pavement from Km 42.80 to Km 60.30 of NH-150 during 2016-17 in the State of Mizoram on EPC Mode under NH (O). RE-ReNIT No.3(2)/RFP/CE-HW/2017-18/AE 15/01/2018 08/11/2017 29/01/2018
Time 11:0Hrs
1216 Independent Engineer services for Six Laning of Gorhar to Khairatunda Section of NH-2 from Km. 320.810 to Km.360.300 in the State of Jharkhand under NHDP Phase-V on Hybrid Annuity Mode. NHAI/11012/JH/IE/NH-2/Pkg-II/2017 14/12/2017 06/11/2017 17/01/2018
Time 11:0Hrs
1217 Independent Engineer services for Six Laning of Khairatunda to Barwa Adda Section of NH‐2 from km. 360.300 to km. 400.132 in the State of Jharkhand under NHDP Phase‐V on Hybrid Annuity Mode. NHAI/11012/JH/IE/ NH-2/Pkg-III/2017 14/12/2017 06/11/2017 27/02/2018
Time 11:0Hrs
1218 Independent Engineer Services during Operation & Maintenance period for 6 laning of Panipat - Jalandhar section of NH-1 (New NH-44) from Km.96.000 to Km.387.100 (Length 291.100 Km including balance work of about 10 Kms) in the State of Haryana & Punjab on BOT (Toll) basis on DBFOT pattern under NHDP Phase V NHAI-RO-CHD-11011-PD-AMB-NH-1 15/11/2017 02/11/2017 18/12/2017
Time 11:0Hrs
1219 Construction of Patharkandi Bypass 1/AE/APWD 01/11/2017 01/11/2017 18/01/2018
Time 11:0Hrs
1220 Consultancy services for Authority’s Engineer for Supervision of four laning of Gandhigram (Godda) to Hansdiha section of NH-133 from km 50.800 to km 95.770 in the state of Jharkhand on EPC mode. NHAI/11012/JH/AE/NH-133/ Gandhigram-Hansdiha/2017 04/12/2017 30/10/2017 28/02/2019
Time 11:0Hrs
1221 Consultancy Services for AE for Supervision of Rehabilitaion Maintenance of Churachandpur-Singhat-Sinzawl- Tuivai road section from Km 0.00 to km 34.5, Km 34.5 to Km 103.1 and Km 103.1 to Km 161.48 on NH-102B in the state of Manipur on EPC basis NHIDCL/AE/Manipur/C-T/2016 27/10/2017 27/10/2017 18/12/2017
Time 15:0Hrs
1222 Consultancy services for AE for 4Laning of Imphal Moreh Section of NH 39 from Km 330.000 to Km 350.000 Pkg1 and Two Laning of Imphal Moreh Section of NH 39 from Km 350.000 to Km 395.680 in the State of Manipur Pkg II under EPC Mode NHIDCL/Manipur/ Imphal-Moreh/AE/2017 27/10/2017 27/10/2017 18/12/2017
Time 15:0Hrs
1223 Consultancy services for Authority’s Engineer for Supervision of Six laning of Bihar/Jharkhand Border (Chordaha) to Gorhar Section of NH-2 from km. 249.525 to km. 320.810 in the State of Jharkhand under NHDP Phase V on EPC mode NHAI/11012/JH/AE/NH-2/Pkg-I/2017 04/12/2017 26/10/2017 16/01/2018
Time 11:0Hrs
1224 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF 4-LANING OF BARHI-KODERMA SECTION OF NH-31 FROM KM. 0.000 TO KM. 27.500 IN THE STATE OF JHARKHAND UNDER NHDP PHASE-IV ON EPC MODE. NHAI/11012/JH/AE/NH-31/ Bar-Kod/2017 29/11/2017 26/10/2017 11/12/2017
Time 11:0Hrs
1225 Consultancy Services of Authority’s Engineer for supervision of Rehabilitation and Up-gradation of Sultanpur-Pratapgarh Section of NH-96 from existing Km. 60/000 to km. 90/000 (Design Chainage 60.000 to 90.865) to two lane with paved shoulder under EPC mode in the State ofUttar Pradesh . 2927/ 1 YATA- NH CIRCLE /2017 DATED 22.09.2017 25/10/2017 25/10/2017 22/11/2017
Time 15:0Hrs
1226 CONSULTANCY SERVICES FOR AUTHORITY ENGINEER FOR SUPERVISION OF SIX LANING OF CHENNAI-TADA SECTION OF NH-5 FROM KM 11/0 TO KM 54/4 IN THE STATE OF TAMIL NADU TO BE EXECUTED UNDER DBFOT BASIS UNDER NHDP PHASE V –BALANCE WORK IN KM 21.400 TO KM 54.400 (LENGTH.33.000 KM) UNDER EPC MODE NHAI/11014/CT Balance/AE/2017 21/10/2017 18/10/2017 21/12/2017
Time 11:0Hrs
1227 Consultancy Services for Authority’s Engineer for Construction of Mechi Bridge and Approaches on India-Nepal border linking Kakarvitta in Nepal and Panitanki in India under Engineering Procurement and Construction (EPC) Mode NHIDCL/AE/Mechi Bridge/2017 17/10/2017 17/10/2017 23/11/2017
Time 15:0Hrs
1228 Independent Engineer services during Operation and Maintenance Period for 4/6 laning of Delhi/Haryana Border to Rohtak section of NH-10 from Km. 29.700 to Km. 87.000 design chainage from km.29.650 to km. 93.140 including Bahadurgarh and Rohtak bye-passes in the State of Haryana NHAI/RO/CHD/11011/PD-RTK/DLH-RTK/NH-10/IE/RFP 03/11/2017 17/10/2017 28/11/2017
Time 11:0Hrs
1229 Consultancy services for Authority Engineer for Supervision of Construction of balance Works of Six Laning of Jaipur Ring Road (Km 0.300 to Km 46.700) between Agra Road and Ajmer Road on EPC mode in the State of Rajasthan NHAI/Tech/JRR/AE/2017 13/10/2017 13/10/2017 16/11/2017
Time 11:0Hrs
1230 Consultancy services for Independent Engineer services for Four laning of Dangiawas (km 96.595 of NH-112) to Jajiwal (km 283.500 of NH 65 Nagaur road) section- Package-I (Design length 74.619 km) of Jodhpur Ring Road (In Principally declared NH) in the State of Rajasthan on Hybrid Annuity Mode under NHDP phase VII NHAI/Raj/Phase-VII/Jodhpur Ring Rd./2017/IE 13/10/2017 13/10/2017 21/11/2017
Time 11:0Hrs
1231 Constancy Services for Authority’s Engineer for Supervision of balance work for four laning of Itarsi to Betul Section of NH-69 from km. 63.000 to km. 137.000 (Design length 73.955 km) in the State of Madhya Pradesh (Package-II / NH-69) on EPC mode. NHAI/MP/AE/Itarsi-Betul/2017 16/10/2017 13/10/2017 29/11/2017
Time 11:0Hrs
1232 Consultancy services for Authority’s Engineer for supervision of 6-laning of existing 2-lane (i) Nandigama bypass from Km 220.700 to Km 226.600 (Design chainage from Km 220.700 to Km 227.480) and (ii) Kanchikacherla bypass from Km 238.200 to Km 245.400 (Design chainage from Km 238.200 to 245.760) on NH-65 in the state of Andhra Pradesh under NHDP Phase -IV on EPC mode NHAI/AP/NH-65/NK Bypasses/AE/17-18 24/10/2017 13/10/2017 27/11/2017
Time 11:0Hrs
1233 Consultancy Services for Authoritys Engineer for Supervision Design and Construction of Delhi-Meerut Expressway (Package-IV) from Dasna to Meerut- Km. 27-740 of NH-24 to Km. 51-975 of NH-58 (Design Chainage 28-000 to 59-777) in the state of Uttar Pradesh on EPC Basis (Length 31-777 Kms) NHAI/DME/Pkg-IV/2017/AE 13/10/2017 13/10/2017 21/12/2017
Time 11:0Hrs
1234 CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF Construction of 4 lane ROB and its approaches in lieu of existing railway crossing LC No 92C at KM 63 at Nangal near Ajouli Mour and Construction of 4lane ROB and its approaches in lieu of existing railway crossing LC No 88C at KM 59870 and 4Lane major bridge on Satluj river at Nangal on NH503 Extn in the State of Punjab 2 12/10/2017 12/10/2017 24/11/2017
Time 16:0Hrs
1235 Consultancy Services for Authoritys Engineer for supervision of Six Laning of Pimplgaon-Nashik-Gonde Section of NH-03 from Km 380.000 to Km 440.000 in the state of Maharashtra - Balance / Additional Works ON EPC Basis NHAI/MH/Tech/AE/PNG/SFC-I/2017 26/10/2017 11/10/2017 20/11/2017
Time 11:0Hrs
1236 Consultancy service for Authority’s Engineer for supervision of Construction of Major Bridge at Km 180.865 across river Krishna on NH-167 Hagari to Jadcherla section in the state of Karnataka on EPC mode EE/NHD/CTA/NH-167/Job-009/NIT/2017-18/1008 17/10/2017 11/10/2017 13/11/2017
Time 16:0Hrs
1237 Consultancy services for Authority s Engineer for supervision of civil construction work for Widening to 2 lane with paved shoulder from km 318 to km 339 and from km 397 to 422 on Churaibari Agartala section of NH 44 in the State of Tripura on EPC mode under NH (O) 20(1)/CE/PWD (NH)/2015/DNIT-27/2017-18/3497 Dated 10/10/2017 10/10/2017 10/10/2017 23/11/2017
Time 12:0Hrs
1238 Consultancy service for Authority’s Engineer for supervision of Consultancy service for Improvement of city portion of Dimapur City (km 106.90 to Km 124.20) and Kohima City (km 177.60 to km 187.60) on NH No. 39 in the state of Nagaland under EPC mode during 2016-2017(2nd Call) CE/NH/etender/2017-18/07/01 04/10/2017 05/10/2017 31/10/2017
Time 12:0Hrs
1239 Consultancy Services for Authority Engineer for Supervision of Four laning of Balachera to Harangajao section of NH-54(Ext) from km 275.000 to km 244.000 in the State of Assam on EPC mode NHIDCL/Assam/B-H/AE/2017 29/09/2017 29/09/2017 27/11/2017
Time 11:0Hrs
1240 Independent Engineer Services for construction of 4-lane Road on NH-12 (New NH-52) from Km 299/000 to 346/540 (Design Chainage from km 9/860 to 58/740) (Darah-Jhalawar-Teendhar section) in the State of Rajasthan under NHDP Phase-III on Hybrid Annuity Mode (Length 48/880 km) – Package –II NHAI/19032/Dara-Teen./Pkg.-II/IE/Raj./2017/1/ 28/09/2017 28/09/2017 30/10/2017
Time 11:0Hrs
-
1241 Consultancy Services For Authoritys Engineer For Upgradation To Four Lane With Paved Shoulder Of Takarkhed Bagile To Jalna Section Of Nh-753a, Existing Km 110/375 To Km 155/110 Exlucing Deulgaon Raja Town From Km 122/600 To Km 127/00 Length Of Malkapur –Jalna Road On Epc Mode In The State Of Maharashtra RO/MUM/AE/PROC/NHO-1170/2017-18 08/10/2017 28/09/2017 22/11/2017
Time 17:0Hrs
1242 Consultancy Services For Authority’s Engineer For Upgradation Of Sakoli –Lakhander –Wadsa –Armori-Gadchiroli-Ashti-Aallapalli Sironcha Road Nh-353c (Sections Gadchiroli To Ashti ) From Km 113/650 To Km 182/350 Length -68.70 Km On Epc Mode In The State Of Maharashtra RO/MUM/AE/PROC/NHO-1174/2017-18 08/10/2017 28/09/2017 22/11/2017
Time 17:0Hrs
1243 Consultancy Services for Authority Engineer for Supervision of Balance work of Rehabilitation and Up-gradation Satna–Bela section of NH-75 from Km. 155.000 to Km. 202.040 (Design length 47.040 Km) to four lane with paved shoulders in the state of Madhya Pradesh on Engineering, Procurement and Construction (EPC) Mode Satna-Bela-Mangwa/AE/EPC/2017-18 03/11/2017 28/09/2017 20/12/2017
Time 17:30Hrs
1244 Consultancy Services for Authority’s Engineer for Supervision of Construction of six/eight lane Vadodara Kim Expressway in the state of Gujarat under NHDP Phase - VI on EPC mode - Package I from km. 355.000 to km. 378.740 (Padra to Vadodara section), Package II from km. 323.000 to km. 355.000 (Sanpa to Padra section), Package III from km. 292.000 to km. 323.000 (Manubar to Sanpa section) of Vadodara Mumbai Expressway NHAI/VME Phase IA/ AE-1 31/10/2017 26/09/2017 20/11/2017
Time 11:30Hrs
1245 Consultancy Services for Authority’s Engineer for Supervision of Construction of six/eight lane Vadodara Kim Expressway in the state of Gujarat under NHDP Phase - VI on EPC mode - Package I from km. 355.000 to km. 378.740 (Padra to Vadodara section), Package II from km. 323.000 to km. 355.000 (Sanpa to Padra section), Package III from km. 292.000 to km. 323.000 (Manubar to Sanpa section) of Vadodara Mumbai Expressway NHAI/VME Phase IA/AE-1 09/10/2017 26/09/2017 31/10/2017
Time 11:0Hrs
1246 Consultancy Services for Authority’s Engineer for Supervision of Construction of six/eight lane Vadodara Kim Expressway in the state of Gujarat under NHDP Phase - VI on EPC mode - Package IV from Km 279.00 to Km 292.00 (Ankleshwar to Manubar Section), Package V from Km 254.430 to Km 279.000 (Kim to Ankleshwar Section) of Vadodara Mumbai Expressway NHAI/VME Phase IA/AE-2 09/10/2017 26/09/2017 21/11/2017
Time 11:0Hrs
1247 Independent Engineer Services for Operation and Maintenance of Lalitpur-Sagar-Lakhnadon section on NH-26 on OMT Basis in the State of Madhya Pradesh 3182 02/11/2017 23/09/2017 13/12/2017
Time 17:0Hrs
1248 Authority Engineer for Construction of Rock Fall Area Bypass on Lengpui Airport Road on NH-44A Via Lengte Road during 2016-17 in the State of Mizoram RE-NIT No. 3/RFP/CE-HW/2017-18/AE 13/10/2017 22/09/2017 30/10/2017
Time 11:0Hrs
1249 Authority Engineer for Construction of 2-lane with paved shoulder of flexible pavement from Km 42.80 to Km 60.30 of NH-150 during 2016-17 in the State of Mizoram on EPC Mode under NH (O). RE-NIT No. 3(2)/RFP/CE-HW/2017-18/AE 13/10/2017 22/09/2017 30/10/2017
Time 11:0Hrs
1250 Consultancy Services For Authority’s Engineer For Supervision ofrehabilitation and up-gradation to 2 lane with paved shoulder / 4 lane standards of National Highway section Dahegaon - Kuhi - Umred section of NH-247 (Length - 41.54 km)in the State of Maharashtra under EPC Mode 3331 06/10/2017 20/09/2017 11/10/2017
Time 17:0Hrs
1251 Consultancy services for Authority’s Engineer for supervision of the works Construction proposed Bridge over River Ajoy at 22nd Km on Panagarh-Illambazar Road (SH-14) adjacent to the existing bridge under Birbhum Highway Division No.-II in the district of Birbhum, West Bengal (2ND CALL) WBPW(R)D/RFP NO-03 of SE/WHC-I/2017-2018 18/09/2017 15/09/2017 13/10/2017
Time 14:0Hrs
1252 Consultancy Services for Authority’s Engineer for (i) Protection works at Nalupani Landslide Zone (Ex.km 123.080 to km. 123.480, km 123.665 to km 123.740 and km 123.770 to km 123.970) Section of NH-34 in the State of Uttarakhand on EPC basis. (ii) Construction of Road, Bridge and Slope Protection works of Landslide at Bareti (Ex. Km. 100.300 to km 101.600 of Section NH-34 in the State of Uttarakhand on EPC basis. NHIDCL/AE/NalupaniBareti/UK/2017 14/09/2017 14/09/2017 07/11/2017
Time 15:0Hrs
1253 CS FOR AE 2nd Call FOR Construction of 1.Steel Bridge River B-M on Jiribam- Barak road on NH-37 Pkg I 2. Imphal-Jiribam Road from Km 3 to Km 220 NH-53 New NH-3 Pkg II 3.Tamenglong Khonsang Road Km 0 to Km39.50 in the State of Manipur Pkg III NHIDCL/2017/AE/Manipur/B-M Bridge 2nd call 15/09/2017 14/09/2017 01/11/2017
Time 15:0Hrs
1254 AUTHORITY ENGINEER FOR SUPERVISION OF CONSTRUCTION OF GRADE SEPARATOR FROM H-7 AREA TO PORT CONNECTIVITY ROAD BY PASSING CONVENT JUNCTION IN THE STATE OF ANDHRA PRADESH ON EPC MODE 11011/1/2017/VPRCL/Convent Junction/AE 12/09/2017 12/09/2017 11/10/2017
Time 11:0Hrs
1255 Consultancy Services as Independent Engineer during Operation, Maintenance and Fee collection of 4- lane divided carriageway facility of Nelamangala – Tumkur section from Km. 29.5 to Km. 62.00 (32.5 Kms.) on (BOT) basis through Concessionaire and Six lane of Tumkur bypass from Km. 62.00 to Km. 75.00 (13 Kms.) on EPC through O&M Contractor of NH-4 (New NH-48) in the state of Karnataka 10/NHAI/RO-BNG/13020/Tender/2017 dated 11.09.2017 06/10/2017 11/09/2017 06/11/2017
Time 15:0Hrs
1256 Independent Engineer services during Operation & Maintenance Period for Four-laning of Rohtak-Hisar section of NH 10 from km.87.000 to km.170.000 including connecting link from km.87.000 (NH 10) to Km. 348.000 (NH 71) to be executed as BOT (Toll) Project on DBFOT Pattern under NHDP Phase-III in the State of Haryana NHAI/RO/CHD/11011/PD-RTK/RTK-HTK-HSR/NH-10/IE/RFP/IE 08/09/2017 07/09/2017 10/09/2017
Time 15:0Hrs
1257 Consultancy service for Authority’s Engineer for supervision of Construction of 2 lane with paved shoulder from km 168.00 to km 183.783 (Yesemyong to Unger) on Mokokchung to Tuli Section of NH-61 under EPC mode in the state of Nagaland (2nd Call) CE/NH/etender/2017-18/06/01 01/09/2017 04/09/2017 07/11/2017
Time 12:0Hrs
1258 Consultancy Service for Authoritys Engineer for Supervision of Widening two lane to four Lane from Km 128.850 to Km 142.750 of NH63 on Ankola Gooty section passing through Hubballi city limits in the State of Karnataka. J no NH63KNT2016/17/838. 2275 01/09/2017 04/09/2017 23/10/2017
Time 15:0Hrs
1259 CONSULTANCY SERVICES OF AUTHORITY ENGINEER FOR SUPERVISION OF REHABILITATION AND UP-GRADATION FROM (I) KM 89.600 TO KM 133-520 (HARPALPUR-SUGIRA SECTION) (II) KM 133-520 TO KM 158-040 (KULPAHAR-MAHOBA SECTION) OF NH-76 AND NH-86 (5-360 KM) TO TWO LANE WITH PAVED SHOULDER AND (III) CONSTRUCTION OF VIADUCT AND ITS APPROACHES TO ROB AT KM 426 OF NH-91 IN KANPUR CITY ON EPC MODE IN THE STATE OF UTTAR PRADESH 1354M/13M-NHCK/17 dt- 05-08-2017 19/09/2017 01/09/2017 13/10/2017
Time 17:0Hrs
1260 Consultancy Services for Authority’s Engineer for construction of four-laning of Bhopal – Biaora section of NH-12 from Mubarakpur to Biaora from km 324.000 to km 423.400 (PKG-II) length 97.325 km on EPC Mode NHAI/HQ/MP/Tech/BPL-BIO/PKG-II/AE/2017 13/09/2017 31/08/2017 20/11/2017
Time 11:0Hrs
1261 CONSULTANCY SERVICES FOR SUPERVISION OF SHORT TERM IMPROVEMENT AND ROUTINE MAINTENANCE CONTRACT OF PORBANDAR – BHILADI – JETPUR SECTION FROM KM. 0.000 TO KM. 117.600 OF NH-8B (NEW -27) IN THE STATE OF GUJARAT PIURAJ/SC/POR-JET/2017 30/08/2017 29/08/2017 28/09/2017
Time 11:0Hrs
1262 CONSULTANCY SERVICES FOR SUPERVISION OF SHORT TERM IMPROVEMENT AND ROUTINE MAINTENANCE CONTRACT OF BAMANBORE – GARAMORE SECTION FROM KM. 182.600 TO KM. 254.600 OF NH-8A IN THE STATE OF GUJARAT PIURAJ/SC/BAM GAR/2017 30/08/2017 29/08/2017 28/09/2017
Time 11:0Hrs
1263 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF WORK OF CONSTRUCTION OF NH-21A (NEW NH-105) 4-LANE PINJORE BYPASS STARTING FROM KM 54.533 OF NH-22 AND TERMINATING AT KM 3.800 OF NH-21A (BYPASS CHAINAGE FROM KM 0.000 TO KM 7.700 TOTAL LENGTH 7.700 KM) IN THE STATE OF HARYANA ON EPC MODE PWD/HR/PKL/AE/15 08/05/2017 19/08/2017 16/10/2017
Time 11:0Hrs
1264 Independent Engineer Services during Operation Maintenance Period for 4-laned Nagpur – Kondhali (Km 9 200 to Km 50 000) Section of NH-53 (Old NH-6) in the State of Maharashtra on BOT basis - Consultancy Package No IE-O and M/NH-53/NAG-6. NHAI/RO-NAG/TENDERS/2017-18/04 17/08/2017 17/08/2017 19/09/2017
Time 12:0Hrs
1265 Consultancy Service for Authoritys Engineer for Supervision of Construction of 4-lane ROB and its approaches in lieu of existing 56/T-C2 km.0.517 on NH-367 in the state of Karnataka on EPC Mode ( J no NH-367-KNT(5)- 16-17-006-SandR(B) .(2nd call) EE/NHD/HBL/NH-367/ROB Banapur /AE/NIT/2017-18/2083 Dt.14.08.2017 17/08/2017 17/08/2017 16/09/2017
Time 17:0Hrs
1266 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF WORK OF CONSTRUCTION OF ROB AND ITS APPROACHES IN LIEU OF EXISTING LEVEL CROSSING LC NO 138B AT KM 1.45 ON NH-21A (NEW NH-105) AT PINJORE IN THE STATE OF HARYANA ON EPC MODE. PWD/HR/PKL/AE/7 22/04/2017 14/08/2017 28/09/2017
Time 15:0Hrs
1267 Consultancy services for Authority’s Engineer for Supervision for Balance work for Four Laning of Obedullaganj to Itarsi Section of NH-69 from km. 2.800 to km. 8.300 and from km. 20.700 to km. 63.000 (Design Length 46.3 km.), excluding km. 8.300 to 20.700 Wild Life Area, in the state of Madhya Pradesh (Package-I ) on EPC Mode. NHAI/MP/AE/11012/Obed-Itarsi/2017 12/08/2017 11/08/2017 11/09/2017
Time 11:30Hrs
1268 Procurement of Consultancy services for short term improvement and routine maintenance of Bhubaneswar (km 435.498) –Ichhapuram (km 620.430) section of NH-16 and Chandikhole (Km.0.000) –Paradip (Km.77.000) section of NH-5A in the state of Odisha NHAI/11011/16/RO/OD/2017 14/08/2017 10/08/2017 18/09/2017
Time 11:0Hrs
1269 Selection of IE for Gadoj (State Border) –Majri to Haryana/Rajasthan Border and Majri to Neemrana ( SH111 & SH 111A) Highway Project 3/2017-18 04/08/2017 08/08/2017 25/09/2017
Time 11:0Hrs
-
1270 Consultancy services for Authoritys Engineer for Supervision of Rehabilitation and upgradation to 2 lane with paved shoulder/ 4-lane standards of National Highway section (i) Sakoli Lakhandur Wadsa Armori Gadchiroli Chamorshi Asti Aallapalli Sironcha NH 353C Package I Sakoli to Bandra Border (Length - 55.8 km) & Section (ii) Duggipar Gondia Kohmara NH 753 Package II from km 28 to km 42.4 Goregaon to Gondia section (Length - 14.4 km) on EPC Mode. NH/MAH/PWD/Nagpur-18/AE/Pkg-29 2nd call 04/08/2017 31/07/2017 30/08/2017
Time 17:0Hrs
1271 Consultancy service for Authority’s Engineer for supervision of Widening to Two/Four Lane with Paved Shoulders from Km. 34.00 to Km. 70.900 (Chittapur cross to Start of Yadgir Bypass) of NH-150 in the state of Karnataka on EPC Mode (Package -I). EE/NHD/KLB/NH-150/Job-828 & 817/AE/NIT/2017-18/550 28/07/2017 28/07/2017 04/09/2017
Time 16:0Hrs
1272 Consultancy service for Authority’s Engineer for supervision of Widening to Two/Four Lane with Paved Shoulders from Km. 79.650 to Km. 118.470 (End of Yadgir Bypass to Andhra Border section) of NH-150 in the State of Karnataka on EPC Mode (Package-II). EE/NHD/KLB/NH-150/Job-817/AE/NIT/2017-18/550 28/07/2017 28/07/2017 04/09/2017
Time 16:0Hrs
1273 Consultancy service for Authority’s Engineer for supervision of Strengthening and widening to two lane with paved shoulder of NH-61 from Km 40.00 to Km 72.40 under EPC mode in the state of Nagaland during 2016-17 (3rd Call) CE/NH/etender/2017-18/05/01 03/07/2017 28/07/2017 22/08/2017
Time 12:0Hrs
1274 Construction of Rock Fall Area Bypass on Lengpui Airport Road on NH-44A Via Lengte Road during 2016-17 in the State of Mizoram. 3/RFP/CE-HW/2017-18/AE 03/08/2017 28/07/2017 10/09/2017
Time 17:0Hrs
1275 Authority Engineer for Construction of 2-lane with paved shoulder of flexible pavement from Km 42.80 to Km 60.30 of NH-150 during 2016-17 in the State of Mizoram on EPC Mode under NH (O). 3(2)/RFP/CE-HW/2017-18/AE 11/08/2017 28/07/2017 10/09/2017
Time 17:0Hrs
1276 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF WORK OF CONSTRUCTION OF 02 NOS. ROBS AND THEIR APPROACHES IN LIEU OF LC NO. 109A AT KM 64.130 ON NH-709A AND IN LIEU OF LC NO. 111C AT KM 300.5 ON NH 71 (NEW NH-352) AT JIND IN THE STATE OF HARYANA ON EPC MODE. PWD/HR/PKL/AE/6 22/04/2017 28/07/2017 11/09/2017
Time 15:0Hrs
1277 Independent Engineer Services during Operation & Maintenance period for 6 laning of Panipat - Jalandhar section of NH-1 (New NH-44) from Km.96.000 to Km.387.100 (Length 291.100 Km including balance work of about 10 Kms) in the State of Haryana & Punjab on BOT (Toll) basis on DBFOT pattern under NHDP Phase-V NHAI/RO/CHD/11011/PD-AMB/NH-1/IE 06/09/2017 26/07/2017 19/09/2017
Time 15:0Hrs
-
1278 Consultancy services for Authority Engineer for supervision for balance work for four lanning work for Lalghati (Bhopal) to Mubarakpur section of NH 12 from km 315.725 to 324.000(Pkg-I) in the state of MP on EPC mode NHAI/HQ/MP/Tech/BPL-BIO/PKG-I/AE/2017 30/07/2017 26/07/2017 28/08/2017
Time 11:30Hrs
1279 Default AE Values Default AE Project 25/07/2017 25/07/2017 25/09/2017
Time 15:0Hrs
1280 RAJKOT-GONDAL-JETPUR BOT PROJECT UNDER O/M PHASE PIURAJ/IE/RAJ-GON-JET/2017 04/08/2017 25/07/2017 23/08/2017
Time 11:0Hrs
1281 Consultancy Services for Authority’s Engineer for Supervision of “Four laning of Dolabari to Jamuguri section from km 17.300 of NH-37A to km 182.000 of NH-52 in the State of Assam under SARDP- NE, Phase A on EPC basis” (Retender) NHIDCL/Assam/Dolabari-Jamuguri/AE /2017/Retender 24/07/2017 24/07/2017 21/09/2017
Time 11:0Hrs
1282 Consultancy Services for Authority Engineer for Construction of Two Lane ROB and its approaches in lieu of existing Level Crossing L.C. No. 39-B at Km. 158.525 on NH-74 including Railway Portion in the State of Uttarakhand on EPC Mode and Construction of 4-lane ROB and its approaches in lieu of existing level crossing no 43-B at Km. 2.400 on NH-121 in the State of Uttarakhand on EPC Mode. 2344/12M-NH/2017 dt 21.07.2017 22/07/2017 22/07/2017 16/09/2017
Time 17:0Hrs
1283 Consultancy services of Authority’s Engineer for supervision of Widening the existing lane to 2 lane with paved shoulder from Km.239.900 to 294.300 km Nayagarh to Khurda excluding Khurda bypass of NH 57 on EPC mode in the state of Odisha 05 CE-NH-17-18 19/07/2017 19/07/2017 06/09/2017
Time 17:0Hrs
1284 Independent Engineer services for Supervision of Six laning of Narasannapeta-Ranastalam section of NH-16 from design Km.580.671 to design Km.634.861 (Length=54.19 Km) in the State of Andhra Pradesh under NHDP phase-V on Hybrid Annuity Mode. NHAI/AP/IE/Nara-Rana/2016-17 25/07/2017 19/07/2017 12/09/2017
Time 11:0Hrs
-
1285 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OFREHABILITATION AND UP-GRADATION TO 2 LANE WITH PAVED SHOULDER / 4 LANE STANDARDS OF NATIONAL HIGHWAY SECTION GUHAGHAR ROAD TO CHIPLUN SECTION OF NH-166E (LENGTH - 39.83 KM) DESIGN CHAINAGE 0/00 TO 26/230 & 40/00 TO 53/600IN THE STATE OF MAHARASHTRA UNDER EPC MODE. (2nd Call) NH/MAH/PWD/PUNE/KLOP-1/AE/PKG.1 13/07/2017 17/07/2017 02/08/2017
Time 17:0Hrs
1286 Consultancy Services For Authority Engineer For Supervision of rehabilitation and up-gradation to 2 lane with paved shoulder / 4 lane standards of National Highway section Jintur- Parbhani section of NH-752 I in the State of Maharashtra under EPC Mode. NH/MAH/MSRDC/Aurangabad-3/AE/Pkg-35 Second call 25/07/2017 14/07/2017 19/08/2017
Time 17:0Hrs
1287 Consultancy Services For Authoritys Engineer For Supervision of rehabilitation and up-gradation to 2 lane with paved shoulder / 4 lane standards of National Highway section Mehkar to Ajispur section of NH- 548 C from km 0.000 (Mehkar) to km 35.836 (Ajispur) (Length 35.836 km) in the State of Maharashtra under EPC Mode NH/MAH/MSRDC/Amravati/ AE/Pkg-41 Second Call 25/07/2017 14/07/2017 19/08/2017
Time 17:0Hrs
1288 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF “STRENGTHENING OF EXISTING TWO LANE PAVEMENT I/C PAVED SHOULDER ON NH NO. 39 FROM KM 212.325 TO KM 260.00” ON EPC IN THE STATE OF MANIPUR DURING 2016-17 UNDER NH(O). Under Job No. 39/MN/2016-17/19 ACE-I/NH/RFP-Authority Engineer/2017-18/136/ Pkg.01 09/08/2017 10/07/2017 19/08/2017
Time 14:0Hrs
1289 CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF STRENGTHENING OF EXISTING TWO LANE PAVEMENT I/C CONSTRUCTION OF PAVED SHOULDER FROM KM 260.000 TO KM 299.000 ON NH -39 (NEW NH-02), MAO-IMPHAL SECTION (SH - KM 260.000 TO KM 287.000 IN THE STATE OF MANIPUR ON EPC MODE DURING 2016-17 UNDER NH(O) Job No. 39/MN/2016-17/18 ACE-I/NH/RFP-Authority Engineer/2017-18/70/ Pkg.02 09/08/2017 10/07/2017 19/08/2017
Time 14:0Hrs
1290 Strengthening of existing two lane pavement including construction of paved shoulders on NH-39 (New NH-02) Mao- Imphal Section (SH - Mao- Senapati from km 212.325 to km 260.00) on EPC mode (2nd Call). (Package-1) ACE-I/NH/RFP-Authority Engineer/2017-18/136/ Pkg.1 13/07/2017 10/07/2017 09/08/2017
Time 14:0Hrs
1291 Strengthening of existing two lane pavement including construction of paved shoulders from km 260.000 to km 299.000 of NH-39 (New NH- 02) Mao-Imphal Section (SH- km. 260.000 to km. 287.000) in the state of Manipur on (EPC) mode (2nd Call) (Package-2) ACE-I/NH/RFP-Authority Engineer/2017-18/136/ Pkg.2 13/07/2017 10/07/2017 09/08/2017
Time 14:0Hrs
1292 Consultancy services for Authority Engineer for supervision of construction of 4-laning from Itanagar to Banderdewa (package A from 29.500 km to 40.40km) in the state of Arunachal Pradesh on EPC mode. CEAP(HW)/WZ/W-24/IB/AE/17-18 10/07/2017 07/07/2017 09/10/2017
Time 15:1Hrs
1293 Consultancy services for Authority’s Engineer for Supervision of Construction of Major Bridge over river Narmada near Garudeshwar at KM 469/00 to 470/00 of NH-56 on EPC mode in the State of Gujarat. 08of2017-18-02 06/07/2017 06/07/2017 24/07/2017
Time 18:0Hrs
1294 CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF REHABILITATION AND UP-GRADATION TO 2 LANE WITH PAVED SHOULDER / 4 LANE STANDARDS OF NATIONAL HIGHWAY SECTION MORSHICHANDURBAZARACHALPUR SECTION OF NH-353K IN THE STATE OF MAHARASHTRA FOR UPGRADATION TWO LANES WITH PAVED SHOULDER/FOUR LANE CONFIGURATION IN THE STATE OF MAHARASHTRA UNDER EPC MODE. EENH⁄AKL⁄RFP⁄AE⁄20 2 nd Call 13/07/2017 05/07/2017 18/07/2017
Time 17:0Hrs
1295 Improvement of T Junction near DhaulaKuan Metro Station including widening of National Highway from DhaulaKuan up to end of Junction on NH-8 and improvement of T Junction near Defence area including widening of National Highway up to Defence area on NH-8 and R&R Hospital Link Underpass on EPC Mode in the State of Delhi NHAI/2017/DEL-GUR/DHAULA KUAN 31/07/2017 05/07/2017 17/08/2017
Time 11:0Hrs
1296 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OFREHABILITATION AND UP-GRADATION TO 2 LANE WITH PAVED SHOULDER / 4 LANE STANDARDS OF NATIONAL HIGHWAY SECTION DAHEGAON - KUHI - UMRED SECTION OF NH-247 (LENGTH - 41.54 KM)IN THE STATE OF MAHARASHTRA UNDER EPC MODE CENH/D1/PROC/AE/2017-18/1417 11/07/2017 03/07/2017 18/07/2017
Time 17:0Hrs
1297 2 LANE PAVED SHOULDER WADI ASOLA 353 I CENH/D1/PROC/AE/2017-18/1417/1 11/07/2017 03/07/2017 18/07/2017
Time 17:0Hrs
1298 Consultancy Services For Authoritys Engineer For Supervision of Rehabilitation and Upgradation of Existing km 98750 Design Ch 121500 to Existing Km 83690 design Ch 136500 from Existing km 78050 Design Ch 142500 to Pimpalgaon Baswant existing km 59100 Design Ch 161281 to Two lane with paved shoulders strengthening of Existing km 83690 to Existing Km 78050 of section Pimpalgaon Vani Saputara Road NH953 in the state of Maharashtra Total Length 39421 Km CENH/D-1/PROC/AE/2017-18/1417/01 13/07/2017 03/07/2017 18/07/2017
Time 15:0Hrs
1299 Consultancy service for Authoritys Engineer for supervision of Construction of New 2lane with Paved Shoulders Configuration of Capital Road (Bypass, Dimapur to Kohima, Length = 34.171 Kms) in the state of Nagaland through Engineering, Procurement & Construction (EPC) Basis during 2016-17. CE/RnB/ISC-BYPASS/21/AE/2017-18 03/07/2017 03/07/2017 14/08/2017
Time 17:0Hrs
1300 Consultancy service for Authority’s Engineer for supervision of Construction of 2 lane with paved shoulder from km 168.00 to 183.783 (Yesemyong to Unger) on Mokokchung to Tuli Section of NH-61 under EPC mode in the state of Nagaland CE/NH/etender/2017-18/04/01 14/06/2017 30/06/2017 29/08/2017
Time 13:0Hrs
1301 Authority’s Engineer for Supervision of Rehabilitation and Up-Gradation to 4-Laning Of Birmitrapur-Brahmani Bypass end Of Nh-23 (New NH No. 143) Km 211.200-Km 237.100 & from Km 0.000-Km 3.200 (Brahmani By-Pass) i.e. upto Km 240.100 on NH-23 Beside BNR Weigh Bridge, Package 1A and Four laning of NH-23(new NH No. 143) from km.240.250 i.e. Brahmani by-pass end beside BNR Weigh Bridge to km.287.200 i.e. Rajamunda Section in the State of Odisha under NHDP Phae IV. Package 1B. NHAI/NHDP-IV/OR/02/2010/AE/PK1/101745 30/06/2017 22/06/2017 08/08/2017
Time 11:0Hrs
1302 Consultancy Services as Independent Engineer Services during Operation & Maintenance Period for 4-lane divided carriageway of Orai-Bhognipur Section (Km. 220.00 to Km. 255.00) on NH-25 and Bhognipur-Barah Section (Km. 421.20 to Km. 449.00) on NH-2 on BOT (Annuity) Basis in the State of Uttar Pradesh. (New Chainage Km. 1515.713 to Km. 1578.513 of NH-27) 01/NHAI/RO-LKO(East)/11012/NH-25/Tender/2017 23/06/2017 21/06/2017 11/07/2017
Time 17:0Hrs
1303 Independent Engineer Services during Operation & Maintenance Period for 6 laning Project of Etawah (Km 323.475) to Chakeri (Km 483.687) Section of NH-2 (New NH-19) on DBFOT basis under NHDP Phase-V in the State of Uttar Pradesh. 02/NHAI/RO-LKO(East)/17017/NH-2/Tender/2017 23/06/2017 21/06/2017 11/07/2017
Time 17:0Hrs
1304 Consultancy Services for Supervision of Short Term Improvement & Routine Maintenance of Chakeri (Kanpur) to Kokhraj (Allahabad) Section from Km 483.687 to Km 628.753 of NH-2 (Length 145.10 Km) in the state of Uttar Pradesh. 03/NHAI/RO-LKO(East)/18018/NH-2/Tender/2017 23/06/2017 21/06/2017 11/07/2017
Time 17:0Hrs
1305 Consultancy Services for Authority Engineer for Supervision of Construction of 2- Lane ROB and its approaches in lies of existing level crossing (LC No. C-61) at Km 165/550 on NH-89 in the State of Rajasthan on Engineering, Procurement and Construction Mode NIT No 01 of 2017-18 SE NH Bikaner 18/06/2017 19/06/2017 03/08/2017
Time 11:0Hrs
1306 Independent Engineer services for Operation & Maintenance Period of Six Lanning of NH-47 from km 102.035 to km 144.680 on Chengapalli to start of Coimbatore Bypass and Four laning from km 170.880 to km 183.010 from end of Coimbatore Bypass to TN/Kerala Border Section of NH-47 In the State of Tamil Nadu under NHDP Phase-II on DBFOT (Toll) Basis RO Chennai/IE/O&M/2017/Package-XVII 20/06/2017 15/06/2017 29/06/2017
Time 11:0Hrs
1307 RFP for Consultancy services for 1 year for supervision of Restoration / Reconstruction of Ukhrul-Toloi-Tadubi road section from Km 0.00 to Km 115.00 covering 115 Km length on NH-102A in the state of Manipur NHIDCL/AE/Manipur/UTT/NH-102A/2017 21/06/2017 15/06/2017 26/10/2017
Time 15:0Hrs
1308 Consultancy services for Authoritys Engineer for supervision of the works Construction of ROB and its approaches in lieu of level crossing LC No. 23/SPL/Tat Km 52.712 of NH-35 in the State of West Bengal on EPC. JOB NO. NH-35/WB 6/15-16/005/SRB. 06/2017-18 of SE NHC-I (2ND CALL of RFP-27 of 2016-17) 14/06/2017 15/06/2017 05/07/2017
Time 17:0Hrs
1309 Consultancy Services for Authority’s Engineer for Supervision of (i) Tura-Mankachar road (0/0 to 1/660km) (ii) Doimukh-Harmuti road from Harmuti Junction (0km) to Khula camp (14/370 km) and Doimukh (0km) to Bagh Tinali (3/10 km) (iii), (iv) and (v) Wokha-Merapani Road from Wokha 0km to 60/585 km NHIDCL/Assam/DONER/AE/2017 15/06/2017 15/06/2017 05/10/2017
Time 11:0Hrs
1310 Consultancy services for Authoritys Engineer for Supervision of Rehabilitation and upgradation of NH-43 (old NH-78) from (Old Ch. 245.000 to 331.000 km, New Ch. 245.000 to 323.100 km) (MP border/ CG border to Surajpur section) to two lane with paved shoulders in the State of Chhattisgarh under Corridor Approach through EPC mode contract 05/CE/NH/TC/44-01/2017/212773 14/06/2017 14/06/2017 09/08/2017
Time 17:0Hrs
1311 Consultancy Service for Authoritys Engineer for Supervision of Construction of 4-lane ROB and its approaches in lieu of existing 56/T-C2 km.0.517 on NH-367 in the state of Karnataka on EPC Mode ( J no NH-367-KNT(5)- 16-17-006-SandR(B) EE/NHD/HBL/NH-367/ROB Banapur /AE/NIT/2017-18/1153Dated 02.06.2017 13/06/2017 13/06/2017 24/07/2017
Time 17:0Hrs
1312 Consultancy Services for Authoritys Engineer Services for Rehabilitation & Upgradation of Two laning of Maheshkhunt-Sasarsa-Purnea Section of NH 107 from km 0.000 to km. 90.000 in the State of Bihar on EPC Mode (Package-I). NHAI/BH/MSP-I/AE/2017/Proc. 21/06/2017 09/06/2017 17/08/2017
Time 11:0Hrs
1313 Consultancy service for Authority’s Engineer for supervision of Strengthening and widening to two lane with paved shoulder of NH-61 from Km 40.00 to Km 72.40 under EPC mode in the state of Nagaland during 2016-17 (2nd call) CE/NH/etender/2017-18/22/01 07/06/2017 08/06/2017 29/06/2017
Time 12:0Hrs
1314 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR (i) Construction of (i) 154m span Steen Superstructure Bridge at Km 145.09 over River Barak and (ii) 122 m span Steel Superstructure Bridge at Km 189.80 over River Makru on Jiribam- Barak road on NH-53 in State of Manipur. (Pkg-I) (ii) Short Term Improvement & Routine Maintenance of Imphal-Jiribam Road from Km 3.00 to Km 220.00 (Length= 217 Km) of NH-53 (New NH-37) (Package-I) in the state of Manipur on Percentage Rate basis. (Pkg-II) (iii) R NHIDCL/2017/AE/Manipur/B-M Bridge 12/06/2017 08/06/2017 20/07/2017
Time 15:0Hrs
1315 Consultancy Services for Selection of Authoritys Engineer for Supervision of Construction of ROBs at Bishnupur and Mejia and Major Bridge on River Shali in the district of Bankura in West Bengal 6/2017-18 of SE, N. H. Circle No. II-3rd Call 07/06/2017 07/06/2017 10/07/2017
Time 14:0Hrs
1316 Improvements and Re- construction to Two lane with Paved Shoulders from km. 544.200 to 594.000 of NH 150Aof Hosamane to Pandavapura section in the state of Karnataka on EPC mode. EE/NHD/TMK/AE/EPC/150A/17-18/262 07/06/2017 07/06/2017 10/07/2017
Time 16:0Hrs
1317 Consultancy Services for Authority’s Engineer Services for Rehabilitation & Upgradation of Two laning of Maheshkhunt – Saharsa - Purnea section of NH 107 from km. 90.000 to km. 177.960 in the State of Bihar on EPC Mode (Package-II) NHAI/BH/MSP-II/AE/2017/Proc 07/06/2017 06/06/2017 18/07/2017
Time 11:0Hrs
1318 Independent Engineer services for Two laning of balance work and Operation & Maintenance of Trichy – Karaikudi including Trichy Bypass road section of NH-210 from (Km 10.000 to Km 94.000) and Bypass (Km 110.016 to Km 135.930) in the State of Tamil Nadu on DBFOT (Annuity) Basis under NHDP-Phase-III RO Chennai/IE/O&M/2017/Package-XV 06/06/2017 06/06/2017 08/06/2017
Time 17:0Hrs
1319 Consultancy Services for Authority’s Engineer for Supervision of Construction of Service Road (Length-32.00 km) in the project of 6-lanning of Indore-Dewas Section of NH-3 from km 577.550 to km 610.199 and km 0.000 to km 12.600 (Approx. length 45.05 km) in the State of Madhya Pradesh under NHDP Phase-V to be executed on EPC mode NHAI/MP/AE/11012/Indore-Dewas/Service Road/2017 07/06/2017 05/06/2017 24/07/2017
Time 11:0Hrs
1320 Consultancy services for Authority’s Engineer for supervision of the work Up-gradation of NH-31C with a minimum of 2-lane with Paved shoulder configuration starting from km 105.00 to km 145.632 (total length 40.632 km) in the district of Jalpaiguri, on EPC mode in the state of West Bengal under Annual Plan 2016-17. (Job No. 31C-WB-2016-17/417) e-RFP No 04 OF 2017-18 of Superintending Engineer/ National Highway Circle No III 30/05/2017 05/06/2017 15/06/2017
Time 17:0Hrs
1321 Consultancy services for Authoritys engineer for Reconstruction with geometric improvement of single intermediate lane to 2 lane with paved shoulder configuration from existing km 92.880 to km 121.550 of NH-125 in the state of Uttarakhand on EPC Mode. 1749/12M-NH/2017 dt 02.06.2017 06/06/2017 05/06/2017 19/07/2017
Time 17:0Hrs
1322 Consultancy services for Authoritys engineer for supervision of civil construction works Reconstruction with geometric improvement of existing Two lane intermediate lane to 2 lane with paved shoulders configuration from existing km. 126.730 to km 135.075 and existing Km 143.750 to Km 163.000 of NH-125 in the State of Uttarakhand 1749/12M-NH/2017 dt 02.06.2017 A 06/06/2017 05/06/2017 19/07/2017
Time 17:0Hrs
1323 Consultancy Services for Authority Engineer for Construction of Two Lane ROB and its approaches in lieu of existing Level Crossing (L.C. No. 39-B) at Km. 158.525 on NH-74 including Railway Portion in the State of Uttarakhand on EPC Mode & Construction of 4-lane ROB and its approaches in lieu of existing level crossing no 43-B at Km. 2.400 on NH-121 in the State of Uttarakhand on EPC Mode 1180/12M-NH/2017 dt 11.04.2017 01/06/2017 01/06/2017 17/07/2017
Time 17:0Hrs
1324 Consultancy services for AE for supervision of the works for Construction of twins 2 Lane ROB and its approaches in replacement of existing LC Gates on Kubai and Kadamdiha on NH60. 04/2017-18 of SE,NHC-I (2ND CALL) 31/05/2017 01/06/2017 22/06/2017
Time 17:0Hrs
1325 Consultancy services for Authority Engineer for Supervision of Four lane Oddanchathram Bypass from km 23.230 to km 30.900 of NH-209 (Design chainage from km 23.100 to km 33.200)in the state of Tamil Nadu under NHDP-IV on EPC Mode NHAI/AE/Oddanchatram Bypass/NH-209/2017 07/06/2017 31/05/2017 10/07/2017
Time 11:0Hrs
1326 Consultancy services for Authority Engineer for Supervision of Four lane Oddanchathram Bypass from km. 23.230 to km. 30.900 of NH-209 (New NH. No. 83), (Design chainage from km. 23.100 to km, 33.200)in the state of Tamil Nadu under NHDP-IV on EPC Mode NHAI/AE/Oddanchatram Bypass/NH209/2017 20/07/2017 31/05/2017 10/08/2017
Time 11:0Hrs
1327 Consultancy services for Authority’s engineer for supervision of civil construction works reconstruction with geometric improvement of single / intermediate lane to 2 lane with paved shoulder configuration from existing km 163.000 to km 194.800 (Tanakpur – Pithoragarh Project Road ) of NH -125 in the State of NH-125 in the state of Uttarakhand on EPC mode under improvement of NH Connectivity to Chardham. 1635/12M-NH/2017 dt 24.05.2017 31/05/2017 30/05/2017 13/07/2017
Time 17:0Hrs
-
1328 Consultancy service for Authority’s Engineer for supervision of Improvement of city portion of Dimapur City (km 106.90 to Km 124.20) and Kohima City (km 177.60 to km 187.60) on NH No. 39 in the state of Nagaland under EPC mode during 2016-2017 CE/NH/etender/2017-18/03 13/04/2017 30/05/2017 04/08/2017
Time 12:0Hrs
1329 Supervision Consultancy Services for construction supervision of Balance work to four lanes of Gwalior - Jhansi Section of NH-75 in the State of UP & MP under N-S Corridor on EPC Mode (Item Rate Basis) (2nd call) NHAI/MP/G-J/EPC-Item Rate/SC/01/17 (2nd Call) 31/05/2017 29/05/2017 20/07/2017
Time 11:0Hrs
1330 CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF STRENGTHENING OF EXISTING TWO LANE PAVEMENT I/C CONSTRUCTION OF PAVED SHOULDER FROM KM 260/000 TO KM 299/000 ON NH -39 (NEW NH-02) MAO-IMPHAL SECTION (SH- KM 260/000 TO KM 287/000 IN THE STATE OF MANIPUR ON EPC MODE DURING 2016-17 ACE-I/NH/RFP-Authority Engineer/2017-18/70/Pkg-2 29/05/2017 29/05/2017 06/07/2017
Time 11:0Hrs
1331 Rehabilitation and upgradation to 2 lane with paved shoulder configuration from existing km 122.00 (Dharasu Bend) to km. 147.230 (Silkyara Bend) (design chainege 0.00 to 24.30) of NH-94 1140/13yata-NH-10/2017 27/05/2017 27/05/2017 31/07/2017
Time 15:0Hrs
1332 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF “STRENGTHENING OF EXISTING TWO LANE PAVEMENT I/C PAVED SHOULDER ON NH NO. 39 FROM KM 212.325 TO KM 260.00” ON EPC IN THE STATE OF MANIPUR DURING 2016-17 ACE-I/NH/RFP-Authority Engineer/2017-18/70 26/05/2017 26/05/2017 06/07/2017
Time 11:0Hrs
1333 Chief Engineer Project Shivalik 80260/Infracon/Consultancy/36TF/E8 25/05/2017 25/05/2017 22/06/2017
Time 17:0Hrs
1334 Independent Engineer services for Four Laning of Solapur- Bijapur Section of NH-13 (NEW NH NO 52) (Four Lane) from km 0.000 to km 110.542 (Design Length 109.08 km) in the states of Maharashtra and Karnataka to be executed under BOT (Toll) on Design, Build, Finance, Operate and Transfer (DBFOT) basis under NHDP Phase III NHAI/GM(T)/IE/Sol-Bij/Mah/2017 23/05/2017 23/05/2017 17/07/2017
Time 11:0Hrs
-
1335 RFP for procurement Consultancy Services For Authority’s Engineer For Supervision of rehabilitation and up-gradation to 2 lane with paved shoulder / 4 lane standards of National Highway section section (i)Indapur-Tala –Mandad –Agardanda section of NH-753F ( Length - 42.345 km) section (ii) Mangaon –Mhalsa- Dighi Port section of NH-753F (Length - 54.75 km) section (iii) Wakan Pali Khopoli section of NH-548A (Length - 40.51 km) On EPC Basis. NH/MAH/MSRDC/Konkan-1/AE/Pkg-30-2nd call 25/05/2017 22/05/2017 12/06/2017
Time 17:0Hrs
1336 6-laning of Chandikhole-Jagatpur-Bhubaneswar section of NH-16 from Km. 413.000-418.000 and Km. 0.000 to Km. 62.000 as BOT (Toll) on DBFOT Pattern under NHDP-Phase-V in the State of Odisha 11011/8/RO-OD/2017/IE 27/05/2017 22/05/2017 27/06/2017
Time 11:0Hrs
1337 Independent Engineer services during balance construction period and O&M period for Four laning of Gwalior-Shivpuri section of NH-3 from km 15.600 of NH-75 (End of Gwalior bypass) to km 236.00 of NH-3 in the state of Madhya Pradesh on BOT (Toll) on DBFOT Pattern under NHDP Phase 660 09/06/2017 17/05/2017 31/07/2017
Time 14:0Hrs
1338 Consultancy Services for Authority Engineer for Supervision for balance work for 4-laning of Bhopal-Biaora section of NH-12 from Lalghati km 315-725 to Bhopal bypass junction km. 324-00 (PKG-I) and balance work for 4-lanning of Bhopal-Biaora section of NH-12 from km. 324-00 to km. 423-40 (PKG-II) in the State of Madhya Pradesh on EPC Mode NHAI/HQ/MP/Tech/BPL- BIO/ AE/2017 dated 15/05/2017 17/05/2017 16/05/2017 15/06/2017
Time 11:30Hrs
1339 Independent Engineer Services during Operation & Maintenance Period of Four lane Chenani - Nashri section of NH-44 (Old NH-1A) from km. 89.00 to km. 130.00 including 9 km long tunnel (2 lane) with parallel escape tunnel in the state of Jammu & Kashmir (2nd Call) J&K/IE/O&M/03 15/05/2017 15/05/2017 13/06/2017
Time 11:0Hrs
1340 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF WORK OF CONSTRUCTION OF ROB AND ITS APPROACHES PARALLEL TO EXISTING ROB AT KM 1.800 ON NH-65 (NEW NH-152) AT AMBALA IN THE STATE OF HARYANA ON EPC MODE. PWD/HR/PKL/AE/4 12/04/2017 15/05/2017 01/08/2017
Time 15:0Hrs
1341 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR CONSTRUCTION OF ROB AND ITS APPROACHES IN LIEU OF LEVEL CROSSING NO. C-25 AT KM 132.850 ON NH-334B AT JHAJJAR IN THE STATE OF HARYANA ON EPC MODE. PWD/HR/PKL/AE/5 12/04/2017 15/05/2017 02/08/2017
Time 15:0Hrs
1342 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF CIVIL CONSTRUCTION WORKS FOR Widening to Two/Four Lane with Paved Shoulders from Km 182.120 to km 227.600 of NH-167 on Haggari-Jadcherla Road on EPC mode under NH(O) in the STATE OF Telangana SE(R&B)NH/HYD/8/2016-17, Dt. 03.05.2017(2nd Call). 11/05/2017 11/05/2017 29/05/2017
Time 15:0Hrs
1343 Feasibility study/ Detailed Engineering report for construction of two lane with paved shoulder for in principle approved National Highway Stretch from Rohat (on NH-62) – Ahore (on NH-325) Length 82 Km NIT No 20 of 2017-18 S.No.03 09/05/2017 09/05/2017 11/05/2017
Time 11:0Hrs
1344 Consultancy Services for Authority’s Engineer for Supervision of “Construction of Four/Six laning from Km 132.375 to Km 158.058 (Total New Alignment length of 20.683 Km) of Daboka Dimapur Section (Dimapur Bypass) of NH-36 & 39 in the state of Nagaland and Dimapur Bypass (Assam Portion) from existing Km 159.400 of NH-36 to existing Km 102.500 of NH-39 and upto end point of Assam portion [Design Km 118.050 to design Km 132.375] (length 14.325 Km) in the State of Assam under SARDP-NE on EPC NHIDCL/Nagaland & Assam/Dimapur Bypass /AE/2017 17/05/2017 09/05/2017 08/09/2017
Time 15:0Hrs
1345 Consultancy service for Authority’s Engineer for supervision of “Widening to two lane with paved shoulders from Km 4.40 to 56.00 of NH-218 Bijapur-Hubli section in the state of Karnataka through EPC Mode. (Job No.NH-218-KNT-2016-17-836)”. EE/NHD/VJP/NH-218/Job-836/AE/NIT/2017-18/476 05/05/2017 06/05/2017 15/06/2017
Time 11:0Hrs
1346 Independent Engineer IE for O and M of Four laned Dhule Pimpalgaon Km 265 Km 380 section of NH 3 New NH 60 in the State of Maharashtra NHAI RO MUM NSK DP NH 3 2017 18 02 11/05/2017 02/05/2017 12/06/2017
Time 11:59Hrs
1347 Independent Engineer IE for O and M of Four laned Vadape Gonde Km 539.5 Km 440 section of NH 3 New NH 160 in the State of Maharashtra NHAI RO MUM NSK VG NH 3 2017 18 01 11/05/2017 02/05/2017 12/06/2017
Time 11:59Hrs
1348 Consultancy services for Authoritys Engineer for supervision of the work of (A) Construction of twins 2-Lane ROB and its approaches in replacement of existing level crossing Gate No – KA-34 (Rly Km 160/25-160/25-160/27) between Midnapore & Bankura in Kubai at Km 154.617 of NH-60 in the State of West Bengal, (JOB NO-NH-60/WB/(5)/16-026-S&R(B) and (B) Construction of Twins 2-Lane ROB and its approaches in replacement of existing level crossing Gate No KA-38 (Rly Km 165/21-165/23) between Chandrako 03/2017-2018 of SE NHC-I 26/04/2017 28/04/2017 19/05/2017
Time 17:0Hrs
1349 Consultancy Services of Authority Engineer for Widening to 2 lane with paved shoulder from km 0 to 40 of NH 2C Dehri Banjari AKbarpur Road & Construction of ROB and its approach in lieu of existing level crossing at Km 119 on N H 30 Under NHO Annual Plan 2016 17 in Bihar under EPC mode of procurement 02/NH-GAYA/2017-18 27/04/2017 28/04/2017 08/05/2017
Time 15:0Hrs
1350 Independent Engineer services for Operation & Maintenance Period of Trichy Bypass to Tovarankurichi – Madurai Section of NH-45B from Km 0/000 to Km 124/840 on OMT Basis in the State of Tamil Nadu RO Chennai/IE/O&M/2017/Package-XII – 2nd Call 02/05/2017 28/04/2017 15/05/2017
Time 15:0Hrs
1351 Independent Engineer services for Two lanes with/without paved shoulders of Tindivanam – Krishnagiri section of NH-66 from Km 37.600 to Km 219.782 (Design Chainage) – DBFOT (Annuity) basis – Under NHDP Phase-III - in the State of Tamil Nadu RO Chennai/IE/O&M/2017/Package-XIV 22/05/2017 28/04/2017 31/05/2017
Time 11:0Hrs
1352 Independent Engineer services for Operation and Maintenance of four laned Jalan-dhar to Punjab/JK Border (km 4.230 to km 117.750/ 4.000 and km 4.000 to km 16.350) of NH-1A in the state of Punjab (OMT Pkg-21A) on OMT basis. NHAI/IE/OMT-21A/2017/CM-III 23/05/2017 27/04/2017 29/06/2017
Time 11:0Hrs
1353 Independent Engineer services for Operation and Maintenance of four laned Jalan-dhar to Punjab/JK Border (km 4.230 to km 117.750/ 4.000 and km 4.000 to km 16.350) of NH-1A in the state of Punjab (OMT Pkg-21A) on OMT basis. NHAI/IE/OMT-21 A/2017/CM-III 03/07/2017 27/04/2017 24/07/2017
Time 11:0Hrs
1354 Independent Engineer services for Operation and Maintenance of four laned Jalan-dhar to Punjab/JK Border (km 4.230 to km 117.750/ 4.000 and km 4.000 to km 16.350) of NH-1A in the state of Punjab (OMT Pkg-21A) on OMT basis. NHAI /IE/OMT-21 A/2017/CM-III 21/08/2017 27/04/2017 09/09/2017
Time 11:0Hrs
1355 Independent Services for Operation and Maintenance for Lalitpur-Sagar-Lakhnadon on NH-26 in the State of Madhya Pradesh on OMT Basis (Package-OMT-14 (NS)) 2017 NHAI 341 1 16/05/2017 26/04/2017 17/05/2017
Time 11:30Hrs
1356 Consultancy Services for supervision of (i) two laning with paved shoulder of NH-53 from Silchar to Badarpur (ii) Construction of Extra-dosed RCC bridge including via duct and approaches over river feni (iii) Improvement and strengthening of road section from chand khera to kurti bridge NHIDCL/Assam/NH 53/AE/Sil-Bad/2016 27/04/2017 26/04/2017 28/06/2017
Time 11:0Hrs
1357 Independent Services for Operation and Maintenance for Lalitpur-Sagar-Lakhnadon on NH-26 in the State of Madhya Pradesh on OMT Basis (Package-OMT-14 (NS)) 2017 NHAI 341 03/06/2017 26/04/2017 08/06/2017
Time 11:30Hrs
1358 Request for Proposal for Selection of Authority’s Engineer for supervision of the project “Rehabilitation and Up-gradation from (i) km 178.000 to 215.000 (Kabrai-Banda) (ii) km 285.000 to 326.000 (Kalupur-Lalata Road) (iii) km 326.000 to 379.555 (Mau-Jasra) of NH-76 to two lane with paved shoulder on EPC Mode in the state of Uttar Pradesh 470/13M-NHCK/17 30/04/2017 24/04/2017 01/06/2017
Time 17:0Hrs
-
1359 Consultancy services for Authority’s Engineer for Supervision of Rehabilitation and upgradation of NH-43 (old NH-78) from (Old Ch. 245.000 to 331.000 km, New Ch. 245.000 to 323.100 km) (MP border/ CG border to Surajpur section) to two lane with paved shoulders in the State of Chhattisgarh under Corridor Approach through EPC mode contract. 02/CE/NH/TC/44-01/2017 17/05/2017 24/04/2017 27/05/2017
Time 17:0Hrs
1360 Consultancy Services for Authority’s Engineer for Supervision of balance work for four Laning of Obedullaganj to Itarsi from km. 2.8 to km. 8.3 and from km. 20.7 to km. 63.00, excluding km. 8.3 to 20.7 Wild Life Area (PKG-I) and balance work for four laning of Itarsi to Betul Section of NH-69 from km. 63.0 to km. 137.0 (PKG-II) in the State of MP on EPC Mode. NHAI/MP/AE/11012/Phase-III/obed-Betul/2017 13/05/2017 21/04/2017 22/05/2017
Time 11:30Hrs
1361 Supervision Consultancy Services for construction supervision of Balance work to four lanes of Gwalior - Jhansi Section of NH-75 in the State of UP & MP under N-S Corridor on EPC Mode (Item Rate Basis). NHAI/MP/G-J/EPC-Item Rate/SC/01/17 12/05/2017 21/04/2017 22/05/2017
Time 11:30Hrs
1362 CONSULTANCY SERVICES OF AUTHORITY ENGINEER FOR UPGRADATION TO 2 LANE WITH PAVED SHOULDER FOR SECTION FROM KM. 58.00 TO KM. 91.600 EXLUDING CHAINAGE (59.460 TO 62.900),(73.120 TO 75.920),(82.650 TO 85.300) BALOTRA TO SANDERAO VIA JALORE SECTION OF NH-325 IN THE STATE OF RAJASTHAN EPC MODE ( JOB NO. NH-325/RJ/2016-17/677) AND UPGRADATION TO 2 LANE WITH PAVED SHOULDER FOR SECTION FROM KM. 118.900 TO KM. 156.955 EXLUDING CHAINAGE (151.100 TO 154.730 BALOTRA TO SANDERAO 02/2017-18 SE NH Jodhpur 26/05/2017 21/04/2017 14/06/2017
Time 11:0Hrs
-
1363 Independent Engineer services for 6-laning of Handia to Varanasi section of NH-2 from km 713.146 to km 785.544 (Design Length-72.398 km) in the State of Uttar Pradesh under NHDP Phase-V on DBFOT Hybrid Annuity mode Handia-Varanasi/NH-2/Hybrid Annuity/UP(Tech-Div)/IE/2016/98564 21/04/2017 20/04/2017 30/05/2017
Time 11:0Hrs
1364 Consultancy services for Authority Engineer for Supervision of Construction of Partially Access Controlled Four lane Elevated Highway between Samrala Chowk (Design Chainage km 0.000) to Ludhiana Municipal Limit (Design Chainage km 12.951) of NH-95 (Section Passing through Ludhiana City) in the State of Punjab on EPC Mode under NHDP Phase IV NHAI/13044/1/2017/PB 12/05/2017 19/04/2017 19/05/2017
Time 11:0Hrs
1365 Independent Engineer Services for Rehabilitation and up-gradation of NH-66 (Erstwhile NH-17) from Km 406/030 to Km 450/170 [Kalmath to Zarap section] to four lane with paved shoulder in the state of Maharashtra under NHDP -IV on Hybrid Annuity Mode. [Job No. 17 -MAH-NHDPIV-2016-17-07] RO/MUM/IE/NHDP-07/2016-17 25/04/2017 17/04/2017 01/06/2017
Time 17:0Hrs
1366 Independent Engineer Services for Rehabilitation and up-gradation of NH- 66 (Erstwhile NH-17) from Km 367.200 to Km 406.030 [Talgaon to Kalmath section] to four lane with paved shoulder in the state of Maharashtra under NHDP -IV on Hybrid Annuity Mode. [Job No. 17 -MAH-NHDPIV-2016-17-08] RO/MUM/IE/NHDP-08/ 2016-17 25/04/2017 17/04/2017 01/06/2017
Time 17:0Hrs
1367 Consultancy services for Authority’s Engineer for Supervision of Rehabilitation and upgradation of Section (i) Indapur to Wadpale section of NH-17 [New NH No. 66] from existing km 84.000 to km 110.750 and section (ii) Veer (Wadpale) to Bhogaon Khurd section of NH-17 [New NH No. 66] from existing km 110.75 to km 148.0 in the State of Maharashtra to four-lanes with paved shoulders under NHDP-IV [Job No. 17 (New NH No. 66)-MAHNHDPIV-2016-17-11 and 12 RO/MUM/AE/NHDP-11-12/ 2016-17 24/04/2017 17/04/2017 01/06/2017
Time 17:0Hrs
1368 Consultancy services for Authority’s Engineer for Supervision of Rehabilitation and upgradation of Watul to Talgaon section of NH-17 [New NH No. 66] from existing km 332.200 to km 367.200 [Design km 165.270 to km 198.528] in the State of Maharashtra to four-lanes with paved shoulders on EPC Mode under NHDP-IV [Job No. 17 (New NH No. 66)-MAH-NHDPIV-2016-17- 18] RO/MUM/AE/NHDP-18/ 2016-17 24/04/2017 17/04/2017 01/06/2017
Time 17:0Hrs
1369 Consultancy services for Authority’s Engineer for Supervision of Rehabilitation and upgradation of Nasratpur to Barasgaon section ofNH-222 [Design Ch. 66.700 to Ch. 92.565 and Design Ch. 92.565 to Ch. 96.750] in the State of Maharashtra to four-lanes with paved shoulders on EPC Mode under NHDP-IV [Job No. 222-MAH-NHDPIV-2016-17-17 RO/MUM/AE/NHDP-17/ 2016-17 24/04/2017 17/04/2017 01/06/2017
Time 17:0Hrs
1370 Consultancy services for Authority’s Engineer for Supervision of Rehabilitation and Upgradation of Mantha Taluk border-Waturphata-Ashti-Majalgaon-Dharur-Maij-Kalamb-Yermala-Kusalamb-Barshi- road section-III from Majalgaon (101.740) to Kaij (159.258) of NH-548C to two lane with paved shoulder in the State of Maharashtra. [Job No. NH-548C-MAH-2016-17-1140 RO/MUM/AE/NHO-1140/ 2016-17 24/04/2017 17/04/2017 01/06/2017
Time 17:0Hrs
1371 Consultancy services for Authority’s Engineer for Supervision of Four-laning of section (i) from existing km 475.000 to 502.500 of NH-17 (Patradevi to Karaswada section) and section (ii) from existing km 502.500 to km 514.830 and km 517.880 to km 522.790 of NH-17 (Karaswada-Porvorim-Panaji-Bambolim section)) in the state of Goa on EPC Mode under NHDP-III (Job No. 17 (New NH No. 66)-GOA-NHDPIV-2016-17-19 and 20) RO/MUM/AE/NHDP-19-20/GOA/ 2016-17 19/04/2017 17/04/2017 01/06/2017
Time 17:0Hrs
1372 IE service for Six laning of Kozhikode Bypass (Calicut Bypass) section of NH-17 in the State of Kerala on Hybrid Annuity Mode. NHAI/Tech/KL/Kozhikode Bypass/NH-17/IE/2017-18 13/04/2017 13/04/2017 26/12/2017
Time 11:0Hrs
1373 Independent Engineer Services for Four laning of End of Pandoh bypass to Takoli Section of NH-21 on Hybrid Annuity Mode in the state of Himachal Pradesh NHAI/HEM/PB-TK/2017/IE/HP 18/04/2017 13/04/2017 25/07/2017
Time 11:0Hrs
1374 Consultancy service for Authority’s Engineer for supervision of Strengthening and widening to two lane with paved shoulder of NH-61 from Km 40.00 to Km 72.40 under EPC mode in the state of Nagaland CE/NH/etender/2017-18/02 27/03/2017 13/04/2017 06/06/2017
Time 12:0Hrs
1375 Independent Engineer services for Operation and Maintenance of Ayodhya-Gorakhpur Section Border stretch of NH-28 in the State Uttar Pradesh (OMT Pkg-11) on OMT basis. 2017-NHAI- 186-1 24/04/2017 13/04/2017 15/05/2017
Time 11:0Hrs
1376 Independent Engineer services for Operation and Maintenance of Gorakhpur-Kasia-UP/Bihar border section of NH-228from km. 279.800 to km. 360.915 (new ch. Km. 285.002 to km. 366.117) (Total Length 81.115 km.) on OMT basis toll collection of Toll Plaza at km. 255.200 (new Ch km. 256.500) (for Toll collection of BOT Annuity reach from km. 251.700 to km. 279.800 (new Ch km. 252.860 to km. 285.215) of Gorakhpur Bypass of NH-28 in the state of Uttar Pradesh (OMT Pkg-27A) on OMT basis. 2017-NHAI- 192-1 24/04/2017 13/04/2017 24/08/2017
Time 11:0Hrs
1377 Independent Engineer services for Operation & Maintenance of Allahabad Bypass (including Ganga Bridge Pkg ABP-1) from Km. 158.00 to Km. 242.708 section of NH-2 in the State of UP under OMT Pkg 32 2017-NHAI-198-1 24/04/2017 13/04/2017 24/08/2017
Time 11:0Hrs
1378 Independent Engineer services for Independent Engineer services for Operation & Maintenance of Kanpur-Lucknow (Km. 11-005 to Km. 75-500) stretch of NH-25 and Lucknow Bypass (Km. 0-00 to 22-850) stretch of NH-56A and 56B and Lucknow-Ayodhya Section (Km. 8-00 to Km. 137-970) stretch of NH-28(Total Length Km. 217-315) in the State of UP under OMT Pkg 10 2017-NHAI-188-1 24/04/2017 13/04/2017 24/08/2017
Time 11:0Hrs
-
1379 Independent Engineer services during balance construction period and O&M period for Four laning of Gwalior-Shivpuri section of NH-3 from km 15.600 of NH-75 (End of Gwalior bypass) to km 236.00 of NH-3 in the state of Madhya Pradesh on BOT (Toll) on DBFOT Pattern under NHDP Phase-IV. 2017NHAI2041 25/04/2017 13/04/2017 11/05/2017
Time 14:0Hrs
1380 Authority’s Engineer for Supervision of Construction of Stand alone Ring Road / Bypass around Jammu City in the state of J&K (4 Lane, Length -58.2Km) on Engineering Procurement and Construction (EPC) Basis NHAI/12011/EPC/AE/2017 03/05/2017 13/04/2017 14/09/2017
Time 11:0Hrs
1381 Independent Engineer services for Operation and Maintenance of Ayodhya Gorakhpur Section Border stretch of NH 28 in the State Uttar Pradesh (OMT Pkg 11) on OMT basis 2017 NHAI 186 1 Extended 18/05/2017 13/04/2017 24/08/2017
Time 11:0Hrs
1382 Consultancy Services of Authority’s Engineer for supervision of Rehabilitation and Up gradation of Barhani Kataya Chowk Near Shohratgarh Section Km. 385 000 to Km. 420 000 of NH 730 to two lane with paved shoulder under EPC mode in the State of Uttar Pradesh 886 357YATA NHCIRCLE 17 DATED 10 04 2017 17/07/2017 13/04/2017 27/11/2017
Time 15:0Hrs
1383 Kadsd rwerew rwetwe 10/04/2017 11/04/2017 12/04/2017
Time 15:0Hrs
-
1384 Feasibility study/ Detailed Engineering report for construction of two lane with paved shoulder for in principle approved National Highway Pokharan-Sankda-Bhainsda-Fatehgarh Length 80 Km NIT No 20 of 2017-18 S.No.02 09/05/2017 10/04/2017 11/05/2017
Time 11:0Hrs
1385 Consultancy Services for Independent Engineer services for Six Laning of Bangalore – Nidigatta Section, Km 18/000 to Km 74/200 of NH-275 in state of Karnataka to be executed on Hybrid Annuity Mode– NHAI/ KNT/ NH-275/Bng-Nid/ IE/2017 07 April 2017 11/04/2017 07/04/2017 18/07/2017
Time 11:0Hrs
1386 Consultancy Services for Independent Engineer services for Six Laning of Nidagatta-Mysore Section, km 74/20 to km 135/304 of NH-275 in the State of Karnataka to be executed on Hybrid Annuity Mode NHAI/ KNT/ NH-275/NID-MSY/IE/2017 07 April 2017 11/04/2017 07/04/2017 18/07/2017
Time 11:0Hrs
1387 Consultancy services for Authority’s Engineer for supervision of the works of 1) Construction of ROB and its approaches in lieu of Level Crossing No. 10/B/T at km 307.050 of NH-60 in the state of West Bengal. Job No. NH-60/(WB)/(9)/15-16/013-S&R(B) 2) Construction of ROB and its approaches in lieu of Level Crossing No. 21/SPL/E at km 338.600 of NH-60 in the state of West Bengal. Job No. NH-60/(WB)/(10)/15-16-020-S&R(B) Bid Package No. 1/2017-18 of SE, NHC - II,Dated - 05.04.2017 04/04/2017 07/04/2017 15/05/2017
Time 15:0Hrs
1388 Consultancy Services for Authority Engineer for Supervision for balance work for 4-lanning of Bhopal-Biaora section of NH-12 from Lalghati km 315-725 to Bhopal bypass junction km 324-00 (PKG-I) and balance work for 4-lanning of Bhopal-Biaora section of NH-12 from km 324-00 to km 423-40 (PKG-II) in the State of Madhya Pradesh on EPC Mode NHAI/HQ/MP/Tech/BPL-BIO/ AE/2017 dated 07/04/2017 08/04/2017 07/04/2017 08/05/2017
Time 11:30Hrs
1389 Construction of ROB including approaches in lieu of Railway Crossing No C57 at Km 76.340 on NH 754 at Jalalabad in the state of Punjab on EPC Mode 61 13/04/2017 31/03/2017 16/04/2017
Time 16:0Hrs
1390 RFP for Consultancy services for Authority’s Engineer for supervision of Civil Construction work for Widening to 2-lane with paved shoulders including geometric improvement from km 318.00 to km 339.940 on Churaibari-Agartala Section of NH-44 in Tripura on EPC mode (Job No. 8(44)/TR/2016-17/06) Bid No. 20(1)/CE/PWD (NH)/2015/DNIT-34/2016-17 31/03/2017 31/03/2017 28/04/2017
Time 12:0Hrs
1391 Authority Engineer for Supervision of Rehabilitation and Upgradation of NH-4 from Km 133.36 to Km 171.59 (Andhra Pradesh / Tamil Nadu Border to Nalagampalli village) and Nalagampalli (Existing Km 171.590/Design Km 172.00) to AP/Karnataka Border (Existing Km 216.912/ Design Km 219.687) to four lane with paved shoulders (Design Length = 47.687 Km) under NHDP-IV in the State of Andhra Pradesh on EPC Mode NHAI/Tech/AP/2016/NH-4/AE 31/03/2017 31/03/2017 02/05/2017
Time 11:0Hrs
1392 Authority Engineer services for Capacity Augmentation of the existing 4 lane stretch from lchhapuram to Narasannapeta from Km 470.415 to Km 580.700 (Design Length=110.285 Km) of NH-16 (Old NH-5) in the State of Andhra Pradesh on EPC mode NHAI/AP/NH-16/AE Services/ lchhapuram- Narasannapeta / 2016-17 03/04/2017 31/03/2017 26/05/2017
Time 11:0Hrs
-
1393 Independent Engineer services for Rehabilitation a¬¬nd Upgradation by 4-Laning of Singhara to Binjhabahal Section from km 311.000 to Km 414.000 (Design Chainage from Km 310.806 to Km 414.982) of NH-6 (New NH-49) in the State of Odisha under NHDP Phase-IV on Hybrid Annuity Mode NHAI/NHDP IV/OR/07/2016/AE/2016/90 26/04/2017 31/03/2017 02/05/2017
Time 11:0Hrs
1394 Consultancy services for Authority’s Engineer for Supervision of construction of NH-24 4-lane bypass starting from km 479.500 of NH-24 and terminating at km 17.600 of MDR-77C (bypass chainage from km 64.900/64.380 to km 79.516/79.000 total length 14.618 km) in the State of Uttar Pradesh under NHDP Phase-VII on EPC Mode NHAI/ NHDP-VII/Pkg-IIIB/NH-24 Bypass/EPC/AE RFP/2017 06/04/2017 30/03/2017 01/05/2017
Time 11:0Hrs
1395 Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. Package No. HP/Shimla/29Sml HP/Shimla/29Sml 06/04/2017 30/03/2017 21/04/2017
Time 15:0Hrs
1396 Reconstruction with geometric improvement of existing single/intermediate lane to 2 lane with earthen shoulder configuration from existing Km 16.545 to Km 33.130 & Km 41.260 to Km 57.975(design chainage 18.700 to Km 35.130 & Km 47.700 to Km 63.700) excluding Khat village from Km 53.425 to 55.330(Design chainage 59.330 to Km 61.150) of NH-109 in the state of Uttarakhand / widening and strengthening from km 57.975 to km 68.600( Fata to Sitapur) on NH-109 RO/UK/NH-109-UR-2016-17-493/01 05/05/2017 28/03/2017 25/05/2017
Time 15:0Hrs
1397 Consultancy services for Authority Engineer for supervision of the works Construction of Twins 2 Lane ROB and its approaches in replacement of existing level crossing Gate No KA 38 Rly Km 165 21 165 23 between Chandrakona Road and Garbeta Stations in Kadamdiha at Km 159 448 of NH 60 in the state of West Bengal JOB NO NH 60 W B 3 15 16 025 S R B 32/016-17 of SE, NHC-I 27/03/2017 27/03/2017 18/04/2017
Time 17:0Hrs
1398 Independent Engineer services for Development and operation of Beawar-Gomti section of NH-8 from km. 58.245 to 177.050 in the State of Rajasthan on Design, Build, Finance, Operate & Transfer (DBFOT) basis RW/JAI/RJ/B-G/4-Lane/New IE/2016 26/03/2017 27/03/2017 11/05/2017
Time 16:0Hrs
1399 Consultancy Services of Authority’s Engineer for supervision of Rehabilitation and Up-gradation of Allahabad-Mirzapur section (km 400.878 to 450.000) of NH 76 E to two lane with paved shoulder under EPC Mode in the State of Uttar Pradesh 543/107COMB-18/17 23/03/2017 24/03/2017 24/04/2017
Time 15:0Hrs
-
1400 Independent Engineer Services during Operation & Maintenance stage for 4/6 laning of Beawer- Pali- Pindwara section of NH- 14 under BOT project in the State of Rajasthan NHAI/Tech/Raj/Misc/2017 /75 27/03/2017 24/03/2017 25/04/2017
Time 11:0Hrs
1401 Independent Engineer services for Four laning of Tuljapur - Ausa (including Tuljapur Bypass) Section of NH-361 from km 0.000 to km 55.835 (Existing Chainage km 416.000 to km 470.000) under NHDP Phase-IV in the state of Maharashtra on Hybrid Annuity Mode NHAI/GM (T)/RON/IE/Tujapur-Ausa/Mah/2017 29/03/2017 24/03/2017 30/05/2017
Time 11:0Hrs
1402 Consultancy services for Authority engineer for supervision of Construction of High Level Thapra Bridge on Chordi Choraha-Kuba-Ananduri Road (MDR-83) in Km. 22 of Banswara District in the state of Rajasthan Under ISC on EPC Mode NIT 13/2016-17 PWD Dn Garhi 23/03/2017 23/03/2017 24/04/2017
Time 11:0Hrs
1403 Consultancy Services for Authority Engineer for Supervision of “ Construction of Two-Laning of Akajan – Likabali- Bame Road on EPC basis from existing Km 71.000 to 99.000 (design Km. 65.810 to Km. 91.928) in the state of Arunachal Pradesh under SARDP-NE on Engineering Procurement & Construction (EPC) Mode NHIDCL/Ar.Pr./Akajan–Likabali– Bame (71.0 to 99.0 /AE/2017 23/03/2017 23/03/2017 11/05/2017
Time 16:30Hrs
1404 Independent Services for Operation and Maintenance for Lalitpur-Sagar-Lakhnadon on NH-26 in the State of Madhya Pradesh on OMT Basis (Package-OMT-14 (NS) NHAI RO Bhopal O and M IE 2017 dated 18.03.2017 20/03/2017 20/03/2017 20/04/2017
Time 11:0Hrs
1405 Consultancy services for Authority’s Engineer for supervision of civil construction works reconstruction with geometric improvement of existing intermediate lane to 2 lane with paved shoulder configuration from km 28.600 to km 59.420 of NH-94 in the state of Uttarakhand on EPC mode. CB/CD/PIU/DDN/RFP-10 20/03/2017 17/03/2017 17/05/2017
Time 11:0Hrs
1406 Consultancy Services for Independent Engineer services for SIX-LANING OF DAVANAGERE – HAVERI FROM KM 260/000 TO KM 338/923 OF NH-48 (OLD NH-4) IN THE STATE OF KARNATAKA TO BE EXECUTED AS HYBRID ANNUITY PROJECT ON DBOT ANNUITY UNDER NHDP PHASE – V NHAI/KNT/ DAV- Haveri /NHDP-V/IE/2017 16th March 2017 17/03/2017 16/03/2017 02/05/2017
Time 11:0Hrs
-
1407 Consultancy Services for Authoritys Engineer for Supervision of Four laning of Dolabari to Jamuguri section from km 17.300 of NH-37A to km 182.000 of NH-52 in the State of Assam under SARDP- NE Phase A on EPC basis NHIDCL/Assam/Dolabari-Jamuguri/AE/2017 16/03/2017 15/03/2017 08/05/2017
Time 11:0Hrs
1408 Independent Engineer Services for Four laning of Jhansi-Khajuraho section (pkg-II) of NH-75/76 from Design Chainage Km 76-300 (Existing Chainage 82-100) near village Chhatipahari to Design Chainage Km 161-700 (Existing Chainage Km 57-9) near Bamitha town in the state of UP & MP under NHDP Phase – IV on Hybrid Annuity mode NHAI/MP/Tech/Jha- Khuj/IE/pkg-II/2017 dated 15/3/2017 17/03/2017 15/03/2017 17/04/2017
Time 17:0Hrs
1409 Independent Engineer Services for Four laning of Jhansi-Khajuraho section (pkg-I) from km 0-00 to km 76-300 (existing km 108-300 of NH-25 Kanpur-Jhansi Section to km 82-10) of NH-75/76 in the state of UP/MP under NHDP Phase-III on Hybrid Annuity mode NHAI/MP/Tech/Jha- Khuj/IE/pkg-I/2017 dated 15/3/2017 17/03/2017 15/03/2017 17/04/2017
Time 17:0Hrs
1410 Consultancy Services for Independent Engineer services for Six-Laning of Chitradurga – Davanagere including Chitradurga bypass (km 189/000 to km 260/000) (Design Chainage Km 0/000 to Km 20/700 & Km 208/000 to Km 260/000) of NH-48 (Old NH-4) in the state of Karnataka to be executed as Hybrid Annuity Project on DBFOT Pattern under NHDP Phase – V NHAI/KNT/Chitra- DAV/NHDP-V/IE/2017 15th March 2017 17/03/2017 15/03/2017 28/04/2017
Time 11:0Hrs
1411 Consultancy Services for Authoritys Engineer for i Rehabilitation and up-gradation of Beodnabad-Ferrargunj of NH-223 from Km 12.0 to Km 45.0 (excluding Km 21.0 to Km 28.0), to 2 Lane with hard shoulder in the UT of A&N PkgI ii Rehabilitation and up-gradation of section from Km 242.0 to 298.0 of NH-223 to 2 Lane with hard shoulder in the UT of A&N PkgII iii Construction of Major Bridge over Humphrey Strait Creek between Km.129.420 to Km. 130.600 of NH-223 in UT of A&N Islands Pkg-III NHIDCL/AE/A&N/Humphrey/Pkg-I&II/2016-17 10/03/2017 10/03/2017 24/04/2017
Time 15:0Hrs
1412 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF REHABILITATION AND UPGRADATION TO TWO LANE WITH PAVED SHOULDERS FROM KM 531/250 TO KM 597/946 (KUNKURI TO CG/JH BORDER SECTION) OF NH-78 IN THE STATE OF CHHATTISGARH UNDER NHDP–IV THROUGH ENGINEERING, PROCUREMENT & CONSTRUCTION (EPC) BASIS CONTRACT BASIS RO/CG/AE/NH78 09/03/2017 10/03/2017 17/04/2017
Time 17:0Hrs
1413 Independent Engineer services for six laning of Ranastalam - Anandapuram section of NH-16 from Km 634.000 to Km 681.000 in the State of Andhra Pradesh under NHDP Phase V on Hybrid Annuity Mode NHAI/AP/NH-16/IE Services/Ranastalam-Anandpuram / 2016-17 10/03/2017 09/03/2017 20/04/2017
Time 17:0Hrs
-
1414 Consultancy Services for 4 Nos ROB and one Road Project in Bihar AE01/NH purnia/2016-17 09/03/2017 09/03/2017 31/03/2017
Time 15:0Hrs
1415 Authority’s Engineer for the Balance Work of Four-Laning of Dhalkola Bypass (Length 5.5 Km) Including ROB on NH-34 (On EPC Mode) in the State of West Bengal. NHAI/NH-34/Dkhl Bypass/2016/Bal. Work/63C 23/03/2017 09/03/2017 07/04/2017
Time 11:0Hrs
1416 Authority Engineer for supervision of Widening of road to 2-lane with paved shoulder including construction of Bridges & Culverts in Km.182 to 266/6 (Design length 81.60 km) on NH-59A (Indore–Betul road) in the State of Madhya Pradesh on EPC mode. RO/BPL/NH(O)/2016-17/83/AE 07/04/2017 09/03/2017 31/05/2017
Time 11:30Hrs
1417 Authority’s Engineer for the work of Development of four-lane Islampur Bypass of 10.31 km length from km.0.00 (ex.ch. 498.500) to km. 10.310 (ex.ch. 506.950) of NH-31 in the State of West Bengal under NHDP PHASE II on Engineering, Procurement and Construction (EPC) mode NHAI/11015/WB-7/8/2015/AE/105 (C) 23/03/2017 08/03/2017 06/04/2017
Time 11:0Hrs
1418 Independent Engineer services for Operation & Maintenance Period of Trichy Bypass to Tovarankurichi – Madurai Section of NH-45B from Km 0/000 to Km 124/840 on OMT Basis in the State of Tamil Nadu RO Chennai/IE/O&M/2017/Package-XII 21/03/2017 07/03/2017 12/04/2017
Time 11:0Hrs
1419 Independent Engineer services for Operation & Maintenance Period of 4 laning of Madurai – Tirunelveli – Panagudi – Kanniyakumari Section from Km 0/000 to Km 243/170 on OMT Basis & 4 Laning and Strengthening of Existing 2 Lanes of Tirunelveli – Tuticorin Road from Km 4/300 to Km 51/200 of NH-7A in the State of Tamil Nadu RO Chennai/IE/O&M/2017/Package-XIII 21/03/2017 07/03/2017 12/04/2017
Time 11:0Hrs
1420 Independent Engineer services for Operation & Maintenance Period of 2/4 laning of Trichy to Karur Section of NH-67 from Km 135/800 to Km 218/028 Including Lalapet ROB 2.28 Km) under NHDP Phase-III on BOT (Toll) basis in the State of Tamil Nadu RO Chennai/IE/O&M/2017/Package-XI 21/03/2017 07/03/2017 12/04/2017
Time 11:0Hrs
1421 Independent Engineer services for Operation & Maintenance Period of 4 Lane divided carriageway facility of Salem –Kumarapalayam Section from Km 0/000 to Km 53/525 (TN-06) and Kumarapalayam-Chengapalli Section from Km.53/525 to Km 102/035 (TN-07) of NH-544 (Old NH-47) in the State of Tamil Nadu RO Chennai/IE/O&M/2017/Package-X 21/03/2017 07/03/2017 12/04/2017
Time 11:0Hrs
1422 Independent Engineer services for Operation & Maintenance Period of 4 Lane divided carriageway of Krishnagiri – Thopurghat - Thumbipadi Section of NH-44 (old NH-7) from Km 94/000 to Km 180/000 (TN-01) in the State of Tamil Nadu RO Chennai/IE/O&M/2017/Package-IX 21/03/2017 07/03/2017 12/04/2017
Time 11:0Hrs
1423 Independent Engineer services for Operation & Maintenance Period of 4 Lane Thumbipadi-Salem -Namakkal Section from Km 180/000 to Km 248/625 (TN-02) and 4-lane Namakkal-Karur Section from Km.248/625 to Km 292/600 (TN-03) of NH-7 in the State of Tamil Nadu RO Chennai/IE/O&M/2017/Package-VIII 21/03/2017 07/03/2017 12/04/2017
Time 11:0Hrs
1424 Consultancy Services for Authoritys Engineer for Supervision of Civil Construction work for Construction of 4lane bypass to Vizianagaram town of NH 43 (New NH 26) from km 537/6 to 552/0 (Raipur to Visakhapatnam section) to 4lane on EPC mode in the state of Andhra Pradesh SE/R&B/NH VJA NIT No.25/SE/AEE2/EPC/2016-17, dt.27.02.2017 09/03/2017 06/03/2017 20/04/2017
Time 17:0Hrs
1425 Consultancy Services for Independent Engineer services for Six Laning & Strengthening of Km 340/000 to Km 403/400 of Hubli – Haveri section of NH-48 (old NH-4) in the state of Karnataka under to be executed on Hybrid Annuity mode under NHDP Phase-V NHAI/KNT/Haveri-Hubli/NHDP-V/IE/2017 dated 3-3-2017 06/03/2017 03/03/2017 17/04/2017
Time 17:0Hrs
1426 Independent Engineer services for Four / Six Laning of Bodhre (km 390.000) to Dhule (km 452.800) section of NH-211 (new NH No. 52) (Existing Length 62.800 km Design Length 67.231 km) in the state of Maharashtra under NHDP Phase IV on Hybrid Annuity Mode NHAI/ Tech /01/IE/Bod-Dhule /2017 30/03/2017 03/03/2017 30/05/2017
Time 11:0Hrs
1427 Independent Engineer services for Four laning of Waranga to Mahagaon section of NH-361 from km 253.700 to km 320.580 (design length 66.880 km) under NHDP Phase-IV on Hybrid Annuity Mode NHAI/ Tech /01/IE/War - Maha /2017 30/03/2017 03/03/2017 30/05/2017
Time 11:0Hrs
1428 Independent Engineer services for Four laning of Mahagaon to Yavatmal (Package–II) section of NH-361 from km 320.580 to km 400.575 (Design Length 80.195) in the State of Maharashtra Under NHDP Phase on Hybrid Annuity Mode NHAI/ Tech /01/IE/Maha - Yavat/2017 31/03/2017 03/03/2017 25/05/2017
Time 11:0Hrs
1429 Independent Engineer services for Four laning of Yavatmal to Wardha (Package -III) section of NH-361 from km 400.575 to km 465.500 (design length 64.925 km) under NHDP Phase-IV on Hybrid Annuity Mode NHAI/ Tech /01/IE/Yavat- War/2017 31/03/2017 03/03/2017 25/05/2017
Time 11:0Hrs
1430 Independent Engineer services for Four Laning of Wardha-Butibori Section of NH-361 from km 465.500 to km 524.690 (design length 59.190 km) under NH (O) in the State of Maharashtra on Hybrid Annuity Mode NHAI/ Tech /01/IE/War - Buti/2017 31/03/2017 03/03/2017 25/05/2017
Time 11:0Hrs
1431 Consultancy Services for Authority’s Engineer for Supervision of 4-laning of Piska More – Palama section of NH-23 and 4-laning of Kutchery Chowk Ranchi - Bijupara section (Package-I) and 4-laning of Bijupara – Kuru section (Package-II) of NH-75 in the State of Jharkhand on EPC mode. NHAI/JH/AE/NH-23 and75/2017 20/03/2017 02/03/2017 13/04/2017
Time 11:0Hrs
1432 Consultancy Services for Independent Engineer for Supervision of Four Laning of Sethiyahopu – Cholopuram from Km 65.960 to Km 116.440 section of NH-45C in the State of Tamilnadu under NHDP Phase-IV on Hybrid Annuity Mode basis NHAI/HAM/SC/IE/11012/05/2017 03/03/2017 02/03/2017 17/04/2017
Time 11:0Hrs
1433 Consultancy services for Independent Engineer for Supervision of Four laning of Cholopuram – Thanjavur from km. 116.440 to 164.275 section of NH-45C in the state of Tamilnadu under NHDP-IV on Hybrid Annuity Mode NHAI/HAM/CT/IE/11012/06/2017 03/03/2017 02/03/2017 17/04/2017
Time 11:0Hrs
1434 RFO document for Authority Engineer of ADB-EPC package no 4 20/2016-17 28/02/2017 01/03/2017 11/05/2017
Time 11:0Hrs
1435 Consultancy Service for Authority’s Engineer for Supervision of Rehabilitation and Up-gradation to Two Lane with Paved Shoulders from Km. 0.000 to Km. 72.600 Nakrekal to Thanamcherla section of NH-365 in the State of Telangana under NHDP-IV through EPC. RW/HYD/NIT/003/2016-17 24/02/2017 24/02/2017 24/04/2017
Time 15:0Hrs
1436 Consultancy Services for Authoritys Engineer for supervision of Rehabilitation and Upgradation to two lane with earthen shoulder of Nongstoin-Wahkhaji road section from km 0.00 to km 43.100 (design km 0.00 to km 43.060) (design length 43.06 km) in the state of Meghalaya under SARDP-NE NHIDCL/MEGHALAYA/N-W/AE/2017 24/02/2017 24/02/2017 06/12/2017
Time 17:0Hrs
1437 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF UPGRADATION OF YAGYI – KALEWA SECTION MILEPOST 40/0 TO MILEPOST 115/5 IN MYANMAR TO TWO LANE WITH EARTHEN SHOULDER ON EPC NHAI/11013/International cooperation - Myanmar/AE/2017 20/03/2017 23/02/2017 09/08/2017
Time 11:30Hrs
1438 Consultancy services for Authority’s Engineer for supervision of Reconstruction with geometric improvement of existing intermediate lane to 2 lane with paved shoulder configuration from Km 1.957 to Km 28.600 excluding Narendra Nagar bypass (km 13.800 to km 18.550) of NH-94 in the state of Uttarakhand on EPC mode. CB/CD/PIU/DDN/RFP-08-2nd call 02/03/2017 20/02/2017 17/04/2017
Time 11:0Hrs
1439 Rehabilitation and up-gradation of NH-85 (old NH-49) from Km119/017 to Km 161/300 (design chainage Km 119/017 to Km 160/800) (Bodimettu to Munnar) to Two Lane with Paved Shoulders in the State of Kerala on EPC mode CENH/MVPA/EPC-AE/04/2016-17 05/03/2017 16/02/2017 20/03/2017
Time 14:30Hrs
1440 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF WORK OF CONSTRUCTION OF 4-LANING OF RAI MALIKPUR (HARYANA/RAJASTHAN BORDER)-NARNAUL-MOHINDERGARH-CHARKHI DADRI-BHIWANI-KHARAK- CORRIDOR, SECTION FROM KM 94.600 TO 125.920 OF NH-148B IN THE STATE OF HARYANA (PACKAGE-IV) ON EPC MODE. PWD/CHD/NH-PKL/8120 16/02/2017 16/02/2017 03/04/2017
Time 15:0Hrs
1441 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF WORK OF CONSTRUCTION OF 4-LANING OF RAI MALIKPUR (HARYANA/RAJASTHAN BORDER)-NARNAUL-MOHINDERGARH-CHARKHI DADRI-BHIWANI-KHARAK- CORRIDOR, SECTION FROM KM 99.00 TO 114.375 OF NH-709 (Extn) and BHIWANI BYPASS FROM KM 125.920 TO 135.141 OF NH-148B IN THE STATE OF HARYANA (PACKAGE-V) ON EPC MODE. PWD/CHD/NH-PKL/8121 16/02/2017 16/02/2017 03/04/2017
Time 15:0Hrs
1442 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF WORK OF CONSTRUCTION OF NH-21A (NEW NH-105) 4-LANE PINJORE BYPASS STARTING FROM KM 54.533 OF NH-22 AND TERMINATING AT KM 3.800 OF NH-21A (BYPASS CHAINAGE FROM KM 0.000 TO KM 7.700 TOTAL LENGTH 7.700 KM) IN THE STATE OF HARYANA ON EPC MODE. PWD/CHD/NH-PKL/8122 16/02/2017 16/02/2017 03/04/2017
Time 15:0Hrs
1443 Consultancy services for construction of 5 ROBs and their approaches in lieu of level crossings at i km 135 on NH 19 ii km 132 on NH 19 iii km 12 on NH-103 iv km 91 on NH 28B and v km 94 on NH-28B in the state of Bihar 92 15/02/2017 15/02/2017 17/03/2017
Time 15:0Hrs
1444 Widening to Two Lane with Paved Shoulders from Km 87/000 to 133/720 (Nattukal to Thanau Jn. in Palakkad) of NH-966 (old NH-213) in the State of Kerala on EPC mode CENH/MLPM/EPC-AE/03/2016-17 05/03/2017 10/02/2017 20/03/2017
Time 14:30Hrs
1445 Consultancy services for Authoritys Engineer for Supervision of construction of NH-28 4-lane bypass starting from km 17.600 of MDR-77C and terminating at km 15.650 of NH-28 (bypass chaiange from km 79.516/79.000 to km 94.457/93.473 total length 14.707 km) in the State of Uttar Pradesh under NHDP Phase-VII on EPC Basis NHAI//NHDP-VII/Pkg.-IIIA/NH-28 Bypass/EPC/AE/ RFP/2017 28/02/2017 06/02/2017 15/03/2017
Time 11:0Hrs
1446 Independent Engineer services for Rehabilitation a¬¬nd Upgradation by 4-Laning of Binjabahal to Telebani Section from Km 414.000 to Km 491.710 (Design Chainage from Km 414.982 to Km 493.300) of NH-6 (New NH-49/53) in the State of Odisha under NHDP Phase-IV on Hybrid Annuity Mode NHAI/NHDP IV/OR/06/2016/AE/2016/019 02/02/2017 31/01/2017 17/03/2017
Time 11:0Hrs
1447 RFP document for Independent Engineer Hanumangarh-Abohar(SH-07A)(upto Punjab Border) Highway Project. 16/2016-17 30/01/2017 30/01/2017 15/03/2017
Time 11:0Hrs
1448 Consultancy Services of Authoritys Engineer for supervision of Construction of High Level Bridge across River Sone at Chanchikala including its approaches on Kone Nakatwar Ranidih road in Sonebhadra District of Uttar Pradesh under LWE scheme on EPC Mode. 2907 12 NIVIDA SON CIRCLE1617 23/02/2017 29/01/2017 12/04/2017
Time 17:0Hrs
1449 Independent Engineer Services for Development and Maintenance of- RSHIP Package-03 F7(11)/BOT/PPP/D-1472 17/01/2017 27/01/2017 23/03/2017
Time 11:0Hrs
1450 Independent Engineer services for Package-I Four Laning of balance work and Operation and Maintenance of Tirupathi – Tiruthani –Chennai Section of NH-205 from Km.274.800 to Km.338.030 in the State of Andhra Pradesh and from Km 0.000 to Km 61.470 in the State of Tamil Nadu on Design, Build Finance, Operate and Transfer (DBFOT) Toll Basis AND Package-II For Chennai Bypass from Km 0.000 to Km 32.600 in the State of Tamil Nadu RO Chennai/IE/O&M/2016/Package-VI 21/02/2017 26/01/2017 28/03/2017
Time 11:0Hrs
1451 Consultancy for AE for Supervision of “Construction of 2- Laning of (i) design Km.0(Khupa) to Km.17.[ExistingKm95.8 of(Khupa – Hayuliang Road) to Km8.97(Hayuliang – Hawai Road)] (ii) design Km. 17.000 (Khupa) to Km. 34.000 [Existing Km 16.950 to Km 34.310 (Hayuliang – Hawai Road)] (iii) Design Km. 34.000 to Km. 51.825 [Existing Km 26.625 to Km 45.050 (Hayuliang – Hawai Road)] (iv) design Km. 51.825 to Km. 63.131 [Existing Km 45.050 of Hayuliang – Hawai road in the state of Ar. Pr.Under SARDP-NE. NHIDCL/Ar. Pr./ Hayuliang – Hawai /AE/2017 03/02/2017 25/01/2017 23/03/2017
Time 17:0Hrs
1452 Consultancy Services for Authority’s Engineer for Supervision of Construction of Two Laning of Joram – Koloriang Road NH-713 on EPC basis from i design Km 20 to Km 32.050 Existing Km 20 to Km 35.150 ii design Km. 32.050 to Km. 44.000 Existing Km 35.150 to Km 50.050 iii design Km 44.000 to Km 59.363 Existing Km 50.000 to Km 70.000 iv design Km 59.363 to Km 77.363 Existing Km 70.00 to Km 88.700 in the state of Arunachal Pradesh under SARDPNE On EPC Mode. NHIDCL/Ar.Pr./Joram-Koloriang/AE/2017/Pkg-I 03/02/2017 25/01/2017 23/03/2017
Time 16:30Hrs
1453 Consultancy Services for Authority’s Engineer for Supervision of Construction of Two Laning of Joram – Koloriang Road NH-713 on EPC basis from i design Km 77.363 to Km 92.363 existing Km 88.700 to Km 104.850 ii design Km. 92.363 to Km. 107.363 existing Km 104.850 to Km 122.600 iii design Km. 107.363 to Km. 122.353 existing Km 122.600 to Km 138.000 iv design Km. 122.353 to Km. 138.389 Existing Km 138.00 to Km 158.00 in the state of Arunachal Pradesh under SARDPNE On EPC Mode. NHIDCL/Ar.Pr./Joram-Koloriang/AE/2017/Pkg-II 03/02/2017 25/01/2017 12/04/2017
Time 17:0Hrs
1454 Consultancy Services for Authority Engineer for Supervision of “ Construction of 2 lane road with Paved Shoulders from Meka-Roing-Hunli from existing Km 16 of Roing Hunli section to Km 21.5 of Hunli-Anini Road (Greenfield alignment) (NH-313) (Total Length = 74.863 Km) in Arunachal Pradesh under Arunachal Pradesh package of SARDP-NE on Engineering Procurement and Construction (EPC) basis. NHIDCL/Ar. Pr./Roing-Hunli/AE/2017 16/02/2017 25/01/2017 23/03/2017
Time 16:30Hrs
1455 Consultancy services for Authority’s Engineer for Supervision of Rehabilitation and upgradation to 2 lane with paved shoulder/ 4-lane standards of National Highway section (i) Helwak to Karad (Km. 85.000 to Km. 133.417) (L - 48.417 Km) section of NH 166 E & Section (ii) Karad to Tasgaon section of NH-2 (Length - 58.83 km) of NH-266 on EPC Mode NH/MAH/PWD/Pune -2/AE/Pkg-2 16/02/2017 24/01/2017 01/05/2017
Time 17:0Hrs
1456 Consultancy services for Authoritys Engineer for Supervision of Rehabilitation and upgradation to 2 lane with paved shoulder/ 4-lane standards of National Highway section (i) Nagaj Junction at NH 166 to Jath (32 Km). From km. 0/000 (at Nagaj) to Km 31/148 (at Jath) & Km 134/000 (at Jath) to Km 151/350 (at Muchandi) section of NH-166E (Length - 48.50 km) & Section (ii) Tasgaon to Shirdhon section of NH-266. (Length - 23 km) of NH-266 on EPC Mode. NH/MAH/PWD/Pune - 3/AE/Pkg-3 16/02/2017 24/01/2017 01/05/2017
Time 17:0Hrs
1457 Consultancy services for Authoritys Engineer for Supervision of Rehabilitation and upgradation to 2 lane with paved shoulder/ 4-lane standards of National Highway section (i) Tembhurni Pandharpur section of from Ch. 00/000 to Ch. 36/190 (Length=36.190 km) and Section (ii) Tembhurni-Pandarpur section, Ch. 40/800 to Ch. 95/136 (Length-54.336Km) of NH-516A on EPC Mode. NH/MAH/PWD/Pune -5/AE/Pkg-5 16/02/2017 24/01/2017 01/05/2017
Time 17:0Hrs
1458 Consultancy services for Authoritys Engineer for Supervision of Rehabilitation and upgradation to 2 lane with paved shoulder/ 4-lane standards of National Highway section (i) Bhokar to Sarsam Budruk Section (Length = 33.00 Km) of NH 161 A ( Starting from NH 548 C Aakot and terminate at Junction of 161 near Wazar Aurangabad) and Section (ii) Sarsam Budruk to Kothari section of NH-161A (Length 57 km) on EPC Mode. NH/MAH/PWD/ Aurangabad -1/AE/Pkg-6 16/02/2017 24/01/2017 01/05/2017
Time 17:0Hrs
1459 Consultancy Services For Authoritys Engineer For Supervision of rehabilitation and up-gradation to 2 lane with paved shoulder / 4 lane standards of National Highway section Aurangabad-Sillod section of NH 753-F Design Chainage Km 0.00 to 60.630 (L=60.630 Km) in the State of Maharashtra under EPC Mode NH/MAH/PWD/ Aurangabad - 2/AE/Pkg-7 16/02/2017 24/01/2017 01/05/2017
Time 17:0Hrs
1460 Consultancy services for Authoritys Engineer for Supervision of Rehabilitation and upgradation to 2 lane with paved shoulder/ 4-lane standards of National Highway section (i) Sillod–Ajanta–Fardapur section of NH 753-F Design Chainage Km 60.630 to 99.660 (L=39.03 Km) and Section (ii) Fardapur - Jalgaon section of NH 753 F Design Chainage Km 99.66 to 147.38 (L=47.720 Km) on EPC Mode NH/MAH/PWD/ Aurangabad -3/AE/Pkg-8 16/02/2017 24/01/2017 01/05/2017
Time 17:0Hrs
1461 Consultancy services for Authoritys Engineer for Supervision of Rehabilitation and upgradation to 2 lane with paved shoulder/ 4-lane standards of National Highway Section (i) Section 0.000 from design chainage Km to 55.937 Km of NH-752E from Paithan to Shirur (Project length 55.937) and Section (ii) Section from design chainage km 55.937 Km to 114.486 Km of NH-752E from Shirur to Kharda (Project length 58.549 Kms) on EPC Mode NH/MAH/PWD/ Aurangabad - 4/AE/Pkg-9 16/02/2017 24/01/2017 01/05/2017
Time 17:0Hrs
1462 Consultancy services for Authoritys Engineer for Supervision of Rehabilitation and upgradation to 2 lane with paved shoulder/ 4-lane standards of National Highway Section (i) Parli—Pimpladahiguda section of NH-548B from From Km. 0.000 to Km. 18.440 (L=18.440 Km) and Section (ii) Lokhandi Sawargaon -Renapur (Latur) (34.463 Km) and Ambajogai Bypass (3.815 Km) Section of NH548B - Length 38.278 km on EPC Mode NH/MAH/PWD/ Aurangabad -5/AE/Pkg-10 16/02/2017 24/01/2017 01/05/2017
Time 17:0Hrs
1463 Consultancy Services For Authoritys Engineer For Supervision of rehabilitation and up-gradation to 2 lane with paved shoulder / 4 lane standards of National Highway section Bhokardhan-Hasnabad-Jawkheda-Rajur-Deaulgaon Raja section of NH-753M from 0.000 (Kumbhari Fata) to km 63.900 (Deaulgaon Raja) and extension from 17.900E (Jawkheda Fata) to 20.730E (Talegaon Fata) Total 66.730 kms in the State of Maharashtra under EPC Mode NH/MAH/PWD/Aurangabad - 6/AE/Pkg-11 16/02/2017 24/01/2017 01/05/2017
Time 17:0Hrs
1464 Consultancy services for Authoritys Engineer for Supervision of Rehabilitation and upgradation to 2 lane with paved shoulder/ 4-lane standards of National Highway Section (i) Bhandara- Ghotitok section of NH-753 (Length - 37.47 km) and Section (ii) Amdi-Saoner section of NH-753 (Length 39.58 km) on EPC Mode NH/MAH/PWD/Nagpur - 1/AE/Pkg-12 16/02/2017 24/01/2017 01/05/2017
Time 17:0Hrs
1465 Consultancy Services For Authoritys Engineer For Supervision of rehabilitation and up-gradation to 2 lane with paved shoulder / 4 lane standards of National Highway section Nagpur-Katol-Warur Section of NH-353J (Length - 40.47 km) in the State of Maharashtra under EPC Mode NH/MAH/PWD/Nagpur - 3/AE/Pkg-14 16/02/2017 24/01/2017 01/05/2017
Time 17:0Hrs
1466 Consultancy Services For Authoritys Engineer For Supervision of rehabilitation and up-gradation to 2 lane with paved shoulder / 4 lane standards of National Highway section Digras-Darwha-Karanja section of NH-361C (Length - 74.35 km) in the State of Maharashtra under EPC Mode NH/MAH/PWD/Nagpur - 5/AE/Pkg-16 16/02/2017 24/01/2017 01/05/2017
Time 17:0Hrs
1467 Consultancy services for Authoritys Engineer for Supervision of Rehabilitation and upgradation to 2 lane with paved shoulder/ 4-lane standards of National Highway Section (i) Nandgaon – Morshi section of NH-753K (Length - 43 km) and Section (ii) Morshi to MH/MP State Border section of NH-353k (length – 52.39 km) on EPC Mode NH/MAH/PWD/Nagpur -7/AE/Pkg-18 16/02/2017 24/01/2017 01/05/2017
Time 17:0Hrs
1468 Consultancy Services For Authoritys Engineer For Supervision of rehabilitation and up-gradation to 2 lane with paved shoulder / 4 lane standards of National Highway section Ajanta - Buldhana section of NH-753E Length - 49.13 Km (Design Chainag kmKM 0.000 to km 49.130) in the State of Maharashtra under EPC Mode NH/MAH/PWD/Nagpur -8/AE/Pkg-19 16/02/2017 24/01/2017 01/05/2017
Time 17:0Hrs
1469 Consultancy services for Authoritys Engineer for Supervision of Rehabilitation and upgradation to 2 lane with paved shoulder/ 4-lane standards of National Highway Section (i) Akola to Akot section of NH-161A from Design Ch. Km 0.000 (Below VUP of NH-6 bypass, Akola) to Ch Km 51.700 (Akot) (Length = 39.286 km) and Section (ii) Akot to Anjangaon section of NH-548 C (Length - 31.53 km) on EPC Mode NH/MAH/PWD/Nagpur-11/AE/Pkg-22 16/02/2017 24/01/2017 01/05/2017
Time 17:0Hrs
1470 Consultancy services for Authoritys Engineer for Supervision of Rehabilitation and upgradation to 2 lane with paved shoulder/ 4-lane standards of National Highway Section (i) Khamgaon - Shegaon section of NH-548 C (Length - 22.800 Km (Ch. 0.000 TO 22.800)) and Section (ii) Shegaon - Deori phata section (Length - 41.500 km Ch 0.000 TO 41.500) (NH-753E and NH 548C) on EPC Mode NH/MAH/PWD/Nagpur-12/AE/Pkg-23 16/02/2017 24/01/2017 01/05/2017
Time 17:0Hrs
1471 Consultancy Services For Authoritys Engineer For Supervision of rehabilitation and up-gradation to 2 lane with paved shoulder / 4 lane standards of National Highway section Chikhli - Khamgaon Section of NH – 548C (Length - 56.103 km) in the State of Maharashtra under EPC Mode NH/MAH/PWD/Nagpur-14/AE/Pkg-25 16/02/2017 24/01/2017 01/05/2017
Time 17:0Hrs
1472 Consultancy services for Authoritys Engineer for Supervision of Rehabilitation and upgradation to 2 lane with paved shoulder/ 4-lane standards of National Highway section (i) MH/CG State border Murumgaon Dhanora Gadchiroli Sawli Mul Chandrapur Road NH 930 Section Gadchiroli to Mul Km. 189.475 to 230.30 & km 233.10 to km 234.02 (Length - 41.62 km) and Section (ii) MH/CG State border Murumgaon Dhanora Gadchiroli Sawli Mul Chandrapur Road NH 930 Section Mul to Chandrapur Km. 234.02 to km 273.719 ( NH/MAH/PWD/Nagpur-16/AE/Pkg-27 16/02/2017 24/01/2017 01/05/2017
Time 17:0Hrs
1473 Consultancy Services For Authoritys Engineer For Supervision of rehabilitation and up-gradation to 2 lane with paved shoulder 4 lane standards of National Highway section KM 47.00 to 98.00 Section Chimur to Warora of Umred Bhisi Chimur Anandwan Warora Road NH353E (Length - 42.75 km) in the State of Maharashtra under EPC Mode NH/MAH/PWD/Nagpur-17/AE/Pkg-28 16/02/2017 24/01/2017 01/05/2017
Time 17:0Hrs
1474 Consultancy services for Authoritys Engineer for Supervision of Rehabilitation and upgradation to 2 lane with paved shoulder 4-lane standards of National Highway section (i) Sakoli Lakhandur Wadsa Armori Gadchiroli Chamorshi Asti Aallapalli Sironcha NH 353C Package I Sakoli to Bandra Border (Length - 55.8 km) and Section (ii) Duggipar Gondia Kohmara NH 753 Package II from km 28 to km 42.4 Goregaon to Gondia section (Length - 14.4 km) on EPC Mode NH/MAH/PWD/Nagpur-18/AE/Pkg-29 16/02/2017 24/01/2017 01/05/2017
Time 17:0Hrs
1475 Consultancy services for Authoritys Engineer for Supervision of Rehabilitation and upgradation to 2 lane with paved shoulder 4-lane standards of National Highway section (i) Pahur-Jamner-Bodhwad section (44.76 km) of NH-753L (Length - 44.76 km) and Section (ii) Bodhwad-Muktainagar-Barhanpur (Icchapur), section (33.385 km) of NH-753L (Length 33.385 km) on EPC Mode NH/MAH/MSRDC/Nashik-1/AE/Pkg-31 16/02/2017 24/01/2017 01/05/2017
Time 17:0Hrs
1476 Consultancy Services For Authoritys Engineer For Supervision of rehabilitation and up-gradation to 2 lane with paved shoulder 4 lane standards of National Highway section Kolde village to Khetia MP border section of NH 752G length 48.60 km Part of NH 6-Wisarwadi-Nandurbar- Prakasha- Shahada- Khetia (MP Border) NH 752-G in the State of Maharashtra under EPC Mode NH/MAH/MSRDC/Nashik-2/AE/Pkg-32 16/02/2017 24/01/2017 01/05/2017
Time 17:0Hrs
1477 Consultancy Services For Authoritys Engineer For Supervision of rehabilitation and up-gradation to 2 lane with paved shoulder 4 lane standards of National Highway section NH-65Jahirabad-Virur-(NH50)-Bhalki(NH52) Nilanga-Nitur-Latur section of NH-752K from km. 00.000 to Km. 64.936 (Design Chainage) (Length - 64.936 km) in the State of Maharashtra under EPC Mode NH/MAH/MSRDC/Aurangabad-4/AE/Pkg-36 16/02/2017 24/01/2017 01/05/2017
Time 17:0Hrs
1478 Consultancy services for Authoritys Engineer for Supervision of Rehabilitation and upgradation to 2 lane with paved shoulder 4-lane standards of National Highway section (i) Satara – Koregaon – Mhaswad section of NH-548C (Length - 85.686 km) and Section (ii) Mhaswad - Tembhurni section of NH-548 C (Length - 57.678 km) on EPC Mode NH/MAH/MSRDC/Pune-1/AE/Pkg-37 16/02/2017 24/01/2017 01/05/2017
Time 17:0Hrs
1479 Consultancy Services For Authoritys Engineer For Supervision of rehabilitation and up-gradation to 2 lane with paved shoulder 4 lane standards of National Highway section Ahmednagar- Vasundephata section of NH 160.(L93.800Km) in the State of Maharashtra under EPC Mode NH/MAH/MSRDC/Pune-2/AE/Pkg-38 16/02/2017 24/01/2017 01/05/2017
Time 17:0Hrs
1480 Consultancy services for Authoritys Engineer for Supervision of Rehabilitation and upgradation to 2 lane with paved shoulder 4-lane standards of National Highway section (i) Kalamb – Ralegaon – Wadki section of NH-361B (Length - 50.275 km) and Section (ii) Ralegaon- Sirasgaon–Vadner section of NH-361B (Length - 27.199 km) on EPC Mode NH/MAH/MSRDC/Amravati/AE/Pkg-40 16/02/2017 24/01/2017 01/05/2017
Time 17:0Hrs
1481 Consultancy Services For Authoritys Engineer For Supervision of rehabilitation and up-gradation to 2 lane with paved shoulder 4 lane standards of National Highway section section (i)Indapur-Tala –Mandad –Agardanda section of NH-753F ( Length 42.345 km) section (ii) Mangaon –Mhalsa- Dighi Port section of NH-753F (Length - 54.75 km) section (iii) Wakan Pali Khopoli section of NH-548A (Length 40.51 km) On EPC Basis NH/MAH/MSRDC/Konkan-1/AE/Pkg-30 16/02/2017 24/01/2017 01/05/2017
Time 17:0Hrs
1482 Consultancy Services For Authoritys Engineer For Supervision of rehabilitation and up-gradation to 2 lane with paved shoulder 4 lane standards of National Highway section (i) Ahmedpur to Pimpla junction Section of Ahmedpur – Kopra – Kinagaon – Ambejogai – Kaij – Manjarsumbha – Patoda – Jamkhed Road (NH 548D ) (Length - 55.623 km) section (ii) Pimpla junction to Manjarsumbha section of NH-548 D (Length - 81.685 km) section (iii) Manjarsumbha to Chumbhali Phata section of NH-548 D (Length - 32. NH/MAH/MSRDC/Aurangabad-1/AE/Pkg-33 16/02/2017 24/01/2017 01/05/2017
Time 17:0Hrs
1483 Consultancy Services For Authoritys Engineer For Supervision of rehabilitation and up-gradation to 2 lane with paved shoulder 4 lane standards of National Highway section (i) Mantha Taluka border to Partur section of NH 548C Length 51.262 Km section (ii) Partur to Majalgaon section from Km 51.262 to Km 101.740. – NH 548C (Length - 50.478 km) section (iii) Kaij to Kusalamb section of NH 548C Length 60.728 km section (iv)Shirod Shahpur - Basmat section of NH 752-I (Length - 22.43 km) on EP NH/MAH/MSRDC/Aurangabad-2/AE/Pkg-34 16/02/2017 24/01/2017 01/05/2017
Time 17:0Hrs
1484 Consultancy Services For Authoritys Engineer For Supervision of rehabilitation and up-gradation to 2 lane with paved shoulder 4 lane standards of National Highway section (i) Pandhrpur to Sangola section of NH-965C (Length 34.358 km) section (ii) Sangola to Kurudwadi section of NH-965C (Length 48.375 km) section (iii) Mhaswad - Pilov - Pandarpur section of NH-548E (Length - 53.08 km) On EPC Basis NH/MAH/MSRDC/Pune-3/AE/Pkg-39 16/02/2017 24/01/2017 01/05/2017
Time 17:0Hrs
1485 Consultancy Services For Authoritys Engineer For Supervision of Rehabilitation and Upgradation of Existing km 98750 Design Ch 121500 to Existing Km 83690 design Ch 136500 from Existing km 78050 Design Ch 142500 to Pimpalgaon Baswant existing km 59100 Design Ch 161281 to Two lane with paved shoulders strengthening of Existing km 83690 to Existing Km 78050 of section Pimpalgaon Vani Saputara Road NH953 in the state of Maharashtra Total Length 39421 Km 11/2016-17 Package 4 07/02/2017 24/01/2017 01/05/2017
Time 17:0Hrs
1486 Consultancy Services For Authority’s Engineer For Supervision of rehabilitation and up-gradation to 2 lane with paved shoulder / 4 lane standards of National Highway section Guhaghar Road to Chiplun section of NH-166E (Length - 39.83 km) Design Chain age 0/00 to 26/230 & 40/00 to 53/600in the State of Maharashtra under EPC Mode. CE/MUM/PUNE/KOP/2016-17/AE/Pack-1 03/02/2017 24/01/2017 08/05/2017
Time 17:0Hrs
1487 CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF REHABILITATION AND UP-GRADATION TO 2 LANE WITH PAVED SHOULDER / 4 LANE STANDARDS OF NATIONAL HIGHWAY SECTION MORSHI-CHANDURBAZARACHALPUR SECTION OF NH-353K IN THE STATE OF MAHARASHTRA FOR UPGRADATION TWO LANES WITH PAVED SHOULDER/FOUR LANE CONFIGURATION IN THE STATE OF MAHARASHTRA UNDER EPC MODE. EENH⁄AKL⁄RFP⁄AE⁄20 21/03/2017 24/01/2017 01/05/2017
Time 17:0Hrs
1488 CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF REHABILITATION AND UP-GRADATION TO 2 LANE WITH PAVED SHOULDER / 4 LANE STANDARDS OF NATIONAL HIGHWAY SECTION UPGRADATION OF ANJANGAON-MP BORDER SECTION OF NH-548C IN THE STATE OF MAHARASHTRA UNDER EPC MODE. EENH⁄AKL⁄RFP⁄AE⁄21 21/03/2017 24/01/2017 01/05/2017
Time 17:0Hrs
1489 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF REHABILITATION AND UP-GRADATION TO 2 LANE WITH PAVED SHOULDER / 4 LANE STANDARDS OF NATIONAL HIGHWAY SECTION JINTUR – PARBHANI SECTION OF NH-752 I IN THE STATE OF MAHARASHTRA UNDER EPC MODE NH/MAH/MSRDC/Aurangabad-3/AE/Pkg--35 22/03/2017 24/01/2017 01/05/2017
Time 17:0Hrs
1490 Consultancy Services For Authority’s Engineer For Supervision of rehabilitation and up-gradation to 2 lane with paved shoulder / 4 lane standards of National Highway section Mehkar to Ajispur section of NH548 C from km 0.000 (Mehkar) to km 35.836 (Ajispur) (Length 35.836 km) in the State of Maharashtra under EPC Mode NH/MAH/MSRDC/Amravati/ AE/Pkg-41 22/03/2017 24/01/2017 01/05/2017
Time 17:0Hrs
1491 Consultancy Services For Authority’s Engineer For Supervision ofrehabilitation and up-gradation to 2 lane with paved shoulder / 4 lane standards of National Highway sectionDahegaon - Kuhi - Umred section of NH-247 (Length - 41.54 km)in the State of Maharashtra under EPC Mode. RO/MUM/2016-17/AE/Pack-13 17/03/2017 24/01/2017 01/05/2017
Time 17:0Hrs
1492 Consultancy Services For Authority’s Engineer For Supervision of rehabilitation and up-gradation to 2 lane with paved shoulder / 4 lane standards of National Highway section Deori - Amgaon section of NH-543 (Length - 38.2 km) in the State of Maharashtra under EPC Mode RO/MUM/2016-17/AE/Pack-15 18/03/2017 24/01/2017 01/05/2017
Time 17:0Hrs
1493 Consultancy Services For Authority’s Engineer For Supervision of rehabilitation and up-gradation to 2 lane with paved shoulder / 4 lane standards of National Highway sectionWadi Junction to Asola Junction section of new NH-353-I (Existing km. 9.200 (NH-53, Wadi Junction) to km 39.400 (NH-361, Asola Junction) [Design km.0.000 to km. 39.200] (Excluding overlapping length of 6.8 km from km 17.200 to km 24.000 of Nagpur Mumbai Expressway)Length = 32.40 Kmin the State of Maharashtra under EPC Mode RO/MUM/2016-17/AE/Pack-24 18/03/2017 24/01/2017 01/05/2017
Time 17:0Hrs
1494 CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF REHABILITATION AND UP-GRADATION TO 2 LANE WITH PAVED SHOULDER / 4 LANE STANDARDS OF NATIONAL HIGHWAY SECTION MEHKAR - CHIKHLI SECTION OF NATIONAL HIGHWAY - NH 548C (LENGTH - 39.7 KM) IN THE STATE OF MAHARASHTRA UNDER EPC MODE. EENH⁄AKL⁄RFP⁄AE⁄17 20/03/2017 24/01/2017 01/05/2017
Time 17:0Hrs
1495 Consultancy service for Authority’s Engineer for supervision of Widening to Two/Four Lane with Paved Shoulders from Km. 0.00 to Km. 54.370 (Maharashtra Border to Bidar) section of NH-50 in the state of Karnataka on EPC Mode (Package -I) RW/BNG/Genl/Authority Engineer/Tender/150/2016 23/01/2017 23/01/2017 08/03/2017
Time 11:0Hrs
1496 Consultancy Services for Authoritys Engineer for supervision of project of 4 laning of Thalassery Mahe Bypass section of NH 17 from km 170.600 (design chainage km 170.600) to km 188.000 (deisgn chainage km 189.200) in the State of Kerala under NHDP Phase III on EPC mode NHAI/Tech/KL/Thala-Mahe Bypass/NH-17/AE/2016-17/104 21/02/2017 18/01/2017 07/03/2017
Time 11:0Hrs
1497 Consultancy Services for Authority’s Engineer for Supervision of Rehabilitation and upgradation of Angul-Sambalpur Section of NH 42 in the State of Odisha (km. 112.00 to km. 265.00) under NHDP IV on EPC mode NHAI/NHDP IV/OR/06/2016/AE/2016/001 09/01/2017 09/01/2017 28/02/2017
Time 11:30Hrs
-
1498 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER for (i) Construction of 1000m length Viaduct at Rangpo between Km 51.1 0 to Km 53.90 on Sevoke - Gangtok Road NH-10 (Old NH- 31A) in the State of West Bengal/Sikkim. (ii) Construction of upgradation of existing road to 2-lane with paved shoulder including geometric improvement from Km. 0.00 0to Km. 26.706 in Rhenok-Rorathang-Pakyong of NH-717A on EPC basis under SARDP-NE Phase ‘Á’ in the State of Sikkim. (iii) Construction/upgradation of existing roa NHIDCL/AE/Sikkim works-1/2016-2017 03/01/2017 03/01/2017 15/02/2017
Time 15:0Hrs
1499 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER OF FOLLOWING PROJECT ON EPC BASIS 1- Widening of existing single lane road to two lane with paved shoulders configuration from Km 235.000 to Km 268.00 of NH-58 including 560m Marine Drive viaduct portion near Byasi in the State of Uttarakhand on EPC Mode 2- Construction of 2-Lane road Tunnel near Dat ki Devi at km. 33/ km. 34 on NH-72A (New No. 307) in the State of Uttarakhand (on EPC mode) 4400/13yata-NH-10/2016 dated 17.12.2016 07/02/2017 03/01/2017 14/03/2017
Time 17:0Hrs
1500 RFP for appointment of Authority Engineer for (i) Reconstruction with geometric improvement of existing 2 lane/ intermediate lane to 2lane with paved shoulder configuration from km. 268.00 to 300.00 of NH-58 in the State of Uttarakhand under EPC mode (ii) Reconstruction with geometric improvement of existing 2 lane/ intermediate lane to 2lane with paved shoulder configuration from km. 300 to 338 of NH-58 in the State of Uttarakhand under EPC 4400/13yata-NH-10/2016 dated 17.12.16 01/02/2017 03/01/2017 20/02/2017
Time 17:0Hrs
1501 CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF WORKS FOR REPLACEMENT OF SUPER-STRUCTURE OF EXISTING 5.575 KM LONG 4 LANE MAHATMA GANDHI SETU OVER GANGA RIVER ON NH-19 FROM KM 212.72 TO KM 218.95 IN PATNA IN BIHAR ON EPC MODE RW-NH/34048/2/2016-S&R (B) 29/12/2016 29/12/2016 02/02/2017
Time 17:0Hrs
1502 CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF WORKS FOR REPLACEMENT OF SUPER-STRUCTURE OF EXISTING 5.575 KM LONG 4 LANE MAHATMA GANDHI SETU OVER GANGA RIVER ON NH-19 FROM KM 212.72 TO KM 218.95 IN PATNA IN BIHAR ON EPC MODE RW/NH-34048/2//2016-S&R(B) 29/12/2016 29/12/2016 30/01/2017
Time 17:0Hrs
1503 Consultancy service for Authority’s Engineer for supervision of Widening to Two/Four Lane with Paved Shoulders from Km. 34.00 to Km. 70.900 (Chittapur cross to Start of Yadgir Bypass) of NH-150 in the state of Karnataka on EPC Mode (Package -I) EE/NHD/KLB/NH-150/Job-828/AE/NIT/2016-17/1010 19/12/2016 19/12/2016 01/02/2017
Time 16:0Hrs
1504 Consultancy Services of Authoritys Engineer for supervision of Construction of High Level Bridge across River Sone at Chanchikala including its approaches on Kone Nakatwar Ranidih road in Sonebhadra District of Uttar Pradesh under LWE scheme on EPC Mode. 2907 12 NIVIDA SON CIRCLE16 17 23/02/2017 16/12/2016 21/02/2017
Time 17:0Hrs
1505 Consultancy services for Authority’s Engineer for supervision of the works of 1) Construction of ROB and its approaches in lieu of existing Level Crossing Gate No. SK-192/(E)SPL (Rly. Km- 46/0-1) in between Oodlabari - Damdim Stations in Oodlabari at Km. 615.500 of NH-31 in the State of West Bengal on EPC (Engineering Procurement and Construction) mode. Job No. NH-31/WB(19)/15-16-017-S&R(B). 2) Construction of twins 2-lane ROB and its Approaches in lieu of the existing level crossing at km 652. e-RFP No. 22 OF 2016-17 OF SUPERINTEDING ENGINEER, N.H. CIRCLE-III 02/11/2016 08/12/2016 19/12/2016
Time 17:0Hrs
1506 Consultancy service for Authority’s Engineer for supervision of Improvements and Re- Construction to Two Lane with Paved Shoulders from Km. 243.200 to 290.200 of NH 234 Huliyar-sira section in the state of Karnataka on EPC mode EE/NHD/TMK/NH-234/Job-815/NIT16/2016-17 06/12/2016 06/12/2016 20/01/2017
Time 16:0Hrs
1507 Consultancy service for Authority’s Engineer for supervision of widening to two lane with paved shoulders from km. 125.626 to 155.800 of NH-167 Hagari to Jadacherla section in the state of Karnataka on EPC mode. EE/NHD/CTA/NH-167/Job-814/NIT/2016-17/1060 01/12/2016 01/12/2016 05/01/2017
Time 16:0Hrs
1508 check Check 09/11/2016 24/11/2016 23/11/2018
Time 15:0Hrs
-
1509 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR PROJECT OF (i) 154 m span Steel Superstructure Bridge at Km 145.09 over River Barak and (ii) 122 m span Steel Superstructure Bridge at Km 189.80 over River Makru on Jiribam-Barak road on NH-53 in Manipur state. NHIDCL/2016 /AE/Manipur/ B-M Bridge 21/11/2016 21/11/2016 13/01/2017
Time 17:0Hrs
1510 Consultancy services for Authority’s Engineer for supervision of Upgradation of NH-31C from chainage 182 km (Hasimara) to 228 km (Salsalabari) to 2-lane with paved shoulder configuration in the district of Alipurduar, West Bengal Under Engineering, Procurement & Construction(EPC) Mode (2nd Call). e-RFP No-21 of 2016-17 of SE/NHC-III 28/10/2016 14/11/2016 21/11/2016
Time 17:0Hrs
1511 Consultancy services for Authority’s Engineer for supervision of Reconstruction with geometric improvement of existing intermediate lane to 2 lane with paved shoulder configuration from Km 1.957 to Km 28.600 excluding Narendra Nagar bypass (km 13.800 to km 18.550) of NH-94 in the state of Uttarakhand on EPC mode CB/CD/PIU/DDN/RFP-08 11/11/2016 13/11/2016 22/12/2016
Time 17:0Hrs
1512 Consultancy services for Authority’s Engineer for supervision of the work Upgradation of NH-31 from chaiage 718.00Km (Birpara) to km 742.50 (Falakata) to 2-lane with paved shoulder configuration in the State of West Bengal under Corridor Approach under EPC mode. (Job-No-031-WB-2016-17/407) e-RFP No-20 of 2016-17 of SE/NHC-III 21/10/2016 09/11/2016 21/11/2016
Time 17:0Hrs
1513 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF CIVIL CONSTRUCTION WORKS FOR REPLACEMENT OF SUPERSTRUCTURE OF EXISTING 5.575 KM LONG 4 LANE MAHATMA GANDHI SETU OVER GANGA RIVER ON NH-19 FROM KM 212.72 TO KM 218.95 IN PATNA IN BIHAR STATE ON EPC MODE RW/NH-34048/2/2016-S&R(B) 07/11/2016 07/11/2016 25/11/2016
Time 17:0Hrs
1514 Consultancy Services for Construction of ROB in lieu of Level crossing A/12/B/2 at Km. 112-113 of NH-15(New NH-54) at Amritsar along with High level Bridge over adjoining UBDC Canal in the state of Punjab 09 05/11/2016 05/11/2016 19/11/2016
Time 13:0Hrs
1515 Consultancy Services for Authority’s Engineer for Supervision of “Construction of Four/Six laning from Km 132.375 to Km 158.058 (Total New Alignment length of 20.683 Km) of Daboka Dimapur Section (Dimapur Bypass) of NH-36 & 39 under SARDP-NE in the state of Nagaland on Engineering Procurement and Construction basis. NHIDCL/Nagaland/DB/AE/2016 19/10/2016 19/10/2016 31/01/2017
Time 17:0Hrs
1516 Independent Engineer (IE) Services during Operation & Maintenance Period of Four lane Chenani - Nashri section of NH-44 (Old NH-1A) from km. 89.00 to km. 130.00 including 9 km long tunnel (2 lane) with parallel escape tunnel in the state of Jammu & Kashmir J&K/IE/O&M/02 07/10/2016 07/10/2016 30/11/2016
Time 11:0Hrs
1517 Consultancy services for Authority’s Engineer for Supervision of Construction, Operation and Maintenance of 2-Lane bidirectional Zojila Tunnel with Parallel Escape (Egress) Tunnel excluding approaches on Srinagar-Leh Section connecting NH-1 at km 95.00 and at km 118.00 in the State of Jammu &Kashmir on EPC Basis. 2017/NHIDC/215274/1 03/07/2017 20/07/2016 02/11/2017
Time 15:0Hrs
1518 Independent Engineer Services during Operation & Maintenance Period for 4/6 laning of Ghaziabad-Aligarh Section of NH-91 from Km. 23.600 to Km. 149.900 in the State of Uttar Pradesh on DBFOT basis under NHDP Phase-III NHAI/PIU-ALG/44023(O&M)/2016 18/07/2019 12/04/2016 09/06/2016
Time 11:0Hrs
1519 0 0 01/12/2015 04/03/2016 04/03/2016
Time 15:0Hrs
-
©2014 | All right Reserved