Projects

AE (Version 2) Projects

S.No Project Name Tender No Tender Date Tender Start Date Tender End Date Document
1 sdsasf sadasdasdasda32234234 01/07/2024 01/07/2024 18/07/2024
Time 15:0Hrs
2 Consultancy Services as Authority Engineer for Supervision of Construction of Intermediate Lane Road with Hard Shoulder from Design Ch 0-000 to Ch 53-040 (Total Design Length -53.04 Km) of Tato to Manigong Section of NH-913 (Frontier Highway) in the State of Arunachal Pradesh on EPC mode. NHIDCL/Ar.Pr./Tato-Manigong//NH-913/AE 05/06/2024 05/06/2024 18/06/2024
Time 15:0Hrs
3 kjfhhdgfgjhshgdfj 76475363 26/03/2024 04/03/2024 29/07/2024
Time 15:0Hrs
4 Consultancy Services as Authority Engineer for Supervision of Construction Four laning of N. Kawnpui (N. Mualvum)-Mualkhang via Khamrang Village - Sairang section (Pkg7) (Pkg 8) of NH-6 Silchar-Vairengte - Sairang road in the state of Mizoram NHIDCl/Miz/AE/NH6/VS78/23-24 29/12/2023 31/01/2024 09/02/2024
Time 15:0Hrs
5 Consultancy Services as AE for Supervision of Construction of Twin Tube Uni-directional Aizawl Bypass Tunnel of 2.5 km and its approaches of 2.1 km from km 10.600 to km 15.200 (P-2) on Sairang - Phaibawk section of NH-6 in the Mizoram NHIDCl/Miz/AE/NH06/ABTP2/23 26/12/2023 17/01/2024 29/01/2024
Time 15:0Hrs
6 Consultancy services for Authoritys Engineer for Supervision of Widening to 4L PS of NH 548B from Km 118.450 Near Shirguppi to Km 128.450 Near Ankali in the State of Karnataka RW/BNG /NH-548B/Km.118.450-128.450/ AE/17/2022 09/01/2024 09/01/2024 05/02/2024
Time 17:0Hrs
7 IE Services for (i)Construction work of 4-laning of Budhni-Shahganj bypass section of NH-146B from km73.750-km102.000 (Pkg-III) and (ii)Construction work of 4-laning of Shahganj bypass to Badi sec-2 of NH-146B km102.000-km142.357 under NH(O) MP NHAI/HQ/MP/Budhni-Badi/IE/PKG-3&4/2023 08/01/2024 03/01/2024 05/02/2024
Time 15:0Hrs
8 Independent Engineer Services for Six laning with both sides Service Road of Ayodhya Nagar Bypass of Bhopal City Section of NH-46 from Design Km 0.000 near Ashram Tiraha to Km 16.439 at Ratnagiri Tiraha (Design Length 16.439 Km) under NH(O) in the state of MP on HAM. NHAI/HQ/MP/Ayodhya Nagar Bypass/2024 05/01/2024 03/01/2024 05/02/2024
Time 11:0Hrs
9 Consultancy Services as Independent Engineer Services during Operation and Maintenance stage of 4Laning of Devihalli Hassan Section From Km.110.00 to 189.500 Of NH 48 New NH No.75 Excluding A New 2 Lanes With Paved Shoulders Bypass For Channarayapatna Town And Widening Of Existing Hassan Bypass To 2 Lanes With Paved Shoulder In The State Of Karnataka On DBFOT BASIS NHDP PHASE IIIA NIT No.24/NHAI/RO-BNG/23019/Tender/2023-24 dated 02.01.2024 02/01/2024 02/01/2024 30/01/2024
Time 15:0Hrs
10 Independent Engineer Services for supervision of 4 lane with paved shoulders from Design Ch 0/000 to Design Ch 43/800 in Belgaum – Hungund – Raichur section of NH748A in Karnataka on HAM under NH(O) [Project Length – 43.80 Kms] – (Package-1) NHAI/KNT/2024/BHR/Pkg-1/IE 02/01/2024 01/01/2024 14/02/2024
Time 11:0Hrs
11 Independent Engineer Services for supervision of 4 Lane with Paved Shoulders from Design Ch 43/800 to Design Ch 89/900 in Belgaum – Hungund – Raichur Section of NH748A in Karnataka on HAM Under NH(O) [Project Length – 46.100 kms] – (Package-2) NHAI/KNT/2024/BHR/Pkg-2/IE 02/01/2024 01/01/2024 14/02/2024
Time 11:0Hrs
12 Consultancy Services For Authoritys Engineer For Supervision of Construction of Morena bypass, Ambah bypass and Porsa bypass (Total length 27.16km) and Ater realignment to Bhind bypass (Total length 21.50 km) Section of NH-552 Ext. to Two lane with paved shoulder configuration in the state of MP on EPC MODE 2023-MoRTH-787790-1 03/01/2024 29/12/2023 12/02/2024
Time 17:30Hrs
13 Consultancy Services for Authoritys Engineer for Supervision of Widening and Strengthening to 2L and PS including LA from Km 318.970 to km 353.450 (Balikuda -Mulakani section) of NH-55 under NH(O) in Annual Plan 2022-23 in the State of Odisha 01-ROBBSR-2023-24/AE 06/12/2023 29/12/2023 22/01/2024
Time 15:0Hrs
14 Consultancy Services for Authority’s Engineer for Supervision of Construction of Elevated Structure at Raniwara Circle Sanchore town of Gandhav – Sanchore Section of NH-68 in the state of Rajasthan on EPC mode under NH(O) Scheme NHAI/Rajasthan/Sanchore Elevated/2023/AE 08/01/2024 28/12/2023 05/02/2024
Time 11:0Hrs
15 Independent Engineer Services for supervision of 4L of Belgaum-Hungund-Raichur from Design Ch 89/900 to Ch 136/100 of NH-748A in the state of Karnataka on Hybrid Annuity Mode under NH(O) [Project Length – 46.200 kms] (Package-3) NHAI/KNT /2023/ BHR/Pkg-3/IE 02/01/2024 26/12/2023 09/02/2024
Time 11:0Hrs
16 Independent Engineer Services for supervision of 4 Lane with Paved Shoulders from Design Ch 136/100 to Design Ch 182/300 in Belgaum – Hungund – Raichur Section of NH748A in Karnataka on HAM under NH(O) [Project Length – 46.200 kms] (Package-4) NHAI/ KNT/2023 /BHR/ Pkg-4/IE 02/01/2024 26/12/2023 09/02/2024
Time 11:0Hrs
17 test test222 26/12/2023 25/12/2023 31/12/2029
Time 15:0Hrs
18 IE Services during O & M Period for 6 laning of Hapur Bypass to Moradabad Section including Hapur Bypass from Km 50.000 (Design Ch. 50.000) to Km 148.277 (Design Ch. 149.867) of NH-24 (New NH-9) and a stretch of NH-24 (New NH-9) from Km 148.277 (Design Ch. 149.867) to Km 149.250 (Design Ch. 150.840) (including existing flyover) in the state of Uttar Pradesh on DBFOT (Toll) under NHDP Phase-V NHAI/IE/O&M/Hapur -Moradabad 27/12/2023 23/12/2023 06/02/2024
Time 11:0Hrs
19 SC of 4 laning of Bar Bilara Jodhpur section on NH 112 from Km 0.000 to Km 111.000 Existing chainage in the state of Rajasthan under EPC mode NHAI/11011/ Tenders-ROJ/SC-BBJ/2nd call 28/12/2023 22/12/2023 06/02/2024
Time 11:0Hrs
20 Widening to 4 Lane Paved Shoulder from Km. 111.500 to 148.088 on NH 69 Old NH 206 Honnavar Chittoor Section in the State of Karnataka On EPC mode RW/BNG /NH-69/Km.111-148.08/AE/15 21/12/2023 21/12/2023 25/01/2024
Time 15:0Hrs
21 Consultancy services for Authority’s Engineer for Supervision of Widening to Two Lane with Paved Shoulders from KB Cross to Chunchanahalliie., Design Ch. 485 240 Km (Existing Km 494.000) to Design Ch. 523 393 Km (Existing km 533.152) & From Design Ch. 530 393 (Existing Km 540.175) to Design Ch. 534 476 (Existing Km 544.200) at Nelligere of NH-150A in the State of Karnataka on EPC Mode. (Job No. NH-150A-KNT-2022-23-977) RW/BNG /NH-150A/Km.494-533 540 544/AE/66/2023 20/12/2023 20/12/2023 29/01/2024
Time 15:0Hrs
22 Consultancy Services For Authority’s Engineer For Supervision Of “Widening of existing 2 lane to 4 lane with paved shoulder from design Km.25.15 to km. 56.70 (except km. 52.70 to 53.50) of NH-169 (Nellisara Camp to Thirthalli) of NH-169 on Shimoga-Mangalore section in the state of Karnataka on EPC Mode”. RW/BNG /NH-169/Km.25.15-56.70/AE/1 20/12/2023 20/12/2023 23/01/2024
Time 15:0Hrs
23 Consultancy Services for Authority Engineer for Supervision of Widening To 2l Ps From Km 71 To 104 Sarjapur To Pattadkallu On Bhanapur To Gaddanakeri Section Of NH 367 In The State Of Karnataka On EPC Mode RW/BNG/NH-367/Km. 71-104/AE/25/2023 20/12/2023 20/12/2023 22/01/2024
Time 15:0Hrs
24 Widening to Four Lane with Paved Shoulders from Design Chainage Km. 27.780 SH Chainage Km. 459.500) to Km. 57.320 SH Chainage Km. 489.040 Belur to Hassan section of NH - 373 in the State of Karnataka in EPC mode RW/BNG /NH-373/Km.27.78-57.32/AE/25 /2023 19/12/2023 19/12/2023 25/01/2024
Time 15:0Hrs
25 Consultancy Services For Authority Engineer For Supervision Of Widening To 2l Ps From Km 0 00 To 37 850 Except 24 45 To 27 20 Of NH 766c Byndoor Ranebennur Section In The State Of Karnataka on EPC mode RW/BNG /NH-766C/Km.0-37.85/AE/26/2 19/12/2023 19/12/2023 23/01/2024
Time 15:0Hrs
26 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF Widening to Four Lane with Paved Shoulders from Design Chainage Km. 27.780 (SH Chainage Km. 459.500) to Km. 57.320 (SH Chainage Km. 489.040) (Belur to Hassan section) of NH - 373 in the State of Karnataka in EPC mode under NH(O) Annual Plan 2022-23 (Package-II) (Job No. NH-373-KNT-2022-23-988) RW/BNG /NH-373/Km.27.78-57.32/AE/25 /2023 19/12/2023 19/12/2023 25/01/2024
Time 15:0Hrs
27 Consultancy Services for Authoritys Engineer for Supervision of Widening to 4L PS of NH 548B from Km 80.000 Near Murgundi To Km 140.200 Near Chikkodi Excluding Length from Km. 118.450 to Km. 128.450 in the State of Karnataka RW/BNG /NH-548B/Km.80 -140.2/12/2022 16/12/2023 16/12/2023 29/01/2024
Time 15:0Hrs
28 Consultancy Services of Authority Engineer for Supervision of Project during O and M period of Two laning with paved shoulders of Biharsharif – Barbigha – Mokama Section of NH – 82 from Desing Chainage km 94.478 (Existing chainage Km 119.320 of NH -31) to Km 149.053 (exiting Chainage km 149.020 to NH – 82) (Total Design length – 54.575 km) in the state of Bihar 230/RO-PATNA/NHAI/2023-24 20/12/2023 16/12/2023 29/01/2024
Time 11:0Hrs
29 Consultancy services for Authority Engineer widening to 2 lane with hard shoulder configuration of Kalimandir (Chainage 133 PT 078) and Lipulekh (Chainage 159 PT 476) road of NH-09 under Project Hirak of BRO in the state of Uttarakhand 90004/KLM-LIPU/AE Appt/EPC 15/12/2023 14/12/2023 29/01/2024
Time 18:0Hrs
30 IE services for Four laning between Existing Km 55.000/Design km 59.000 (Kuru) to Existing Km 96.470/Design km 97.600 (Udaipura) on NH75 (New NH39) Sec I in the State of Jharkhand on HAM mode 2023-NHAI-177619-1 19/12/2023 13/12/2023 29/01/2024
Time 11:0Hrs
31 Consultancy services of Authority’s Engineer for Long Term Rectification of MoRT&H identified Blackspots (17 no’s) & Removal of 2 At-Grade Junctions and allied works on existing 4/6-Lane Hyderabad-Vijayawada section of NH-65 from Km.40.000 to Km.221.500 in the state of Telangana on EPC mode NHAI/Tech/TS/17BS 2VUPs/AE/2023 13/12/2023 12/12/2023 10/01/2024
Time 11:0Hrs
32 SC Services during OnM stage of 4 laning of Jaipur Reengus section of NH 11 (New NH 52) from Km. 246.300 to Km. 298.075 in the State of Rajasthan (Total Length 51.842 Kms) NHAI/11011/12/ Tenders-ROJ/SC-JR/01 26/12/2023 12/12/2023 18/01/2024
Time 11:0Hrs
33 IE Services during OnM stage of Reengus Sikar Section of NH 11 (New NH 52) and Salasar Nagaur Section of NH 65 (New NH58) in the State of Rajasthan NHAI/11011/12/ Tenders-ROJ/IE-RS-SN/02 28/12/2023 12/12/2023 24/01/2024
Time 11:0Hrs
34 Consultancy services as Independent Engineer during Operation and Maintenance for the projects of NH 206 on HAM under Bharathmala Pariyojana in the state of Karnataka NIT No.21/NHAI/RO-BNG/24016/Tender/2023-24 dated 11.12.2023 15/12/2023 11/12/2023 18/01/2024
Time 11:0Hrs
35 Consultancy Services for AE for the work of Construction and widening of 2 lane with paved shoulders from existing ch 0.000 to 56.600 and design ch from 0.000 to 51.000 (total length is 51 km) on RKCTC NH(701) road Project Beacon in the UT of JK RO/JK/RKCTC/AE/W01/PKG1/BEACON 13/12/2023 11/12/2023 11/01/2024
Time 15:0Hrs
36 Consultancy Services for AE for supervision of Construction of Realignment Between Pandrass Pashkyum Net Length is 27.10 km on road Zozila Kargil Leh NH 01 to 2 lane specifications under Project Vijayak BRO in the UT of Ladakh on EPC Mode RW/JK/W(57)/BRO/Ladakh/2023 08/12/2023 08/12/2023 08/01/2024
Time 15:0Hrs
37 IE Services during OM period of 5 years for Narnaul Bypass Crossing to Pacheri Kalan 11.30 Km Package-I.Ateli Mandi to Narnaul Section of NH-11 from Km.43.445 to Km.56.900 Package-II.Ateli Mandi as Feeder Route in Haryana on HAM(Pkg-III) 2023-NHAI-177159-1 27/12/2023 08/12/2023 22/01/2024
Time 11:0Hrs
38 Consultancy services for Authority’s Engineer for Supervision of Construction of 2 Laning with Hard Shoulder of Peren – Dimapur section on NH – 129A from Design (i) Km 146.208 to Km 163.592 (Length – 17.384 Km) (Pkg-III) (ii) Km 163.592 to Km 173.850 (Length – 10.258 Km) (Pkg-IV) (iii) Km 173.850 to Km 190.850 (Length – 17.00 Km) (Pkg-V) in the state of Nagaland on EPC mode under NH(O)-TSP. NHIDCL/AE/PEREN-DIMPAUR-III IV V/2022-23 13/12/2023 07/12/2023 26/12/2023
Time 15:0Hrs
39 Consultancy services for Authoritys Engineer for supervision of the work of Up gradation to 2 lane with paved shoulder from Neechli Oden (Nathdwara) at design km 88.800 (existing km 55.95) to Bhatewar at Design km 142.028 (existing km 0.00) of NH-162E in the state of Rajasthan on EPC Mode. NIT/JAIPUR/03/23 13/12/2023 05/12/2023 05/01/2024
Time 11:0Hrs
40 Consultancy Services for assisting Authoritys Engineer for supervision of Construction of Bypass Road to Adoni town connecting NH-167 Hagari-Jadcherla Road from Km.62/700 to Km.71/400 in Kurnool District in State of Andhra Pradesh on EPC mode 2022-23(2nd call) 39/AAE/SE,NH,ATP/2023-24,dt.4.12.2023 12/12/2023 05/12/2023 20/12/2023
Time 15:0Hrs
41 Independent Engineer Services for O&M Period for the work 4 lane Bridge across river Kosi and including its Approaches & Guide Bund & Afflux Bund from km. 148.550 to Km. 159.185 in the state of Bihar on Annuity Basis on NH-27(old NH-57) 229/RO-PATNA/NHAI/2023-24 06/12/2023 05/12/2023 20/12/2023
Time 11:0Hrs
42 Independent Engineer Services for O&M Period for the work 4 lane Bridge across river Kosi and including its Approaches & Guide Bund & Afflux Bund from km. 148.550 to Km. 159.185 in the state of Bihar on Annuity Basis on NH 27 (old NH -57). 229/RO-PATNA/NHAI/2023-24 07/12/2023 05/12/2023 20/12/2023
Time 11:0Hrs
43 Consultancy Services for assisting Authority’s Engineer for supervision of Rehabilitation and Upgradation of existing road to two lane with paved shoulder configuration from Km 22/300 (Mudireddypalli) to 58/635 (Kadapa Nellore Border section) of NH167B in the state of Andhra Pradesh under Plan 2021 22 on EPC Mode. NIT No. 38/SE,NH,ATP/2023-24, Dt. 27.11.2023 19/12/2023 05/12/2023 04/01/2024
Time 15:0Hrs
44 Independent Engineer Services during Operation & Maintenance period of Lalitpur-Sagar-Lakhnadon (existing Km 99 005 to Km 415 089) on NH-44 under TOT in the state of Uttar Pradesh and Madhya Pradesh 2023-NHAI-176576-1 04/12/2023 04/12/2023 04/01/2024
Time 11:0Hrs
45 Supervision Consultancy (SC) Services during O&M stage of 4-Laning of Sultanpur to Varanasi Section of NH-56 (Package-I and II) including Supervision Consultant of construction work related to the Sultanpur Varanasi section of NH 56 Package- I and II NHAI/PIU/VNS/SC/NH-56/2023-24/3/ 06/12/2023 04/12/2023 09/01/2024
Time 11:0Hrs
46 Consultancy services for Authoritys Engineer for supervision of the work of Up gradation to 2 lane with paved shoulder from Neechli Oden (Nathdwara) at design km 88.800 (existing km 55.95) to Bhatewar at Design km 142.028 (existing km 0.00) of NH-162E in the state of Rajasthan on EPC Mode. NIT/JAIPUR/03/23/2741 11/12/2023 01/12/2023 05/12/2023
Time 11:0Hrs
47 Consultancy Services for Supervision Consultants of Operation Maintenance of the (i) Chennai Bypass (NH-32) from Km 00.000 to Km 32.600 and (ii) Chennai – Tada section of NH-5 from Km.11.000 to Km.21.400 in the State of Tamil Nadu NHAI/ROC/SC/2022-23/156 16/12/2023 01/12/2023 28/12/2023
Time 17:0Hrs
48 Consultancy Services for preparation of Feasibility Study and Detailed Project Report and providing preconstruction services for Rehabilitation / Upgradation of existing road to 2lane/4lane with paved shoulders configuration of Murum-Alur-Waghdari-Akkalkot-Nagansur-Tolnur-Maharashtra State Border NH 548B Km 263 00 (Dalimb Junction) to 344 562 (Maharashtra State Border) (Length = 81.562 km Approx)- District Solapur in the State of Maharashtra. 2023-MoRTH-782648-1 02/12/2023 25/11/2023 09/12/2023
Time 17:55Hrs
49 Supervision Consultancy (SC) services during Operation and Maintenance (Total Length 80.522 Km) period of Six Laning of Gorhar to Barwa Adda section of NH-2 from Km 320.810 to Km 400.132 in the state of Jharkhand (2nd call) NHAI/RO/RNC/JH/2023-24/10-1 30/11/2023 24/11/2023 18/12/2023
Time 11:0Hrs
50 Consultancy services for Authority engineer of Construction of balance work of two number of interchange at Jaipur ring road including supervision for Operation and maintenance of six laining of Jaipur ring road (km 300 to km 46700) on EPC mode 2023-NHAI-175451-1 23/11/2023 23/11/2023 10/01/2024
Time 11:0Hrs
51 Consultancy services for Authority Engineer for Supervision of Improvement/ Construction of 2-lane with Hard shoulder of Askote – Lipulekh Road from Tawaghat village to Budhi Village (Design Km 56 PT 935 to Km 95 PT 748) and from end of Tunnel Portal to Kali Mandir (Design Km 113 PT 828 to Km 133 PT 078) Total Design Length = 58 PT 063 km under Project Hirak of BRO in the State of Uttarakhand under Bharatmala Pariyojna on EPC Mode 90002/T-K/AE Appt/EPC 23/11/2023 23/11/2023 15/01/2024
Time 18:0Hrs
52 Consultancy Services For Authority Engineer For Supervision Of Widening to 2 lane with paved shoulder from Km 0000 to Km 102310 Design Chainage of NH 548B ie Murrum Maharashtra border IB circle Bijapur Section in the State of Karnataka on EPC mode RW/BNG /NH-548B/km 0.0-102/ Authority Engineer/16 22/11/2023 22/11/2023 05/01/2024
Time 15:0Hrs
53 Consultancy Services for Authoritys Engineer for Supervision of Construction of Paderu bypass of 2 lane with paved shoulder configuration on NH 516E in the State of Andhra Pradesh under NH O on EPC mode MoRTH/PIU/VSKP/PaderuBypass 01/12/2023 21/11/2023 04/01/2024
Time 17:0Hrs
54 Supervision Consultancy Services (SC) for Supervision of Operation and Maintenance of Anandapuram – Visakhapatnam – Anakapalle (Greater Visakhapatnam Municipality Limits) from Km.682.980 to Km.741.256 of NH-16 in the State of Andhra Pradesh 2023-NHAI-175289-1 21/11/2023 21/11/2023 08/01/2024
Time 16:30Hrs
55 Consultancy Services as Independent Engineer Services during Operation and Maintenance stage of Four laning of Bellary Byrapura section of NH-150A from Km.266.820 to Km.277.690 and Km.278.690 to Km.308.550 on HAM mode under Bharatmala Pariyojna in the state of Karnataka NIT No.18/NHAI/RO-BNG/17017/Tender/2023-24 dated 20.11.2023dated 22.06.2023 21/11/2023 20/11/2023 19/12/2023
Time 15:0Hrs
56 selection of Authoritys Engineer for project supervision of Work of widening to 4 lane rigid pavement configuration from km 90.00 to km 100.800 of NH96(km42.00 tokm 53.300 as per new NH330)design length of 11.300 km under EPC mode in the State of UP 3589/170YATA-NH Circle/23-24 dt.17.11.2023 25/11/2023 17/11/2023 26/12/2023
Time 11:0Hrs
57 Consultancy Services for Authoritys engineer for Construction of Ramnagar ByPass on NH116B and Construction of Raniganj ByPass on NH60 and Construction of Dubrajpur ByPass on NH60. Bid Pkg No 04/2023-24 of SE NHC-I 01/12/2023 10/11/2023 05/02/2024
Time 15:0Hrs
58 Authority Engineer Services for the project of Consultancy services for Authority’s Engineer for Supervision of A)Providing Service Road on Panvel Mahad Panji Road NH 66 Km. 406/030 to 450/170, Road Safety Panvel Mahad Panji Road NH 66 Km. 406/030 to 450/170 to four lane with paved shoulder & Construction of Foot Bridge near New English High school And Jr. Collage, Kasal Tal. Kankavli, Dist. Sindhudurg, at Ch.422/600 (Design Ch 254.140) (Kalmath - Zarap Section) in the state of Maharashtra.on EP No. 02/NHD/AB/TC/2022-23/4636 26/11/2023 09/11/2023 02/01/2024
Time 17:30Hrs
59 Independent Engineer services for Construction of Salempur bypass to four lane with paved shoulder configuration from km 64.000 of NH-727A (Km 171.00 of Sonauli Balia Marg, old SH-01, near Mahadahan Chauraha) to km 61.500 of NH-727B (Km 178.500 of Sonauli Balia Marg, old SH-01, near Ahirauli Village),design length of 14.700 km under Hybrid Annuity Mode (HAM) in the State of Uttar Pradesh. CE-RO/LKO/NH(O)/24/NH-Salempur bypass(NH-727Aand727B)/2022-2023/IE Dated 09.11.2023 10/11/2023 09/11/2023 17/01/2024
Time 11:0Hrs
60 Independent Engineer (IE) Services for Tolling Operation Maintenance and Transfer of Allahabad Bypass Section of NH-19 (Old NH-02) from km 628-753 to km 713-215 in the state of Uttar Pradesh (TOT Bundle-11) NHAI/TOT-11/IE/UP/Allahabad Bypass/2023/efile-189843 08/11/2023 08/11/2023 12/12/2023
Time 11:0Hrs
61 Consultancy Services for Authority Engineer for Supervision of Project during OandM period of Two Laning with paved shoulder of Chhapra-Gopalganj section of NH–85 from km 0 to Km 93.500 Existing Chainage and Km 0 to Km. 94.258 Design Chainage Total Design Length 94.258Km in the State of Bihar 223/RO-PATNA/NHAI/2023-24 15/11/2023 08/11/2023 21/12/2023
Time 11:0Hrs
62 Independent Engineer services during Operation and Maintenance stage of 4 Laning of Walayar Vadakkencherry Thrissur to Angamali section and Angamali to Edappally section of NH 544 in the State of Kerala RO Kerala/PIUPKD/IE/KL 01 02/2163 16/11/2023 07/11/2023 07/12/2023
Time 15:0Hrs
63 CONSULTANCY SERVICES FOR AE OF THE WORK OF WIDENING AND STRENGTHENING TO 2 LANE WITH PS FROM EX CH 56.720 TO 100.820 AND DESIGN CH 62.600 TO 106.360 (TOTAL LENGTH is 43.760 KM) SBU NH 1 ON THE UT OF JAMMU AND KASHMIR UNDER BEACON BRO ON EPC MODE. RW/CH/W(34)/AE/JK/2023 11/11/2023 07/11/2023 09/12/2023
Time 17:0Hrs
64 Consultancy services for Authoritys Engineer for Supervision of Construction of Balrampur bypass with 2 lane flexible pavement configuration from Km. 223.000 of NH330 to Km.328.300 of NH730,design length of 20.515km under EPC mode in the State of UP 3476/252C(3)-NHCircle/2023 03.11.2023 09/11/2023 06/11/2023 06/12/2023
Time 11:0Hrs
65 Consultancy Services for Authority’s Engineer for Supervision of 4-laning road of Dimapur-Kohima Package- I,II, III, in the state of Nagaland NHIDCL/AE/DK-Package-I II III 06/11/2023 03/11/2023 04/01/2024
Time 16:0Hrs
66 Consultancy Services for Authoritys Engineer for Supervision of Rehabilitation and Upgradation from 2 lane to Four lane of Muddanur to B. Kothapalli section of NH 716G from Km. 0.000 to Km. 56.500 in the State of Andhra Pradesh on EPC mode RWNH12014/30/21-AP/Z-III/741AE 13/11/2023 03/11/2023 25/01/2024
Time 17:0Hrs
67 Consultancy Services for Authoritys Engineer for Supervision of Widening and Strengthening to four lane of Gorantla Hindupur section of NH-716G from km 120.300 to km 153.880 Package 03 EPC mode in the State of Andhra Pradesh Annual Plan 2022 23 RWNH-12014/4/2022AP/Z-III754AE 13/11/2023 03/11/2023 25/01/2024
Time 17:0Hrs
68 Independent Engineer services for Development of 4 lane Economic Corridor from Kharagpur to Chandrakona-Ghatal Road Crossing section Km 0.000 to Km 41.000 of NH 116A in the state of West Bengal under Bharatmala Pariyojana (Package-I) in the State of West Bengal on Hybrid Annuity Mode NHAI/WB/Kharagpur-Moregram/Pkg1/IE/2023 14/11/2023 02/11/2023 15/01/2024
Time 15:0Hrs
69 Independent Engineer services for Development of 4 lane Economic Corridor from Chandrakona-Ghatal Road Crossing to Bowaichandi section Km 41.000 to Km 89.814 of NH 116A (Package-2) in the state of West Bengal under Bharatmala Pariyojana on Hybrid Annuity Mode NHAI/WB/Kharagpur-Moregram/Pkg2/IE/2023 17/11/2023 02/11/2023 15/01/2024
Time 15:0Hrs
70 Independent Engineer services for Development of 4 lane Economic Corridor from Guskara-Katwa Road to Mayurakshi Bridge Approach section Km 133.000 to Km 180.000 of NH 116A (Package-4) in the state of West Bengal under Bharatmala Pariyojana on Hybrid Annuity Mode NHAI/WB/Kharagpur-Moregram/Pkg4/IE/2023 20/11/2023 02/11/2023 15/01/2024
Time 15:0Hrs
71 Independent Engineer services for Development of 4 lane Economic Corridor from Before Mayurakshi Bridge Approach to Moregram section Km 180.000 to Km 230.957 of NH 116A (Package-5) in the state of West Bengal under Bharatmala Pariyojana on Hybrid Annuity Mode. NHAI/WB/Kharagpur-Moregram/Pkg5/IE/2023 30/11/2023 02/11/2023 15/01/2024
Time 15:0Hrs
72 Consultancy Services for Independent Engineer services for Operation and Maintenance of 8-laning of section of NH-44 from Mukarba Chowk at Km. 15.500 to Panipat at Km. 86.000 on BOT (Toll) basis in the States of Delhi and Haryana. 2023-NHAI-172922-1 24/11/2023 02/11/2023 29/11/2023
Time 15:0Hrs
73 Engaging consultancy service for proof checking assisting supervision quality control of work for widening and strengthening of Dhoraji Jamkandorana Kalavad road of NH927D btn km 0.0 to 58.115 to two lane with paved shoulder configuration on EPC mode 18 of 2023/24 30/10/2023 31/10/2023 23/11/2023
Time 12:0Hrs
74 CS for AE for Supervision of “Construction of Greenfield Road connecting North and south industrial cluster of Khandaleru Creek near Krishnapatnam port at Thamminapatnam to Narikellapalle, Part-I from Ch 0.000 to 14.650, and extension of Dedicated port Road on NH-67, Part-II from Ch 18.000 to 19.300 in the state of Andhra Pradesh on EPC Mode under Bharatmala Pariyojana Phase-I (2nd Call). 2023-NHAI-172162-1 30/10/2023 30/10/2023 28/11/2023
Time 11:0Hrs
75 CS for AE for Supervision of Construction of 4L Greenfield Highway from Chatrapur on NH16 to Gopalpur port (Km 0.000 to km 4.500) and upgradation to 6L elevated configuration of existing NH16 (Km 429.025 to km 430.990) under Bharatmala Pariyojana in Odisha State on EPC Mode (2nd Call) 2023-NHAI-172150-1 30/10/2023 30/10/2023 28/11/2023
Time 11:0Hrs
76 IE Services for four laning of existing 2-lane stretch from Bamni (Design km 19-000) to MH/TG Border (Design km 51-985) (Design Length – 32-985 km) section of NH-930D in the State of Maharashtra on Hybrid Annuity Mode under NH(O) 2023-NHAI-172571-1 18/11/2023 30/10/2023 14/12/2023
Time 11:0Hrs
77 Consultancy services of Authority s Engineer for Widening of Edamon Kollam section Edamon to Kollam of NH-744 to 2 lane with paved shoulder in the state of Kerala on EPC mode NHAI/Kerala/Edamon-Kollam/AE/2023 24/11/2023 27/10/2023 12/12/2023
Time 15:0Hrs
78 Independent Engineer Services during Operation & Maintenance period of Lucknow-Raebareli Section of NH-24B (New NH-30) from km. 12.700 to km. 82.700 on DBFOT (Annuity) and TOT in the State of U.P. 2023-NHAI-172063-1 20/11/2023 25/10/2023 28/11/2023
Time 11:0Hrs
79 Consultancy services for Authority’s Engineer for Supervision of Construction of 2 Laning with Hard Shoulder of Peren – Dimapur section on NH–129A (i) Design Km 146.208 to Km 163.592 (Length – 17.384 Km) (Pkg-III) (ii) Design Km 163.592 to Km 173.850 (Length – 10.258 Km) (Pkg-IV) (iii) Design Km 173.850 to Km 190.850 (Length – 17.00 Km) (Pkg-V) in the state of Nagaland on EPC mode under NH (O)-TSP NHIDCL/NagalandAE/PD-III,IV,V/2023 06/11/2023 23/10/2023 20/11/2023
Time 15:0Hrs
80 Independent Engineer services for Development of 4 lane Economic Corridor from Bowaichandi to Guskara-Katwa Road section Km 89.814 to Km 133.000 of NH 116A (Package-3) in the state of West Bengal under Bharatmala Pariyojana on Hybrid Annuity Mode NHAI/WB/Kharagpur-Moregram/Pkg3/IE/2023 10/11/2023 19/10/2023 15/01/2024
Time 15:0Hrs
81 Supervision Consultant (SC) Services during operation and Maintenance Period for Two lane with paved shoulder of Padhi-Dahod section of NH-113 (New NH-56) from Km.180.00 to Km.267.00 (Design length 85.588 ) in the state of Rajasthan and Gujarat on EPC mode 2023-NHAI-171104-1 25/10/2023 17/10/2023 23/11/2023
Time 16:0Hrs
82 Consultancy services of Authority’s Engineer for Rectification of 12Nos Blackspots Accident spots in the stretch of Walayar - Angamaly Section of NH-544 and 4 Nos Blackspots Accident spots in the stretch of Thiruvananthapuram Bypass section of NH-66 under Annual Road Safety plan for 2023-2024 in the state of Kerala on EPC mode 2023-NHAI-170965-1 02/11/2023 16/10/2023 30/11/2023
Time 11:30Hrs
83 Authority Engineer Services during O&M Period for Four laning of Bakhtiyarpur-Mokama section of NH-31 from Km 153.300 to Km 197.900 (Design chainage) and (Existing Chainage Km 153.300 to Km 204.741 of NH-31), Total Design Length 44.6 Km in the State of Bihar on EPC Mode 221/RO-PATNA/NHAI/2023-24 18/10/2023 16/10/2023 23/11/2023
Time 11:0Hrs
84 Consultancy Services of Authority Engineer during O&M Period of Four Laning of Koilwar to Bhojpur of NH-30 & 84 from Existing Chainage Km. 137.375 of NH-30 to Km. 27.370 of NH-84 (Design Chainage Km. 33.250 to Km. 77.100) (Design Length- 43.850 Km.) in the State of Bihar under NHDP Phase-III on EPC Mode 222/RO-PATNA/NHAI/2023-24 18/10/2023 16/10/2023 23/11/2023
Time 11:0Hrs
85 Independent Engineer Services for O&M Period for the work of 4 lane Muzaffarpur – Darbhanga – Purnea section of NH 57 (km. 0.00 to km. 148.550 and 159.357 to km. 287.860) (BOT Annuity section) of NH – 57 on OMT Basis in the state of Bihar. (OMT Pkg no. 20) 219/RO-PATNA/NHAI/2023-24 18/10/2023 13/10/2023 23/11/2023
Time 11:0Hrs
86 Independent Engineer Services during O&M Period for 2 laning of Muzaffarpur – Sonbarsa Section of NH – 77 from Km. 2.800 to Km. 89.000 in the state of Bihar under NHDP Phase - III on Design, Built, Finance, Operate and Transfer (DBOT) Annuity Basis. 220/RO-PATNA/NHAI/2023-24 18/10/2023 13/10/2023 23/11/2023
Time 11:0Hrs
87 Independent Engineer Services for O&M Period for the work 4 laning of Kotwa – Mehsi - Muzaffarpur Section of NH – 28 from Km. 440.00 to Km. 520.00 in the state of Bihar 217/RO-PATNA/NHAI/2023-24 17/10/2023 13/10/2023 23/11/2023
Time 11:0Hrs
88 Independent Engineer Services for O&M Period for the work 4 lane Bridge across river Kosi and including its Approaches & Guide Bund & Afflux Bund from km. 148.550 to Km. 159.185 in the state of Bihar on Annuity Basis. 218/RO-PATNA/NHAI/2023-24 17/10/2023 13/10/2023 07/12/2023
Time 12:0Hrs
89 CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF Work of development and construction of elevated corridor from km 38.660 to km 42.690 from Iscon Junction to Start point of approach of Sanand Flyover of NH 147 in the State Of Gujarat EPC mode NIT No. RW/NH-12014/05/2022-23-GJ/ /AE 06/10/2023 11/10/2023 04/01/2024
Time 15:0Hrs
90 SC Services during OnM stage of 2 laning with paved shoulders of Tonk Sawaimadhopur Section from Km. 1.300 to Km. 69.750 of NH-116 in the State of Rajasthan under NHDP Phase-IV on EPC mode NHAI/11011/1/ Tenders-ROJ/SC-TS 17/10/2023 09/10/2023 30/11/2023
Time 11:0Hrs
91 SC Services for project OnM of Tanot- Jaisalmer to Jaisalmer bypass and Jaisalmer Phalodi Section of NH11 in the State of Rajasthan NHAI/11011/1/ Tenders-ROJ/SC-JS 02/11/2023 09/10/2023 06/12/2023
Time 11:0Hrs
92 SC for rojects Bheem Parasoli Gulabpura Section of NH 48 D and a Raipur Section of NH 58 (Length 54.763 Km.) NHAI/11011/1/ Tenders-ROJ/SC-BP 07/11/2023 09/10/2023 30/11/2023
Time 11:0Hrs
93 IE Srvices during OnM stage of Bikaner Phalodi section on BOT (Toll) basis in the State of Rajasthan (Length 159.17Km) NHAI/11011/Tenders-ROJ/IE-BP/ 17/11/2023 06/10/2023 21/11/2023
Time 11:0Hrs
94 IE Srvices during OnM stage of 2LPS of Khajuwala Poogal section and Poogal Dantour Jaggasar Gokul Godu Ranjeetpura Charanwala Naukh Bap section of NH911 on Hybrid Annuity Mode under Bharatmala Pariyojana in the State of Rajasthan. NHAI/11011/1/Tenders-ROJ/IE-KP 17/11/2023 06/10/2023 21/11/2023
Time 11:0Hrs
95 Consultancy Services as AE for Supervision of Widening and Upgradation to two lanes with paved shoulders road from Tamenglong to Mahur NH-13 Package - 7 and 8 on EPC mode in the State of Assam NHIDCL/Assam/AE /Tamenglong-MahurPkg-7&8/2023 13/10/2023 04/10/2023 30/10/2023
Time 15:0Hrs
96 Consultancy services for Authority’s Engineer for Supervision of work of Rehabilitation and Up-gradation to two-lane with paved shoulder configuration from Km. 0.000 to Km. 7.800 and km. 35.400 to Km.52.345 (Design length - 24.745 Km. except, Bihar portion) of NH-727B (Tamkuhiraj to Bihar Border and Bihar Border to Majhauli) on EPC mode in the State of Uttar Pradesh. CE-RO/LKO/NH(O)/19/NH 727B/2022-23/AE Dt.03.10.23 06/10/2023 03/10/2023 20/11/2023
Time 11:0Hrs
97 SC Services during OnM stage of 2 laning with paved shoulders of Jhalawar Rajasthan M.P.Border Section of NH 12 (New NH 52) from Km. 346.540 to Km. 408.700 in the State of Rajasthan NHAI/11011/2/ ROJ/SC-JMB/2ndcall 07/11/2023 30/09/2023 16/11/2023
Time 11:0Hrs
98 Consultancy Services for Authoritys Engineer for Supervision of Construction of Kasrawad bypass, Selani bypass, Khargone bypass and Bistan bypass (Total length 31.950) Section of NH-347C to 2lane with PS configuration in the state of Madhya Pradesh on EPC 771491 15/10/2023 29/09/2023 04/12/2023
Time 17:30Hrs
99 CS for AE for Balance works of Rehabilitation and Upgradation to Four laning of NH31D from Km 113/200 to Km 154/854 (Package IIA) Falakata Salsalabari Section in the State of West Bengal on Engineering Procurement and Construction (EPC) Mode NHAI/AE/Pkg(2A)/NH31D/2023/E-222310 03/10/2023 26/09/2023 25/10/2023
Time 15:0Hrs
100 Consultancy Services for assisting Authority’s Engineer for supervision of Construction of Bypass road to V Kota (Km.333/400 to 340/900) and Byreddypalli town (Km.315/900 to 318/250) to two lane with paved shoulder of NH-42 (Palamaneru Krishnagiri Boarder) in Chittoor District of Andhra Pradesh on EPC mode under Annual Plan 2022-23 NIT No.27/SE,NH,ATP /2023-24,Dt.19.9.2023 21/09/2023 25/09/2023 25/10/2023
Time 15:0Hrs
101 Supervision Consultancy (SC) services during Operation and Maintenance (Total Length 42.680 Km) period of Four Laning of Barhi - Hazaribagh section of NH-33 from Km 0.000 to Km 40.500 Including supervision of under construction 6-lane Grade Separator at Km 36.530 with LVUP at Km 36.894 including Approaches to Grade-Separator and LVUP from Km 35.840 to Km 37.240 in the State of Jharkhand NHAI/RO/RNC/JH/2023-24/11 14/10/2023 25/09/2023 26/10/2023
Time 11:0Hrs
102 Supervision Consultancy (SC) services during Operation and Maintenance (Total Length 80.522 Km) period of Six Laning of Gorhar to Barwa Adda section of NH-2 from Km 320.810 to Km 400.132 in the state of Jharkhand NHAI/RO/RNC/JH/2023-24/10 14/10/2023 25/09/2023 26/10/2023
Time 11:0Hrs
103 Consultancy Services for Authority Engineer for Supervision of REHABITATION AND UP-GRADATION TO 2-LANE CONFIGURATION OF BAGESHWAR TO KANGARCHINA ROAD FROM KM 129.600 TO KM 161.600 EXISTING CHAINAGE 136.00 TO KM 169.00 OF NH 309A IN THE STATE OF Uttarakhand 2023-MoRTH-772754-1 18/10/2023 22/09/2023 20/11/2023
Time 17:0Hrs
104 Independent Engineer Services during Operation and Maintenance period for Six Laning of Chakeri Allahabad Section of NH 2 in the state of Uttar Pradesh on Hybrid Annuity Mode 24001/1/RO-W-UP/NH-2/IE 21/09/2023 21/09/2023 21/11/2023
Time 15:0Hrs
105 Consultancy Services for Assisting Authoritys Engineer for Widening to 2 lane with paved shoulders of Nandyal to Jammalamadugu section NH167K (from Km.250/000 to 274/000) in the state of Andhra Pradesh under NH(O) under Annual Plan 2022 23. NIT No. 26/AAE/SE,NH,ATP/2023-24, Dt.02.09.2023 25/09/2023 21/09/2023 25/10/2023
Time 15:0Hrs
106 ABC 0 06/09/2023 20/09/2023 27/10/2023
Time 15:0Hrs
107 Consultancy Services for Authority Engineer for supervision of Operation and maintenance of 4-Laning of UR Section of NH1A from Km 67 to Km 89 from Km 130 to Km 151 on EPC Mode in defect liblity Period ,Construction of tunnelsviaducts at identified sliding,slip zones in design Ch 130600 to 130750 Ch 131170 to 131763 Ch 132560 to 133168 Ch 133590 to 133743 and Ch 147877 to 148715 on EPC mode in Udhampur Ramban section in the UT of Jammu & Kashmir under NHDP PhaseII 2023NHAI1680211 25/09/2023 18/09/2023 08/11/2023
Time 11:0Hrs
-
108 Independent Engineer Services during Operation & Maintenance Period for “2 laning with paved shoulder of Agra to Aligarh Section of NH-93 from km. 0.00 to km 79.00 in the State of Uttar Pradesh on DBFOT on Toll basis under NHDP Phase-IVA NHAI/PIU/AGRA/MISC/36 29/09/2023 15/09/2023 17/10/2023
Time 11:0Hrs
-
109 Consultancy Services for assisting Authority s Engineer for supervision of Widening and Strengthening of existing two lane road of bypassed reaches of Punganur town limits from Km.0.000 (design chainage) to Km.10.035 (design chainage) on NH-42 as one time improvement in the state of Andhra Pradesh under NH(O) on EPC mode under Annual plan 2022-23 NIT No.24/SE,NH,ATP /2023-24,Dt.02.09.2023 14/09/2023 15/09/2023 09/10/2023
Time 15:0Hrs
110 Consultancy Services as AE for for Supervision of Widening and Upgradation to two lanes with paved shoulders road from Tamenglong to Mahur (NH-137) (Package-9 and 10) in the State of Assam NHIDCL/Assam/AE Tamenglong -Mahur Pkg 9 and 10 /20 25/09/2023 12/09/2023 10/10/2023
Time 15:0Hrs
111 Consultancy Services for Authoritys Engineer for Supervision of Upgradation and Reconstruction of Shahpura-Dindori section of NH 45 Total length 60.88 km to Two lane with paved shoulder in the State of Madhya Pradesh on EPC mode. 756198-1 24/09/2023 09/09/2023 25/10/2023
Time 17:30Hrs
112 Consultancy Services for assisting Authority s Engineer for supervision of Construction of proposed 2-lane ROB and its approaches in lieu of existing level Crossing No.95 at Km.183/600 (railway chainage 145/500-600) of NH 205 (Km.9/6 of new NH-71) under Setu Bharatam in the State of Andhra Pradesh under NH(O) for the year 2022-23 on EPC mode 25/2023-24,dt.02.09.2023 08/09/2023 08/09/2023 09/10/2023
Time 15:0Hrs
113 Consultancy Services for Authority Engineer for Supervision of widening to 2-lane with Hard Shoulder configuration of Mana Ch. 0.00 to Mana Pass Ch. 50.987 road on NH-07 under Bharatmala Pariyojana in the state of Uttarakhand on EPC mode 2023-MoRTH-770401-1 17/10/2023 08/09/2023 14/11/2023
Time 17:0Hrs
114 Consultancy Services for assisting Authoritys Engineer for supervision of Construction of two lane ROB and its approaches in lieu of existing LC No.119 at Km 226.800 of NH205 (Km 52.688 of New NH71) under Setu Bharatam in the state of Andhra Pradesh NIT No.23/SE,NH,ATP/2023-24, Dt. 02.09.2023 21/09/2023 07/09/2023 09/10/2023
Time 15:0Hrs
115 Independent Engineer Services for Construction of Four Laning of near Satai ghat to Chowka section NH-34 from D. Ch. 89.875 to D. Ch. 145.000 (Total Length 55.125 kms) in the State of Madhya Pradesh (Package-3) on Hybrid Annuity Mode & Four Laning of Chowka to Kaimaha near MP/UP Border section NH-34 form Design Ch. 145.000 to Design Ch. 197.266 excluding existing Chhatarpur bypass from Design Ch. 160.307 to Design Ch. 168.630 (Length - 8.323 km) [Total Length – 43.924 km] (Pkg-IV) on HAM NHAI/HQ/MP/Sagar-Kabrai/IE/PKG-3&4/2023 21/09/2023 06/09/2023 11/01/2024
Time 11:0Hrs
116 CS for AE for improvement and rehabilitation of Lucknow Ayodhya sec of NH28(New27) from Km 8.000 to Km 121.600 in the State of Uttar Pradesh on EPC Mode (Package I and II) NHAI/HQ/UP (West)/Lucknow-Ayodhya /AE/2023 22/09/2023 06/09/2023 26/09/2023
Time 11:0Hrs
117 Supervision Consultancy Services for Operation & Maintenance of Piska More- Palma section From Km. 3.500 to Km. 26.000 of NH- 23 and Kutchery Chowk Ranchi– Bijupara Section From Km. 3.560 to Km. 34.000 & Bijupara-Kuru from Km. 34.000 to Km. 55.000 section of NH-75 in the State of Jharkhand NHAI/RO/RNC/JH/2023-24/09 05/09/2023 04/09/2023 18/10/2023
Time 11:0Hrs
118 Selection of Authority Engineer for supervision of Joshimath Malari road 0 to 60.55 in State of Uttarakhand Chardham/Shivalik/02/2023-24 08/09/2023 02/09/2023 16/10/2023
Time 11:0Hrs
119 Consultancy Services for Authority’s Engineer for Development of Jhajra - Asharori Link Road (Design Ch 0-050 to Ch 12-220) in the State of Uttarakhand on EPC Mode 2023-NHAI-166205-1 26/09/2023 31/08/2023 29/11/2023
Time 11:0Hrs
120 Independent Engineering Services for the work of Construction of Two Lane with paved Shoulder of road stretches from Bakaur to Parsarma (km 13 300 to km 18 875) NH-527A Parsarma to Bariyahi (km 0 000 to km 24 068) NH-327E Bangaon Bypass (km 0 000 to 3 820) & Mahishi Spur road (km 0 000 to km 5 720), the total length of 39 183 km under BRT Scheme in the State of Bihar on HAM Mode 2023-NHAI-166133-1 12/09/2023 30/08/2023 09/10/2023
Time 11:0Hrs
121 Consultancy services for Independent Engineer Construction of 4/6 lane bypass for Belagavi city from Km 11/00 (Goa side) of NH-4A to Km 516/000 (Pune side) of NH-4 (Design Length 34/48 km) in the state of Karnataka on Hybrid Annuity Mode. Package 1A 2023-NHAI-166123-1 31/08/2023 30/08/2023 11/10/2023
Time 11:0Hrs
122 Consultancy Services for Authoritys Engineer for supervision of ongoing EPC works on Surat-Dahisar (Km 381 000 to Km 502 000) section of NH 48 in the State of Maharashtra NHAI/RO/MUM/THANE/SD/AE/2023 01/09/2023 29/08/2023 27/09/2023
Time 11:0Hrs
123 Supervision Consultancy services during Operation and Maintenance period of Four Laning of Chauka Mahulia Baharagora section of NH 33 from Km 217.300 to Km 333.500 and Baharagora JH WB Border section of NH 6 from Km 199.200 to Km 183.587 Jharkhand NHAI/RO/RNC/JH/2023-24/06 05/09/2023 29/08/2023 16/10/2023
Time 11:0Hrs
124 Consultancy Services for Authoritys Engineer for Supervision of Upgradation of MP/RJ Border- Sheopur-Goras Road section of NH-552Extn, from design Ch. 0.00 to 48.400 to 2L PS configuration along with OTI of 16.6 km in the State of Madhya Pradesh CE-RO/BPL/NH/03/AE/2023-24 29/08/2023 25/08/2023 08/11/2023
Time 17:30Hrs
125 Consultancy Services for Authoritys Engineer for Supervision of Upgradation of Goras to Shyampur section of NH-552Extn from design Ch 48.40 to 111.80 to 2 lane with paved shoulder configuration along with OTI of 8.91km in the State of Madhya Pradesh CE-RO/BPL/NH/02/AE/2023-24 29/08/2023 25/08/2023 08/11/2023
Time 17:30Hrs
126 Consultancy Services for Authoritys Engineer for Supervision of Upgradation of Sarvardevla to Pal (MP/MH Border) section of NH-347C from design Ch 81.600 to 137.400 to 2L PS configuration along with OTI of 1.95 km in the State of Madhya Pradesh CE-RO/BPL/NH/04/AE/2023-24 29/08/2023 25/08/2023 20/11/2023
Time 17:30Hrs
127 Independent Engineer Services for Supervision of Four/Six lanning of Bhaniyawala-Jollygrant-Rishikesh spur section of NH-07 from Km 0-000 to Km 19-780 in the state of Uttarakhand under NH (O) on Hybrid Annuity Mode 2023-NHAI-165749-1 13/09/2023 25/08/2023 25/09/2023
Time 11:0Hrs
128 Engaging consultancy services for proof checking assisting supervision of the work quality control of work for widening of Dhoraji Jamkandorana section of NH927D in the state of Gujarat 03 of 2023-2024 25/08/2023 25/08/2023 05/09/2023
Time 12:0Hrs
129 Selection of AUTHORITYS Engineer (AE) for Supervision of Construction of Shohratgarh Bypass (Design Length 6.273 Km) to two lane with paved shoulder on NH-730 (starts near ch. 413.700 and ends near ch. 419.000) under EPC mode in the State of U.P. 1346/8 Com-NH Circle/23 dt 22.08.23 28/08/2023 25/08/2023 12/10/2023
Time 11:0Hrs
130 Supervision Consultancy Services for Operation & Maintenance of the stretch from Km 113.730 Km 217.300 of Ranchi to Chauka Section of NH-33 in the State of Jharkhand NHAI/RO/RNC/JH/2023-24/05 05/09/2023 24/08/2023 12/10/2023
Time 11:0Hrs
-
131 IE Services during O and M stage for 4 laning of Suryapet (Design Ch.0.420 Existing Km.128.500 of NH65) to Khammam (Design Ch.59.046 Existing Km.50.750 of old SH42) of NH365BB (Old SH42) (Design Length 58.626) in the State of TS under BMP on HAM 165609 05/10/2023 24/08/2023 18/10/2023
Time 15:0Hrs
132 Consultancy services for (AE)/PMC for supervision of Impr. and Upgradation to 2 Lane with PS configu.from existing Km 420.000 to Km 454.000 (dl.Km 420.000 to Km 454.643, dl.32.543 Km) of NH730(Shohratgarh to Uska Bazar)in the state of UP on(EPC)basis 1314/03com-NHcircle/23 dated 14.08.2023 23/08/2023 19/08/2023 27/09/2023
Time 11:0Hrs
133 Independent Engineer services during Operation & Maintenance Period of the Project Construction of New Bridges/Structures, Repair of Existing Four Lane Highway from Baleshwar to Kharagpur Section of NH 60 (New NH-16) (Km 0.000 to Km 119.300) in the State of Orissa and West Bengal and its Operation and Maintenance under NHDP Phase I to be executed as BOT (Toll) on DBFOT Pattern 10/OandM/IE/2023-24 20/09/2023 18/08/2023 11/10/2023
Time 12:0Hrs
134 Independent Engineer services for Operation and Maintenance Supervision of Gurgaon Faridabad and Ballabhgarh Sohna Roads in Faridabad and Gurgaon Districts on Build Operate and Transfer BOT Basis (Package No Haryana PWD (BnR) Branch BOT 4and5) 2023 HRY 304380 1 01/09/2023 17/08/2023 21/09/2023
Time 17:0Hrs
135 IE Services for Construction of 4 laning Greenfield corridor from Suara (sasaram) at Ch 0 000 to Garhani (at SH-12) at Ch 74 432 package-1 of Patna-Arrah-sasaram corridor of NH-119A in Bihar on HAM Mode 2023-NHAI-164729-1 28/08/2023 17/08/2023 21/11/2023
Time 11:0Hrs
136 Consultancy services for Authority Engineer for Construction of New Double Tier 4-lane Elevated Corridor from Chennai Port to Maduravoyal in Chennai District from Km -0/342 to Km 20/223 on EPC mode under Bharatmala Pariyojana in the State of Tamil Nadu-(2nd Call) 2023-NHAI-164535-1 18/08/2023 14/08/2023 11/09/2023
Time 11:0Hrs
137 Consultancy Services for Supervision Consultant (SC) during Operation and Maintenance Period of Govindpur-Chas section of NH-32 from km 0.000 to km 56.889 in the State of Jharkhand (2nd Call) NHAI/RO/RNC/JH/2022-23/25-1 21/09/2023 14/08/2023 10/10/2023
Time 11:0Hrs
138 Rehabilitation and Up-gradation to Four Laning of NH-31D from Km Ch 83 340 to Km Ch.113 200 Package-II B of Dhupguri to Falakata Section in the State of West Bengal on EPC Mode 2023-NHAI-164355-1 15/09/2023 12/08/2023 09/10/2023
Time 15:0Hrs
139 IE for 4 laning of Tejajinagar Balwara sec of NH 347BG (Indore to Boregaon Pkg 2) Design Ch. 9.000 to Design Ch. 42.400 (Length 33.400 Km) under Bharatmala Pariyojana Phase-I in Madhya Pradesh on Hybrid Annuity Mode 3rd call NHAI/HQ/MP/Tejajinagar balwara/Pkg II/HAM/IE/2022 19/08/2023 10/08/2023 12/09/2023
Time 11:0Hrs
140 Supervision Consultancy Services for Operation & Maintenance of 4-Laning of Nagina-Kashipur section of NH-74 from Km. 73.000 (design chainage 71.614) to Km. 175.000 (design chainage Km. 170.407) in the States of Uttarakhand and Uttar Pradesh NHAI/RO-DDN/PIU-NBD/OM/NGN-KSP 05/09/2023 08/08/2023 19/09/2023
Time 15:0Hrs
141 Consultancy Services for assisting Authoritys Engineer for supervision of Construction of Bypass Road to Adoni town connecting NH-167 Hagari-Jadcherla Road from Km.62/700 to Km.71/400 in Kurnool District in State of Andhra Pradesh on EPC mode 2022-23 22/2023-24,dt.02.08.2023 07/08/2023 07/08/2023 13/09/2023
Time 15:0Hrs
142 Consultancy services for Authority Engineer for Supervision of following projects - Improvement/Widening of National Highway No. 217 (Dainadubi-Darugiri Section) to Two lane with paved shoulder and Improvement and Widening of National Highway No. 127B (Darugiri - Songsak - Williamnagar Junction Section) to two lane in the state of Meghalaya, under Bharatmala Pariyojana (Lot-1) Pkg-1B on EPC mode 2023-NHIDC-765761-1 09/08/2023 07/08/2023 04/09/2023
Time 15:0Hrs
143 Independent Engineer services for Construction of Basti Ring Road (Phase-I) with four lane configuration (Design length 22.150 Km) for Basti City in the state of Uttar Pradesh on Hybrid Annuity Mode CE-RO/LKO/NH (O)/04/Basti Ring Road/2021-22/IE 22/08/2023 05/08/2023 18/09/2023
Time 11:0Hrs
144 Consultancy services for Authoritys Engineer for Supervision of Work of Widening and Strengthening from design Km. 67.280 to Km. 88.622 of NH727A (Salempur-Mairwa Road) to two lane with paved shoulder configuration under EPC mode in the State of UP CE-RO/LKO/NH(O)/13/NH 727A/2022-23/AE 22/08/2023 04/08/2023 11/10/2023
Time 11:0Hrs
145 (i) Consultancy services for preparation of DPR for widening to four lane from Km 69/750 to Km 75/750 of NH-552 Extn. and plantation, street lighting and road safety works from Km 0/00 to Km 28/00 on NH-248 & (ii) Consultancy services for preparation of DPR for grade separated structure with slip road at Achrol from km 11/00 to km 12/00 of NH-248 02/2023-24 04/08/2023 04/08/2023 05/08/2023
Time 0:1Hrs
146 AE for Design-const of 26 VUPs and 4SR Instal of Metal Beam Crash Barrier (for PKG C3-C9) and Demolition and Reconst of Distressed Bridge at ch 402.987 (LHS) on Lalitpur-Sagar-Lakhnadone from Km 99.005 to Km 415.089 Sec of NH44 (Old NH26) in UP & MP on EPC Mode NHAI/HQ/MP/Lalitpur SagarLakhnadon/26 VUP/AE/2023 19/08/2023 01/08/2023 31/08/2023
Time 11:0Hrs
147 Consultancy Services for Independent Engineer services for Supervision of Construction of Left Out work of Four laning of Talaja-Kagvadar section of NH-8E from km 53.585 to km. 139.915 (Design chainage from km 54.990 to km to Km. 140.470) in the State of Gujarat on single percentage item rate contract (Package-II , III) NHAI/RO-GNR/NH-8E/Tal-Mah-Kag/IE/2023/July/ 22/09/2023 31/07/2023 24/11/2023
Time 13:0Hrs
148 ENGAGEMENT OF CONSULTANCY SERVICES FOR SUPERVISION OF VARIOUS EPC PROJECTS Kothun-Lalsot-Karoli-Dholpur road, ROB Existing (Railway portion & approach) at Km 76 of old NH-116 (New NH-552Extn.) in Sawaimadhopur City & Shahpura-Thanagazi and Span Bridge over Sawamadhopur- Sheopur 1-2023/24 21/08/2023 28/07/2023 05/09/2023
Time 18:0Hrs
149 Authority Engineer for Construction of new 4 lane Prayagraj Southern Bypass from design km. 43.200 (near Mahuari) to design km. 50.860 (near Nababa urf Nibi Kala Uparhar) (design length 7.660 km) Package-2 under Phase-I on NH-19 in the state of UP under Bharatmala on EPC mode 2023-NHAI-162734-1 25/08/2023 28/07/2023 14/09/2023
Time 11:0Hrs
150 Authority Engineer for Construction of new 4 lane Prayagraj Southern Bypass from design km. 50.860 (Nababa urf Nibi Kala Uparhar) to design km. 64.763 on NH-19 (near Khodaypur Kasgaon) including Interchange loop at NH-19 (design length 14.980 km) in the state of UP Package-3 under Phase-I on EPC mode under Bharatmala Pariyojna 2023-NHAI-162737-1 24/08/2023 28/07/2023 14/09/2023
Time 11:0Hrs
151 ENGAGEMENT OF CONSULTANCY SERVICES FOR SUPERVISION OF VARIOUS EPC PROJECTS Kothun-Lalsot-Karoli-Dholpur road, ROB Existing (Railway portion & approach) at Km 76 of old NH-116 (New NH-552Extn.) in Sawaimadhopur City & Shahpura-Thanagazi and Span Bridge over Sawamadhopur- Sheopur 1/2023-24 28/07/2023 28/07/2023 28/08/2023
Time 18:0Hrs
152 Independent Engineer Services during Operations & Maintenance stage of Four laning of Amritsar to Wagah Border Section of NH-1 from Km. 456.100 to Km. 492.030 in the State of Punjab. 2023-NHAI-162469-1 23/08/2023 26/07/2023 31/08/2023
Time 11:0Hrs
153 Independent Engineer (IE) Services for Operation and Maintenance Stage of Widening of Pipli-Bhavnagar-Section Pkg 1 from km136.025 to 169.328 (Design Chainage km 136.000 to 169.308) Near Adhelai Village to Nari Junction to 4L in the State of Gujarat 2023-NHAI-162398-1 16/08/2023 26/07/2023 01/09/2023
Time 11:0Hrs
154 Supervision Consultancy (SC) Services during O and M of Two lane Maharashtra border-Sagbara-Dediapada-Netrang section of NH- 753B from Km. 117.400 to Km. 175.400 (Length 58.000 Km) in the state of Gujarat 2023-NHAI-162413-1 16/08/2023 26/07/2023 08/09/2023
Time 12:0Hrs
155 Consultancy Services for Authoritys Engineer for Supervision of (i) Construction and Operation Maintenance of Long term measures for rectification of Accident Blackspots with Blackspots ID (1) Aslali Bypass - GJ 02-151, (2).Bidaj Patiya, GJ-02-219, (3). Vadala Junction GJ-02-214) on Ahmedabad - Vadodara section of NH-48 on EPC Basis (ii) Operation & Maintenance of Improvement Works at Dumad Junction at Merging of Ahmedabad Vadodara Section of NH-48, Ahmedabad Vadodara NE-1 & Sama-Savli Road 2023-NHAI-162319-1 16/08/2023 25/07/2023 31/08/2023
Time 15:0Hrs
156 IE Services during 2 or 4 Laning with Paved shoulder from Km 0.000 to Km 83.453 of Dausa Lalsot Kothoon Section of NH 11A Extn. In the State of Rajasthan under NHDP Phase IV on Hybrid Annuity Mode NHAI/11011/Admn/2022-ROJ /Tenders/DLK/2nd 28/08/2023 24/07/2023 11/09/2023
Time 11:0Hrs
157 Independent Engineer Services during O and M period of 4 laning of Singhara binjabahal section of NH 49 in the State of Odisha under HAM NHAI/13012/110/RO/OD/2076/2023 10/08/2023 22/07/2023 30/08/2023
Time 11:0Hrs
158 Supervision Consultancy (SC) Services during O&M stage of Six Laning of Km 108.700 to Km 263.000, Vadodara to Surat section of NH-48 in Gujarat 2023-NHAI-161672-1 16/08/2023 19/07/2023 28/08/2023
Time 17:0Hrs
159 Consultancy Services for Supervision Consultants of O & M of Four laning of Punjab/ Haryana Border-Jind section of NH-71 from Km 238.695 to Km 307.000 on EPC mode in the State of Haryana. 2023-NHAI-161323-1 02/08/2023 17/07/2023 14/08/2023
Time 11:0Hrs
160 Independent Engineer Services for Construction, Operation and Maintenance for Four Laning of Sattanathapuram to Nagapattinam (Design Ch.123.800 to 179.555) section of NH 45A (New NH32) in the state of Tamil Nadu & Puducherry U.T. under NHDP Phase–IV on Hybrid Annuity Mode (HAM) NHAI/RO Chennai/IE/NH-32/2023-24/136 25/07/2023 17/07/2023 22/08/2023
Time 17:0Hrs
161 Independent Engineer Services during operation & Maintenance period for 4/6 laning of Rohtak-Hisar section of NH-10 from Km. 87.000 to Km. 170.000 including connecting link from 87.000 (NH-10) to Km. 348.000 (NH-71) on DBFOT pattern under NHDP Phase-III in the state of Haryana. 2023-NHAI-160951-1 02/08/2023 13/07/2023 10/08/2023
Time 11:0Hrs
162 Consultancy Services For Authority Engineer for Construction of Major Bridge with approaches across Andhari River on Design Km 249.724 on Mul- Chandrapur Road NH 930 in the Chandrapur District in the state of Maharashtra 04/EENH/NGP/2022-23 13/07/2023 13/07/2023 04/08/2023
Time 17:0Hrs
163 Consultancy services for Authority Engineer for Four Laning of Left-Over Works of Hospet-Bellary-Karnataka/ AP border from Km 280 (Design Chainage) to Km 375 (Design Chainage) of NH-63 in the State of Karnataka on EPC Mode NHAI/KNT/Hospet-Bellary-KNT/AP-Border/4L/NH-63/AE/2023(2nd Call) 13/07/2023 11/07/2023 14/08/2023
Time 11:0Hrs
164 Consultancy Services for Authority’s Engineer for Supervision of Balance Work of Construction of Two/Four Lane With Paved Shoulder From Km 422.000 To Km 523.600 (Chitradurga to Shivamogga Section) of NH-13 In the State of Karnataka on EPC Basis No.NH-KNT-2020-21-AE 05/07/2023 05/07/2023 10/07/2023
Time 15:0Hrs
165 Consultancy Services for Authoritys Engineer for Supervision of Construction of four/six lane Greenfield connectivity from Talwara Jattan Village on NH-44 to Gobindsar village on Delhi - Amritsar - Katra Expressway from km 0.000 to km 12.345 (Pathankot Link Road) in the State of Punjab on EPC Mode under Bharatmala Pariyojana (2nd Call) 2023-NHAI-158986-1 04/07/2023 04/07/2023 27/07/2023
Time 11:0Hrs
166 Consultancy services for Supervision Consultants (SC) of Operation & Maintenance of Balance work of two laning with paved shoulder of Tindivanam to Krishnagiri section of NH-66 from Km.37.600 to Km. 219.782 under NHDP Phase-III in the state of Tamil Nadu on Item Rate Contract NHAI/RO Chennai/SC/O&M/NH-66/2023-24/131 03/07/2023 30/06/2023 24/07/2023
Time 17:0Hrs
167 AUTHORITY’S ENGINEER FOR SUPERVISION OF “Upgradation /widening and construction of 4 – lane with paved shoulders from Srirampur to Dhubri (Length 54.154 km) of NH- 127B in the State of Assam under JICA ODA Loan assistance (Phase- V) on EPC mode. (3rd Call) NHIDCL/ASSAM/S-D/JICA5/AE /2021/199467/RFP/C3 28/06/2023 29/06/2023 27/07/2023
Time 15:0Hrs
168 Consultancy services for Authoritys Engineer for Supervision of following three Civil Projects under single consultancy package (i) Construction of Two lane with Paved shoulder for Rajgarh Bypass from Design km.0.000 to km.5.400 and Pilani Bypass from Design km.35.840 to km.43.120 of NH-709 Extn on EPC Mode (ii) Construction of Two lane with Paved Shoulder for Fatehpur Bypass (Design km.O.000 to km.7.400) Mandawa Bypass (Design km.20.925 to km.27.300) Jhunjhunu Bypass (Design km.41.625 to km NIT.No.02/2023-24 10/07/2023 28/06/2023 31/07/2023
Time 11:0Hrs
169 Consultancy services for Authoritys Engineer for Supervision of Work of Rehabilitation and up-gradation from km. 0.000 to km.40.390 of NH730S(Maharajganj Nichloul Thuthibari)to two lane with P.S. configuration under EPC mode in the State of U.P. CE-RO/LKO/NH(O)/16/ NH-730S/2022-23/AE dt 27.06.23 28/06/2023 27/06/2023 23/08/2023
Time 11:0Hrs
170 Independent Engineer for Operation & Maintenance for Kolaghat - Haldia section from km 0.000 to km 53.472 including ROB Cum Flyover from Km 52.080 to 53.472 at the end of NH-41 on OMT basis in the state of West Bengal 08/O and M/IE/2023-24 25/07/2023 26/06/2023 23/08/2023
Time 12:0Hrs
171 Consultancy Services for Supervision Consultants of New NH-354 section from Khemkaran to start of Amritsar Bypass from Km 22.673 to Km 71.496 for length of 48.822 Km on EPC mode in the State of Punjab 2023-NHAI-158960-1 14/07/2023 26/06/2023 31/07/2023
Time 11:0Hrs
172 Consultancy services as Independent Engineer during Operation and Maintenance for the projects in the state of Karnataka. Six laning of Bangalore-Nidaghatta Section, km 18.000 to km 74.200 of NH-275 Six laning of Nidagatta-Mysore Section, Km 74.200 to Km 135.304 of NH-275 NIT No.05/NHAI/RO-BNG/22016/Tender/2023-24 dated 22.06.2023 23/06/2023 23/06/2023 07/08/2023
Time 15:0Hrs
173 CONSULTANCY SERVICES FOR AE FOR SUPERVISION OF Rehabilitation-Upgradation of Karanja-Kherda-Murtizapur Section to 4-LPS standards (Excluding overlapping portion with Samruddhi Mahamarg) section of NH 361C on EPC Mode in the state of Maharashtra. NH/MAH/RO/Amravati-1/AE/PKG-5 30/06/2023 22/06/2023 08/08/2023
Time 17:0Hrs
174 Consultancy Services of Supervision Consultant (SC) for Operation & Maintenance Period for Bhubaneswar-Puri section of NH-316 (Old Section of NH-203) from Km.0.000 to km 67.400 in the State of Odisha to be executed as BOT (Toll) basis on DBFOT pattern under NHDP-III NHAI/13012/107/RO/OD/2023 03/07/2023 16/06/2023 25/07/2023
Time 11:0Hrs
175 Independent Engineer Services during Operation and Maintenance Period for Six-laning of Chilakaluripet to Nellore section of NH-16 from Km.1182.802 to Km.1366.547 (length 183.620) in the State of Andhra Pradesh under NHDP Phase V to be executed as BOT (Toll) project on DBFOT pattern 2023-NHAI-157727-1 06/07/2023 16/06/2023 31/08/2023
Time 15:0Hrs
176 CS FOR AE FOR SUPERVISION OF CONSTRUCTION OF 4 LANE PS PATTAN GREENFIELD BYPASS EXISTING CH.KM 24.320 TO KM 33.760 DESIGN CH. KM 24.400 TO KM 35.300 LENGTH 10.900 KM SBU (NH01) UT JK PROJECT BEACON BRO RW/CH/W(28)/JK/2022 16/06/2023 16/06/2023 24/07/2023
Time 15:0Hrs
177 SC Services during OnM stage of 2 laning with paved shoulders of Nimbi Jodha (Near Ladnu) Degana Merta City Section of NH 458 (Package I) from Km 0.000(Existing Km. 0.000) to Km. 139.900 (Existing Km. 144.377) in the State of Rajasthan NHAI/11011/2023-ROJ /Tenders-SC/NM 17/07/2023 16/06/2023 02/08/2023
Time 11:0Hrs
178 CS FOR AE FOR SUPERVISION OF CONSTRUCTION OF 2 LANE PS BARAMULLA GREENFIELD BYPASS EXISTING CH. 47.020 TO 56.720 DESIGN CH. FROM 48.500 TO 62.600 LENGTH 14.100 KM IN AOR OF 760 BRTF SBU NH01 UT JK PROJECT BEACON BRO RW/CH/W(33)/JK/2022 14/06/2023 14/06/2023 24/07/2023
Time 15:0Hrs
179 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF Rehabilitation/Up-gradation to 4 lane with paved shoulder of existing section in Sillod Town with Design Ch.(Km 54/500 to 60/679) (Length 6.179Km) section of NH 753-F (Aurangabad- Jalgaon road) on EPC Mode in the state of Maharashtra EENH/Aurangabad/Tender/NIT No.7/3001072 dt12/6/2023 23/06/2023 13/06/2023 03/08/2023
Time 17:30Hrs
180 Independent Engineer services during O and M phase for 4-lane with paved shoulder configuration of Bilaspur to Pathrapali from Km 0.000 to Km 53.300 (Package-1) section of NH- 111 (New NH- 130) in the State of Chhattisgarh under Bharatmala on Hybrid Annuity Mode on design, Build, operate and transfer 11052/NHAI/RO-RAIPUR/TENDER/IE/O and M/B-P 14/07/2023 10/06/2023 20/07/2023
Time 15:0Hrs
181 IE Services during Operation and Maintenance Period for Tada Nellore section of NH-16 and Nandigama - Ibrahimpatnam - Vijayawada section of NH-65 on BOT(Toll) and Nellore Bypass section of NH-16 (Total length 176 km) 2023-NHAI-156526-1 07/06/2023 07/06/2023 29/08/2023
Time 15:0Hrs
182 Consultancy Services for AE for Supervision of Chotahapjan Bogapani section) (2-Lane PS) in(Package-3) Digboi Bypass (Green Field and Brownfield) (Package-4) and Digboi Bypass (Green Field and Brownfield) (2-Lane PS) (Package-5) in Assam NHIDCL/Assam/AE/Dib-Led Pkg-3 to 5/2023/218140 08/06/2023 06/06/2023 26/06/2023
Time 15:0Hrs
183 Consultancy services for Authority Engineer PMC for supervision of construction of one Flyover at Km 2.735 and one Major Bridge at Km 31.260 on NH 730 in the State of Uttar Pradesh Under EPC Mode 1688 1 Tender Cashier BLY 23 Dated 06.06.2023 22/06/2023 06/06/2023 05/07/2023
Time 12:0Hrs
184 Consultancy Services for Authoritys Engineer for Supervision of Upgradation and Reconstruction of Shahpura-Dindori section of NH 45 Total length 60.88 km to Two lane with paved shoulder in the State of Madhya Pradesh on EPC mode 756198 04/06/2023 05/06/2023 17/07/2023
Time 17:30Hrs
185 Independent Engineer services during Operation and Maintenance stage for Four laning of Hyderabad-Yadgiri section of NH 163 (Old NH-202) from Km.18.600 to Km.54.000 in the states of Telangana under NHDP Phase III on Design, Build, inance, Operate and Transfer (DBFOT) Toll basis Package No NHDP-III/BOT/AP-04 154035 12/07/2023 05/06/2023 08/08/2023
Time 11:0Hrs
186 Supervision Consultant (SC) during O and M stage of Two Lane with paved shoulder of Mandla-Chilpi Section of NH-12A (New NH-30) from Ch. 85.400 to Ch. 177.750 (Length 92.35 Km) in the state of Madhya Pradesh. 2023-NHAI-156282-1 19/07/2023 05/06/2023 03/08/2023
Time 11:0Hrs
187 Independent Engineer Services during O and M period for 6 laning ofChandikhole Bhadrak section of NH 16 in the sttae of Odisha to be executed on HAM under NHDP Phase V NHAI/13012/100/RO/OD/2023 05/06/2023 01/06/2023 03/07/2023
Time 11:0Hrs
188 Consultancy services as Independent Engineer during Operation and Maintenance for the projects in the state of Karnataka NIT No.03/NHAI/RO-BNG/11018/Tender/2023-24 dated 31.05.2023 02/06/2023 31/05/2023 11/07/2023
Time 15:0Hrs
189 Consultancy services for AE for Supervision of Improvement Widening of National Highway No. 217 (Dainadubi-Darugiri Section) and (Darugiri - Songsak - Williamnagar Junction Section) to Two lane with paved shoulder ine of Meghalaya, (Lot-1) Pkg-1B 2023-NHIDC-755609-1 01/07/2023 30/05/2023 10/08/2023
Time 15:0Hrs
190 CS of AE for Supervision of Construction of 4 lane flyover from MES College Junction to Bogmalo Junction on NH-566 from km 7.106 to km 10.460 and 4 lane VUP at Queeny Nagar Junction from km 3.330 to km 4.550 on EPC mode in the State of Goa under NH(O). NHAI/Goa/NH-566/AE/2023 30/05/2023 29/05/2023 23/01/2024
Time 11:0Hrs
191 Consultancy services for AE for Supervision of Shillong Western Bypass Road of following green field projects of (Existing km 60.900 of NH-40) to NH-106 (OLD NH-44E) (Package-I,II and III) 2023-NHIDC-755100-1 30/06/2023 26/05/2023 07/08/2023
Time 15:0Hrs
192 Independent Engineer Services during Operation & Maintenance of 6-Lane Anandapuram – Pendurthi – Anakapalli section of NH-16 from Km.681.000 to Km.731.780 under Bharatmala Pariyojana on Hybrid Annuity Mode in the State of Andhra Pradesh 2023-NHAI-155358-1 30/05/2023 26/05/2023 26/07/2023
Time 11:0Hrs
193 Consultancy services for Authoritys Engineer(AE)/PMC for supervision of Construction of Jasra bypass with four lane paved shoulder configuration from km 379.670 of NH-76 (New NH-35) to km 18.000 of NH-27 (New NH-30) on EPC mode in the State of U P 1375/3 Com A(II)-NHCP/23 Dated.23.05.2023 05/06/2023 25/05/2023 22/06/2023
Time 11:0Hrs
194 CS of AE Services for Long Term Rectification of MoRTH identified Blackspots (17 nos) Removal of 2 At-Grade Junctions and allied works on existing 4/6-Lane Hyderabad-Vijayawada section of NH-65 from Km.40.000 to Km.221.500 in Telangana on EPC mode. NHAI/Tech/TS/ 17BS VUPs/AE/2023 30/05/2023 25/05/2023 24/06/2023
Time 11:0Hrs
195 Consultancy Services for Authority’s Engineer for Supervision of Balance Work of Construction of Two/Four Lane With Paved Shoulder From Km 422.000 To Km 523.600 (Chitradurga to Shivamogga Section) of NH-13 In the State of Karnataka on EPC Basis RW/BNG/NH-13R/Km 422-528/94/2020 25/05/2023 25/05/2023 10/07/2023
Time 15:0Hrs
196 IE Services for Operation & Maintenance for a) Four laning of Trichy to Kallagam (from km. 0.000 to km.38.700) (Package-I), b) Four laning of Kallagam to Karuppur (from km. 38.700 to Km. 50.382) and Two laning with paved shoulder from Karuppur to Meensurutti (from km. 50.382 to Km. 98.433) (Package-II) and c) Two laning with Paved Shoulder of Meensurutti to Chidambaram (from km. 98.433 to km. 129.965) (Package-III) section of NH-227 (New No.81) NHAI/RO Chennai/IE/O&M/NH-227/2023-24/125 02/06/2023 24/05/2023 26/06/2023
Time 15:0Hrs
197 Consultancy Services for Authority’s Engineer for Supervision of Const. of 4-Lane ROB and its approaches in replacement ofexisting (i) RUB of NH-2B at Bhedia (ii) LC No 21/SPL/E of NH-60 at Suri (iii) LC No 39/A/3E of NH-60 at Bishnupur-II (iv) LCNo KA-34 of NH-60 at Kubai (v) LC No 38 of NH-60 at Kadamdiha in West Bengal. (2nd Call) MORTH/RO-KOL/NIT/AE/2023-24/09(2nd Call) 22/05/2023 22/05/2023 07/07/2023
Time 15:0Hrs
198 Consultancy Services for Authority’s Engineer for Supervision of ‘Construction of four-lane Concrete Road from Police Headquarter Gondia City to Rawanwadi Village (Birsi Airport Junction) from design km 0.000 to km 15.781 (existing km 39/720 of NH-753 to existing Km 8/400 of NH 543) on section from Kohmara - Goregaon- Police Headquarter (Karanja) - Collector Office Square - Balaghat T Point- Rawanwadi - Rajegaon of NH-753 and NH-543 in Gondia District in the state of Maharashtra on EPC Mode 02/EENH/NGP/2023-24/ 2094 21/05/2023 19/05/2023 14/07/2023
Time 17:0Hrs
199 Consultancy Services as Authority’s Engineer for Supervision of (i) Widening/Improvement to 2 (Two) lane with earthen shoulder of Choithar to Marrem Khullen section of NH-202 of Imphal- Ukhrul-Jessami Economic Corridor from Design Chainage km 53.110 to 95.700 (Package-5) in the State of Manipur on EPC Mode under Bharatmala Pariyojana (ii) Widening/Improvement to 2 (Two) lane with earthen shoulder of Marrem Khullen to Jessami section of NH-202 of Imphal – Ukhrul – Jessami Economic Corridor fr NHIDCL/Manipur/AE/U-J (Pkg-5, 6, 7) & (UTT Pkg-2)/2023 22/05/2023 19/05/2023 31/07/2023
Time 15:0Hrs
200 Consultancy services as Authoritys Engineer for Supervision of i) Tamenglong to Mahur (NH-137) in the State of Assam starting from km 136500 near Hejaichak to km 156489 near P Leikul (Package-9) on EPC mode ii) Tamenglong to Mahur (NH-137) in the State of Assam starting from km 156489 near P Leikul to km 176581 near Borowapu (Package-10) on EPC mode NHIDCL/Assam/AE Tamenglong -Mahur Pkg 9 and 10 /2 02/06/2023 19/05/2023 13/07/2023
Time 15:0Hrs
201 Consultancy Services as AE for Supervision of) Construction of Four Lane Panchgram Bypass and Construction of Four Lane Badarpur Bypass in the State of Assam on EPC Mode NHIDCL/Assam/AE/PB Bypass/2023/222392 08/06/2023 18/05/2023 06/07/2023
Time 15:0Hrs
202 Consultancy Services as AE for Supervision of Four laning of Silchar - Dhanehari section (Package-1) and Dhanehari - Lailapur / Vairengte section (Package-2) in the State of Assam NHIDCL/Assam/Silchar-Vairengte Pkg-1&2/AE/2023/2023 08/06/2023 18/05/2023 06/07/2023
Time 15:0Hrs
203 Consultancy Services as Authoritys Engineer for Supervision of i) Widening Upgradation to two lanes with paved shoulders road from Tamenglong to Mahur (NH-137) starting near Jiri River (Assam/Manipur Border) at km 96870 and ending near Hangrum at km 116550 (Package – 7) (Length-1968 km) ii) Widening Upgradation to two lanes with paved shoulders road from Tamenglong to Mahur (NH-137) starting from km 116480 near Hangrum to km 136500 near Hejaichak (Package-8) under NH(O)-NE NHIDCL/Assam/AE/Tamenglong - MahurPkg-7 and 8/202 31/05/2023 18/05/2023 13/07/2023
Time 15:0Hrs
204 Consultancy Services as AE for Supervision of Widening/Improvement of NH-515 to 4 (Four) Lane with Paved Shoulder from km (Kandulijan Gaon) to (Oyan) in the State of Assam and Arunachal Pradesh on EPC mode (Package-1 -2- 3) NHIDCL/Assam/AE /KandulijanGaon-Oyan Pkg-1,2,3 07/06/2023 17/05/2023 13/07/2023
Time 16:0Hrs
205 Consultancy Services as AE for Supervision of Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Bilasipura- Guwahati road(NH 17) to Milmila RF in the state of Assam on EPC mode (Package-9 and 10) NHIDCL/Assam/Bil-Ghy Pkg-9 and 10/2023/218181 08/06/2023 17/05/2023 06/07/2023
Time 15:0Hrs
206 Consultancy services for Authoritys Engineer for supervision of Construction of Kaithi-Padaria Kala bypass, start of Pawai Bypass to end of ChandiaGhat realignment of NH-43Extn on NH 339 in the State of Madhya Pradesh on EPC Mode 2023-MoRTH-753202-1 21/05/2023 15/05/2023 08/08/2023
Time 17:30Hrs
207 CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF Construction of Six lane Elevated Corridor from Km. 508.000 to Km. 513.150 including approaches on NH-66 in the State of Goa on EPC mode. RO/MUM/AE-2023-24 28/05/2023 15/05/2023 30/06/2023
Time 17:0Hrs
208 Independent Engineer Services for Operation and Maintenance stage under TOT mode of four laning with paved shoulder of Porbandar-Jetpur section of NH-27 from km 1-960 to 117-600 in the state of Gujarat 2023-NHAI-154025-1 16/05/2023 12/05/2023 12/06/2023
Time 11:0Hrs
209 Consultancy Services For Authoritys Engineer For Supervision Of Rehabilitation and upgradation to 2-lane with paved shoulder configuration of Jirapur-Susner MP-RJ Border Road, Khilchipur Bypass of Section of NH-752B and Biaora Bypass of Section of NH-752B Total design length 57.29 km in the State of Madhya Pradesh under EPC Mode 2023-MoRTH-751202-1 23/04/2023 11/05/2023 02/08/2023
Time 17:30Hrs
210 Consultancy Services For Authoritys Engineer For Supervision of Upgradation of Jirapur-Pachore road including Pachore, Jirapur, Chhapiheda and Khujner Bypasses Section of NH 752 C and Shujalpur Bypass section of NH-752C Total Design length 69.26 km in the state Madhya Pradesh on EPC mode 2023-MoRTH-751195-1 23/04/2023 11/05/2023 02/08/2023
Time 17:30Hrs
211 CS FOR AE FOR SUPERVISION OF CONSTRUCTION OF 2 LANE PS BARAMULLA GREENFIELD BYPASS EXISTING CH. 47.020 TO 56.720 DESIGN CH. FROM 48.500 TO 62.600 LENGTH 14.100 KM IN AOR OF 760 BRTF SBU NH01 UT JK PROJECT BEACON BRO RW/CH/W(33)/JK/2022 10/05/2023 10/05/2023 09/06/2023
Time 17:0Hrs
212 IE Services for Operation and Maintenance of Madurai to Kayathar section from km 0-000 to km 116-500 of NH-44 on TOT mode in the state of Tamil Nadu 2023-NHAI-153769-1 11/05/2023 10/05/2023 15/06/2023
Time 11:0Hrs
213 Independent Engineer Services for Operation & Maintenance of (i) Kayathar-Nanguneri section from km 116-500 to km 180-000 of NH-44 (old No 7) on TOT mode in the state of Tamil Nadu, and (ii) Nanguneri-Kanyakumari section from km 180-000 to km 243-470 of NH-44 (Old No 7) on TOT mode in the state of Tamil Nadu 2023-NHAI-153776-1 12/05/2023 10/05/2023 15/06/2023
Time 11:0Hrs
214 IES for Supervision of i Construction of 4/6 Lane Northern Ayodhya Bypass total length of 35.40 kms of Part 1 north of NH27 and Part2 south of NH27 ii Construction of 4/6 Lane Southern Ayodhya Bypass from km 5.000 to km 37.172 of total length of 32.1 2023-NHAI-153764-1-1 08/09/2023 10/05/2023 18/01/2024
Time 11:0Hrs
215 IES for Supervision of i-Construction of 4-6 Lane Northern Ayodhya Bypass total length of 35.40 kms of Part-1 north of NH27 and Part2 south of NH27 ii-Construction of 4-6 Lane Southern Ayodhya Bypass from km 5.000 to km 37.172 of total length of 32.1 2023-NHAI-153764-1 31/08/2023 10/05/2023 05/09/2023
Time 11:0Hrs
216 Supervision Consultant (SC) Services for O & M phase of 4/6L of Khed (Km. 42.00) to Sinnar (Km. 177.00) of NH - 60 (Old NH - 50) in the State of Maharashtra NHAI/RO/MUM/PUNE/KS/SC/2023/4 09/05/2023 09/05/2023 22/06/2023
Time 11:0Hrs
217 CS FOR AE FOR SUPERVISION OF CONSTRUCTION OF 4 LANE PS PATTAN GREENFIELD BYPASS EXISTING CH. KM 24.320 TO KM 33.760 DESIGN CH. KM 24.400 TO KM 35.300 LENGTH 10.900 KM SBU(NH01) UT JK PROJECT BEACON BRO RW/CH/W(28)/JK/2022 09/05/2023 09/05/2023 09/06/2023
Time 17:0Hrs
218 Consultancy Services for Authoritys Engineer for Supervision of Construction of 2 lane with paved shoulders in Harpalpur bypass from km 0/000 to km 9/630 on NH 339 (old NH 76) in the State of Madhya Pradesh on EPC Mode 2023-MoRTH-751239-1 27/04/2023 08/05/2023 08/08/2023
Time 17:30Hrs
219 Consultancy services for authority engineer/ PMC for supervision of rehabilitation and up- gradation from km. 51.600 to km. 75.700 of NH 321G (Nuhkhas to Etah section) to two lane with paved shoulder configuration under EPC Mode in the State of UP 761M/13M-NHCK/23 Dated 03.06.2023 17/05/2023 05/05/2023 05/07/2023
Time 17:0Hrs
220 Consultancy services for authority engineer/ PMC for supervision of Rehabilitation and Up-Gradation to Four Lane Road From Km. 70.500 to Km. 78.600 of NH-92 Under EPC Mode in The State of Uttar Pradesh ON EPC 762M/13M-NHCK/23 dated 03.05.2023 18/05/2023 05/05/2023 05/07/2023
Time 17:0Hrs
221 SC Services during OnM stage of 2 laning with paved Shoulders of Manoharpur Dausa of NH 11A (New NH-148) from Km. 62.100(Design Ch. 0.000 (Design Ch.62.318) in the State of Rajasthan NHAI/11011/1/tenders-ROJ/SC-MD 29/05/2023 05/05/2023 22/06/2023
Time 11:0Hrs
222 Consultancy services for Authoritys Engineer for Supervision of Construction of Mihona bypass, Lahar bypass, Daboh bypass and Bhander Bypass (total length 20.60 km) to 2-lane with paved shoulder from on Mihona-Bhander-UP border section of NH 552E in the State of Madhya Pradesh 751893 07/05/2023 04/05/2023 09/06/2023
Time 17:30Hrs
223 IE services for Improvement and Upgradation to 4Lane with PS configuration from Existing Km 0.000 to Km 39.500 Design Ch 0.500 to Ch 40.342 Design length 40.842 Km of NH227A near Mehrauna Ghat UP Bihar Border to Siwan in the state of Bihar on HAM NH-12030/5/2022-RO Patna/NH-227A/IE 05/05/2023 03/05/2023 15/01/2024
Time 11:0Hrs
224 Consultancy Services of Supervision Consultant during Oand M phase from Malshej Ghat to Ane Ghat Km 101 000 to Km 161 570, from end of Ane Ghat to Start of Ahmednagar Bypass Km 161 570 to Km 211 000 and from Kharwandi Kasar to Junction of NH 211 Km 284 000 to Km 337 000 of two lane with paved shoulder on NH 61 in the state of Maharashtra. 2 03/05/2023 03/05/2023 20/06/2023
Time 11:0Hrs
225 Consultancy Services for Authority Engineer of Operation & Maintenance of Pollachi to Coimbatore Section of NH-83 (Km.123.550 to Km.150.400 of Old NH 209) in the State of Tamil Nadu NHAI/RO-Chennai/AE/O&M/ 2023-24/118 11/05/2023 02/05/2023 06/06/2023
Time 15:0Hrs
226 Consultancy services as AEs for Supervision of Construction of four lane with paved shoulder Agartala bypass (Western side-length 25402 m) connecting NH-8 (near Amtali) to NH-108B (near Lembuchhera) in the state of Tripura on EPC basis NHIDCL/Tripura/AE/A-L/Agt Western Bypass/2023 04/05/2023 01/05/2023 08/06/2023
Time 15:0Hrs
227 Independent Engineer services during O&M phase for four laning of Sangli-Solapur section of NH-166 from Km. 182/556 to Km. 378/100 (Length 194.644 Km) in the state of Maharashtra on HAM. NHAI/RO/MUM/SLP/NH-166/IE/O&M/2023-24/29 01/05/2023 28/04/2023 22/06/2023
Time 11:0Hrs
228 Independent Engineer services during O&M phase for 4 laning of Solapur to Vijayapura section of NH-52 from Design Ch 0 to Ch 110 542 in the State of Maharashtra & Karnataka on DBFOT mode & Akkalkot – Solapur section of NH-150E with paved shoulders from design chainage Km 99 400 to Km 138 352/ Existing Chainage from Km 102 819 to Km 141 800 (Design length-38 952 km) including Akkalkot Bypass (Design Length 7 350 Km) in the state of Maharashtra on HAM NHAI/RO/MUM/SLP/NH-52/IE/O&M/2023-24/30 01/05/2023 28/04/2023 22/06/2023
Time 11:0Hrs
229 Consultancy services for Authority Engineer (AE) for supervision of Widening and Strengthening from km. 0.000 to Km. 15.089 (Purkaji-Laksar-Haridwar Road) of NH-334A to Two lane with paved shoulder configuration in the state of Uttar Pradesh 1222/354Com-4-NH Circle/23 Dt. 21.04.2023 25/04/2023 25/04/2023 19/05/2023
Time 12:0Hrs
230 Consultancy services of AE for Supervision of Construction Widening of Structures ie MJB MNB ROB LVUP etc rectification of drainage and rain cuts and other works and operation & Maintenance of remaining stretch of Panipat Jalandhar section of NH-44 from Km 96 000 to Km 387 100 in the state of Haryana and Punjab on EPC mode 2023-NHAI-152484-1 10/05/2023 25/04/2023 24/05/2023
Time 11:0Hrs
231 Independent Engineer Services during Operation and Maintenance stage of Six Lane Agra-Etawah Bypass Section of NH 2 from Km. 199.660 to Km. 323.525 under NHDP Phase V in the State of Uttar Pradesh on BOT Toll basis NHAI/PIU/AGRA/Misc./31 30/05/2023 21/04/2023 05/06/2023
Time 11:0Hrs
232 Consultancy services for authority’s engineer for supervision of rehabilitation and upgradation to 2-lanes with paved shoulder configuration of Mahud - Sangola of NH-965G from km 159.400 to 161.900 and 162.400 to 183.960 km (design from km 32.300 to km 34.800 to km 35.300 to km 56.860) on EPC mode in the state of Maharashtra NO/NHD/TC/873/2023 05/05/2023 21/04/2023 26/07/2023
Time 17:30Hrs
233 Supervision Consultancy Services (SC) for Supervision of Operation and Maintenance including Supervision of Completion of Balance work of Losari to Ongole Section (4 Packages) of NH-216 (i.e. from 34.230 to 254.500 of NH-214A(NH216)) to 2 Lane with paved shoulder in the state of Andhra Pradesh on EPC Basis MORTH/PIU/MTM/NH-216/O/MCo 24/04/2023 21/04/2023 08/06/2023
Time 17:0Hrs
234 Consultancy services for authority’s engineer for supervision of rehabilitation and upgradation to 2-lanes with paved shoulder configuration of Mahud - Sangola of NH-965G from km 159.400 to 161.900 and 162.400 to 183.960 km (design from km 32.300 to km 34.800 to km 35.300 to km 56.860) on EPC mode in the state of Maharashtra NO/NHD/TC/873/2023 18/07/2023 21/04/2023 05/06/2023
Time 15:0Hrs
235 26/07/2023 NO/NHD/TC/873/2023 19/07/2023 21/04/2023 05/06/2023
Time 15:0Hrs
236 Consultancy services for authority’s engineer for supervision of rehabilitation and upgradation to 2-lanes with paved shoulder configuration of Mahud - Sangola of NH-965G from km 159.400 to 161.900 and 162.400 to 183.960 km (design from km 32.300 to km 34.800 to km 35.300 to km 56.860) on EPC mode in the state of Maharashtra NO/NHD/TC/873/2023 19/07/2023 21/04/2023 11/08/2023
Time 17:30Hrs
237 Consultancy services for authority’s engineer for supervision of rehabilitation and upgradation to 2-lanes with paved shoulder configuration of Mahud - Sangola of NH-965G from km 159.400 to 161.900 and 162.400 to 183.960 km (design from km 32.300 to km 34.800 to km 35.300 to km 56.860) on EPC mode in the state of Maharashtra NO/NHD/TC/873/2023 17/07/2023 21/04/2023 05/06/2023
Time 15:0Hrs
238 Consultancy services for authority’s engineer for supervision of rehabilitation and upgradation to 2-lanes with paved shoulder configuration of Mahud - Sangola of NH-965G from km 159.400 to 161.900 and 162.400 to 183.960 km (design from km 32.300 to km 34.800 to km 35.300 to km 56.860) on EPC mode in the state of Maharashtra NO/NHD/TC/873/2023 17/07/2023 21/04/2023 05/06/2023
Time 15:0Hrs
239 Supervision Consultancy Services (SC) for Supervision of Operation and Maintenance including Supervision of Completion of Balance work of Timmapuram to Losari Section (5 Pcakages) of NH-216 (i.e. from Km 26.150 to Km 135.740 of NH-214(New NH-216) and i.e. from Km 0.000 to Km 34.230 of NH-214A (New NH-216)to 2 Lane with paved shoulder in the state of Andhra Pradesh MORTH/PIU/MTM/NH-216/O/MCo. 24/04/2023 20/04/2023 05/06/2023
Time 16:0Hrs
240 Consultancy services for Authority’s Engineer for Development of Six lane green field Ring Road (Package-III) starts from Design Ch.51.200 to Design Ch. 68.650 (Length=17.450 kms) around Kanpur City and Construction of 4- lane Airport link road (Length = 1.45 km) at Chainage 62.090 of Kanpur ring road in the state of Uttar Pradesh on EPC mode 2023-NHAI-152038-1 17/05/2023 19/04/2023 08/06/2023
Time 11:0Hrs
241 Independent Engineer Services during O&M Period for 2 laning of Khagaria – Purnea Section of NH – 31 from Km. 270.00 to Km. 410.00 in the state of Bihar under NHDP III on Design, Built, Finance, Operate and Transfer (DBOT) Annuity. 185/RO-Patna/NHAI/2023-24 17/04/2023 17/04/2023 15/05/2023
Time 11:0Hrs
242 CS for AE for Supervision of “Construction of Six Lane Elevated Kona Expressway from Km. 0.145 to Km. 7.337 of NH-117 in the state of West Bengal on EPC mode 2023-NHAI-151542-1 17/04/2023 17/04/2023 18/05/2023
Time 11:0Hrs
243 Independent Engineer Services for Operation and Maintenance of 4/6 lane section of NH-34 from Km. 149.900 (Aligarh) to Km. 302.108 (Naviganj) (Aligarh-Kanpur Section Pkg.-I to III) in the State of Uttar Pradesh on Hybrid Annuity Mode NHAI/ALG/15022/Pkg-I to III/IE/OM/Tender/01 30/05/2023 15/04/2023 04/07/2023
Time 12:0Hrs
244 Independent Engineer Services during Operation and Maintenance stage of Four Laning of Bamanbore to Garamore section (from Km 182-600 to Km 254-537) of NH27 in the state of Gujarat under TOT project. 2023-NHAI-151661-1 17/04/2023 14/04/2023 23/05/2023
Time 11:0Hrs
245 Independent Engineer Services during Operation & Maintenance stage of Four Laning of Garamore to Samakhiyali section (From Km 254-537 to Km 306-000) of NH-27 in the state of Gujarat under TOT project. 2023-NHAI-151670-1 18/04/2023 14/04/2023 23/05/2023
Time 11:0Hrs
246 Supervision Consultancy Services during Operation and Maintenance of Lucknow-Kanpur Section (Km. 28.000 to Km. 80.960) of NH-25, Lucknow Bypass Section (Km. 0.000 to Km. 22.875) of NH-56 A&B, Lucknow Outer Ring Road-3B (Km.79.516/79.000 to Km. 94.457/93.473) and Lucknow Outer Ring Road-Kisan Path (Km.0.491/0.495 to Km. 11.660/12.210) total length 102 Km in the State of Uttar Pradesh PIU-LKO/SC/NH-27-LRR/2023/02 13/04/2023 13/04/2023 27/05/2023
Time 11:0Hrs
247 Consultancy services for SC of 2 laning with paved shoulders of Tonk Sawaimadhopur Section from Km. 1.300 to Km. 69.750 of NH 116 in the State of Rajasthan under NHDP Phase IV on EPC mode NHAI/11011/1/Tender-ROJ/SC-TSm 24/05/2023 13/04/2023 30/05/2023
Time 11:0Hrs
-
248 Independent Engineer Services during Operation and Maintenance stage of Six Lane Handia-Rajatalab (Varanasi) Section of NH-19 (Old NH-02) from Km 712-900 to Km 785-544 in the state of Uttar Pradesh under TOT project 2023-NHAI-151389-1 20/04/2023 11/04/2023 18/05/2023
Time 11:0Hrs
249 Authoritys Engineer for Supervision of Rehabilitation and Up- gradation for Talere Gaganbawda Kolhapur Road (NH-166G) stretches start from Start of Karul Ghat to End of Gaganbawda of NH-166G in the State of Maharashtra on EPC Mode. 02/NHD/AB/TC/2022-23 03/05/2023 11/04/2023 20/06/2023
Time 17:30Hrs
250 Consultancy services for Authoritys Engineer for Supervision of Rehabilitaion and Up-gradation of Guhagar Chiplun Helwak Road 2LPS configuration in the state of Maharashtra on EPC Mode Rampur-Chiplun-Helwak Section. 03/NHD/AB/TC/2022-23 04/06/2023 11/04/2023 20/06/2023
Time 17:30Hrs
251 Consultancy Services for Authoritys Engineer for Supervision of Upgradation of Keonchi-Ratanpur Road Package-I Design Ch. Km. 237.860 to Km. 273.200 and Package-II Design Ch. Km. 278.750 to Km. 321.348 of NH-45 to two lane with paved shoulders with Flexible Pavement in the state of Chhattisgarh on EPC mode 01/CE/NH/TC/44-01/2023 17/04/2023 10/04/2023 25/05/2023
Time 11:0Hrs
252 CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF UPGRADATION OF PACKAGE-II MUNGELI TO PONDI FROM NH KM 51.600 TO KM 77.870 and 80.970 TO KM 96.970 AND PACKAGE-III TAKHATPUR BYPASS FROM DESIGN CH. 18.700 TO 25.900 MUNGELI BYPASS FROM DESIGN CH. 39.600 TO 51.600 PANDARIYA BYPASS FROM DESIGN CH. 77.900 TO 81.000 and PONDI BYPASS FROM DESIGN CH. 97.000 TO 100.395 OF NH-130A TO TWO LANE WITH PAVED SHOULDERS WITH FLEXIBLE PAVEMENT IN THE STATE OF CHHATTISGARH ON EPC MODE. 02/CE/NH/TC/44-02/2023 17/04/2023 10/04/2023 25/05/2023
Time 11:0Hrs
253 CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF UPGRADATION OF PACKAGE-I RAJPURI KHURD VILLAGE TO PADIH VILLAGE SECTION FROM EXISTING KM 7.830 TO KM 57.650 DESIGN CH.13.700 TO CH. 62.700 AND PACKAGE-III BADKI MAHRI VILLAGE TO RAMANUJGANJ SECTION FROM EXISTING KM 80.600 TO KM 110.330 DESIGN CH. 85.370 TO CH. 114.800 OF NH-343 TO TWO LANE WITH PAVED SHOULDERS WITH FLEXIBLE PAVEMENT IN THE STATE OF CHHATTISGARH ON EPC MODE 03/CE/NH/TC/44-03/2023 17/04/2023 10/04/2023 25/05/2023
Time 11:0Hrs
254 Consultancy Services of Independent Engineer for the project Improvement and Up-gradation of Existing Road to Four laning of NH 530B from Kasganj Bypass End (Existing Km. 150.100 of NH 530B/ Design Km. 123.100) to Chandan Nagar (Existing Km 96.200 of NH 530B/Design Km. 179.500) section of NH 530B -(Package 3) - in the State of Uttar Pradesh on HAM mode NHAI/11013/NH-530B/MHB/PKG-III/KB/2023/IE/E-198202 10/04/2023 10/04/2023 05/06/2023
Time 11:0Hrs
255 Consultancy Services for Supervision Consultants of Operation & Maintenance of Tambaram to Tindivanam section of NH-32 (Old No.45) from Km.28/000 to Km.121/000 in the State of Tamil Nadu NHAI/RO-Chennai/SC/O&M/2022-23/114 10/04/2023 07/04/2023 16/05/2023
Time 17:0Hrs
256 Independent Engineer services for Construction of 4 Lane Bypass to NH114A Connecting NH-333 and NH-133(Deoghar Bypass) from design km 0.000 to design Km 49.000(Total Length 49.000 km) in the state of Jharkhand on HAM 2023-NHAI-151115-1 12/04/2023 06/04/2023 13/11/2023
Time 11:0Hrs
257 CS for AE for Supervision of Const. of Initial Improvement works n supervision of ATMS/TMS installation under TOT of Shivpuri-Jhansi (from km 1305.087 to km 1380.387) in MP and Agra Bypass (from km 0.000 to km 32.800) in UP. NHIPMPL/2022-23/ Shivpuri-Jhansi n Agra Bypass/AE/ 06/04/2023 05/04/2023 30/05/2023
Time 11:0Hrs
258 Supervision Consultancy services during Operation and maintenance stage for Ghoshpukur to Dhupguri section of NH-31D and Salsalabari to Assam Bengal Section of NH-31C in the state of West Bengal 10/Ghosh-Dhup and Salsa-Assm/SC/22-23 03/04/2023 03/04/2023 29/05/2023
Time 12:0Hrs
259 Consultancy services for AE for Supervision of Improvement and rehabilitation of Existing Ayodhya Bypass from design km 121.600 to Design km 144.020 (Length 22.420 Km) of NH-28 (New NH-27) of EPC Mode under BMP in the state of Uttar Pradesh NHAI/UP(W)/Existing AyodhyaBypass/AE/2023 17/04/2023 31/03/2023 01/05/2023
Time 11:0Hrs
260 CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF Up-gradation to four lane/ two lane with paved shoulders configuration of Kaylan - Murbad - Malshej Ghat - Nirmal Road NH- 61 km 15/200 to Km 38/00 and from Km. 58/00 to Km 84/00 (design length 48.55 km) of NH-61 on EPC Mode in Thane District in the state of Maharashtra NH/MAH/RO/Mum-1/AE/PKG-4 07/05/2023 29/03/2023 01/06/2023
Time 17:0Hrs
261 Selection of AUTHORITYS Engineer (AE) PMC Services for Supervision of Construction of Mariahu Bypass with four lane paved shoulder configuration (Km. 53.540 to Km.59.200) of NH-135A on EPC mode in the state of Uttar Pradesh. 840/NH-135A-NHCP-22/23 Dated. 27.03.2023 Tender 01/04/2023 29/03/2023 10/06/2023
Time 11:0Hrs
262 CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF WIDENING AND STRENGTHENING/RECONSTRUCTION TO FOUR LANE/FOUR LANE WITH SERVICE ROAD INCLUDING STRUCTURES FROM POKHARIA MORE AT KM47.600 (EX. KM 50.230) TO GOVINDPUR AT KM 62.949 (EX. KM 65.325) OF NH-419 IN THE STATE OF JHARKHAND UNDER EPC MODE RW/Ranchi/AP-24/2021-22/JHR 29/03/2023 28/03/2023 11/05/2023
Time 10:30Hrs
263 Independent Engineer Services during Operation and Maintenance period of 5 years for Six laning and Strengthening of NH-248A from existing km 2.740 Rajiv Chowk to km 24.536 Design Ch Km 0.340 to Km 22.136 in in the State of Haryana under NHDP-IV on Hybrid Annuity Mode 2023-NHAI-150439-1 29/03/2023 28/03/2023 20/06/2023
Time 11:0Hrs
264 Independent Engineering Services for Four Laning of Behsuma - Bijnor Section of NH-119 from Design Ch.39.250 km (Existing chainage 39.240) to Design Ch. 78.810 km (Existing chainage 89.590) with Design Length 39.560 km in the State of Uttar Pradesh on Hybrid Annuity Mode under Bharatmala Pariyojna 2023-NHAI-150329-1 17/04/2023 27/03/2023 01/05/2023
Time 11:0Hrs
265 Consultancy Services For Authority Engineer for Construction of Major Bridge on Shivni River at design chainage from Km. 122.080 to Km. 123.100 on NH 353C along with approaches of 940m (Total Length . 1020m) of National Highway Sakoli Lakhandur Wa 13/EENH/GAD/2022-23 10/05/2023 24/03/2023 17/05/2023
Time 17:0Hrs
266 Consultancy Services for Authority Engineers for Construction Of Seven Minor Bridge On Allapalli Bhamragad Laheri Binagunda Naraynpur National Highway (NH) 130D (Section from Allapalli to Bhamragd) At Chainage 2.400 km, 9.200 km, 14.200 km, 32.600 km, 34.200 km, 43.400 km and 46.400 km. in Gadchiroli District In State Of Maharashtra on EPC mode. (Total 1.645 km With Approaches.). NIT13/EENHD/GAD/2022-23 12/05/2023 24/03/2023 17/05/2023
Time 17:0Hrs
267 IE Services during OnM stage of 2 lane with paved shoulder of NH 70 from Munabao Sundra Myajlar Dhanana Asutar Ghotaru Tanotunder Phase I of Bharatmala Pariyojna in the state of Rajasthan on HAM NHAI/11011/2/ROJ-Tenders/IE-MT 13/05/2023 23/03/2023 18/05/2023
Time 11:0Hrs
268 IE Services during OnM stage of 2 lane with paved shoulder of NH 70 from Munabao Sundra Myajlar Dhanana Asutar Ghotaru Tanotunder Phase I of Bharatmala Pariyojna in the state of Rajasthan on HAM NHAI/11011/1/ROJ-Tenders/IE-MT 05/05/2023 23/03/2023 08/05/2023
Time 11:0Hrs
269 CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF Upgradation of Jharkheda- Berasia - Dholkhedi from km 0/000 to km 87/900 of NH-346 (including 3 nos. green field bypasses 13.10 Km) in the State of Madhya Pradesh under EPC mode 2023-MoRTH-746890-1 24/03/2023 23/03/2023 12/06/2023
Time 17:30Hrs
270 Consultancy services for Authority Engineer for Four Laning of Left-Over Works of Hospet-Bellary-Karnataka/ AP border from Km 280/080 (Design Chainage) to Km 375/450 (Design Chainage) of NH-63 in the State of Karnataka on EPC Mode 2023-NHAI-149607-1 21/03/2023 21/03/2023 03/07/2023
Time 11:0Hrs
271 Consultancy Services for Independent Engineer services for Supervision of Development of Six-Lane Access Controlled Greenfield Highway from Audireddipalle (Ch. 160.000) to Chandrasekharpuram (Ch. 228.000) of [NH-544G] Bengaluru –Vijayawada Economic Corridor on HAM Mode under Bharatmala Pariyojana Phase-I in the state of Andhra Pradesh (Package-III)-2nd Call NHAI/BM/EC/Bengaluru-Vijayawada/IE/PkgIII/2022 21/03/2023 21/03/2023 20/04/2023
Time 11:0Hrs
272 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF Rehabilitation, Upgradation and Widening of existing Highway to Rigid Pavement 2 Lane/2LPS of NH 965DD from Lonand Shirval-Bhor Mandangad-Pachral Section Shindewadi Phata to Varandha Ghat Dist Border in the state of Maharashtra. NH/MAH/RO/Pune-2/AE/PKG-3 06/05/2023 21/03/2023 01/06/2023
Time 17:0Hrs
273 CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF Rehabilitation/Upgradation from Lagam to Alapalli to 2L.PS / 4 lane configuration section of NH-353 C in Gadchiroli District in the state of Maharashtra on EPC mode NH/MAH/RO/Ngp-1/AE/PKG-1 13/04/2023 21/03/2023 01/06/2023
Time 17:0Hrs
274 CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF Up-gradation to 4 lane configuration for the work of Peth Naka to Sangli Road (section of NH-166H in the state of Maharashtra on EPC mode. NH/MAH/RO/Pune-1/AE/PKG-2 13/04/2023 21/03/2023 01/06/2023
Time 17:0Hrs
275 Consultancy services for Authority’s Engineer for Supervision of balance work and Operation & Maintenance of project of Four Laning of Kodebad -Dhamtari section (Km 43.400 to Km 82.209) of NH-30 in the state of Chhattisgarh under NHDP-IV through EPC mode NHAI/CG/Kod-Dhamtari/NH-30/AE/2023 13/04/2023 21/03/2023 25/04/2023
Time 11:0Hrs
276 Consultancy Services for AE for supervision of design & construction of Elevated structure (flyover) from Indora Chowk to Dighori Chowk (Design Length – 8.90 km) in Nagpur city on Nagpur-Umred section of NH-353D in the state of Maharashtra on EPC mode NHAI/Tech/MH/AE/Indora Flyover/2023 03/04/2023 21/03/2023 24/04/2023
Time 11:0Hrs
277 Consultancy services for Authority Engineer for supervision of Construction of MSL rd to NHDL Specification for Design chainage km 244pt000 to km 268pt670 on NH 03(Taken Manali as Km 0pt000) under project Himank in Ladakh(UT) on EPC mode(Length 24pt670 Km) HIMANK/EPC/14/2022-23 20/03/2023 20/03/2023 04/05/2023
Time 11:0Hrs
278 IE Services for Six laning of Surat – Nashik – Ahmednagar – Solapur – MH/KNT Border Greenfield stretch [Package –XIV from km 512.000 (Hasapur) to km 548.400 (Badadal)] in the State of Maharashtra to be executed on HAM under Bharatmala Pariyojana NHAI/Tech/MH/IE/S–N–A–S (Pkg-XIV)/2023 03/04/2023 16/03/2023 14/04/2023
Time 11:0Hrs
279 IE Services for Six laning of Surat – Nashik – Ahmednagar – Solapur – MH/KNT Border Greenfield stretch [(a) Package –IV and (b) Package –V] in the State of Maharashtra to be executed on HAM under Bharatmala Pariyojana NHAI/Tech/MH/IE/S–N–A–S (Pkg-IV & V)/2023 03/04/2023 16/03/2023 30/01/2024
Time 11:0Hrs
280 Operation and Maintenance of Gorakhpur Bypass 148894 09/05/2023 15/03/2023 18/05/2023
Time 12:0Hrs
281 Independent Engineer Services for Supervision of Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with Bhabhua Adhaura road in Bhairopur village to Konki village (from Km. 54.000 to Km. 90.000) under Bharatmala Pariyojana in the state of Bihar on Hybrid Annuity Mode NHAI/BM/Varanasi-Kolkata/2023/Pkg3/IE 22/03/2023 14/03/2023 20/04/2023
Time 11:0Hrs
282 Independent Engineer Services for Supervision of Construction of 6lane Greenfield Varanasi Ranchi Kolkata Highway from junction with NH19 & Varanasi Ring Road near Rewasa village to junction with Bhabhua-Adhaura road near Palka village (from Km. 0.000 to Km. 54.000) under Bharatmala Pariyojana in the state of Uttar Pradesh & Bihar on Hybrid Annuity Mode NHAI/BM/Varanasi-Kolkata/2023/Pkg1&2/IE 22/03/2023 10/03/2023 20/04/2023
Time 11:0Hrs
283 Supervision Consultancy Services (SC) for Supervision of Operation and Maintenance including Incident Management for the 4-laning stretch of Kathipudi to start of Kakinada bypass from Km.0.000 to Km.27.500 of NH 216 in the state of Andhra Pradesh 2023-NHAI-148323-1 21/03/2023 08/03/2023 10/05/2023
Time 16:0Hrs
284 Independent Engineer Services during Operation and Maintenance period for Six Laning of Etawah to Chakeri (Kanpur) Section of NH-2 from Km. 323.475 to Km. 483.687 on DBFOT (Toll) Basis under NHDP Phase V in the State of Uttar Pradesh 24001/1/RO-W-UP/E-C/IE/2023 27/03/2023 07/03/2023 30/03/2023
Time 12:0Hrs
285 Supervision Consultancy Services during O&M stage of 2 laning with paved shoulder of Piprakothi – Motihari – Raxaul Section of NH 28 A from km. 0.650 to km. 68.650, and 4 lane with Paved Shoulder from km. 68.650 to 69.240 ICP Raxaul) in the State of Bihar under NHDP Phase – III . 173/RO-Patna/NHAI/2022-23 21/03/2023 06/03/2023 12/04/2023
Time 11:0Hrs
286 Independent Engineer Services for Supervision of Construction of 6 lane Greenfield Varanasi Ranchi Kolkata Highway from Sonepurbigha village to junction with NH 100 in Deoria village from km 184.700 to km 253.000 under Bharatmala Pariyojana in the State of Jharkhand on Hybrid Annuity Mode NHAI/BM/Varanasi-Kolkata/2023/Pkg8&9/IE 22/03/2023 06/03/2023 25/04/2023
Time 11:0Hrs
287 Independent Engineer Services for Supervision of Construction of 6 lane Greenfield Varanasi Ranchi Kolkata Highway from Deoria village to junction with NH 20 in Bongabar village from km 253.000 to km 325.500 under Bharatmala Pariyojana in the State of Jharkhand on Hybrid Annuity Mode NHAI/BM/Varanasi-Kolkata/2023/Pkg10&11/IE 22/03/2023 06/03/2023 25/04/2023
Time 11:0Hrs
288 Independent Engineer Services for Supervision of Construction of 6 lane Greenfield Varanasi Ranchi Kolkata Highway from junction with NH 20 in Bongabar village to Kamlapur village (JH/WB border) from km 325.500 to km 387.200 under Bharatmala Pariyojana in the State of Jharkhand on Hybrid Annuity Mode NHAI/BM/Varanasi-Kolkata/2023/Pkg12&13/IE 22/03/2023 06/03/2023 25/04/2023
Time 11:0Hrs
289 Independent Engineer Services for Supervision of Construction of 6 lane Greenfield Varanasi-Ranchi-Kolkata Highway from Pachmon village to Sagrampur village (From KM. 116.000 to KM. 184.700) under Bharatmala Pariyojana in the state of Bihar on Hybrid Annuity Mode NHAI/BM/Varanasi-Kolkata/2023/Pkg6&7/IE 22/03/2023 06/03/2023 20/04/2023
Time 11:0Hrs
290 Consultancy Services for Supervision Consultants of O & M of Four lanes with paved shoulders of Lambra-Shahkot Section NH-71 (New NH-703) from existing km 12.000 to 44.600 including construction of Nakodar and Shahkot Bypasses in the State of Punjab. 2023-NHAI-148105-1 03/04/2023 06/03/2023 10/04/2023
Time 11:30Hrs
291 Consultancy Services for Supervision Consultants of O & M of Four lanes with paved side shoulders of Tallewal-Barnala Section NH-71 (New NH-703) from existing km. 114.000 to km 136.070 of NH-71 to existing km. 149.000 of NH-64 in the State of Punjab. 2023-NHAI-148132-1 03/04/2023 06/03/2023 10/04/2023
Time 11:30Hrs
292 Independent Engineer Services during Operation and Maintenance for Rehabilitation and Upgradation of Giddalur – Vinukonda section of NH-544D from Design Km.212.983 (Existing Km 213.000) to Design Km.322.800 (Existing Km.322.840) (Design length – 112.797kms) in the State of Andhra Pradesh to two lane with paved shoulders under NH 16 on Hybrid Annuity Mode. 2023-NHAI-147619-1 06/03/2023 06/03/2023 18/04/2023
Time 11:0Hrs
293 SC of 2 laning with paved shoulders of Jhalawar Rajasthan M.P.Border Section of NH 12 from Km. 346.540 to Km. 408.700 in the State of Rajasthan NHAI/11011/2/ROJ/SC-JMB 02/03/2023 03/03/2023 18/05/2023
Time 11:0Hrs
294 Independent Engineer Services for Construction of new Six-lane Capital Region Ring Road from Rameswar NH-16 to Gobindpur NH-55 package-I from Design chainage Km. 0.000 to Km. 40.700 in the State of Odisha under Bharatmala Pariyojna on Hybrid Annuity Mode Package-I 2023 NHAI 147593 1 02/03/2023 02/03/2023 14/02/2024
Time 11:0Hrs
295 Independent Engineer Services for Construction of new Six-lane Capital Region Ring Road from Rameswar (NH-16) to Gobindpur (NH-55) package-II from Design CH. 40.700 to 70.995, (village Bilipada to Gobindpur) in the State of Odisha under Bharatmala Pariyojna on Hybrid Annuity Mode. 2023 NHAI 147599 1 02/03/2023 02/03/2023 14/02/2024
Time 11:0Hrs
296 Independent Engineer services for Supervision of Construction of 6-lane Greenfield Ambala Ring Road starting from junction with Shamli-Ambala section of NH-344GM near Village Kapuri (Design km 18.226) and terminating at Ismailabad - Ambala Section of NH-152G near Village Bhari (Design km 40.750) (Total length 22.524 Kms) under Bharatmala Pariyojana in the State of Haryana on Hybrid Annuity Mode NHAI/AmbalaRingRoad/IE/2023/HR 14/03/2023 02/03/2023 01/04/2023
Time 11:0Hrs
297 Consultancy services of Authority’s Engineer for Upgradation of existing 4 lane IsmailabadAmbala section of NH-152 (Km. 0.000 to Km 42.500) (Part of Ambala-Kotputli Corridor) to 4- lane access controlled stretch by providing grade separated structures and service/Slip roads under Bharatmala Pariyojana-I in the state of Haryana on EPC mode. NHAI/ Ismailabad-Ambala/ AE/2023/HR 14/03/2023 02/03/2023 01/04/2023
Time 11:0Hrs
298 Independent Engineer Services for Rehabilitation and Upgrading of Existing Road from Dareota Village to Nauni Chowk of NH 205 for 2/4 Lane with Paved Shoulder Design Chainage – Km 33.175 to Km 40.300 (Two Lane), Design Length 7.125 Km including single tube tunnel & Km 40.300 to Km 58.450 (Four Lane), Design Length 18.150 Km (Total length 25.275km) Package IIB in the State of Himachal Pradesh under NH (O) on Hybrid Annuity Mode 2023 NHAI 147440 1 10/03/2023 01/03/2023 26/06/2023
Time 11:0Hrs
299 Consultancy services for Authority Engineer services for Construction of 4 lane Greenfield North - East side Gorakhpur bypass (26.616 kms) starting from NH-29E (Km 83.308) and end at NH-28 (Km 285.100) in the state of Uttar Pradesh under Bharatmala pariyojana on EPC mode. 147111 07/03/2023 27/02/2023 03/05/2023
Time 11:0Hrs
300 Consultancy services for Independent Engineer Construction of 4/6 lane bypass for Belagavi city from Km 11.00 (Goa side) of NH-4A to Km 516.000 (Pune side) of NH-4 (Design Length 34.48 km) in the state of Karnataka on Hybrid Annuity Mode. Package 1A 2023-NHAI-146930-1 09/03/2023 24/02/2023 22/03/2023
Time 11:0Hrs
-
301 AUTHORITY’S ENGINEER FOR SUPERVISION OF “Upgradation /widening andconstruction of 4 – lane with paved shoulders from Srirampur to Dhubri (Length 54.154km) of NH- 127B in the State of Assam under JICA ODA Loan assistance (Phase- V) onEPC mode. 2nd Call NHIDCL/ASSAM/S-D/JICA5/AE/2021 /199467/RFP/C2 21/02/2023 24/02/2023 16/03/2023
Time 15:0Hrs
302 Consultancy Services for AE for Supervision of Rehabilitation Upgradation of Existing two Lane Road to 4Lane With Paved Shoulders from km 32.0 to km 79.650 D c Km 32.000 to km 78.760 Puttaparthi Koduru Section of NH342 in the State of Andhra Pradesh RW/NH-12014/7/AP/Z-III/745/AE 24/02/2023 23/02/2023 17/04/2023
Time 17:0Hrs
303 Consultancy Services for AE for Supervision of Rehabilitation Upgradation of Newly Declared NH Somayajulapalli Dhone Road of NH 340B from Km.0.0 To 56.200 D Ch. Km 0.00 to km 53.33 to two lane with paved shoulders in the State Of Andhra Pradesh RW/NH-12014/1/AP/Z-III/744/AE 24/02/2023 23/02/2023 18/04/2023
Time 17:0Hrs
304 Consultancy Services for Supervision Consultant (SC) during Operation and Maintenance Period of Govindpur-Chas section of NH-32 from km 0.000 to km 56.889 in the State of Jharkhand NHAI/RO/RNC/JH/2022-23/25 09/05/2023 22/02/2023 25/05/2023
Time 15:0Hrs
305 Consultancy services for Authoritys Engineer for Operation and Maintenance of project of Four Laning of Raipur – Kodebad section (Km 10.200 to Km 43.400) of NH-30 in the state of Chhattisgarh under NHDP-IV through EPC mode. 11052/RO-Raipur/Tender/AE/R-K 22/02/2023 21/02/2023 23/03/2023
Time 15:0Hrs
306 Consultancy services for Authority Engineer for construction of four laning with paved shoulder from Hassan to Adihalli EC-20 Ch. Km 00.000 Hassan to Ch. Km 37.000 Adihalli Village under Bharatmala Pariyojana on EPC Mode in the state of Karnataka (Package-I) NHAI/ KNT/Hassan Adihalli/Pkg1/AE /2023/190744 20/02/2023 20/02/2023 20/03/2023
Time 11:0Hrs
307 Consultancy Services for Authoritys Engineer for Supervision of Widening and Strengthening/Reconstruction to Two Lane with Paved Shoulder/Two lane paved shoulder with service road from km 0.000 to 42.250 (excluding design ch. 03.220 to 04.200 and 28.350 to 29.060) and from km 98.00 to 176.310 of NH-320G in the State of Jharkhand under EPC mode RW/Ranchi/DPR/NH/IAHE/36/2017 20/03/2023 20/02/2023 29/03/2023
Time 16:0Hrs
308 Independent Engineer services for supervision of Rudrapur Bypass from Design Km 00-000 to Design Km 20-640 in the State of Uttarakhand on Hybrid Annuity mode 2023-NHAI-146059-1 15/03/2023 20/02/2023 23/03/2023
Time 11:0Hrs
309 Consultancy services for Independent Engineer for Construction of STRR (West side) (i) Kunagal-Thattekere from km 79.000 to km 112.600 with length of 33.6 Km (Pkg-1) and (ii) Bagganadoddi S.Mudugadapalli from km120.980 to 144.17 with length of 23.44 Km (Pkg-3) in the state of Karnataka & Tamil Nadu on Hybrid Annuity Mode (HAM) under Bharatmala Pariyojana NHAI/KNT/STRR/Phase-II/Pkg-1-3/IE/2023/191113 21/02/2023 17/02/2023 15/01/2024
Time 11:0Hrs
310 Operation and Maintenance of Dindigul Theni Kumili section of NH183 in the State of Tamil Nadu NHAI/17011/02/14/2023 17/02/2023 17/02/2023 18/03/2023
Time 13:0Hrs
311 Consultancy services for Authoritys Engineer for Supervision of Rehabilitation and Upgradation of Shirapur Junction to Shivaji Chowk section of NH-561 and Barshi Naka to Jarud Phata section of NH-361F to 2LPS/ Four Lanes configuration on EPC mode. EENHD/Latur/NITNo-10/293/22-23 21/02/2023 16/02/2023 03/04/2023
Time 17:30Hrs
312 Independent Engineer services for Construction of 4-Lane Access Controlled Greenfield Highway section on NH-163G (Warangal-Khammam) from Oorugonda village in Hanamkonda District at Design Ch. 112.240 Km to Venkatpur village in Warangal District at Design Ch. 150.240 Km (total length 38.000 Km) under other Economic Corridor (NH(O)) programme on Hybrid Annuity Mode in the State of Telangana (Package-I) NHAI/GM(T) /DGM(T)/War Kha(PkgI)/ IE/02-2023 21/02/2023 16/02/2023 22/03/2023
Time 11:0Hrs
313 Independent Engineer services for Construction of 4-Lane Access Controlled Greenfield Highway section on NH-163G (Warangal-Khammam) from Venkatpur village in Warangal District at Design Ch. 150.240 Km to Thallasenkesa village in Mahabubabed District at Design Ch. 189.650 km (total length 39.410 Km) under other Economic Corridor (NH(O)) programme on Hybrid Annuity Mode in the State of Telangana (Package-II). NHAI/GM(T)/DGM(T)/War Kha(PkgII)/IE/02-2023 21/02/2023 16/02/2023 22/03/2023
Time 11:0Hrs
314 Independent Engineer services for Construction of 4-Lane Access Controlled Greenfield Highway section on NH-163G (Warangal-Khammam) from Thallasenkesa village at Design Ch. 189.650 km to V.Vekatayapalem village in Khammam District at Design Ch. 220.480 Km (total length 30.830 Km) under other Economic Corridor (NH(O)) programme on Hybrid Annuity Mode in the State of Telangana (Package-III) NHAI/GM(T)/DGM(T)/War Kha(Pkg-III)/ IE/02-2023 21/02/2023 16/02/2023 22/03/2023
Time 11:0Hrs
315 Independent Engineer services for Construction of 4-Lane Access Controlled Greenfield Highway section on NH-163G (Khammam– Vijayawada) from V.Venkatayapalem village at Design Ch. 220.480 Km to Brahmanapalli(K) village at Design Ch. 250.400 Km (total length 29.920 Km) under other Economic Corridor (NH(O)) programme on Hybrid Annuity Mode in the State of Telangana (Package-I) NHAI/GM(T)/DGM(T)/Kha Vij (Pkg-I)/ IE/02-2023 21/02/2023 16/02/2023 22/03/2023
Time 11:0Hrs
316 Independent Engineer services for Construction of 4-Lane Access Controlled Greenfield Highway section on NH-163G (Khammam – Vijayawada) from Brahmanapalli(K) village at Design Ch. 250.400 Km to Remidicherla village at Design Ch. 280.200 Km (total length 29.800 Km) under other Economic Corridor (NH(O)) programme on Hybrid Annuity Mode in the State of Telangana & AP (Package-II) NHAI/GM(T)/ DGM(T)/Kha-Vij (PkgII)/IE/ 02-2023 21/02/2023 16/02/2023 22/03/2023
Time 11:0Hrs
317 Independent Engineer services for Construction of 4-Lane Access Controlled Greenfield Highway section on NH-163G (Khammam – Vijayawada) from Remidicherla village at Design Ch. 280.200 Km to Jakkampudi village (on NH-16) at Design Ch. 309.909 Km (total length 29.709 Km) under other Economic Corridor (NH(O)) programme on Hybrid Annuity Mode in the State of Telangana & AP (Package-III) NHAI/GM(T)/DGM(T)/Kha Vij(Pkg-III)/IE/ 02-2023 21/02/2023 16/02/2023 22/03/2023
Time 11:0Hrs
318 Consultancy services for Independent Engineer for Construction of 4 lane Thiruvananthapuram Outer Ring Road (ORR)-( Civil Package I &and II) from Navaikulam to Vizhinjam (Ch-(-)0.450 to Ch-62.200 Design length-62.65 km in the State of Kerala on HAM mode under Bharatmala Pariyojana in the State of Kerala in HAM mode under Bharatmala Pariyojana 2023-NHAI-145824-1 27/02/2023 16/02/2023 11/09/2023
Time 11:0Hrs
319 Consultancy services for Authoritys Engineer for Supervision of Rehabilitation and Upgradation of Parli to Sirsala section of NH-361F (km 136.700 to115.000) to Two lanes with paved shoulder/Four lane configuration on EPC mode in the State of Mahrashtra EENHD/Latur/NITNo-10/293/22-23 28/02/2023 16/02/2023 03/04/2023
Time 17:0Hrs
320 CS for AE for Supervision of R and U of Hoshiarpur-Una of NH-503A to 2 lane paved shoulder configuration (from km 15.200-km 30.348)and construction of 4 lane Hoshiarpur Bypass (from km 2.425-km 15.200) (Total 27.923 Kms) in Punjab (Package-IV) on EPC NHAI/34044/1/2023/PB/ 07/03/2023 16/02/2023 20/03/2023
Time 11:0Hrs
321 Independent Engineer services for Construction of 4 lane Access Controlled New Greenfield Highway Section (Mancherial–Warangal) from Narva village at Design Ch. 3.834 Km to Puttapaka village at Design Ch. 35.300 Km (Total length 31.466 km) under Other Economic Corridor (NH(O)) programme as part of Nagpur - Vijayawada Corridor on Hybrid Annuity mode in the state of Telangana (Package-I). NHAI/GM(T)/DGM(T)/Man-War (Pkg-I)/IE/02-2023 17/02/2023 15/02/2023 21/03/2023
Time 11:0Hrs
322 Independent Engineer services for Construction of 4 lane Access Controlled New Greenfield Highway Section Mancherial – Warangal) from Pangidipalle village at Design Ch. 72.350 Km to Oorugonda village at Design Ch. 112.240 Km (Total length 39.890 km) under Other Economic Corridor (NH(O)) programme as part of Nagpur - Vijayawada Corridor on Hybrid Annuity mode in the state of Telangana (Pkg-III) NHAI/GM(T)/DGM(T)/Man-War (Pkg-III)/IE/02-2023 18/02/2023 15/02/2023 21/03/2023
Time 11:0Hrs
323 Independent Engineer services for Construction of 4 lane Access Controlled New Greenfield Highway Section (Mancherial – Warangal) from Puttapaka village at Design Ch. 35.300 Km to Pangidipalle village at Design Ch. 72.350 Km (Total length 37.050 km) under Other Economic Corridor (NH(O)) programme as part of Nagpur – Vijayawada Corridor on Hybrid Annuity mode in the state of Telangana (Package-II) NHAI/GM(T)/DGM(T)/Man-War (Pkg-II)/IE/02-2023 17/02/2023 15/02/2023 21/03/2023
Time 11:0Hrs
324 Independent Engineer services for Four Laning of NH-39 (old NH-75) from design Km 97.600 (existing Km 96.470) (Udaipura village) to design km 147.540 (existing Km 148.020) (Bhogu Village) in the State of Jharkhand on Hybrid Annuity mode (Package – II) 2023-NHAI-145548-1 16/02/2023 14/02/2023 05/04/2023
Time 11:0Hrs
325 Independent Engineer services for Four laning of Basukinath to Deoghar section of NH- 114A from design Km 85.081 to design Km. 130.240 (Design Length 45.159 Km.) in the State of Jharkhand on Hybrid Annuity Mode 2023-NHAI-145542-1 16/02/2023 14/02/2023 05/04/2023
Time 11:0Hrs
326 Consultancy Services for AE for Supervision of Rehabilitation and Upgradation of Existing Road to 2 Lane with Paved Shoulder Configuration from Seetharamapuram to Duttaluru Section of NH167 BG From Km. 0.000 To Km. 36.400 Km in the State Of AP RW/NH22-23-AP/167BG-Z-III/AE 18/02/2023 13/02/2023 29/03/2023
Time 15:0Hrs
327 IE SC of 4-Laning with Paved Shoulder of Bijni to Mandi Section from existing Km 202.815-Km 208.000 of NH-20 including construction of Twin Tube Tunnel for a length of 3.500 Km of Pathankot-Mandi under NH(O) in Himachal Pradesh on HAM basis (PKG-VB 2023 NHAI 145349 1 23/02/2023 13/02/2023 21/03/2023
Time 11:0Hrs
328 Consultancy Services For Authoritys Engineer For Supervision of Upgradation and reconstruction of Dindori - Mandla Section of NH 543 from Km 77/100 to Km 170/580 (Total length 93.48km) to Two lane with paved shoulder in the State of Madhya Pradesh on EPC RO/BPL/02/AE/Din-Man2022-23 26/02/2023 13/02/2023 05/04/2023
Time 15:0Hrs
329 Consultancy Services for Authoritys Engineer for supervision of Construction of 2-lane with paved shoulder configuration of Ashta Bypass of Length 7.580 Km, section of NH-752C and Upgradation of Nasrullagani-Rehti-Budhni Section of NH-146B, total length-47.300 Km from Km 0/150 to Km 50/500 in the state of Madhya Pradesh on EPC mode 2023-MoRTH-739976-1 25/03/2023 13/02/2023 25/04/2023
Time 17:30Hrs
330 Consultancy Services for Authoritys Engineer for supervision of Construction of 2-lane with paved shoulder configuration of Ashta Bypass of Length 7.580 Km, section of NH-752C and Upgradation of Nasrullagani-Rehti-Budhni Section of NH-146B, total length-47.300 Km from Km 0/150 to Km 50/500 in the state of Madhya Pradesh on EPC mode 19/SAC/NIT/AE/2022-23 09/02/2023 13/02/2023 28/03/2023
Time 15:0Hrs
331 Independent Engineer services during Operation and Maintenance Period for 4laned Chikhali to Tarsod (Package-IIA) Section of NH-53 from Km.360.000 to Km.422.700 in the State of Maharashtra on Hybrid Annuity Mode (DBFOT Annuity) under NHDP Ph-IV-2nd call NHAI/RO-NAG/TENDERS/2022-23/37 11/02/2023 11/02/2023 16/03/2023
Time 11:0Hrs
332 Consultancy Services for Authority’s Engineer for Supervision of (i) Construction and Operation & Maintenance of Viaduct from Sahakarijin Junction to Motipura Circle from Km.490.940 to Km.493.290 of the Shamlaji – Motachiloda section of NH-48 in the state of Gujarat on EPC Basis (ii) Operation & Maintenance of Six-lane Motachiloda - Nanachiloda section of NH-48 from Km.540.595 to Km.555.905 in the state of Gujarat implemented on EPC Basis 2023-NHAI-145178-1 17/02/2023 11/02/2023 13/03/2023
Time 15:0Hrs
333 Consultancy Services for Independent Engineer services for Supervision of Development of Six-Lane Access Controlled Greenfield Highway from Audireddipalle (Ch. 160.000) to Chandrasekharpuram (Ch. 228.000) of (NH-544G) Bengaluru –Vijayawada Economic Corridor on HAM Mode under Bharatmala Pariyojana Phase-I in the state of Andhra Pradesh (Package-III) NHAI/BM/EC/Bengaluru-Vijayawada/IE/Pkg-III/2022 17/02/2023 10/02/2023 14/03/2023
Time 11:0Hrs
334 Consultancy Services for Authority Engineer for Supervision of Development and Upgradation of Four lane Access Control Expressway from Design Chainage Km 530.000 to Km 545.300 (Sidhra to Ban Village Section of NH-44) of Delhi Amritsar Katra Expressway on EPC Mode under Bharatmala Pariyojana in the UT of J and K (Phase II Package XVIII) NHAI/BM/DAKExpressway/2022/Pkg XVIII/AE 03/03/2023 10/02/2023 30/03/2023
Time 11:0Hrs
335 Independent Engineer Services for Construction of Four Lane Access Controlled Greenfield Atal Progressway (Chambal Expressway) From Km 206.000 (Village Jhundpura In Morena District) To Km 265.000 (Village Maithana In Morena District) under Bharatmala Pariyojna in the State of Madhya Pradesh (Package-V) on Hybrid Annuity Mode & Construction of four lane access controlled Greenfield Atal Progressway (Chambal Expressway) from km 265.000 (village Maithana Morena District) to km 312.950 in MP NHAI/HQ/MP/AtalProgressway/IE/Pkg-V & VI/2023 06/03/2023 10/02/2023 21/03/2023
Time 11:0Hrs
336 Supervision Consultant (SC) for maintenance works and activities on Chunculuru - Nellore section from km.652.200 to km 741.950 (length 89.75) of NH 67 NHAI/ROVJA/ Badvel-Nellore /2023 10/02/2023 10/02/2023 15/03/2023
Time 11:0Hrs
337 IE Services for Four Laning of Abohar 75.500 to Fazilka (114.080) and Construction of 4-lane Greenfield highway of Abohar bypass (From 0.000 Malout-Abohar Road on NH-07 to chainage 6.380 AboharFazilka) 44.96 km on HAM Mode in Punjab under BMP NHAI/25044/1/2022/PB/ABH-FZL 14/02/2023 09/02/2023 13/03/2023
Time 11:0Hrs
338 Consultancy Services for AE for Supervision of Chotahapjan Bogapani section) (2-Lane PS) in(Package-3) Digboi Bypass (Green Field and Brownfield) (Package-4) and Digboi Bypass (Green Field and Brownfield) (2-Lane PS) (Package-5) in Assam NHIDCL/Assam/AE/Dib-Led Pkg-1 to 3/2023/218140 01/02/2023 09/02/2023 16/02/2023
Time 16:0Hrs
339 Independent Engineer Services for Construction of four lane access controlled Greenfield Atal Progressway (Chambal Expressway) from km 94.100 (village sada ka pada in Sheopur District) to km 155.400 (village Chhavar in Sheopur District) under Bharatmala Pariyojna in the State of Madhya Pradesh Pkg III & Construction of four lane access controlled Greenfield Atal Progressway (Chambal Expressway) from km 155.400 (village Chhavar in Sheopur District) to km 206.000 in the state of MP NHAI/HQ/MP/AtalProgressway/IE/Pkg-III & IV/2023 06/03/2023 09/02/2023 21/03/2023
Time 11:0Hrs
340 IE Services for the work of Construction of four laning of Bakarpur-Manikpur road section starting from village chitarsenpur km 0 00 and terminating at SH 74 near Manikpur (38 814) at NH-139W under BMP on HAM mode in Bihar 2023-NHAI-144670-1 06/03/2023 08/02/2023 28/03/2023
Time 11:0Hrs
341 Consultancy Services for assisting Authoritys Engineer for supervision of Construction of 4 Lane ROB at Km 510/8 of NH565 (Near Yerpedu) in Lieu of L.C.No.36 in the State of Andhra Pradesh on EPC Mode NIT No.40/SE,NH,ATP/2022-23, Dt.02.02.2023 15/02/2023 08/02/2023 16/03/2023
Time 15:0Hrs
342 CS for AE for Supervision of Construction of 4L Greenfield Highway from Chatrapur on NH16 to Gopalpur port (Km 0.000 to km 4.500) and upgradation to 6L elevated configuration of existing NH16 (Km 429.025 to km 430.990) under Bharatmala Pariyojana in Odisha State on EPC Mode 2023-NHAI-142347-1 07/02/2023 07/02/2023 28/02/2023
Time 11:0Hrs
343 CS for AE for Supervision of Six laning of Tuticorin Port Road section of NH-7A (New NH-138) from Km 0.000 to Km 6.140 (Effective Length – 5.16 km) on EPC Mode in the state of Tamil Nadu on EPC mode 2023-NHAI-142353-1 07/02/2023 07/02/2023 10/03/2023
Time 11:0Hrs
344 CS for Independent Engineer Services for Rehabilitation and upgradation from 4 to 8 laning of Chandikhole – Paradip Section of NH-53 (Old NH-5A) from km 0.000 to km 76.646 in the state of Odisha on HAM Mode under NH(O) 2023-NHAI-143351-1 07/02/2023 07/02/2023 21/03/2023
Time 11:0Hrs
345 Consultancy Services for Authority Engineer for Supervision of Construction of four six lane Greenfield connectivity from Talwara Jattan Village on NH 44 to Gobindsar village on Delhi Amritsar Katra Expressway from km 0.000 to km 12.345 (Pathankot Link Road) in the State of Punjab on EPC Mode under Bharatmala Pariyojana NHAI/Tech/BM/Pathankot Link Road/2021/AE 03/03/2023 06/02/2023 28/03/2023
Time 11:0Hrs
346 Consultancy Services for Authoritys Engineer for Supervision of Up-gradation of Daultabad T point to Shivoor from existing km 222.893 On SH-16, Daulatabad Jn. to km 64.000 On SH51, Shivoor Design km.0.000 to km 4.000 Daultabad T oint to Maliwada EENH/Aurangabad/Tender/NIT No-5/3000204 19/02/2023 03/02/2023 20/03/2023
Time 17:30Hrs
347 Independent Engineer services during O and M stage for 4/6 laned stretch from Km.40.000 to Km.221.500 of Hyderabad to Vijayawada Section of NH65 (Old NH No.9) of 181.500 kms, Package No.NHDP-III/BOT/AP01 in the State of TS and AP 144034 06/03/2023 03/02/2023 18/04/2023
Time 15:0Hrs
348 Consultancy Services for AE for Supervision of Jamugurihat to end of Biswanath Chariali Bypass from end of Biswanath Chariali by pass (Km.208) to Gohpur and Gohpur to Holongi in the state of Assam NHIDCL/Assam/AE/Jamugurihat-Holongi/2022/216559 14/02/2023 03/02/2023 23/02/2023
Time 15:0Hrs
349 CS FOR AE FOR SUPERN OF REHABILITATION UPGRADATN 2 LANE PS EXISTG CH KM 166 100 TO KM 192 980 (DC KM 146 700 TO KM 162 800)(PKGVII) INCL CONSTN OF BHIMBER GALI TUNNEL (LENGTH 1.100 KM) UNDER 31 TF ON AKHNOOR POONCH ROAD (NH144A) UT JK BRO ON EPC RW/SR/W(53)/JK/2021/ 03/02/2023 03/02/2023 15/02/2023
Time 15:0Hrs
350 Consultancy services as Authority’s Engineer for Supervision of “Construction of Uni-Directional Singhpora-Vailoo Tunnel (Under Sinthan pass) and its approach road (of 2-lane with paved shoulder) on Sudhmahdev-Goha-Khellani-Kishtwar-Vailoo-Khanabal stretch (Design Length 38.61 Km including Uni directional twin tube Tunnel 10.3km/10.3 Km) on NH-244 in the Union Territory of Jammu and Kashmir on EPC mode NHIDCL/J&K/NH-244/AE(SVT)/2023 16/01/2023 02/02/2023 12/04/2023
Time 15:0Hrs
351 Independent Engineer Services during Operation and Maintenance of 4 laning of UP/Haryana Border-Rohna-Hassangarh- Jhajjar Section of NH-334B from Km 0.000 to Km 80.250 on HAM mode in State of Haryana 2023-NHAI-143698-1 14/02/2023 01/02/2023 09/03/2023
Time 11:0Hrs
352 Consultancy services for Independent Engineer for Construction of 4 Lane with Paved Shoulders from AP/KN Border (Design Ch 0-000) to KN/TS Border (Design Ch 54-566) in AP/KN Border – Raichur - KN/TS Border Section of NH 167 in the State of Karnataka on Hybrid Annuity Mode 2023-NHAI-143528-1 14/02/2023 31/01/2023 06/03/2023
Time 11:0Hrs
353 Consultancy services for Section I Construction of Four laning of Bellary Bypass from junction with NH67 (Old NH 63) Design Chainage -0-454 km to Design Chainage 10-00kms (Length 10-454Kms) junction of NH150A Siruguppa-Bellary Road and from NH150A - Bellary Bypass Ch 53-600Km to Ch 255-150Km (Length 1-550Kms) in the State of Karnataka under Hybrid Annuity Mode AND Section II- Construction of four lane with paved shoulder of Bellary Bypass from Design Ch-255-150Km (Ex Ch 255-150) and Ends at Ju 2023-NHAI-143518-1 15/02/2023 31/01/2023 06/03/2023
Time 11:0Hrs
354 Independent Engineer Services during O&M stage of 2 laning of Mokama - Munger Section of NH -80 from Km. 1.430 to Km. 70.000 in the state of Bihar under NHDP – Phase III on BOT (Annuity) on DBFOT Basis. 170/RO-Patna/NHAI/2022-23 21/03/2023 31/01/2023 13/04/2023
Time 11:0Hrs
355 Consultancy services for Construction of 4 Lane with Paved Shoulders from Design Ch 228/500 to Design CH 273/400 in Belgaum – Hungund – Raichur section of NH-748A (Ext SH-20) on Hybrid Annuity Mode (Package-6) 2023-NHAI-143544-1 20/02/2023 31/01/2023 06/03/2023
Time 11:0Hrs
356 Consultancy services for 4 Lane with Paved Shoulders from Design Ch 182/300 to Design Ch 228/500 in Belgaum – Hungund – Raichur Section of NH 748A (Ext SH-20) in the State of Karnataka on Hybrid Annuity Mode 2023-NHAI-143540-1 16/02/2023 31/01/2023 06/03/2023
Time 11:0Hrs
357 Consultancy services for Authoritys Engineer for Supervision of (i) Rehabilitation and upgradation of Panvel Mahad Panji Road NH-66 L 406/030 to 450/170 Section Kalmath to Zarap Section in the State of Maharashtra (ii) Construction of Flyover in Km.468/500 Vehicular Under pass in Km 470/00 and Overpass in Km 451/300 to 453/600 Including Road Safety Along with avenue and Midean Plantation from Km 450/170 to 471/330 (Zarap to Patradevi) Section of NH-66 (Panvel Mahad Panjim) on EPC Mode. 02/NHD/AB/TC/2022-23/ 354 03/03/2023 27/01/2023 20/03/2023
Time 17:30Hrs
358 CONSULTANCY SERVICES FOR AE FOR SUPERVISION OF IMP.AND UPGRADATION OF NEWLY DECLARED NH-227B (84 KOSI PARIKRAMA MARG) Pkg-I,DESIGN KM 228.920(JAGARNATHPUR)TO KM 235.960/0.000(MAKHAUDA DHAM)TO KM 29.000(SARPUR) IN THE STATE OF U.P. ON (EPC) BASIS. CE-RO/LKO/NH(O) /24/AE/NH227B(PkgI)/21-22 dt25.01.2023 04/02/2023 25/01/2023 27/03/2023
Time 11:0Hrs
359 Consultancy Services for Independent Engineer services for Supervision of Development of Six-Lane Access Controlled Greenfield Highway from Chandrasekharapuram (Ch. 228.000) to Muppavaram (Ch.343.240) of Bengaluru –Vijayawada Economic Corridor on HAM Mode under Bharatmala Pariyojana Phase-I in the state of Andhra Pradesh (Package-IV) NHAI/BM/EC/Bengaluru-Vijayawada/IE/Pkg-IV/2022 01/02/2023 25/01/2023 27/02/2023
Time 11:0Hrs
360 Consultancy Services for Independent Engineer for Construction of access controlled four laning with paved shoulder from Mysore to Kushalnagara section of NH-275 from Design Ch. Km 122.200 (Existing Km 124.488) near Guddehosur at start of Kushalnagara Bypass to Design Ch. Km 214.535 joining (at Ch. Km 131.180 Approx) to Srirangapatna Bypass Near Paschima Vahini on Hybrid Annuity Mode under NH (O) in the state of Karnataka NHAI/KNT/Mysore-Kushalanagara/ Pkg-2-3-4-5/IE/2023 20/02/2023 24/01/2023 10/03/2023
Time 11:0Hrs
361 CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF Rehabilitation and Upgradation of kurwai-Mungaoli Chanderi Road Section of NH-346 From Design Chainage 0.000 to 81.300 km (Total Length 81.300 km) Two Lane With Paved Shoulder Configuration along with one time improvement in 07 Nos of Bypassd built-up area in total length of 22.625 km in the State Of Madhya Pradesh On EPC Basis 2023-MoRTH-736489-1 19/03/2023 23/01/2023 31/03/2023
Time 17:30Hrs
362 CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF Rehabilitation and Upgradation of kurwai-Mungaoli Chanderi Road Section of NH-346 From Design Chainage 0.000 to 81.300 km (Total Length 81.300 km) Two Lane With Paved Shoulder Configuration along with one time improvement in 07 Nos of Bypassd built-up area in total length of 22.625 km in the State Of Madhya Pradesh On EPC Basis 2023-MoRTH-736489 05/04/2023 23/01/2023 24/04/2023
Time 17:30Hrs
363 CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF Rehabilitation and Upgradation of kurwai-Mungaoli Chanderi Road Section of NH-346 From Design Chainage 0.000 to 81.300 km (Total Length 81.300 km) Two Lane With Paved Shoulder Configuration along with one time improvement in 07 Nos of Bypassd built-up area in total length of 22.625 km in the State Of Madhya Pradesh On EPC Basis 2023-MoRTH-736489-2 11/04/2023 23/01/2023 24/04/2023
Time 17:30Hrs
364 Consultancy services for Authority’s Engineer for Supervision of Rehabilitation and Upgradation of kurwai-Mungaoli Chanderi Road Section of NH-346 From Design Chainage 0.000 to 81.300 km (Total Length 81.300 km) Two Lane With Paved Shoulder Configuration along with one time improvement in 07 Nos of Bypassd built-up area in total length of 22.625 km in the State Of Madhya Pradesh On EPC 10/SAC/Kurwai/GWL/AE/2022-23 17/01/2023 23/01/2023 15/03/2023
Time 17:30Hrs
365 Independent Engineer services during Operation and & Maintenance Period for Four laining of Krishnagar-Baharampore section of NH-34 from Km. 115.00 to KM. 193.000 in the state of West Bengal under NHDP phase III on (Package No NHDP/III/BOT/WB/02)- on DBFOT(Annuity) Basis 12/O and M/Krish-Bah/2nd Call 23/01/2023 20/01/2023 10/04/2023
Time 12:0Hrs
366 Consultancy Services For Authoritys Engineer For Supervision of Widening and strengthening to 4 lane 2-lane with paved shoulders of Mahabubnagar Chincholi section from km 60.255 to Km 102.834 of NH-167N in the State of Telangana RW/HYD/Misc28 NIT AE/2022-23/08dt20.01.2023 24/01/2023 20/01/2023 06/03/2023
Time 15:0Hrs
367 Consultancy services for Authoritys Engineer for Supervision of Rehabilitation and Upgradation of Pathri to Selu section design chainage from km 41/000 to 47/900 and Selu to Deogaon Phata section design chainage from km 63/100 to km 68/700 of Injegaon- Sonpeth- Pathri-Selu- Degaon Phata road NH-548B to 2-lane/4-lane with paved shoulder (Rigid Pavement) configuration on EPC Mode in the State of Maharashtra EENH /JALNA /Tender/NIT-02/ 110 03/02/2023 20/01/2023 06/03/2023
Time 17:30Hrs
368 Consultancy services for Authoritys Engineer for Supervision of Rehabitation /Upgradation of New Highway to 2L-PS from Bhokardan to Kumbhari Phata (Km13-500 to 17-000) and Rajur to Jalna (39-850 to Km 62-420) section of NH753H i e Sillod -Bhokardan-Kumbhari Fata-Rajur-Jalna on EPC Mode in the State of Maharashtra. (Total Length- 26-07 Km) EENH /JALNA /Tender/NIT-02/110 05/02/2023 20/01/2023 06/03/2023
Time 16:30Hrs
369 Consultancy Services For Authoritys Engineer For Supervision of Upgradation and reconstruction of Jabalpur – Kundam - Shahpura section of NH-45 from design km 40.500 to 68.100 to 103.700 including Kundam bypass (total Length 63.20 km) to Two lane with paved shoulder configuration alongwith one time improvement of bypassed built up areas in the total length of 14.470 Km in the State of Mandhya Pradesh on EPC Mode 39/SAC/NIT/AE/2022-23 31/12/2022 19/01/2023 28/02/2023
Time 17:30Hrs
370 Consultancy Services For Authoritys Engineer For Supervision of Upgradation and reconstruction of Jabalpur – Kundam - Shahpura section of NH-45 from design km 40.500 to 68.100 to 103.700 including Kundam bypass (total Length 63.20 km) to Two lane with paved shoulder configuration alongwith one time improvement of bypassed built up areas in the total length of 14.470 Km in the State of Mandhya Pradesh on EPC Mode 39/SAC/NIT/AE/2022-202323 15/03/2023 19/01/2023 03/04/2023
Time 17:30Hrs
371 Consultancy Services for assisting Authoritys Engineer for supervision of Construction of Major Bridge across Papagni river including approaches at Km 153/200 of Renigunta Kadapa Muddanur road NH716 in the state of Andhra Pradesh on EPC Mode NIT No.35/2022-23, Dt.10.01.2023 17/02/2023 18/01/2023 06/03/2023
Time 15:0Hrs
372 CS for IE for Rehabilitation and upgradation of NH340C PKG1- from Kurnool to Mandlem 4 lane with paved shoulders (DL 30.600 kms) in AP under NH(O) on HAM. PKG-2-from Mandlem Atmakur to 4 lane paved shoulders(DL 35.515 kms)in AP under NH(O)on HAM. NHAI/Tech/IE/NH-340C/KRN-MAN-ATK/2023 23/02/2023 17/01/2023 03/03/2023
Time 11:0Hrs
373 Consultancy service OF Authority Engineer for- Widening/Improvement to 4 (Four) Lane with Paved Shoulder from KM 38500 to Km 51246 (Design Chainage 38500 to 50959) with proposed Daboka Bypass of Daboka – Parokhaowa (Package-1) of NH- 29 in the state of Assam on EPC mode. NHIDCL/Assam/NH-29/AE/Dab-Man Pkg-1/199774 08/02/2023 17/01/2023 13/02/2023
Time 16:0Hrs
374 Widening/Improvement to 4 Four Lane with Paved Shoulder from Ch 99930 km to Ch 143680 km Design Ch96000 km to Ch 139750 km for Package-8 of Bilasipura- Guwahati road NH 17 Section Paikan to Dhupdhara Sahar in the state of Assam on EPC mode NHIDCL/Assam/AE/Bil-Ghy Pkg-8/2023/218170 08/02/2023 17/01/2023 13/02/2023
Time 16:0Hrs
375 Consultancy services for Independent Engineer for Construction of STRR (West side), NH948A - Obalapura (Nelamangala Taluk)) to Somakkanamutta (Magadi Taluk) from km 0.000 to km 46.300 (Design) Phase-I Package-I & Consultancy services for Independent Engineer for Construction of STRR (West side), NH948A - Somakkanamutta (Magadi Taluk) to Kunigal (Ramanagara Taluk) from km 46.300 to km 79.000 (Design Chainage) Phase-I Package-II in the state of Karnataka on (HAM) under Bharatmala Pariyojana. 2023-NHAI-141571-1 07/02/2023 13/01/2023 27/02/2023
Time 11:0Hrs
376 CS FOR AE FOR SUPERN OF REHABILITATION UPGRADATN 2 LANE PS EXISTG CH KM 166 100 TO KM 192 980 (DC KM 146 700 TO KM 162 800)(PKGVII) INCL CONSTN OF BHIMBER GALI TUNNEL (LENGTH 1.100 KM) UNDER 31 TF ON AKHNOOR POONCH ROAD (NH144A) UT JK BRO ON EPC RW/SR/W(53)/JK/2021/ 11/01/2023 11/01/2023 08/02/2023
Time 15:0Hrs
377 Consultancy Services as AE for Supervision of Construction of Uni-directional Sudhmahadev - Dranga Twin Tube Tunnel and its approach roads on NH-244 in the Union Territory of Jammu and Kashmir NHIDCL/JK/NH-244/AE(SDT)/2023 12/01/2023 11/01/2023 01/05/2023
Time 15:0Hrs
378 Consultancy services as Independent Engineer during Operation and Maintenance for the project of Design Engineering Finance Construction Operation and Maintenance of access controlled highway project of Bangalore Nelmangala section of NH-4 from Km. 10.000 to km. 29.500 in the State of Karnataka on Build Operate Transfer Basis 30 13/01/2023 10/01/2023 31/01/2023
Time 15:0Hrs
-
379 Independent Engineer services for supervision of Four laning of Bhaniyawala Jollygrant Rishikesh spur section of NH 07 from km 0 00 to km 20 600 in the state of Uttarakhand under NH O on Hybrid Annuity Mode 2023 NHAI 141046 1 27/01/2023 10/01/2023 10/02/2023
Time 11:0Hrs
380 IE Services for Operation and Maintenance of Madurai to Kayathar section from km 0-000 to Km 116-500 of NH-44 on TOT mode in the state of Tamil Nadu 2023-NHAI-141152-1 25/01/2023 10/01/2023 13/02/2023
Time 11:0Hrs
381 Consultancy services for Authority s Engineer for supervision of Construction of 6 lane HL/Extra-dosed Cable Bridge on river Ganga parallel to western side (180 meter upstream) of Digha- Sonepur Rail- cum-Road Bridge at Patna on Ganga River on NH-139W in the state of Bihar on EPC Mode NH-12014/1/2023-RO Patna 18/01/2023 10/01/2023 10/05/2023
Time 17:0Hrs
382 Independent Engineer Services for Operation & Maintenance of (i) Kayathar- Nanguneri section from Km 116-500 to Km 180-000 of NH-44 (Old No 7) on TOT mode in the state of Tamil Nadu, and (ii) Nanguneri - Kanyakumari section from Km 180-000 to Km 243-470 of NH-44 (Old No 7) on TOT mode in the state of Tamil Nadu 2023-NHAI-141156-1 25/01/2023 10/01/2023 13/02/2023
Time 11:0Hrs
383 Consultancy Services for AE for Supervision of Rehabilitation and widening work for 2Lane with PS of Existing National Highway 122B Alignmentfrom Km 29.730 to Km 72.348 of Mahnar Bachhwara section in the State of Bihar on EPC Mode NH-12014/52/2021-RO Patna- Part(1) 27/01/2023 07/01/2023 02/03/2023
Time 17:0Hrs
384 Consultancy Services for Authority Engineer for Supervision of (i) Upgradation to two lane with paved shoulder of Hanumangarh to Kenchiyan from km 0/000 (existing Chainage km 23.200) to km 49/605 (existing Chainage km 23.200) of NH-54 in the State of Rajasthan on EPC Mode (ii) Construction of flyover at Indira Circle along with LVUP a with provosion of RE walls in approaches in the State of Rajasthan on EPC Mode NIT No. 05/ 2022-23 17/01/2023 06/01/2023 20/02/2023
Time 11:0Hrs
385 Consultancy services for Independent Engineer services for Package-II Four Laning Byrapura to Challakere section of NH 150 A from Km.308.550 to Km.358.500 on HAM Mode under Bharatmala Pariyojana in the State of Karnataka NIT No.29 06/01/2023 06/01/2023 06/02/2023
Time 15:0Hrs
386 Consultancy Services for Authority’s Engineer for Supervision of (i) “4-lane ROB (twin’s 2-lane) & its approaches in replacement of existing level crossing at (Railway km 226/0) km 3.950 of NH-2B at Talit [Job No.NH-2B/WB (18)/15-16/018-S&R (B)]” & (ii) “Construction of ROB and its approaches in lieu of Level Crossing No. 10/B/T km 307.050 of NH-60 at Bhimgarh [Job No.NH-60/WB/ (9)/15-16/013-S&R (B)]” in the State of West Bengal. MORTH/RO-KOL/NIT/AE/2022-23/05 05/01/2023 05/01/2023 01/03/2023
Time 15:0Hrs
387 Consultancy Services as Authority’s Engineer for Supervision of “Construction of 2-lane with paved shoulders of Aizawl Bypass from km 0.000 to km 10.600 (Package-1) and km 15.200 to km 34.500 (Package-3) on Sairang-Phaibawk section of NH-6 in the State of Mizoram under Bharatmala Pariyojna on EPC mode NHIDCL/Mizoram/NH-6/AE/Aizawl Bypass/Pkg-1 and 3 19/12/2022 04/01/2023 30/01/2023
Time 11:0Hrs
388 RFP For Consultancy Services for Authoritys Engineer for Supervision of Construction of 4Lane Chapra Manjhi ByPass Connecting NH19 and NH85 Length 7.155 Km in the State of Bihar through an EPC Contract. 02/NHCHAPRA/2022-23 09/01/2023 03/01/2023 03/03/2023
Time 11:0Hrs
389 Consultancy services for Authority Engineer for supervision of (i) Strengthening/Reconstruction in km 0/0 to 1/200,1/800 to 42/400,43/900 to 44/100, 47/400 to 59/100,64/450 to 72/080,72/680 to 78/750,79/050 to 88/330 of NH-752 in State of Rajasthan (Total length-76.680 km) on EPC Mode.(ii) Construction of 2 lane with paved shoulders of Northern Bypass Phase-II of Kota City in the State of Rajasthan on EPC Mode. NIT No. 04/ 2022-23 10/01/2023 03/01/2023 23/02/2023
Time 11:0Hrs
390 CS FOR AE FOR SUPERVISION FOR WORK WIDENING STRENGTHENING UPGRADATION TO 2LANE WITH PS EXIST CH KM 192 980 TO KM 229 820 DC KM 162 800 TO KM 198 180 PKGVIII UNDER 31TF ON AKHNOOR POONCH ROAD NH144A IN UT JK UNDER PROJECT SAMPARK BRO ON EPC RO-CH-SR-W(19)/AE/JnK-2022 03/01/2023 03/01/2023 26/01/2023
Time 15:0Hrs
391 Consultancy Services for Authority’s Engineer for Supervision of Const. of 4-Lane ROB and its approaches in replacement of existing (i) RUB of NH-2B at Bhedia (ii) LC No 21/SPL/E of NH-60 at Suri (iii) LC No 39/A/3E of NH-60 at Bishnupur-II (iv) LC No KA-34 of NH-60 at Kubai (v) LC No 38 of NH-60 at Kadamdiha in West Bengal. MORTH/RO-KOL/NIT/AE/2022-23/04 04/01/2023 03/01/2023 27/02/2023
Time 15:0Hrs
392 Consultancy services for Authoritys Engineer for Supervision of (i) Rehabilitation and upgradation of Panvel Mahad Panji Road NH-66 L 406/030 to 450/170 Section Kalmath to Zarap Section in the State of Maharashtra (ii) Construction of Flyover in Km.468/500 Vehicular Under pass in Km 470/00 and Overpass in Km 451/300 to 453/600 Including Road Safety Along with avenue and Midean Plantation from Km 450/170 to 471/330 (Zarap to Patradevi) Section of NH-66 (Panvel Mahad Panjim) on EPC Mode in the st 02/NHD/AB/TC/2022-23/ 4444 06/01/2023 02/01/2023 01/02/2023
Time 17:30Hrs
393 Consultancy Services for Authority Engineer for i) Development of Six Lane greenfield Ring Road (Package-I) starts from Design Ch 0 to Design Ch 23-325 ( Length 23-325 kms ) around Kanpur City in the state of Uttar Pradesh on EPC mode ii Development of Six Lane greenfield Ring Road (PackageIV) starts from Design Ch 68-650 to Design Ch 93-209 ( Length 24-559 kms ) around Kanpur City in the state of Uttar Pradesh on EPC mode 2022-NHAI-139859-1 25/01/2023 29/12/2022 22/02/2023
Time 15:0Hrs
-
394 Consultancy services for Authoritys Engineer for Supervision of Rehabilitation and up-gradation of Sabalkhed to Ashti and Chinchpur to Jamkhed of NH-561 to 2PLS/Four lane configurations in the state of Maharashtra on EPC mode No.EENHD/Latur/NIT No. 09/AE/2299/2022-23 05/01/2023 28/12/2022 03/03/2023
Time 17:30Hrs
395 Consultancy services for Authoritys Engineer for Supervision of Rehabilitation and up-gradation to 2-4LPS of NH-63 in section Aashta mode to Aashta Village and section Tiwatgyal pati to Malkapur-Udgir) with Rigid pavement on EPC mode in the State of Maharashtra No.EENHD-Latur-NIT No.09-AE-2299-2022-23 02/01/2023 28/12/2022 27/02/2023
Time 17:30Hrs
396 Consultancy services for Authoritys Engineer for Supervision of Up-gradation and Rehabilitation of section of NH-361 F from Parli 00-000 to Gangakhed 30-400 to Two lanes with paved shoulder Four lane configurations on EPC mode in the state of Maharashtra. No EENHD/Latur/NIT No 09/AE/2299/2022-23 30/12/2022 28/12/2022 03/03/2023
Time 17:30Hrs
397 Consultancy services for Independent Engineer of four-lane greenfield highway from Edamon (Design km 20-730/Existing km 38-000 of NH-744) to Kadampattukonam near Paripally (Design km 59-347/Existing km 517-567 of NH-66) in the State of Kerala in HAM mode under Bharatmala Pariyojana 2022-NHAI-139486-1 12/01/2023 26/12/2022 12/02/2024
Time 11:0Hrs
398 Consultancy services as AE for Supervision of Widening to 2 (Two) Lane with Hard shoulder of Akegwo-Avangkhu section of NH-202K for Package- I,II and III (in the State of Nagaland on EPC mode NHIDCL/Nagaland/AE/ Akegwo- Avangkhu/Pkg 1,2,3/20 28/12/2022 23/12/2022 08/05/2023
Time 15:0Hrs
399 Consultancy services for Supervision Consultant for Operation and Maintenance of Four laning of Parwanoo - Solan section of NH-22 (Now NH-05) from Km 67.000 to Km 106.139 under NHDP Phase-III on EPC basis in the State of Himachal Pradesh including Authority Engineer services for Construction of Two Viaducts at Km 88.440 (LHS) and Km 103.320 (LHS) at Parwanoo-Solan section of NH 05 in the State of Himachal Pradesh (HP) on EPC Mode (2nd Call) 2022-NHAI-139126-1 27/12/2022 22/12/2022 12/01/2023
Time 11:0Hrs
400 Consultancy Services for IE for 4/6 laning of Marutharoad to Edathanattukara section of NH966 from Km. 0.000 to Km.61.440 (Design Length 61.279 Km) (Civil Package 1 and 2) in Kerala in HAM mode under Bharatmala Pariyojana. 2022-NHAI-138881-1 05/02/2023 21/12/2022 12/02/2024
Time 11:0Hrs
401 Consultancy Services for assisting Authority’s Engineer for supervision of (i) Construction of proposed 2-Lane ROB and its approaches in lieu of existing level crossing no120 at km 56.700 of NH-18 (new NH-40) under SETU-BHARATAM in the state of Andhra Pradesh under NH(O) for the year 2021-22 on EPC mode (ii) Widening to 4-Lane of missing link between NH-40 andNH-69 from existing chainage km 351.460 to km 358.260(Design Chainage 351.460 to 358.130(6.67Km) of NH-40 in the State of Andhra Pradesh 34/2022-23,dt-1-12-2022 21/12/2022 21/12/2022 06/02/2023
Time 15:0Hrs
402 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF Construction of major bridge across Wainganga River in Km 134.000 (Near Armori) on Nagpur-Umred- Nagbhir-Armori section of NH-353D in the State of Maharashtra on EPC mode. 16/EENH/NGP/2022-23/ 5649 22/12/2022 20/12/2022 20/02/2023
Time 17:0Hrs
403 Consultancy services for Authority’s Engineer for Supervision of Construction of Animal Underpasses at Nagbhid - Bramhapuri - Armori Road NH -353D in Km 109.650 & 111.175 In State Of Maharashtra On EPC Mode. 17/EENH/NGP/2022-23/ 5650 15/12/2022 20/12/2022 20/02/2023
Time 17:0Hrs
404 Consultancy Services For Authority Engineer Services for supervision of Rehabilitation and Upgradation to Mudkhed to Nanded section from Km 372000 to Km 388400 of NH161A Length 15.65 Km to 2LPS configuration in the State of Maharashtra on EPC mode 2022-MoRTH-730305-1 13/01/2023 20/12/2022 10/02/2023
Time 17:30Hrs
405 Independent Engineer services for Balance Construction and Operation & Maintenance of Six-laning of Shamlaji – Motachiloda section of NH-48 from Km.447.385 to Km.540.595 (Length - 93.210 Km) in the State of Gujarat (Package VI) on Hybrid Annuity Mode 2022-NHAI-138742-1 09/01/2023 19/12/2022 27/01/2023
Time 13:0Hrs
406 AE for i) Const and OM of LT measures for rect of Blackspots at 1).Aslali Bypass - GJ02151, 2).Bidaj Patiya, GJ02219, 3).Vadala Jn GJ02214 of A-V sect NH48 on EPC ii) OM of Impr Works at Dumad Jn at Merging ofA-V Sect NH48, A-V NE1 and Sama-Savli Rd 2022-NHAI-138770-1 09/01/2023 19/12/2022 24/01/2023
Time 15:0Hrs
407 AE for Supervision of 1. Const and OM of Viaduct from Sahakarijin Jn to Motipura Circle Km.490.940 to Km.493.290 of the Shamlaji-Motachiloda section of NH-48 on EPC 2. OM of 6L Motachiloda-Nanachiloda section of NH-48 Km540.595 to Km555.905 on EPC 2022-NHAI-138749-1 09/01/2023 19/12/2022 27/01/2023
Time 15:0Hrs
408 Consultancy Services for Independent Engineer services for Construction of Four laning of NH 530B from Devinagar Bypass (End) (Existing Km. 208.000 of NH 530B/Design Km. 66.000) to Kasganj Bypass (End) (Existing Km.150.100 of NH 530B/ Design Km. 123.100) in the State of Uttar Pradesh on Hybrid Annuity mode NHAI/HQ/UP(W)/Hathras- Kasganj/HAM/IE/2022 27/12/2022 19/12/2022 21/02/2023
Time 11:0Hrs
409 REHABILITATION AND UP-GRADATION TO 2 LANE WITH PAVED SHOULDER INCLDING 260M LONG KANDI TUNNEL FROM EXISTING CHAINAGE KM 30.053 TO KM 49.150 (DESIGN CHAINAGE KM 30.000 TO KM 46.450) (PACKAGE-I)ON EPC BASISUNDER 35 BRTF ON AKHNOOR - POONCH ROAD (NH-144A) UNDER PROJECT SAMPARK (BRO) IN THE UT OF JAMMU & KASHMIR ON EPC MODE (3RD CALL). CE (P) SPK/AE/A-P RD/PKG-I(3rd CALL)/2022-23 20/12/2022 15/12/2022 23/01/2023
Time 11:0Hrs
410 Consultancy services for Authority Engineer for Construction of New Double Tier 4-lane Elevated Corridor from Chennai Port to Maduravoyal in Chennai District from Km -0/342 to Km 20/593 on EPC mode under Bharatmala Pariyojana in the State of TamilNadu 138293 18/12/2022 15/12/2022 07/02/2023
Time 11:0Hrs
411 AE services for 4laning of left over works including Additional Structures in KL-TN Border Kanyakumari from Km43/000 to Km96/714 of NH47 in TN on EPC and O-M Period for Nagercoil to Kavalkinaru Sec from Km0000 to Km16/276 of NH47B in TN 138292 18/12/2022 15/12/2022 24/01/2023
Time 11:0Hrs
412 Consultancy Services as Authoritys Engineer for Supervision of Four laning of (i) Jhanji toDemow section of NH-37 from km 491 050 to km 535 250 (Design Chainage) from Km 490800 to Km 534 800 (ii) Section between Demow (km 534 800) to End of Moran Bypass (km561 700) (iii) end of Moran Bypass (km 561 700) to Bogibeel junction near Lapetketa (km 580875) (iv) Construction of Dibrugarh Bypass/ Realignment from Bogibeel Junction at Km580/875 to Km 596/322 in the state of Assam under SARDP-NE NHIDCL/Assam/AE/Jhanji- Dibrugarh/2022/208578 05/12/2022 15/12/2022 22/12/2022
Time 15:0Hrs
413 IE Services for Construction of Four laning of Marakkanam (Design Km 62/000) to Puducherry (Design Km 108/042) of Mamallapuram Puducherry section of NH332A in the state of Tamil Nadu on HAM 138289 18/12/2022 14/12/2022 30/01/2023
Time 11:0Hrs
414 INDEPENDENT ENGINEER (IE) SERVICES FOR OPERATION AND MAINTENANCE STAGE UNDER TOT MODE OF FOUR LANING OF BAMANBORE-GARAMORE AND GARAMORE - SAMAKHIYALI SECTION OF NH - 27 IN THE STATE OF GUJARAT - 2nd Call 2022-NHAI-130984-2 15/12/2022 14/12/2022 30/01/2023
Time 13:0Hrs
415 INDEPENDENT ENGINEER (IE) SERVICES FOR O and M STAGE AND BALANCE CONSTRUCTION WORK FOR FOUR LANING OF BHAVNAGAR-TALAJA SECTION OF NH-51 FROM KM 07.090 TO KM 53.585 (DESIGN CH FROM KM 6.945 TO KM 54.990) (PKG-1) THROUGH HAM IN THE STATE OF GUJARAT 2022-NHAI-138125-1 14/12/2022 13/12/2022 03/02/2023
Time 13:0Hrs
416 Four laning of Jamugurihat to end of Biswanath Chariali Bypass from Km 18200 to Km 20800 of NH-52 (ii) Four Laning of NH-52 from end of Biswanath Chariali by pass (Km 208) to Gohpur (Km 26550 (iii) Four laning of NH-52A from Gohpur (Km 264100 on NH-52) to Holongi (Km20.370 on NH-52A) (Total Length 10080 Km) in the state of Assam on EPC basis under SARDP-NE NHIDCL/Assam/AE/ Jamugurihat- Holongi/2022/216559 04/01/2023 13/12/2022 11/01/2023
Time 15:0Hrs
417 Independent Engineer services for 4-laning of Tejajinagar - Balwara section of NH-347BG (Indore to Boregaon- Pkg II) Design Ch. 9.000 to Design Ch. 42.400 (Length 33.400 Km) under Bharatmala Pariyojana Phase-I in the State of Madhya Pradesh on Hybrid Annuity Mode NHAI/HQ/MP/Tejajinagar-balwara/Pkg II/HAM/IE/2022 12/12/2022 12/12/2022 17/01/2023
Time 11:0Hrs
418 Completion of Balance works (item rate and EPC mode) and Operation of Maintenance of Tirupati- Tiruttani-Chennai Section of NH-205 from Km 274/800 to Km 338/030 in Andhra Pradesh and from Km 0/000 to Km 61/470 in Tamil Nadu 137725 18/12/2022 09/12/2022 09/01/2023
Time 11:0Hrs
419 IE Services for Four laning of Rajapalayam to Senkottai Section of NH744 from Km 71/600 to Km 107/000 (Design Chainage) under Bharatmala Pariyojana on HAM Mode in Tamil Nadu (Pkg -1) 137716 19/12/2022 09/12/2022 23/01/2023
Time 11:0Hrs
420 IE Services for Four laning of Rajapalayam to Senkottai Section of NH-744 from Km107/000 to Km 139/900 (Design Chainage) under Bharatmala Pariyojana on HAM Mode in Tamil Nadu (Package-2) 137721 19/12/2022 09/12/2022 23/01/2023
Time 11:0Hrs
421 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF Up-gradation of Tirora-Gondia (Design Km. 87.000 to 115.200) NH 753 to Two lane with Paved Shoulders& Up-Gradation of Amgaon-Gondia, NH 543 in Km 41.880 To Km 21.620 on EPC Mode. 14//EENH/NGP/2022-23/5511 26/12/2022 09/12/2022 25/01/2023
Time 17:0Hrs
422 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF Up-gradation of Tirora-Gondia (Design Km. 87.000 to 115.200) NH 753 to Two lane with Paved Shoulders& Up-Gradation of Amgaon-Gondia, NH 543 in Km 41.880 To Km 21.620 on EPC Mode. 14//EENH/NGP/2022-23/5511 27/01/2023 09/12/2022 20/02/2023
Time 17:0Hrs
423 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF Up-gradation of Tirora-Gondia (Design Km. 87.000 to 115.200) NH 753 to Two lane with Paved Shoulders& Up-Gradation of Amgaon-Gondia, NH 543 in Km 41.880 To Km 21.620 on EPC Mode. 14/EENH/NGP/2022-23/5511 25/01/2023 09/12/2022 25/01/2023
Time 17:0Hrs
424 CS FOR AE FOR SUPERVISION FOR WORK WIDENING ND STRENGTHENING UPGRADATION TO 2LANE WITH PS FRM EXIST CH.KM192.980 TO KM229.820(DSGN CH.KM162.800 TO KM198.180) (PKGVIII)UNDER 31TF ON AKHNOOR POONCH ROAD(NH144A)IN UT JK UNDER PROJECT SAMPARK BRO ON EPC. RO-CH-SR-W(19)/AE/JnK-2022 08/12/2022 08/12/2022 20/01/2023
Time 15:0Hrs
425 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF REHABILITATION AND UP-GRADATION OF SECTION WATUR (00) TO CHARTHANA (27) OF NH 752 I TO TWO LANE WITH PAVED SHOULDER CONFIGURATION ON EPC MODE IN THE STATE OF MAHARASHTRA 2022-MoRTH-727733-1 17/12/2022 07/12/2022 10/02/2023
Time 17:30Hrs
426 IE Services for 4 Laning of Ariyanendal to Perungulam Sec of NH49 (New NH87) from Design Ch 80/360 (Existing km 80/360) to Design Ch 127/025 (Existing km 127/289)(Design length 46/665km) on HAM in the State of Tamil Nadu 137557 18/12/2022 07/12/2022 23/01/2023
Time 11:0Hrs
427 Independent Engineer services for Construction of Raebareli Ring Road Phase-II with four lane configurations (Design Length 21.888 km) for Rae-Bareli City in the state of Uttar Pradesh on Hybrid Annuity Model (HAM) basis. CE-RO/LKO/IE/NH(O) /25/Rbly Ring Road Ph-II/21-22 08/12/2022 06/12/2022 23/08/2023
Time 11:0Hrs
428 Consultancy services for AE for Supervision of Rehabi and Upgradation to 2 lane with PS from existing km 166.100 to km 192.980 (Design km 146.600 to km 162.800) (Package VII) inclu constr of Bhimber Gali Tunnel (total length of tunnel 1.100 km) RW/CH/W(53)/JK/2021/02-12-2022 06/12/2022 06/12/2022 17/01/2023
Time 15:0Hrs
429 CS for AE for Supervision of Construction of Initial Improvement works and supervision of ATMS or TMS installation under TOT of Shivpuri Jhansi (from km 1305-087 to km 1380-387) in the state of Madhya Pradesh (InvIT Bundle 2) 2022-NHAI-137301-1 04/01/2023 06/12/2022 15/02/2023
Time 11:0Hrs
430 Independent Engineer Services during Operation and Maintenance Period of (i) Four Laning of NH161 from Ramsanpally Village to Mangloor Village. (ii) Four laning of NH161 from Mangloor to TS / MH Border in the state of TS under BPHAM 137386 04/01/2023 06/12/2022 18/01/2023
Time 15:0Hrs
431 Consultancy Services for Authority’s Engineer for Supervision of Construction of Initial Improvement works & supervision of ATMS/TMS installation under Tolling, Operation, Maintenance & Transfer of Borkhedi-Wadner-Deodhari-Kelapur (from km 36 600 to km 175 000 in the state of Maharashtra 2022-NHAI-137299-1 06/01/2023 06/12/2022 08/05/2023
Time 11:0Hrs
432 Consultancy Services for Authority’s Engineer for Supervision of Construction of Improvement works & supervision of ATMS/TMS installation under Tolling, Operation, and Maintenance & Transfer of Agra Bypass (from km 0 000 to km 32 800) in the state of Uttar Pradesh (InvIT Bundle 2) 2022-NHAI-137298-1 07/01/2023 06/12/2022 15/02/2023
Time 11:0Hrs
433 Consultancy services for Authority’s Engineer for Operation and Maintenance of NH-43 (New NH-30) from Dhamtari - Kanker (Km 81.500 to Km 130.000), Bedma-Dahikonga (Km.180.000 to Km.241.000) & Dahikonga-Jagdalpur (Km.241.000 to Km.298.000) to 2-lanes with paved shoulders in the state of Chhattisgarh under NHDP-IV through EPC mode. 11052/RO-Raipur/Tender/DJ 26/12/2022 02/12/2022 18/01/2023
Time 15:0Hrs
434 IE Services for 6 aning of Walajahpet/Ranipet to Tamil Nadu/Andhra Pradesh Border from Km 106/800 to Km 134/879 of NH4 (New NH 40) under NHDP Phase III in Tamil Nadu on HAM 137053 17/12/2022 02/12/2022 24/01/2023
Time 11:0Hrs
435 Consultancy Services for Authority’s Engineer for Supervision of Construction of Two Lane with Paved shoulder of Hinotiya to Mehluwa from Design Km 27.000 (of existing SH-19 Km 26.530) near Hinotiya Village to Design Km 75.700 (of existing SH-19 Km 74.820) near Mehulwa village Section of NH-346 Vidisha –Talbehat of length 48.700 kms in the State of Madhya Pradesh (Package 2) on EPC Mode. NHAI/HQ/MP/Hinotiya-Mehulwa/Pkg-2/Proc/AE /2022 26/12/2022 02/12/2022 10/01/2023
Time 11:0Hrs
436 Consultancy Services for Authority’s Engineer for Supervision of Construction of 4 lane divided carriageway with paved shoulder from Km 0.000 to Km 41.210 (Balaghat-Gondia section) of NH-543 (Design Length 41.210 Km) under Bharatmala Pariyojana in the State of Madhya Pradesh and Maharashtra on EPC Mode NHAI/HQ/MP/Balaghat-Gondia/EPC/AE/2022 26/12/2022 02/12/2022 17/01/2023
Time 11:0Hrs
437 Independent Engineer Services for Construction of Four Laning of Raghogarh (Design Ch. 29.300/Existing Ch. 29.555) to Nanasa (Design Ch. 92.811/Existing Ch. 95.000) Section of NH-47 (Old NH-59A) (Design Length 63.511 km) under Bharatmala Pariyojana Phase I (Economic Corridor) in the State of Madhya Pradesh on HAM NHAI/HQ/MP/Indore-HardaPkg-2/Raghogarh-Nanasa/IE/2022 26/12/2022 01/12/2022 17/01/2023
Time 15:0Hrs
438 Consultancy Services for Authority’s Engineer for Supervision of (i) Construction of 2-lane with paved shoulder of Ashapur to Rudhi (Betul – Khandwa Pkg – IV) from Design CH km 114.000 to km 149.000 section in State of MP on EPC Mode (ii) Construction of 4-Laning of Khandwa bypass from Rudhi to Deshgaon, Km 149.000 to Km 177.680 section of SH-71/NH-347B/NH-753L (Betul – Khandwa Pkg-V) in State of MP on EPC Mode. NHAI/HQ/MP/Ashapur-Deshgaon/AE/2022 05/12/2022 01/12/2022 18/01/2023
Time 11:0Hrs
439 Consultancy services for Authoritys Engineer for Supervision of Rehabilitation and Upgradation of Pathri to Selu section design chainage from km 41/000 to 47/900 and Selu to Deogaon Phata section design chainage from km 63/100 to km 68/700 of Injegaon- Sonpeth- Pathri-Selu- Degaon Phata road NH-548B to 2-lane/4-lane with paved shoulder (Rigid Pavement) configuration on EPC Mode in the State of Maharashtra EENH /JALNA /Tender/NIT-02/ 1497 04/01/2023 01/12/2022 13/01/2023
Time 17:30Hrs
440 Consultancy services for Authoritys Engineer for Supervision of Rehabitation /Upgradation of New Highway to 2L-PS from Bhokardan to Kumbhari Phata (Km13-500 to 17-000) and Rajur to Jalna (Km 39-850 to Km 62-420) section of NH753H i e Sillod -Bhokardan-Kumbhari Fata-Rajur-Jalna on EPC Mode in the State of Maharashtra. (Total Length- 26-07 Km) EENH/Jalna/Tender/NIT-01/1497 03/01/2023 01/12/2022 13/01/2023
Time 17:30Hrs
441 Independent Engineer services for 4-Laning of NH-39 (old NH-75) from design Km 147.540 (existing Km 148.020)(Bhogu Village) to design km 196.870 (existing Km 197.420) (Sankha Garhwa Road) in the State of Jharkhand on HAM (PKG-III) 2022-NHAI-136791-1 06/12/2022 29/11/2022 11/01/2023
Time 11:0Hrs
442 Independent Engineer services during Operation & Maintenance Period for 4–laned Chikhali to Tarsod (Package-IIA) Section of NH-53 (Old NH-6) from Km.360.000 to Km.422.700 in the State of Maharashtra on Hybrid Annuity Mode (DBFOT Annuity) Pattern under NHDP Phase-IV–Consultancy Package No.IE-O&M/NH-53/NAG-20 NHAI/RO-NAG/TENDERS/2022-23/28 26/11/2022 28/11/2022 26/12/2022
Time 11:0Hrs
443 Supervision Consultancy services during O and M stage of two lane with paved shoulder from Km 1.300 to Km 74.349 (Existing chainage from Km 1.300 to Km 74.200) of Chhapra-Rewaghat-Muzaffarpur of NH-102 in State of Bihar NIT No - 164/RO-PATNA/NHAI/2022-23 06/12/2022 26/11/2022 05/01/2023
Time 11:0Hrs
444 Supervision Consultancy services during O&M stage of four laning of Forbesganj to Jogbani section from km. 0.00 to 9.26 (ICP at Jogbani) of NH – 57-A in state of Bihar. NIT No - 165/RO-PATNA/NHAI/2022-23 06/12/2022 26/11/2022 05/01/2023
Time 11:30Hrs
445 IE Services for supervision of Borkhedi Wadner Deodhari Kelapur Maharashtra/Telangana Border (from km 36.600 to km 175.000 of NH44 old NH7)on toll operate maintain and transfer basis (InvIT Bundle 2 2022-NHAI-136324-1 15/12/2022 24/11/2022 09/01/2023
Time 11:0Hrs
446 Independent Engineer Services for Operation & Maintenance of km 0-000 to km 99-005 of NH-26 in the state of UP& MP under North-South corridor (NHDP Phase- II) on TOT Mode ( TOT Bundle 3) Package No. NS-1/BOT/UP- 2/UP-3 2022-NHAI-136429-1 29/11/2022 24/11/2022 09/01/2023
Time 11:0Hrs
447 Independent Engineer Services for Supervision of Agra Bypass (From Km 0-000 to Km 32-800) in the state of Uttar Pradesh on Toll, Operate, maintain and transfer basis (InvIT Bundle 2) 2022-NHAI-136420-1 29/11/2022 24/11/2022 09/01/2023
Time 11:0Hrs
448 Independent Engineer Services during Operation Maintenance stage of Two laning with paved shoulders of Kanpur to Kabrai Section of NH86 from Km.7.430 to Km.130.100 BOT Project in the State of Uttar Pradesh 2022-23/KANPUR-KABRAI/IE/PIU KANPUR 03/01/2023 24/11/2022 24/01/2023
Time 12:0Hrs
449 IE Services for supervision of Shivpuri to Jhansi from Chainage km 1305-000 to Chainage km 1380-300 of NH 27 in Madhya Pradesh on toll operate maintain and transfer basis (InvIT Bundle 2) 2022-NHAI-136321-1 24/11/2022 23/11/2022 09/01/2023
Time 11:0Hrs
450 Consultancy Services for Supervision Consultants of Chandigarh-Kharar from km 0.000 to km 10.185 and Kharar-Kurali from km 15.765 to 29.900 of NH-21 and NH-95 in the State of Punjab. 2022-NHAI-136254-1 26/12/2022 23/11/2022 05/01/2023
Time 11:0Hrs
451 Consultancy Services for Supervision Consultants of Amritsar-Tarn-Taran-Harike-Zira-Faridkot-Bathinda section of NH-15 (New NH-54) from existing km 445.250 of NH-01 to Km 287.615 of NH-15 (New NH-54) in the State of Punjab. 2022-NHAI-136184-1 26/12/2022 22/11/2022 05/01/2023
Time 11:0Hrs
452 Consultancy Services for Independent Engineer services for Supervision of Development of Six-Lane Access Controlled Greenfield Highway from Kodur (Ch. 0.000) to Odulaplle (Ch. 72.000) of Bengaluru –Vijayawada Economic Corridor on HAM Mode under Bharatmala Pariyojana Phase-I in the state of Andhra Pradesh (Package-I) NHAI/BM/EC/Bengaluru-Vijayawada/IE/Pkg-I/2022 01/12/2022 22/11/2022 29/12/2022
Time 11:0Hrs
453 Consultancy Services for Independent Engineer services for Supervision of Development of Six-Lane Access Controlled Greenfield Highway from Odulaplle (Ch. 72.000) to Audireddipalle (Ch. 160.000) of Bengaluru –Vijayawada Economic Corridor on HAM Mode under Bharatmala Pariyojana Phase-I in the state of Andhra Pradesh (Package-II) NHAI/BM/EC/Bengaluru-Vijayawada/IE/Pkg-II/2022 01/12/2022 22/11/2022 29/12/2022
Time 11:0Hrs
454 Consultancy Services for Authoritys Engineer for Supervision of Up-gradation of Daultabad T point to Shivoor from existing km 222.893 On SH 16 Daulatabad Jn to km 64.000 On SH51 Shivoor Design km.0.000 to km 4.000aultabad T point to Maliwada EENH-Aurangabad-tender-nit-5-3002051 29/12/2022 22/11/2022 13/01/2023
Time 15:0Hrs
-
455 CS for AE for Supervision of Const of 4L with PS from Exitg Ch 14200 to 24320 Ch 33760 to 42780 and Ch 43440 to 47020 Delina Flyover-incl flyover length 1704 km of total length 22736 kms in AOR of 760 BRTF on road Srinagar-Baramula-URI NH01 in UT JK RW/SR/Wroks(3)/AE/JnK/2022 21/11/2022 21/11/2022 05/12/2022
Time 11:0Hrs
456 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF BALANCE WORK OF I) REHABILITATION AND UPGRADATION OF PANVEL MAHAD PANJI ROAD NH-66 02/NHD/AB/TC/2022-23/3583 27/11/2022 19/11/2022 02/01/2023
Time 17:30Hrs
457 Consultancy Services for AE for Supervision of Widening of Existing Road to Two lane with paved shoulder from Km 0.000 to Km 32.000 Mudigubba to Puttaparthi of NH 342 in the State of Andhra Pradesh through Engineering procurement Construction EPC RW/NH-12014/31/2021-AP/ZoneIII 21/11/2022 18/11/2022 12/01/2023
Time 17:0Hrs
458 Consultancy services for Authoritys Engineer for Supervision of ( CONSTRUCTION OF 4-LANE MANGALDOI BYPASS FROM KM 26.400 to km 41.500 ON NH 15 ( L- 15.10 km) UNDER RANGIA NH DIVISION IN THE STATE OF ASSAM under EPC mode RW/GHT/AS/AE/Tender/932 23/11/2022 18/11/2022 13/01/2023
Time 15:0Hrs
459 Independent Engineer Services for four laning of existing 2 – lane stretch from Govindpur (MH/TG Border) (Design km 32.910) to Rajura (Design km 89.090) (Design Length – 56.180 km) section of NH-353B in the State of Maharashtra on Hybrid Annuity Mode under NH (O) NHAI/Tech/MH/IE/NH-353B/2022 16/12/2022 18/11/2022 22/12/2022
Time 11:0Hrs
460 Consultancy Services of Authority Engineer for Supervision and O n M of Cuttack Angul PKG 1 and 2 on EPC Mode in the state of Odisha NHAI/13012/137/RO/OD/2962/2023 11/12/2023 17/11/2022 21/12/2023
Time 11:0Hrs
461 IE Services during OnM stage of Jaipur Reengus Section, Reengus Sikar section and Salasar Nagaur Section in the State of Rajasthan (Total Length 215.323 KM) NHAI/11011/ROJ-Tenders -JR-RS-SN/2ndcall 18/11/2022 16/11/2022 02/01/2023
Time 11:0Hrs
462 Independent Engineer Services for National Highways Stretches under Bundle1 of Tolling, Operation, Maintenance and Transfer (TOT) Projects from Km. 741.255 to Km. 1022.494 (IE for the sections Anakapalli to Annavaram and Annavaram to Diwancheruvu sections of NH-16 and Diwancheruvu to Siddantham and Siddantham to Gundugolanu sections of NH 216A in the state of Andhra Pradesh). 2022-NHAI-135571-1 17/11/2022 16/11/2022 10/01/2023
Time 15:0Hrs
463 Consultancy Services for Authoritys Engineer for supervision of Upgradation of Dindori Sagartola Kabirchabutra(MP/CG border) Section of NH 45 from Km 0/00 to Km 77/00 total length 77km 2lane with paved shoulder in the State of Madhya Pradesh on EPC 2022-MoRTH-723561-1 19/11/2022 16/11/2022 11/01/2023
Time 17:30Hrs
464 Consultancy Services as Authority’s Engineer for Supervision of “2- laning of Zorinpui - Longmasu section of NH-502A from km 0.000 to km 28.244 in the State of Mizoram on EPC mode” NHIDCL/Mizoram/NH-502A/AE/2021-22 16/11/2022 15/11/2022 12/01/2023
Time 11:0Hrs
465 Consultancy Services as Authoritys Engineer for Supervision of Four laning of (i) Jhanji to Demow section of NH-37 from km 491 050 to km 535 250 (Design Chainage) from Km 490 800 to Km 534 800 (ii) Section between Demow (km 534 800) to End of Moran Bypass (km 561 700) (iii) end of Moran Bypass (km 561 700) to Bogibeel junction near Lapetketa (km 580 875) (iv) Construction of Dibrugarh Bypass/ Realignment from Bogibeel Junction at Km 580/875 to Km 596/322 in the state of Assam under SARDP-NE. NHIDCL/Assam/AE/Jhanji- Dibrugarh/ 2022/208578 10/11/2022 15/11/2022 22/11/2022
Time 15:0Hrs
466 IE Services during OnM stage of 4 lane Road on New NH 52 Darah Jhalawar Teendhar section in the State of Rajasthan under NHDP Phase III on HAM (Length 48.880 Km.),Package II NHAI/11011/2022/ ROJ-Tenders/IEDJT 18/11/2022 11/11/2022 10/01/2023
Time 11:0Hrs
467 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF REHABILITATION AND UPGRADATION TO 2LPS OF SHEWALI (SAKRI) – NANDURBAR SECTION OF NH-753B FROM KM 0.000 TO KM 49.050 (EXCLUDING KM 0.300 TO KM 4.500 & KM 13.485 TO KM 25.975 (DESIGN CHAINAGE) TO TWO LANE WITH PAVED SHOULDER CONFIGURATION ADDITIONAL BRIDGE WORKS AT KM 13.915 (60M), & KM 19.845 (70M) IN THE STATE OF MAHARASHTRA ON EPC MODE. 2022-MoRTH-723024-1 29/11/2022 11/11/2022 09/12/2022
Time 17:30Hrs
468 Independent Engineering Services for the work of Construction and Upgradation to Four Lane from Manikpur (Design Ch Km 0 000) to Sahebganj (Design Ch Km 44 650) section of NH139W under Bharatmala Pariyojana scheme in the State of Bihar on HAM Mode 2022-NHAI-135127-1 07/02/2023 11/11/2022 22/06/2023
Time 17:0Hrs
469 Consultancy Services for Authoritys Engineer for Supervision of Rehabilitation and Upgradation of existing highway to 2 lane with paved shoulders (rigid pavement) from Start of Kolhapur Municipal Corporation near Phulewadi to Kale Section of NH-166G 2022-MoRTH-722706-1 15/11/2022 10/11/2022 23/12/2022
Time 17:0Hrs
470 Independent Engineer Services for Construction of new 4-lane coastal road with paved shoulder from Rameshwar to Puri (km.0 to km. 47.050) on Hybrid Annuity Mode in the State of Odisha (Package-I) 2022 NHAI 134739 1 14/11/2022 07/11/2022 07/02/2023
Time 11:0Hrs
471 Independent Engineer Services for Construction of new 4 Lane Coastal road with paved shoulder from Puri to kakatpur (Km.47.050 to km.91.600) on Hybrid Annuity Mode in the state of Odisha (Package-II) 2022 NHAI 134741 1 14/11/2022 07/11/2022 07/02/2023
Time 11:0Hrs
472 Independent Engineer Services for Construction of new 6-lane Capital Region Ring Road (CRRR) from Gobindpur near Kuspangi (NH-42) to Tangi near Bandalo Toll Palza (NH-16) (Km.70.540 to Km. 110.870) on Hybrid Annuity Mode in the State of Odisha. 2022 NHAI 134744 1 14/11/2022 07/11/2022 07/02/2023
Time 11:0Hrs
473 Consultancy Services for Supervision Consultants of Operation and Maintenance of Dalkhola to Ghoshpukur Section including Islampur Bypass of NH-31 from km 447.000 to km 551.000 in the state of West Bengal 06/OandM/Dalkhola-Ghoshpukur/SC/2022-23 04/11/2022 04/11/2022 03/01/2023
Time 12:0Hrs
474 Consultancy Services for Supervision Consultants during Operation and Maintenance of Ghoshpukur-Dhupguri Section of NH-31D from km 0.00 to km 83.785 (Pkg-1) in the state of West Bengal 05/Ghosh-Dhup/SC/22-23 03/11/2022 03/11/2022 21/12/2022
Time 12:0Hrs
475 Consultancy services for Authoritys Engineer for Supervision of Rehabilitation and up-gradation of existing road to 2 lane from km 84/000 to km 101/000 of Malshej Ghat of NH-61 in the state of Maharashtra on EPC basis contract. 2022-MoRTH-721566-1 12/11/2022 03/11/2022 05/12/2022
Time 17:30Hrs
476 IE services for 6Laning of Kottukulangara(Design Km454.500) Start of Kollam Bypass(Km486.000) Kadambattukonam(Design Km517.250) sec of New NH66(Old NH47)in Kerala in HAM mode under BMP. 2022-NHAI-134273-1 29/11/2022 03/11/2022 12/12/2022
Time 11:0Hrs
477 AUTHORITY’S ENGINEER FOR SUPERVISION OF “Upgradation /widening and construction of 4 – lane with paved shoulders from Srirampur to Dhubri (Length 54.154 km) of NH- 127B in the State of Assam under JICA ODA Loan assistance (Phase- V) on EPC mode. NHIDCL/ASSAM/S-D/JICA5/AE /2021/199467/RFP 25/10/2022 02/11/2022 16/12/2022
Time 15:0Hrs
478 Independent Engineer services during Operation & Maintenance Period for 6 laned Satara-Pune (Km 725.000 to Km 865.350) Section of NH-48 (Old NH-4) on DBOFT basis in the State of Maharashtra NHAI/RO/MUM/PUNE/IE/O&M/2022/18 05/11/2022 01/11/2022 14/12/2022
Time 11:0Hrs
479 Project Management Consultancy services for Up-gradation to existing 2 lanes highway with construction of elevated flyover (section Talegaon-Chakan – Shikrapur of NH-548D (from Km. 0.000 to Km. 54.000)). NHAI/RO/MUM/Pune/TCS/PMC/2nd Call 04/11/2022 01/11/2022 07/12/2022
Time 11:0Hrs
480 Supervision Consultancy Services for Operation and Maintenance of Barabanki to Jarwal Section from Km. 0.000 to Km. 42.546 (Pkg-1), Jarwal to Bahraich Bypass Section from Km. 42.546 to Km. 93.037 (Pkg-2) and Bahraich Bypass to Rupaidiha Section from Km.99.000 to Km.152.847 (Pkg-3) of NH-927 (Old NH-28C) with 2-Lane Paved Shoulders in the State of Uttar Pradesh NHAI/PIU-LKO/SC/NH-927/2022/15 19/11/2022 01/11/2022 21/12/2022
Time 11:0Hrs
481 Supervision Consultancy Services for Operation & Maintenance of Barabanki to Jarwal Section from Km. 0.000 to Km. 42.546 (Pkg-1), Jarwal to Bahraich Bypass Section from Km. 42.546 to Km. 93.037 (Pkg-2) and Bahraich Bypass to Rupaidiha Section from Km.99.000 to Km.152.847 (Pkg-3) of NH-927 (Old NH-28C) with 2-Lane Paved Shoulders in the State of Uttar Pradesh NHAI/PIULKO/ SC /NH-927 /2022/15 15/12/2022 01/11/2022 21/12/2022
Time 15:0Hrs
482 Consultancy Services for Authority’s Engineer for Supervision of Construction of 4-laning of NH-45 to Amjhar Road from km 38.400 to Km 98.950 (Jabalpur Ring Road, Pkg – 3 & 4) under Bharatmala Pariyojna in the State of Madhya Pradesh on EPC Mode NHAI/HQ/MP/NH-45 to Amjhar/Pkg-3&4/EPC/AE/2022 15/11/2022 31/10/2022 24/01/2023
Time 11:0Hrs
483 CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF Rehabilitation Up-gradation to 2L PS 4 L to Nhavara to Chaufulla Section of NH 548DG i.e. Nhavara to Choufula Section ch. 0.00 to km. 24.037 of state highway in the state of MH No.3/EENH/Pune/2103/2022 dated 21/10/2022 31/10/2022 31/10/2022 07/12/2022
Time 17:5Hrs
484 Consultancy Services for Authority’s Engineer for supervision of the work of “Widening to two lane with paved Shoulders from Km 40.00 to Km 75.00 (Existing chainages) of Mangalore - Tumkur section of NH-73 in the State of Karnataka under Annual Plan 2021-22 on EPC mode. (Job No NH-73-KNT-2021-22-945)”. NoNH-73-KNT-2022-23-AE 28/10/2022 28/10/2022 29/12/2022
Time 15:0Hrs
485 Consultancy services for Authority’s Engineer for Supervision of (i) Rehabilitation and up-gradation to two lane with paved shoulders of Rajewadi to Warandh village Section (km. 75.100 to 88.100) part of Lonand- Bhor- Mahad - Mhapral - Mandangad - Pachral - Ambadave, NH-965 DD and (ii) Construction of Major high-level bridges across panvel-mahad-panjim road nh-66 (old 17) at km91/400 god river, 94/400 kal river & km 161/400 choradi river in Raigad District in the state of Maharashtra on EPC Mode NIT/01/1631 25/10/2022 25/10/2022 22/11/2022
Time 17:0Hrs
486 AUTHORITY Engineer AE PMC Services for supervision of construction of one Flyover at Km 2.735 and one Major Bridge at Km 31.260 on NH 730 in the State of Uttar Pradesh Under EPC Mode 3079 1 Tender cashier bly Dt 20.10.2022 21/10/2022 22/10/2022 21/11/2022
Time 12:0Hrs
487 Consultancy services for AUHORITY ENGINEER / PMC FOR SUPERVISION OF Construction of 1 ROB & 3 Flyovers of National Highway No. 730 at the section from Km 133.230 to Km 134.330, Km 134.550 to Km 135.650, Km 136.200 to Km 137.800 under EPC mode in the State of Uttar Pradesh 3080 638C NH CIRCLE 22 Dated 20.10.2022 22/10/2022 22/10/2022 21/11/2022
Time 12:0Hrs
488 Consultancy Services for Authoritys Engineer for Supervision of Rehabilitation and Upgradation for Kopargaon to Savali Vihir Section from Km.354.000 to 362.663 Total length 8.663 Km of NH752 G to 4L PS in the state of Maharashtra on EPC mode 02/EENH/Nashik 11/11/2022 22/10/2022 05/12/2022
Time 17:45Hrs
489 Consultancy Services for Authority’s Engineer for Supervision of Rehabilitation and Upgradation of Jamkhed to Saudata section of NH- 548D (From Km.195.375 to Km.208.774, Length-13.399 Km) to 2L PS/4L configuration with rigid pavement in the state of Maharashtra on EPC mode. 2022-MoRTH-719621-1 17/11/2022 22/10/2022 05/12/2022
Time 17:45Hrs
490 Independent Engineer services for Upgradation of Existing Two Lane Carriageway to Four Lane Divided Carriageway from Ch 208 900 (Existing Km 535 930) in Nasarpore Village in Umarpada Taluka to Ch 241 700 (Existing Km 582 000) in Bedkuva Dur Village in Vyara Taluka (Length 32 800 Km) Section of NH-56 in the State of Gujarat on Hybrid Annuity Mode (Package VI) NHAI/Gujarat/IE/Pkg-VI/2022 16/11/2022 21/10/2022 05/02/2024
Time 15:0Hrs
491 Independent Engineer services for Upgradation to Six Lane with paved Shoulder of NH 27 from Samakhiyali to Santalpur section from km 339 700 to Km. 430 100 in the State of Gujarat on BOT (Toll) Mode NHAI/Gujarat/NH-27/Samakhiyali-Santalpur/BOT/IE/2022 23/11/2022 21/10/2022 23/12/2022
Time 15:0Hrs
492 Independent Engineer services for Upgradation of Existing Two Lane Carriageway to Four Lane Divided Carriageway from Ch 241 700 (Existing Km 582 000) in Bedkuva Dur Village in Vyara Taluka to Ch 290 050 (Existing Km. 629 690) in Pathakwadi Village in Dolvan Taluka (Length 48 350 m) Section of NH-56 in the State of Gujarat on Hybrid Annuity Mode (Package VII) NHAI/Gujarat/IE/Pkg-VII/2022 21/11/2022 21/10/2022 15/01/2024
Time 15:0Hrs
493 Independent Engineer services for Upgradation of Existing Two Lane Carriageway to Four Lane Divided Carriageway from Ch 290 050 (Existing Km 629 690) in Pathakwadi Village in Dolvan Taluka to Ch 330 800 (Existing Km 671 850) in Karanjveri Village in Dharampur Taluka (Length 40 750 Km) Section of NH-56 in the State of Gujarat Hybrid Annuity Mode NHAI/Gujarat/IE/Pkg-VIII/2022 21/11/2022 21/10/2022 22/01/2024
Time 15:0Hrs
494 Independent Engineer services for Upgradation of Existing Two Lane Carriageway to Four Lane Divided Carriageway from Ch. 330 800 (Existing Km671 850) in Karanjveri Village in Dharampur Taluka to Ch 372 185 (Existing Km 714 010) in Karvad Village near Vapi, post junction with Mumbai Vadodara Expressway (Length 41 385 Km) Section of NH-56 in the State of Gujarat on Hybrid Annuity Mode (Package IX) NHAI/Gujarat/IE/Pkg-IX/2022 21/11/2022 21/10/2022 22/01/2024
Time 15:0Hrs
495 Independent Engineer services for Construction of Six lane access controlled Expressway from Km 0 000 to Km 43 500 (Tharad to Khimana of Tharad Ahmedabad Expressway- Design length 43500 m) under Bharatmala Pariyojana in the State of Gujarat (Package I) on Hybrid Annuity Mode NHAI/Gujarat/ Tharad to Khimana /IE/Pkg-I/2022 29/11/2022 21/10/2022 08/11/2023
Time 15:0Hrs
496 Independent Engineer services for Construction of Six lane access controlled Expressway from Km 43 500 to Km 83 500 (Khimana to Diodarda of Tharad Ahmedabad Expressway Design length 40 kms) under Bharatmala Pariyojana in the State of Gujarat (Package II) on Hybrid Annuity Mode NHAI/Gujarat/ Khimana toDiodarda /IE/Pkg-II/2022 29/11/2022 21/10/2022 08/11/2023
Time 15:0Hrs
497 Independent Engineer services for Construction of Six lane access controlled Expressway from Km 83 500 to Km 127 000 (Diodarda to Udalpur of Tharad Ahmedabad Expressway- Design length 43500 kms) under Bharatmala Pariyojana in the State of Gujarat (Package III) on Hybrid Annuity Mode NHAI/Gujarat/ Diodarda to Udalpur/IE/Pkg-III/2022 29/11/2022 21/10/2022 08/11/2023
Time 15:0Hrs
498 Independent Engineer services for Construction of Six lane access controlled Expressway from Km 127 000 to Km 173 500 (Udalpur to Giyod of Tharad Ahmedabad Expressway Design length 46 5 kms) under Bharatmala Pariyojana in the State of Gujarat (Package IV) on Hybrid Annuity Mode NHAI/Gujarat/ Udalpur to Giyod /IE/Pkg-IV/2022 29/11/2022 21/10/2022 08/11/2023
Time 15:0Hrs
499 Independent Engineer services for Construction of Six lane access controlled Expressway from Km 173 500 to Km 213 803 (Giyod to Bhuval of Tharad Ahmedabad Expressway- Design length 40303 m) under Bharatmala Pariyojana in the State of Gujarat (Package V) on Hybrid Annuity Mode NHAI/Gujarat/ Giyod to Bhuval /IE/Pkg-V/2022 29/11/2022 21/10/2022 08/11/2023
Time 15:0Hrs
500 Independent Engineer services for Upgradation of Existing Two Lane Carriageway to Four Lane Divided Carriageway from Ch 179 780 (Existing Km 506 660) in Bitada/Movi Village in Netrang Taluka to Ch 208 900 (Existing Km 535 930) in Nasarpore Village in Umarpada Taluka (Length 29120 m) Section of NH 56 in the State of Gujarat on Hybrid Annuity Mode (Package V) NHAI/Gujarat/IE/Pkg-V/2022 11/11/2022 21/10/2022 20/11/2023
Time 15:0Hrs
501 Independent Engineer services for Upgradation of Existing Two Lane Carriageway to Four Lane Divided Carriageway from Ch 94 030 Junction with Existing NH-56 (Km 414 646) in Jabugam Village in Bodeli Taluka to Ch 132 320 (Existing Km 454 500) in Dhamasiya Village in Naswadi Taluka (Length 38290 m) Section of NH-56 in the State of Gujarat on Hybrid Annuity Mode (Package III) NHAI/Gujarat/IE/Pkg-III/2022 04/11/2022 21/10/2022 20/11/2023
Time 15:0Hrs
502 Supervision Consultancy Services for Operation & Maintenance of the stretch from Km 00.000 to Km 52.200 of Sitarganj to Tanakpur Section of NH-125 (new NH-09) in the State of Uttarakhand NHAI/PIU-RUPC/NH-125/SC/2022 15/11/2022 18/10/2022 18/11/2022
Time 11:0Hrs
503 Independent Engineer (IE) Services during OandM period for Const of 8L VKE from km355 to km378.74(Pkg I-Padra to Vadodara) from km323 to km355 (Pkg II -Sanpa to Padra) and from km292 to km323 (Pkg III -Manubar to Sanpa) in the State of Gujarat on HAM 2022-NHAI-132312-1 06/12/2022 17/10/2022 06/01/2023
Time 11:0Hrs
504 Independent Engineer services for Construction of 4-Laning of Jagtial Karimnagar Section of NH-563 from Design Ch.0.000 km to Design Ch. 58.866 km at Karimnagar Bypass End (Design Length 58.866 km) in the State of Telangana on HAM under BMP NHAI/HQ/GM-Tel./DGM(T)/ Jag-Kar/IE/10-2022 17/10/2022 17/10/2022 15/12/2022
Time 11:0Hrs
505 IE services for Construction of 4-laning of existing 2-lane from Gudebellur (Deosugur) to Marikal (Design Chainage 182.930 km to 228.500 km with design length 45.57 km) in Telangana of Hyderabad-Panaji section of NH-167 on HAM under BMP (Package-l) NHAI/HQ/GM-Tel./DGM/ Gude-Mari/PKG-I/IE/10-2022 20/10/2022 17/10/2022 15/12/2022
Time 11:0Hrs
506 IE services for Construction of Four laning of Marikal-Hasnapur Potulamadugu section of NH-167 from Design Km 228.500 to Km 267.360 in Telangana as a part of development of EC to improve the efficiency of freight movement in India on HAM Package-II NHAI/HQ/GM-Tel./DGM/Mari-Hasn/ Pkg-II/IE/10-2022 20/10/2022 17/10/2022 27/02/2023
Time 11:0Hrs
507 Consultancy Services for Independent Engineer for Four laning from Godibandha to Ballahar Chhak Ballhar Chhak to Banarapal Banarapal to Start of Anugul bypass at Km 314.130 to Km.321.035 of NH 53 at Km.75.200 to Km.84.000 of NH 149 and at Km.84.000 to Km.86.100 of NH 55 on HAM in the state of Odisha 2022 NHAI 130166 1 14/10/2022 14/10/2022 14/02/2023
Time 11:0Hrs
508 Consultancy Services for Supervision Consultant SC during Operation and Maintenance Period of 4 laning of Ghaghra Bridge to Varanasi Section of NH 233 from Km 180420 to Km 240340 Package II from Bhudanpur Urban section of start of Gossai bazar bypass and from Km 240340 to Km 299350 Package III from start of Gossai Bazar bypass to Varanasi in the State of Uttar Pradesh 2022-NHAI-131916-1 18/10/2022 13/10/2022 31/10/2022
Time 11:0Hrs
509 Consultancy services for Independent Engineer for 4/6 laning of Edathanattukara to Iringaullur section of NH-966 from Km. 61.440 to Km.121.006 (Design Length=59.566 Km) (Civil Package 3,4 and 5) in the State of Kerala in HAM mode under Bharatmala Pariyojana. 2022-NHAI-132030-1 30/12/2022 13/10/2022 12/02/2024
Time 11:0Hrs
510 Consultancy Services for Authority’s Engineer for Supervision of Construction of Six lane access-controlled Paniyala-Barodameo Inter Corridor Route from Km 0.000 to Km 86.513 in the State of Rajasthan on EPC Mode under Bharatmala Pariyojana NHAI/Bharatmala/ICR/PAB/AE/2022 10/11/2022 10/10/2022 01/12/2022
Time 11:0Hrs
511 Consultancy Services for Authoritys Engineer for Supervision of (i) Construction of ROB at Km 116 of NH-99 (new NH-22) at Chandwa (LC No. 12A/T) in the State of Jharkhand on EPC mode (ii) Construction of RoB at Km-11 of NH-419 at Chittranjan (LC No. 5 SPL/E) in the State of Jharkhand on EPC mode (iii) Construction of ROB at Km. 209 of NH-114A at Jagdishpur (LC No. 5/B/E) in the State of Jharkhand on EPC mode for the Year 2020-21, (iv) Construction of ROB at km 204 of NH-114A at Patharia (LC No. NH/RANCHI/EPC/AE/2022-23/13 10/10/2022 10/10/2022 28/11/2022
Time 11:0Hrs
512 CS for AE for Supervision of Construction of 4L Elevated Corridor and at-grade improvements from Design Ch0-000 to Design Ch19-870 of Danapur–Bihta Section with providing connectivity to the existing RoB near Danapur station (0.231 km) 1.35 Km ramps & at-grade improvements to 4L section on Danapur side and Upgradation of existing 2L carriageway to 4L carriageway from Design Ch19-870 to Design Ch23-500 of Bihta-Koilwar section (Total Length 25.081 Kms) in Bihar on EPC Mode 2022-NHAI-131330-1 27/10/2022 07/10/2022 13/12/2022
Time 11:0Hrs
513 CS for AE for Supervision of Const of 4L with PS from Exitg Ch 14200 to 24320 Ch 33760 to 42780 and Ch 43440 to 47020 Delina Flyover-incl flyover length 1704 km of total length 22736 kms in AOR of 760 BRTF on road Srinagar-Baramula-URI NH01 in UT JK RW/SR/Wroks(3)/AE/JnK/2022 06/10/2022 06/10/2022 18/11/2022
Time 11:0Hrs
514 Consultancy Services for Authority’s Engineer for Supervision of (i) Construction of 4-lane from Barela to Manegaon section of NH-30 from design Ch. 2.900 to design Ch 19.050 (Jabalpur Ring Road, Package-1) under Bharatmala Pariyojna in the State of Madhya Pradesh on EPC mode (ii) Construction of 4-Laning of Manegaon to NH-45 from Km.19.050 to Km. 39.180 (Jabalpur Ring Road, Package-2) under Bharatmala Pariyojna in the State of Madhya Pradesh on EPC Mode. NHAI/HQ/MP/Barela-NH-45/Pkg-1&2/EPC/AE/2022 04/10/2022 04/10/2022 17/11/2022
Time 11:0Hrs
515 Consultancy Services For Authority’s Engineer For Supervision of “Widening to 2- Lane with Paved shoulders of Bodhan-Basar-Bhainsa section of NH-161BB in the state of Telangana RW/HYD/Misc-28 NIT AE/2022-23/07dt03.10.2022 07/10/2022 03/10/2022 17/11/2022
Time 15:0Hrs
516 Consultancy Services for Authority’s Engineer for Development of existing 2 Lane NH-1 from km 8.660 to km 33.775 (Sumbal to Wayul) to 4 lane dual carriageway NH standard as part of Srinagar Ring Road Phase – II [Design Ch 41 907 to Ch 66 609] under Bharatmala Pariyojna Phase I in the Union Territory of Jammu and Kashmir on EPC mode 2022 NHAI 130994 1 10/10/2022 03/10/2022 10/11/2022
Time 11:0Hrs
517 Independent Engineer services for Operation & Maintenance of (i) Chennai Bypass from Km 0.000 to Km 32.600 in the State of Tamil Nadu, (ii) Chennai – Tada Section of NH-5 from Km 11.000 to Km 21.400 in the State of Tamil Nadu and (iii) Koyambedu - Maduravoyal section of NH-4 from Km 9.410 to 13.535 in the state of Tamil Nadu NHAI/RO-Chennai/IE/O&M/2022/23/100 03/10/2022 03/10/2022 13/10/2022
Time 17:0Hrs
518 Supervision Consultancy Services during Operation Maintenance of 4-laning of Ghaghra Bridge to Varanasi section of NH-233 from Km. 121.800 to Km. 180.420 (Package-1) from Ghaghra Bridge Abutment on Basti side to Bhudanpur Urban section in the State of Uttar Pradesh under on EPC mode (3rd Call). 11015/NHAI/PIU-AZM/SC/2022-23/ 03/10/2022 03/10/2022 25/11/2022
Time 12:0Hrs
519 Independent Engineer (IE) Services for Operation and Maintenance stage under TOT Mode of Four Laning of Bamanbore - Garamore and Garamore-Samakhiyali Section of NH - 27 in the State of Gujarat 2022-NHAI-130984-1 01/11/2022 03/10/2022 17/11/2022
Time 11:0Hrs
520 Consultancy Services for AE for Supervision of Widening and Reconstruction of existing road to 4-lane from Km 56/400 to Km 120/300 (i.e. from B. Kothapalli Junction to Gorantla) (excluding Kadiri Bypass from Km 70/200 to Km 77/105) of NH-716G in the State of Andhra Pradesh on EPC mode under Annual Plan 2021-22 12014/31/2021AP/ZoneIII/742/AE 04/10/2022 30/09/2022 14/11/2022
Time 17:0Hrs
521 Independent Engineer Services for Operation and Maintenance of Jhansi Orai section Stretch of NH-27 Old NH-25 KM 90.300 New Ch.-1380.300 to KM 225.713 New Ch. 1515.713 2022-23/Jhansi-Orai/IE/PIU Kanpur 07/11/2022 29/09/2022 14/12/2022
Time 12:0Hrs
522 Consultancy services for Authoritys Engineer for Supervision of Work of Imp. and up-gradation of newly declared NH, NH-227B (84 Kosi Parikrama Marg)PkgIII, Design Km 47 800(Gosaiganj)to Km 73 300 (Bikapur) on (EPC) basis in the State of U.P. 4088/733C (3)-NH Circle/2022 Date.19.09.2022 28/10/2022 22/09/2022 14/03/2023
Time 15:0Hrs
523 Construction/upgradation of existing 2 Lane with paved shoulder Km 504.871 to Km 508.610 and Km 468 to Km 489.35 85053/Auth Engg/5C Joshimath bypass/01/EPC C 27/10/2022 22/09/2022 03/03/2023
Time 11:0Hrs
524 CS for AE for Supervision of Construction of 6Lane Bridge with approaches from Km 8.480 near Sherpur to Km 23.000 near Dighwara across River Ganga as Part of Patna Ring Road in Bihar on EPC Basis 2022-NHAI-129635-1 12/10/2022 21/09/2022 13/12/2022
Time 11:0Hrs
525 Consultancy Services for Authority s Engineer for Supervision of Widening and Strengthening/Reconstruction of existing pavement to two lane with paved shoulder from km 116.00 to 176.220 (except km 155.00 to 156.00 km 160.368 to 161.368 km 164.500 to 165.500 and km 168.800 to 169.800) of NH 75E (New NH-20) in the State of Jharkhand under EPC mode NH/CHAIBASA/EPC/AE/2022-23/01 06/10/2022 20/09/2022 20/10/2022
Time 11:0Hrs
526 AE services for Pkg-I/II/III of NH-734 Moradabad Kashipur 2022NHAI1295951 28/09/2022 20/09/2022 08/11/2022
Time 15:0Hrs
527 Consultancy Services for Authority Engineer for Supervision of Rehabilitation And Upgradation of existing road to 4 lane from Km 0.000 to Km 56.500 Muddanur to B. Kothapalli of NH-716G in the State of Andhra Pradesh on EPC mode under Annual Plan 2021-22 RW/NH-12014/30/2021-AP/ZoneIII 29/09/2022 20/09/2022 18/11/2022
Time 17:0Hrs
528 Independent Engineer services during O & M phase of Four laning of Solapur Yedshi section of NH 211 from Km 0 000 to Km 100 000 Design Length 98 717 Km Four Laning of Solapur MAH KNT Border from Km 249 000 to Km 348 800 Section of NH 9 Design Length 100 06 Km and Four laning of Pune Solapur section of NH 9 from Km 144 400 to Km 249 000 in the State of Maharashtra 2022 NHAI 129143 1 20/09/2022 20/09/2022 10/11/2022
Time 11:0Hrs
529 CONSULTANCY SERVICES FOR AUTHORITY ENGINEER SERVICES FOR FOUR LANING OF GAZIPUR - BALLIA - UP/BIHAR STATE BORDER (GREENFIELD) SECTION OF NH-31 (I) HRIDAIPUR (KM 0.000) TO SHAHAPUR (KM 42.500) (PACKAGE-I) AND (II) BUXAR SPUR OF LENGTH 17.270 KM (PACKAGE-IV) IN THE STATE OF UTTAR PRADESH ON EPC MODE NHAI/Tech/Gazipur/ Ballia/Pkg-IandIV/AE/2022 21/09/2022 20/09/2022 09/11/2022
Time 11:0Hrs
530 Consultancy services for Authority Engineer services for Four Laning of Gazipur - Ballia - UP/Bihar State Border (Greenfield) section of NH-31 (i) Package II [from Shahapur (km 42.500) to Pindari (km 78.150)] and (ii) Package III [from Pindari (km 78.150) to Rawalganj Bypass (km 117.120)] in the state of Uttar Pradesh on EPC Mode NHAI/Tech/Gazipur /Ballia/Pkg-IIandIII/AE/2022 21/09/2022 20/09/2022 09/11/2022
Time 11:0Hrs
531 Consultancy Services for Supervision of Routine Maintenance Incident Management Toll Operation Special Repairs Periodical Renewals Civil Works Contract from Km 1184/322 to Km 1380/387 on Four Lane of Baran-Shivpuri-Jhansi section of NH-27 in the state of Raj MP UP 2022/NHAI/129598/1 04/11/2022 20/09/2022 16/11/2022
Time 11:0Hrs
-
532 AE services for Widening and Development of Existing NH85 from Km 0.000 to km 124.636 section of NH85 to 2L and 2L plus PS section in Kerala on EPC mode 2022-NHAI-129627-1 05/11/2022 20/09/2022 22/11/2022
Time 11:30Hrs
533 Consultancy for AE services for Widening and Development of Existing NH85 from Km 0.000 to km 124.636 section of NH85 to 2L and 2L plus PS section in Kerala on EPC mode. 2022/NHAI/129627/1 05/11/2022 20/09/2022 22/11/2022
Time 11:0Hrs
534 Consultancy Services for AE for Construction of 6 lane Elevated Corridor along with development of existing 4 lane road at ground level from Aroor to Thuravoor Thekku section of NH66 Km.366.330 to Km. 379.082 of NH66 under BMP in Kerala on EPC 2022-NHAI-129632-1 11/11/2022 20/09/2022 06/12/2022
Time 11:0Hrs
535 Consultancy Services for 6-laning of Chittor - Mallavaram Section of NH-140 NHAI/RO-VJA/IE/C-M/2022 30/09/2022 19/09/2022 09/11/2022
Time 11:0Hrs
536 Consultancy Services of Independent Engineer for (i) Improvement and Up-gradation of Existing Road to 4- lane with paved shoulder from Km. 88-750 to 123-650, Start of Shahjahanpur bypass to Start of Shahabad bypass of Nh-731 on HAM basis in the state of Uttar Pradesh (Package-2A) and (ii) Improvement and Up-gradation of Existing Road to 4–lane with Paved Shoulder from Km 123-650 to 175-080, Start of Shahabad bypass to End of Hardoi bypass of NH-731 on HAM basis in the state of Uttar Pradesh (Pac 2022NHAI1292061 30/09/2022 16/09/2022 08/11/2022
Time 15:0Hrs
537 Supervision Consultant Services for Operation and Maintenance of Shillong Bypass from Km 61.8 of NH 40 to Km 34.85 of NH 44 connecting NH40 and NH44 along with supervision of construction of the new bridge at Km 12.865 of Shillong Bypass 2022-NHAI-129226-1 22/09/2022 16/09/2022 10/11/2022
Time 17:30Hrs
538 Consultancy Services of Independent Engineer for Improvement and Up-gradation of NH-74 (New NH-30) Bareilly -Pilibhit - Sitarganj NH-74 (New -30) on following projects-Package-I of Bareilly -Pilibhit from Km 0-00 to Km 32-500 on HAM basis in the state of Uttar Pradesh Package-II of Pilibhit - Sitarganj from Km 32-500 to Km 64-800 Ch 0-00 to 6-00 (Sitarganj Bypass) on HAM basis in the state of Uttar Pradesh -Uttarkhand NHAI/11013/Brly/IE/NH-74(NH-30)/BS/2022/E-166990 20/12/2022 16/09/2022 24/01/2023
Time 11:0Hrs
539 Independent Engineering Services for the work of Rehabilitation and Up-gradation of Chorma – Bargania section of NH-227F from Design Chainage Km 0 000 to Km 34 566 to two under lanes with paved shoulders in the state of Bihar 2022-NHAI-129077-1 28/09/2022 15/09/2022 21/11/2022
Time 11:0Hrs
540 Independent Engineering Services for the work of Construction of Two Lane with paved Shoulder of road stretches from Bakaur to Parsarma (km 13 300 to km 18 875) NH-527A Parsarma to Bariyahi (km 0 000 to km 24 068) NH-327E Bangaon Bypass (km 0 000 to 3 820) & Mahishi Spur road (km 0 000 to km 5 720) the total length of 39 183 km under BRT Scheme in the State of Bihar on HAM Mode 2022-NHAI-129058-1 28/09/2022 15/09/2022 21/11/2022
Time 11:0Hrs
541 CS FOR PREPARATION OF DPR CARRYING OUT FS DETAILED SURVEY INVESTIGATION ALIGNMENT OPTION PREPARATION OF GAD ENGINEERING REPORT FOR CONSTRUCTION OF PROPOSED FOB AND ITS APPROACHES ALONG WITH SERVICE ROAD AND PREPARATION OF LA-UTILITY ON BATHINDA RW/CH/W(40)/PB/2022 14/09/2022 14/09/2022 28/10/2022
Time 16:0Hrs
542 CS FOR AE FOR SUPERVISION OF Const 2Lane ROB in replacement of LCNo3ESPL3 on Gudivada Machilipatnam rly sec at Km231.7 of NH165 and LCNo52 on VJA Bhimavaram rly sec at Km230.6 of NH165 inc. one time imp of bypass Gudiwada Km228 to 233.540 in AP EPC SE/NH/VJA/17/2022-23 dt 11.08.2022 21/09/2022 12/09/2022 07/10/2022
Time 17:0Hrs
543 Independent Engineer Services for Construction of 4 -Laning of MP/UP Border to Kabarai section of NH-34&35 from km 197.000 to km 242.991 (Length= 45.991 Km) (Sagar-Kabrai Package-5) under Bharat Mala Pariyojana (EC) in MP & UP on HAM. NHAI/HQ/MP/Sagar- Kabrai-Pkg-V/Proc/IE/2022 12/09/2022 09/09/2022 09/11/2022
Time 11:0Hrs
544 Consultancy Services for AE for Supervision of 69 standalone bridges including Approach Road on the Tamu Kalewa Kyigone (TKK) section from Km 0-00 to Km149-70of Trilateral Highway in Myanmarto be executed on EPC Mode 2022-NHAI-128503-1 16/09/2022 09/09/2022 20/10/2022
Time 11:0Hrs
545 Independent Engineer Services for (i) Construction of 4-laning of Boregaon Buzurg to Shahpur section of NH-753L from Km. 139.000 to Km. 186.000 (length 47 Km) under Bharatmala Pariyojana in the State of Madhya Pradesh on Hybrid Annuity Mode (ii) Construction of 4-laning of Shahpur Bypass to Muktainagar section of NH-753L from Km. 186.000 to km 216.278 under Bharatmala Pariyojana in the State of MP and MH on Hybrid Annuity Mode. NHAI/HQ/MP/Boregaon Buzurg to Muktainagar/IE/2022 04/10/2022 09/09/2022 17/11/2022
Time 11:0Hrs
546 Consultancy Services for AE for Supervision of 69 standalone bridges including Approach Road on the Tamu Kalewa Kyigone (TKK) section from Km 0-00 to Km149-70of Trilateral Highway in Myanmarto be executed on EPC Mode 2022-NHAI-128503-1 11/10/2022 09/09/2022 27/10/2022
Time 17:0Hrs
547 4 laning of Haridwar to Muzzaffarnagar section from 356.450 km to 360.270 km of NH-34 & from 0.000 km to 36.400 km of NH-334. [Package1] & from CH. 36.400 to CH. 71.900 section of NH 334 [Package2] in the State of Uttar Pradesh & Uttarakhand NHAI/RO-DDN/UKD/SC/NH-34 334/2022-23/ 21/09/2022 07/09/2022 12/10/2022
Time 11:0Hrs
548 Consultancy services for Authority’s Engineer for Supervision of Construction of Animal Underpasses at Nagbhid - Bramhapuri - Armori Road, NH -353D in Km. 109.650 and 111.175 In State of Maharashtra on EPC Mode. 10/EENH/NGP/2022-23/4026 23/09/2022 06/09/2022 30/09/2022
Time 17:0Hrs
549 Consultancy services for Independent Engineer for Four-Laning of NH-716 from Kadapa (Junction with Kadapa Bypass Road) (Design Km 0.000/Existing Km 260.652 of NH-716) to Chinna Orampadu (Design Km 64.200 / Existing km 196.125) (Design Length = 64.200 Km) (Package-1) on HAM under Bharatmala Pariyojna in the state of Andhra Pradesh NHAI/AP/Tech/IE/NH-716/ Kad-Reni/Pkg-I/2022 03/10/2022 06/09/2022 01/11/2022
Time 11:0Hrs
550 Consultancy services for Independent Engineer for Four-Laning of NH 716 from Chinna Orampadu (Design Km 64.200/ Existing km 196.125 of NH-716) to Renigunta on NH 565 near Tirupati Airport Road (Design Km 121.935 / Existing km 137.000) (Design Length = 57.735 Km) (Package-2) on HAM under Bharatmala Pariyojna in the state of Andhra Pradesh NHAI/AP/Tech/IE/NH-716/ Kad-Reni/Pkg-II/2022 03/10/2022 06/09/2022 01/11/2022
Time 11:0Hrs
551 Consultancy services for Construction Supervision of Strengthening from 0.00 kmp to 48.80 km of Panagarh Illambazar Dubrajpur Road (SH-14) under Asansol Highway Division and Birbhum Highway Division No. II in the districts of Paschim Bardhaman and Birbhum in the State of West Bengal WBPW(R)D/NIB- 02 of SE/WHC-I/2022-2023 02/09/2022 02/09/2022 27/09/2022
Time 14:0Hrs
552 CONSULTANCY SERVICES FOR AUTHORITY S ENGINEER FOR SUPERVISION OF Widening to two lane with paved shoulder from Km 0.000 to Km 45.946 of Nizampet Narayankhed Bidar section of NH 161B in the State of Telangana RW/HYD/Misc28/NIT/AE/2022 23/06 dt 02.09.2022 08/09/2022 02/09/2022 26/10/2022
Time 15:0Hrs
553 CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF Widening and strengthening to 2 Lane 4 lane with paved shoulders from km 0.000 to km 60.255 of Mahabubnagar Chincholi section of NH 167N in the State of Telangana RW/HYD/Misc-28/NIT/AE/2022-23/05 dt 02.09.2022 09/09/2022 02/09/2022 25/10/2022
Time 15:0Hrs
554 Consultancy services for authoritys engineer for supervision of construction of rudraprayag tunnel of length 900.30 m including approaches and one major bridge on river alaknanda connecting nh-107 (old-109) to nh-07 (old nh-58) on epc mode in the state of Uttarakhand 4154/13 yata-NH-10/2022 dated 29.08.2022 02/09/2022 01/09/2022 30/09/2022
Time 15:0Hrs
555 Consultancy Services for Supervision Consultants of Operation & Maintenance of Start of Sangrur Bypass to Tapa including Dhanaula Bypass from km 110.720 to km 175.000 of NH-64 (New NH-07) & Sangrur to Punjab/Haryana Border section of NH-71 (New NH- 52) from km 181.805 to km 238.695 in the State of Punjab 2022-NHAI-127597-1 26/09/2022 01/09/2022 10/10/2022
Time 15:0Hrs
556 Consultancy Services for Supervision Consultant (SC) of Routine Maintenance including Incident Management for Operation and Maintenance of Mydukur – Dornala T junction from Km 589.00 to Km.641.000 of NH 67 and Dornala T junction - Nellore section from Km.641.000 to Km 741.950 of NH 67 (3rd call) NHAI/ROVJA/M-D-N/2022-3C 13/09/2022 31/08/2022 27/09/2022
Time 11:0Hrs
557 Independent Engineer Services for Rehabilitation and Upgradation to Four Lane configuration & Strengthening of Sihuni to Rajol from Km 51.000 to Km 72.000 of NH 20 (New NH 154) (Design Length 18.450 KM) of Pathankot Mandi Section under NH (O) in HP on HAM basis (Package IIA 2022 NHAI 127502 1 06/09/2022 31/08/2022 21/09/2022
Time 11:0Hrs
-
558 Independent Engineer services during Operation & Maintenance period of four-laning of Kashipur-Sitarganj section of NH-74 from km 175.000 to km 252.200 in the State of Uttarakhand and Uttar Pradesh under NHDP Phase-IV on DBFOT (Toll) Basis.Independent Engineer services during Operation & Maintenance period of four-laning of Kashipur-Sitarganj section of NH-74 from km 175.000 to km 252.200 in the State of Uttarakhand and Uttar Pradesh under NHDP Phase-IV on DBFOT (Toll) Basis NHAI/RO-UKD/RUP/KSH-SIT/NH-74 01/09/2022 31/08/2022 10/10/2022
Time 11:0Hrs
-
559 Consultancy services for Independent Engineer Services for Construction of 4 Lane Access controlled Highway from Vakalapudi Light House to Annavaram on NH 16 section of NH 516 F from Km 0 00 to Km 40 621 on HAM under BP Phase 1 in the State of Andhra Pradesh 2022-NHAI-127330-1 30/08/2022 30/08/2022 21/03/2023
Time 11:0Hrs
560 AE Services for supervision of Four laning of Aurangabad to Paithan section of NH-752E from design km 0.000 to design km 42.417 (Design Length – 42.417 km) in the State of Maharashtra to be executed on EPC mode under BMP NHAI/Tech/MH/AE/A - P/2022 19/09/2022 30/08/2022 06/10/2022
Time 11:0Hrs
561 Independent Engineer Services for Construction of (i) 4-lane highway from Vidisha to Hinotiya from km 0.000 to Km 27.000 (Length = 27 Km) (Vidisha – Mehulwa-Talbehat Pkg-I) Section of NH- 346 and (ii) 4-laning of Vidisha to Morikori from Km 39.000 to 59.476 (Length = 20.476Km.) section of NH-146 under Bharatmala Pariyojana in the State of Madhya Pradesh on Hybrid Annuity basis. NHAI/HQ/MP/Vidisha -Mehulwa/HAM/IE/2022 15/09/2022 30/08/2022 29/11/2022
Time 11:0Hrs
562 Consultancy services for Authority Engineer for Upgradation of Bijapur Gulbarga Homnabad section of NH 218 to 2 lane With Paved Shoulders from Km.195.000 to Km.418.000 in the State of Karnataka under NHDP Phase IV executed on Engineering, Procurement and Construction EPC mode under Operation and Maintenance Phase NIT No.20/NHAI/RO-BNG/16019/Tender/2022-23 dated 29.08.2022 30/08/2022 29/08/2022 26/09/2022
Time 15:0Hrs
563 Widening and strengthening to 4LPS2LPS from km 0.000 to 35.800 Kuakhia -Mangalpur Section of NH20 in the State of Odisha on EPC mode 02-ROBBSR-2022-23/AE 26/08/2022 26/08/2022 12/01/2023
Time 15:0Hrs
564 Independent Engineer Services during Operation & Maintenance Period for Two Laning of Raebareli to Jaunpur section of NH-31 (Old NH-231) from Km 0.000 to Km 166.400 in the State of Uttar Pradesh under NHDP Phase-IVA on BOT (Annuity) on DBFOT pattern NHAI/PIU-RBLY/IE/NH31/2022 26/08/2022 26/08/2022 09/09/2022
Time 13:0Hrs
565 CONSULTANCY SERVICES FOR AUTHORITY ENGINEER FOR IMPROVEMENT TO TWO LANE WITH PAVED SHOULDER FROM RAMNAGAR TO ROSEDA FROM KM 3.500 TO KM 43.000 OF NH 527E ON EPC MODE IN STATE OF BIHAR. NH-12014/80/2021-RO Patna 09/09/2022 25/08/2022 07/11/2022
Time 16:0Hrs
566 RFP for providing Independent Engineer (IE) services during O & M phase of 4/6 laned Dhule –Pimpalgaon-Nashik-Gonde- Vadape (Km 265 - Km 539.500) section of NH-3 (New NH-60/160) in the State of Maharashtra NHAI/RO/MUM/NSK/IE/O&M/2022/15 24/08/2022 23/08/2022 06/10/2022
Time 12:0Hrs
567 Independent Engineer services for Construction of 4-lane highway with paved shoulders from Km 74.700 to Km 112.950 of NH-731A (i/cYamuna Bridge ) on HAM in the state of Uttar Pradesh. CE-RO/LKO/IE/NH-731A(Pkg IV)/2021-22 dt.23.08.2022 25/08/2022 23/08/2022 17/03/2023
Time 17:0Hrs
568 Consultancy Services for Authority Engineer for Supervision of 4- Laning of Mohari to Satai Ghat section NH-934 from Km 50.300 to Km 89.875 (Total length 39.575 km) (Package-2) in the State of Madhya Pradesh on EPC Mode NHAI/HQ/MP/Mohari-Satai Ghat/Pkg-2/EPC/ AE /2022 08/09/2022 22/08/2022 15/11/2022
Time 11:0Hrs
569 CONSULTANCY SERVICES FOR AUTHORITY ENGINEER FOR SUPERVISION OF (i) Up gradation and Rehabilitation to Two lane with Paved Shoulder of Barmer -Ghagariya section from Km 0.972 to 69.910 of NH-25 Ext. (ii) Construction of 4 lane ROB and its approaches in lieu of existing level crossing no. 328A at km. 0.500 of NH-25E. (iii) Construction of 4 lane Road Over Bridge from Design Chainage at Km 0.000 (km. 102 of NH-325) to Design Chainage at km 1.060 in a length of 1.060 kms on EPC in the State of Raj NIT No. 03/ 2022-23 22/08/2022 18/08/2022 20/09/2022
Time 11:0Hrs
570 4 Laning of NH 544D from existing km 346.300 of NH 44 (Design Chainage km 0.000) to km 39.380 (Design Chainage km 37.000) of Anantapur - Muchukota on Hybrid Annuity Mode under NH (O) in the state of Andhra Pradesh & (ii) 4 Laning of NH 544D from existing km 39.380 of NH 544D (Design Chainage km 37.000) to km 74.450 (Design Chainage km 69.000) of Muchukota – Bugga section of NH-544D on Hybrid Annuity Mode under NH (O), in the state of Andhra Pradesh. NHAI/AP/Tech/IE/NH-544D/ATP-MKT-BUGGA/2022 21/09/2022 18/08/2022 03/10/2022
Time 11:0Hrs
571 Independent Engineer services for supervision of Upgradation and Four Laning of Haridwar Bypass Package-1 From Ch 0-000 (Km 188-100 of NH-58) to Ch 15-100 (Km 5-100 of NH 74) in the state of Uttarakhand on Hybrid Annuity mode 2022-NHAI-125835-1 18/08/2022 17/08/2022 16/09/2022
Time 11:30Hrs
572 Consultancy services for Authority Engineer for Supervision of Rehabilitation and Upgradation of Nongstoin-Rambrai-Kyrshai road up to Meghalaya-Assam Border from km 0-335 to km 34-039 to 2-Lane under SARDP-NE Phase-A in the state of Meghalaya on EPC mode (Package-I) NHIDCL/Megh/AE/NRK-I/2021 03/08/2022 17/08/2022 31/08/2022
Time 15:0Hrs
573 Consultancy Services for Supervision Consultants of Operation & Maintenance of four laning of Hisar to Dabwali Section of NH-10 from km 170.000 to 227.000 (Package-I) and km 227.000 to km 314.660 (Package-2) with paved shoulder in the State of Haryana 2022-NHAI-125789-1 14/09/2022 16/08/2022 19/09/2022
Time 11:0Hrs
574 Independent Engineer Services for Construction of 6 - lane Greenfield Karnal Ring Road starting from NH-44 near Village Shamgarh (Design km 0 000 ) and terminating at Karnal – Munak Road (MDR - 115) near Village Samalakha (Design km 34 500) under Bharatmala Pariyojana in the State of Haryana on Hybrid Annuity Mode 2022-NHAI-125689-1 24/08/2022 13/08/2022 26/09/2022
Time 11:0Hrs
575 Independent Engineer Services for 4-Laning of Bhiwani - Hansi road section of NH 148B (Design Length 42 934 km) under Bharatmala Pariyojana in the State of Haryana on Hybrid Annuity Mode 2022-NHAI-125690-1 24/08/2022 13/08/2022 26/09/2022
Time 11:0Hrs
576 Independent Engineer Services for 4-laning of Ambala-Kala Amb section of NH-72 (Part of New NH-344 from Ambala Ring road (Design Chainage (-) 0 800) to Shahzadpur and Part of New NH-7 from Shahzadpur to Kala Amb (HR/HP Border) (Design Chainage 33 015)) in the state of Haryana and Punjab (Design Length 33 815 Km) on Hybrid Annuity Mode under NH(O) 2022-NHAI-125687-1 24/08/2022 12/08/2022 26/09/2022
Time 11:0Hrs
577 IE Services for the work of Const and Upgrad to 4 Lane from Siwan (Design Ch. Km 4.217) to Mashrakh (Design Ch. Km 50.123) of NH 227A including const of 4 Lane Tanrwa/Siwan Bypass (Km 0.000 to Km 4.217) of NH 531 in Bihar on HAM Mode 2022-NHAI-125398-1 20/08/2022 11/08/2022 06/10/2022
Time 17:0Hrs
578 IE Services for the work of Construction of 4 laning of Kishanganj Bahadurganj road sec starting from NH 31 near village Uttar Rampur (Km. 0.000) and terminating at NH 327E near Village Satal Istamarar under BMP in Bihar on HAM 2022-NHAI-125396-1 20/08/2022 10/08/2022 06/10/2022
Time 17:0Hrs
579 Project Management Consultancy services for Construction of Double Tier Elevated Highway Corridor including provision for metro (section from Pune to Shirur of NH-753F (from Km. 0.000 to Km. 56.000)) NHAI/RO/MUM/Pune/Pune-Shirur/2022/13 11/08/2022 10/08/2022 26/09/2022
Time 11:0Hrs
580 Project Management Consultancy services for Up-gradation to existing 2 lanes highway with construction of elevated flyover (section Talegaon-Chakan –Shikrapur of NH- 548D (from Km. 0.000 to Km. 54.000)). NHAI/RO/MUM/Pune/TCS/2022/14 11/08/2022 10/08/2022 26/09/2022
Time 11:0Hrs
581 Selection of AUTHORITYS Engineer (AE)/PMC Services for Supervision of Construction of two lane with paved shoulder from Km. 0 000 to Km. 10 603) (UP Bihar Border to Chandauli) of NH-219 on EPC mode in the state of Uttar Pradesh. 1403/219 NHCP/22 Date.08/08/2022 17/08/2022 10/08/2022 08/09/2022
Time 11:0Hrs
582 Consultancy services for Authority Engineer (AE) for supervision of Widening of Existing four lane to Six lane road from Chainage 3.000 to 7.469 of NH-235 (New NH-334) Meerut (Hapur Adda to bijli bamba chauraha) in the State of Uttar Pradesh 1881/1tender cashier(GZB)-28/21 dt. 06.08.2022 10/08/2022 09/08/2022 05/09/2022
Time 15:0Hrs
583 Consultancy services for Authority Engineer (AE) for supervision of Widening and Strengthening from km. 0.000 to Km. 15.089 (Purkaji-Laksar-Haridwar Road) of NH-334A to Two lane with paved shoulder configuration in the state of Uttar Pradesh 1880/1tender cashier(GZB)-28/21 dt. 06.08.2022 10/08/2022 09/08/2022 05/09/2022
Time 12:0Hrs
584 Supervision Consultant during O and M period for 4L of Chandikhole Paradip section of NH 53 in the state of Odisha NHAI/RO/OD/13012/56/2022 26/08/2022 09/08/2022 21/09/2022
Time 11:0Hrs
585 Independent Engineer Services during O and M Period for 6L of Chandikhole Jagatpur Bhubaneswar of NH 16 in the state of Odisha NHAI/13012/RO/OD/2022 30/08/2022 08/08/2022 21/09/2022
Time 11:0Hrs
586 Consultancy services for Supervision Consultant for Operation and Maintenance of Up gradation of Kullu-Manali section of NH-21 (new NH-3) from Km 272.00 to Km 309.345 (Designed Chainage) on EPC mode in the state of Himachal Pradesh under NHDP Phase IVB. 2022-NHAI-125018-1 05/09/2022 06/08/2022 20/09/2022
Time 15:0Hrs
587 Supervision Consultancy Services During Maintenance of Two-Lane with Paved Shoulders of Tanda- Raebareli Section Of NH-128 (Total Design Length-162.050 Km Including 13.060 Km Of NH-330) On EPC Mode Under NHDP Phase-IVB in the State Of Uttar Pradesh. NHAI/PIU-RBLY/SC/NH128/2022 03/08/2022 03/08/2022 09/09/2022
Time 13:0Hrs
588 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF (i) Widening of Pachpadra-Bagundi section to 4- Lane of NH-25 on EPC Mode and (ii) 4 lane divided carriageway from km 0.000 (Km. 144.200 of NH-15 (NewNH-68)) to km 21.042 (Km. 160.700 of NH-15 (New NH-68)) Barmer Bypass of NH-15 (New NH-68) on EPC mode in the State of Rajasthan. NIT No. 02/ 2022-23 05/08/2022 03/08/2022 06/09/2022
Time 11:0Hrs
589 4 laning of Ghaghra Bridge to Varanasi Section of NH233 from Km. 180420 to Km 240340 Package II from Bhudanpur Urban section of start of Gossai bazar bypass and from Km. 240340 to Km 299350 PackageIII from start of Gossai Bazar bypass to Varanasi in the State of Uttar Pradesh 2022-NHAI-124392-1 31/08/2022 02/08/2022 29/09/2022
Time 15:0Hrs
590 (i) Construction of ROB at km 154/831 of NH-75E between Singhpokaharia and Jhinkpani railway station (LC No RBK-21) (ii) Construction of ROB at km 160/327 of NH-75E between Jhinkani and Talaburu railway station (LC no RBK-24) (iii) Construction of ROB at km 164/444 of NH-75E between Jhinkpani and Talaburu Railway station (LC no RBK-26) (iv) Construction of ROB at km 168.954 of NH-75E between Talaburu and Kendposi railway station (LC no. RBK-30) in the State of Jharkhand RW/Ranchi/AP-27/2021-22/AE 01/09/2022 27/07/2022 14/10/2022
Time 15:0Hrs
591 Independent Engineer Services for Four Laning of Neraluru - Thorapalli Agraharam section of NH-844 from Km 0 to Km 23350 (Design Chainage) under Bharatmala Pariyojana Phase I (National Corridor) on Hybrid Annuity Mode in the States of Karnataka & Tamil Nadu 2nd Call (Package-I of Hosur-Dharmapuri Section) NHAI/11024/NT/HAM/P1/IE/2022 23/08/2022 27/07/2022 05/09/2022
Time 11:0Hrs
592 CS for AE for Supervision of Const of 4L with PS from Exitg Ch 14200 to 24320 Ch 33760 to 42780 and Ch 43440 to 47020 Delina Flyover-incl flyover length 1704 km of total length 22736 kms in AOR of 760 BRTF on road Srinagar-Baramula-URI NH01 in UT JK RW/SR/Wroks(3)/AE/JnK/2022 27/07/2022 27/07/2022 08/09/2022
Time 11:0Hrs
593 Consultancy Services for Authority’s Engineer for Supervision of Civil Construction works for Rehabilitation and up-gradation to 2 lane with paved shoulder from existing chainage Km 30.000 to Km 49.150 (design chainage Km 30.000 to Km 46.450) under 35 BRTF on Akhnoor - Poonch road (NH-144A) in UT of Jammu & Kashmir under Project Sampark, Border Roads Organization (BRO) on EPC mode (Package-I) CE (P) SPK/AE/A-P RD/PKG-I/2022-23 27/07/2022 27/07/2022 10/09/2022
Time 11:0Hrs
594 Consultancy services for Authoritys Engineer for Supervision of Work of Widening to four lane with paved shoulder from design km 49.200 to Km 89.285 of NH-731B on EPC Mode in the State of Uttar Pradesh. CE-RO/LKO/NH(O)/27/ NH-731B(Pkg-II)/AE/2021-22 27.07.2022 27/07/2022 27/07/2022 14/03/2023
Time 17:0Hrs
595 Consultancy services for Authority Engineer (AE) for supervision of Widening and Strengthening from km. 0.000 to Km. 15.089 (Purkaji-Laksar-Haridwar Road) of NH-334A to Two lane with paved shoulder configuration in the state of Uttar Pradesh 1715/1tender cashier(GZB)-NHC/22 dt. 23.07.2022 02/08/2022 27/07/2022 26/08/2022
Time 12:0Hrs
596 Consultancy services for Authority Engineer (AE) for supervision of Widening of Existing four lane to Six lane road from Chainage 3.000 to 7.469 of NH-235 (New NH-334) Meerut (Hapur Adda to bijli bamba chauraha) in the State of Uttar Pradesh under EPC mode. 1748/1tender cashier(GZB)-NHC/22 dt. 26.07.2022 02/08/2022 27/07/2022 26/08/2022
Time 12:0Hrs
597 Consultancy Services for Authority’s Engineer for Supervision of “Construction of Meka-Roing-Hunli from existing Km 16 of Roing Hunli Road to Km 21.5 of Hunli-Anini Road (Total Length = 74.863 Km) to NH double lane specification in Arunachal Pradesh on Engineering Procurement and Construction (EPC) basis NHIDCL/Ar.Pr.Roing/Hunli/AE/2022 10/08/2022 26/07/2022 08/09/2022
Time 11:0Hrs
598 Consultancy Services for Authority’s Engineer for Supervision of Construction of 6-lane Durg – Raipur – Arang Bypass section of NH-53 from Design Ch. 0.000 (Vill. Tendesara) to Design Ch. 44.500 (Vill. Parsada) in the state of Chhattisgarh on EPC Mode under Bharatmala (Package - I) NHAI/BM/ Durg–Raipur-Arang /AE/Pkg-I/2022 26/07/2022 25/07/2022 25/08/2022
Time 11:0Hrs
599 Consultancy Services for Authority’s Engineer for Supervision of Construction of 6-lane Durg – Raipur – Arang Bypass section of NH-53 from Design Ch. 44.500 (Vill. Parsada) to Design Ch. 92.230 (Vill. Paragaon) in the state of Chhattisgarh on EPC Mode under Bharatmala (Package - II) NHAI/BM/ Durg–Raipur-Arang /AE/Pkg-II/2022 26/07/2022 25/07/2022 25/08/2022
Time 11:0Hrs
600 SC services during O and M stage of 2 laning with paved shoulder of Karauli Dholpur section and Uncha Nagla Khanuan Roopvas Dholpur section of NH 123 length 75.008 km in the state of Rajasthan or Uttar Pradesh under NHDP Phase IV on EPC mode NHAI/11011/Tenders-ROJ/KD-UD 01/09/2022 22/07/2022 05/09/2022
Time 11:0Hrs
601 Independent Engineer (IE) for Operation and Maintenance on the basis of International Competitive Bidding for the Bridge between Dhola and Sadia Ghats along with 2-lane connecting roads from near about Dhola to Islampur Tiniali (about 28.511 km) RW/GHT/TENDER/IE/DHOLA SADIA IE/2022-23/394 18/07/2022 21/07/2022 12/09/2022
Time 15:0Hrs
602 Supervision Consultant Services for Operation and Maintenance of package AS-27, AS-26, AS-25 and AS-24 2022-NHAI -123044-1 20/07/2022 20/07/2022 06/09/2022
Time 17:30Hrs
603 (i) Four laning of Jhanji to Demow section of NH-37 from km 491/050 to km 535/250 (Design Chainage) from Km 490/800 to Km 534/800 (ii) 4-laning of NH-37 Section between Demow (km 534/800) to End of Moran Bypass (km 561/700) under SARDP-NE (iii) Four laning of NH-37 from end of Moran Bypass (km 561/700) to Bogibeel junction near Lapetketa (km 580/875) Construction of Dibrugarh Bypass/ Realignment of NH-37 from Bogibeel Junction at Km 580/875 to Km 596/322 in the state of Assam under SARDP-NE. NHIDCL/Assam/AE/Jhanji-Dibrugarh/2022/208578 08/07/2022 18/07/2022 25/07/2022
Time 15:0Hrs
604 Supervision Consult ant Services f or Rectification work of Blackspot location at Tihu, Society Chowk and Changsari Madanpur and Operation and Maintenance of package AS-06, AS-05, AS-04 and AS28 2022-NHAI -122782-1 07/07/2022 18/07/2022 06/09/2022
Time 17:30Hrs
605 Consultancy Services for Supervision Consultant of Operation and Maintenance of 4 Lane NH Connectivity to ICTT Vallarpadam and additional charge of Independent Engineer services for Operation and maintenance of Edapally-Vytilla-Aroor section Kerala 11203/RO Kerala/Tender Consultants/0988 15/07/2022 15/07/2022 19/08/2022
Time 11:30Hrs
606 Independent Engineer Services for Four laning of Phagwara to Hoshiarpur road (NH 344B) including Phagwara and Hoshiarpur Bypass under Bharatmala Pariyojana (from Ch -0.600 to Ch 46.902 of NH-344B & Ch 7.780 to Ch 8.900 of NH-344A Total design length 48.622 km) in the State of Punjab on Hybrid Annuity Mode NHAI/32044/1/2022/PB/ 15/07/2022 15/07/2022 05/01/2023
Time 11:0Hrs
607 IE Services for supervision of Eastern Peripheral Expressways (6 lane from Km 1-000 to Km 136-000) of NE-2 in the National Capital Region on toll operate maintain and transfer basis. 2022-NHAI-122588-1 20/07/2022 15/07/2022 13/09/2022
Time 11:0Hrs
608 Supervision Consultancy services during O and M stage of two lane with paved shoulder from Km. 1.300 to Km. 74.349 (Existing chainage from Km. 1.300 to Km. 74.200) of Chhapra-Rewaghat-Muzaffarpur of NH-102 in state of Bihar. NIT No. - 149/RO-PATNA/NHAI/2022-23 13/07/2022 12/07/2022 11/08/2022
Time 12:0Hrs
609 Independent Engineer services during Operation and Maintenance period of 6-laning of Vadakkechery-Thrissur section of NH-544 from Design Ch 236.135 to Ch. 264.490 in the State of Kerala under NHDP Phase-II on DBFOT (Toll) Basis for a Total Design Length of 28.355 Km. 11203/RO Kerala/Tender Consultants/0963 12/07/2022 11/07/2022 19/08/2022
Time 11:30Hrs
610 Operation and Maintenance of Ayodhya - Gorakhpur Section (From km. 137.970 to km 252.860) of NH-28(new NH-27) in the state of UP on OMT basis (Total Length- 116.101 Km) NHAI/GKP/IE/Ayo-Gkp/OMT/22-2023 25/08/2022 11/07/2022 08/09/2022
Time 11:0Hrs
-
611 Operation and Maintenance of Ayodhya - Gorakhpur Section (From km. 137.970 to km 252.860) of NH-28(new NH-27) in the state of UP on OMT basis (Total Length- 116.101 Km) NHAI/GKP/IE/Ayo-Gkp/OMT/22-23 16/08/2022 11/07/2022 24/08/2022
Time 11:0Hrs
612 Consultancy Services For Authoritys Engineer For Supervision of Development to 4/6-lanning of NH-31 (New NH-10) with both side service roads from km 569.258 to km 581.030 (end of AH-02 project on NH- 31 near Shivmandir to Sevoke Army Cantonment) in districts of Darjeeling and Jalpaiguri in the state of West Bengal on EPC Mode (Job No. 010/WB/2021-22/490) MORTH/RO-KOL/NIT/AE/2022-23/01 08/07/2022 08/07/2022 01/09/2022
Time 15:0Hrs
613 Supervision Consultant and Services for Operation and Maintenance of package AS-03,AS-20,AS-19,AS02 ANDAS-18 2022-NHAI -121770-1 19/07/2022 08/07/2022 23/08/2022
Time 17:30Hrs
614 Supervision Consultant Services for Rectification work of Blackspot location at Daboka section and Operation and Maintenance of package AS-17,AS-16 AND AS-15 2022-NHAI-121721-1 20/07/2022 08/07/2022 26/08/2022
Time 17:30Hrs
615 Supervision Consultant Services for Operation and Maintenance of package AS-23 and 01 2022-NHAI -121743-1 20/07/2022 08/07/2022 30/08/2022
Time 17:30Hrs
616 Supervision Consultant Services for Rectification work of Blackspot location at Sundari, Kishanbazar, Manikpur and Operation and Maintenance of package AS-11,AS-10,AS-09 and AS-08 2022-NHAI -121662-1 14/07/2022 07/07/2022 30/08/2022
Time 17:30Hrs
617 Consultancy services for Authority Engineer for supervision of Development and Upgradation of Bijapur Gulbarga Homnabad section of NH 218 of 2 lane With Paved Shoulders from Km.195.000 to Km.418.000 in the State of Karnataka under NHDP Phase IV to be executed on Engineering, Procurement and Construction mode NIT No.07 03/08/2022 06/07/2022 11/08/2022
Time 15:0Hrs
618 Consultancy Services for Supervision Consultant (SC) of Routine Maintenance including Incident Management for Operation and Maintenance of Mydukur – Dornala T junction from Km 589.00 to Km.641.000 of NH 67 and Dornala T junction - Nellore section from Km.641.000 to Km 741.950 of NH 67 (2ND CALL). NHAI/ROVJA/M-D-N/2022 06/07/2022 05/07/2022 23/08/2022
Time 11:0Hrs
619 Meerut-Muzaffarnagar Section of NH-58 from Km. 52.250 to Km. 131.000 in the State of Uttar Pradesh NHAI/PIU/MEERUT/02 16/07/2022 01/07/2022 26/07/2022
Time 11:0Hrs
620 Supervision Consultancy Services for Operation and Maintenance of the stretch from Km.71.200 to Km.121.000 of AP/Telangana Border to Rudrampur Section of NH-30 in the State of Telangana. 120827 05/07/2022 30/06/2022 22/08/2022
Time 15:0Hrs
621 Consultancy services for Authoritys Engineer for Supervision of Rehabilitation and Up-gradation to 4 LPS configuration from Undewadi Kade pathar - Deshmukh Chowk ) and Dhawan Patil Chowk (Baramati)-Phaltan section of NH-160 in the State of Maharashtra. NH/MAH/RO/Pune -1/AE/Pkg-4 06/07/2022 29/06/2022 23/09/2022
Time 17:0Hrs
622 Independent Consultancy Services during O and M Period of 4-Lane Dual Carriageway from km 488.270 to km 413.200 (Lucknow–Sitapur Section) of NH-30 (old NH-24) in the State of Uttar Pradesh on BOT basis-2nd Call NHAI/PIU-LKO/IC/NH-30/2nd Call/2022/11 30/06/2022 29/06/2022 12/08/2022
Time 11:0Hrs
623 Consultancy Services for Authority’s Engineer for Supervision of “Widening of existing road to 4 lane with paved shoulder from Km 0/000 to Km 51/119 [existing chainage km 476/700 to km 523/530] (51.119 Km) of Tadipatri to Muddanur Bypass section of NH-67 in the State of Andhra Pradesh on EPC mode 12014/30/2021-AP/Z-III/739/AE 02/07/2022 29/06/2022 12/08/2022
Time 17:0Hrs
624 Consultancy services for Authoritys Engineer for Supervision of Rehabilitation and Up-gradation to 2LPS- 4 laning configuration of Chikhli-Dabhadi-Talegaon-Pal Phata section of NH-752H in the State of Maharashtra on EPC Mode. NH/MAH/RO/Aur-3/AE/Pkg-3 19/07/2022 29/06/2022 23/09/2022
Time 17:0Hrs
625 Consultancy services for Authoritys Engineer for Supervision of Rehabilitation and Up-gradation of Jintur- Shirad Shahapur Section of NH-752 I to 2PLS configuration on EPC Mode in the State of Maharashtra. NH/MAH/RO/Aur -2/AE/Pkg-2 14/07/2022 29/06/2022 23/09/2022
Time 17:0Hrs
626 Consultancy services for Authoritys Engineer for Supervision of Construction of new four lane bypass to Parbhani city (Parwa to Asola) section of NH-61 on EPC mode in the State of Maharashtra. NH/MAH/RO/Aur-1/AE/Pkg-1 12/07/2022 29/06/2022 23/09/2022
Time 17:0Hrs
627 Consultancy services for Authoritys Engineer for Supervision of Rehabilitation and Upgradation of Satana to Mangrul (Chandwad) section of NH- 752G 2LPS/ Four Lane configuration in the state of Maharashtra on EPC mode. NH/MAH/RO/Pune -2/AE/Pkg-5 21/07/2022 29/06/2022 23/09/2022
Time 17:0Hrs
628 Independent Consultancy Services during O and M Period of 4-Lane Dual Carriageway from km 488.270 to km 413.200 (Lucknow–Sitapur Section) of NH-30 (old NH-24) in the State of Uttar Pradesh on BOT basis-2nd Call NHAI/PIU-LKO/IC/NH-30/2ndCall/2022/11 16/08/2022 29/06/2022 23/08/2022
Time 11:0Hrs
629 CS for AE for Supervision of Improvement-Upgradation of Existing Two Lane Bypass to 6-laning from Km 403-100 (Design Ch 402-600) to Km 433-000 (Design Ch 433-200) of Hubli-Dharwad Bypass section of NH-48 in Karnataka on EPC mode 2022-NHAI-120490-1 14/07/2022 27/06/2022 27/07/2022
Time 11:0Hrs
-
630 AE Services for supervision of Balance Work of four laning of Panvel - Indapur section of NH-66 from km 42.300 (Kasu) to km 84.600 (Indpaur) in the State of Maharashtra under BMP on EPC mode NHAI/Tech/MH/AE/BW/Pan-Ind/2022 15/07/2022 24/06/2022 28/07/2022
Time 11:0Hrs
631 AE services for supervision of six laning of Kagal-Satara section of NH-48 (old NH-4) (Package – I from km 592.240 to km 658.000) in the State of Maharashtra to be executed on EPC mode under BMP NHAI/Tech/MH/AE/K – S/Pkg-I/2022 15/07/2022 23/06/2022 28/07/2022
Time 11:0Hrs
632 Independent Engineer Services during Operation and Maintenance Period for Four laning of Gundugolanu – Devarapalli - Kovvuru section of NH - 16 from Design Ch. Km 15.320 (Existing Km 15.700) to Design Ch.85.204 (Existing Km 81.400) in the State of Andhra Pradesh under Bharatamala Pariyojana on Hybrid Annuity Mode 2022-NHAI-120012-1 23/06/2022 23/06/2022 17/08/2022
Time 15:0Hrs
633 Supervision Consultancy Services for Operation and Maintenance of the stretch 4 Laning of Yadgiri to Warangal section of NH 163 from Km.54.0 to km.150.0 (Design length 99.103km) in the State of Telangana. 119794 08/07/2022 21/06/2022 08/08/2022
Time 15:0Hrs
634 IE Services during OnM stage of 4/2 laning with paved shoulder from Km 0.000 to 83.453 of Dausa Lalsot Kothoon section of NH 11A Extn. under NHDP Phase IV on Hybrid Annuity Mode NHAI/11011/Admn/2022-ROJ /Tenders/DLK/2nd 21/07/2022 21/06/2022 04/08/2022
Time 11:0Hrs
635 Consultancy Services for Supervision Consultants of Operation & Maintenance of Four Lane Yamunanagar-Saha- Barwala-Panchkula section of NH-344 (Old NH-73) from Km. 70.830 to Km. 157.192 (Package-I & II) in the State of Haryana. 2022-NHAI-119294-1 17/07/2022 16/06/2022 21/07/2022
Time 11:0Hrs
636 Consultancy Services for Authority’s Engineer for Supervision of Widening to two lane with paved shoulder of Rampachodavaram Koyyuru section of NH-516E from Km 43/700 to Km 113/820 in the State of Andhra Pradesh on Engineering, Procurement & Construction (EPC) Basis Contract RW/NH-12014/29/2021AP/737/AE 19/06/2022 16/06/2022 05/08/2022
Time 15:0Hrs
637 Consultancy services for Authority Engineer for Up-gradation to 2 lane with Paved shoulder from Charbhuja at Design km 0.00 (existing km 150.00) to Neechli Oden (Nathdwara) at Design ch. Km 88.800 (existing km 55.950) of NH-162E on EPC Mode NIT No. 01/ 2022-23 16/06/2022 15/06/2022 08/08/2022
Time 17:0Hrs
638 APPOINTMENT OF SUPERVISION CONSULTANT FOR THE WORK OF Upgradation of four lane road with cement Concrete road (White Topping) in Km 0/800 to Km 2/240, Km 5/050 to Km 8/500 (Total Length 4.89 Km) on Nagpur- Amravati road NH-53 in Nagpur city in the state of Maharashtra. NIT 03/2022-23 29/06/2022 13/06/2022 04/07/2022
Time 17:0Hrs
639 Consultancy Services for Authority’s Engineer for Supervision of Rehabilitation & widening work for 2- Lane with Paved Shouldering of Existing National Highway 122BAlignmentfrom Km 29.730 to Km 72.348 of Mahnar - Bachhwara section in the State of Bihar through an Engineering, Procurement and Construction (EPC)Contract NH-12014/52/2021-RO PATNA-PART(1) 28/06/2022 09/06/2022 22/08/2022
Time 16:0Hrs
640 CONSULTANCY SERVICES FOR AUTHORITY ENGINEER FOR SUPERVISION REHABILITATION & UP-GRADATION TO 2 LANE WITH PAVED SHOULDER INCLDING 260 M LONG KANDI TUNNEL FROM EXISTING CHAINAGE KM 30.000 TO KM 49.150 (DESIGN CHAINAGE KM 30.000 TO KM 46.450) (PACKAGE-I) UNDER 35 BRTF ON A- P RD (NH-144A) PROJECT SAMPARK (BRO) IN THE UT OF J&K ON EPC MODE SPK/AP RD/AE/PKG-I/2022-23 09/06/2022 09/06/2022 29/07/2022
Time 11:0Hrs
641 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF WIDENING OF EXISTING SINGLE/ INTERMEDIATE LANE ROAD TO 2 LANE ROAD FROM KM 101.00 TO KM 125.00 ON (PACKAGE-I) & FROM KM 135.00 TO KM 147.00 & KM 156.00 TO KM 168.00 (PACKAGE-II) ON NH-61 (NEW NH-2)IN THE STATE OF NAGALAND CE/NH/AE-GEN/2021-22/I 20/05/2022 09/06/2022 27/08/2022
Time 18:0Hrs
642 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF WIDENING OF EXISTING SINGLE LANE ROAD TO INTERMEDIATE LANE ROAD FROM MOKOKCHUNG TO CHARE VIA DIKHU IN THE STATE OF NAGALAND (PACKAGE-I) & WIDENING TO 2-LANE FROM KM185.00 TO KM 220.00 OF NH-61 (NEW NH-02) (PACKAGE-II) IN THE STATE OF NAGALAND CE/NH/AE-GEN/2021-22/ll 27/05/2022 09/06/2022 27/08/2022
Time 18:0Hrs
643 Consultancy Services for Authority Engineer services for Four laning of i Thirumangalam Vadugapatti section from Km 0/000 to Km 36/000 of NH 744 Package I and ii Vadugapatti-Therkuvenganallur section from Km. 36/000 to KM. 71/600 of NH-744 Package-II in the state of Tamil Nadu on EPC Mode under Bharatmala Pariyojana NHAI/Tech/TN/ Thiru-Ther/AE/2022 06/07/2022 08/06/2022 01/08/2022
Time 11:0Hrs
644 Consultancy Services for Supervision Consultants of Operation & Maintenance of Four Lane Zirakpur - Start of Sangrur bypass section of NH-64 (New NH-07) from Km 0.000 to Km. 110.720 in the State of Punjab. 2022-NHAI-118523-1 06/07/2022 08/06/2022 10/10/2022
Time 15:0Hrs
-
645 Independent Engineer Services for Capacity Augmentation from 2 lane to 4 lane of Rajasthan Border-Fatehpur-Salasar Section of NH-65 (new NH-52 and 58) in the state of Rajasthan on Design Build Finance Operate and Transfer (DBFOT) basis 2022-NHAI-118232-1 14/07/2022 06/06/2022 26/07/2022
Time 11:0Hrs
646 CS of AE for Supervision of Construction of Emergency Landing facility on NH Development of emergency landing facility on Balasore Kharagpur sec from Km 83.400 to Km 88.400(total 5 Km) of NH60(NewNH16) in West Bengal on EPC Mode. NHAI/HQ/WB/ Balasore-Kharagpur section/ AE/2022 10/06/2022 03/06/2022 21/07/2022
Time 11:30Hrs
647 Supervision Consultancy (SC) services during O&M stage of Six Laning of Surat-Dahisar Section of NH-8 from Km 263.000 to Km 502.000 (Length Km 239.000) in the state of Gujarat and Maharashtra executed as BOT (Toll) on DBFO pattern NHDP Phase V 2022-NHAI-117925-1 06/07/2022 02/06/2022 25/07/2022
Time 11:0Hrs
648 Consultancy services for Authority Engineer for Supervision of Improvement/widening to Two laning with earthen shoulder of (i) Nongjri (Design Ch 30 00km) to Maheshkola (Design Ch 55 525km) (R-M-B Package-II) (ii) stretch from km 55 525 to km 79 680 (Package-III) (iii) Panda (Design Ch 112 300 km) to Baghmara (Design Ch 129 385 km) [R-M-B Package-VI] on SH-4 section of Ranikor- Maheshkhola-Baghmara Project in the state of Meghalaya on EPC basis NHIDCL/Megh/AE/R-M-B/Pkg-II III and VI/SH-4/2021 12/05/2022 02/06/2022 16/06/2022
Time 15:0Hrs
649 Consultancy services for Authoritys Engineer for supervision of Balance work of Rehabilitation and up-gradation to 2 lane with paved shoulder/4lane with paved shoulder configuration from Km. 343.800 to 401.300 of Madhugiri-Chikkaballapura section of NH-69 (old NH-234) except Gauribidnur bypass (from Km, 362.400 to 368.400) in the State of Karnataka on EPC mode NH-69-KNT-2021-22-AE 01/06/2022 01/06/2022 11/07/2022
Time 15:0Hrs
650 Project Management Consultancy services for JNPT Package V Part 1 NHAI/RO/MUM/PNVL/JNPT-V/PMC/10 01/06/2022 01/06/2022 18/07/2022
Time 11:0Hrs
651 Consultancy services for Supervision Consultant (SC) for Operation and Maintenance of NH-200 (New NH 130) (Package-I) from Km 0.000 to Km 48.580 (Raipur-Simga). (Total length-48.580 km) of Raipur-Bilaspur Road in the State of Chhattisgarh under NHDP-IV on EPC mode 11052/RO-Raipur/Tender/AE/Raipur-Simga 02/06/2022 31/05/2022 11/07/2022
Time 15:0Hrs
652 INDEPENDENT ENGINEER (IE) SERVICES FOR OPERATION AND MAINTENANCE STAGE UNDER TOT MODE OF FOUR LANING WITH PAVED SHOULDER OF PORBANDAR - JETPUR SECTION OF NH - 27 FROM KM. 1.960 TO 117.600 IN THE STATE OF GUJARAT 2022-NHAI-117563-1 06/07/2022 31/05/2022 27/07/2022
Time 11:0Hrs
653 CONSULTANCY SERVICES FOR AUTHORITY ENGINEER FOR SUPERVISION OF CONSTRUCTION OF RUDRAPRAYAG TUNNEL OF LENGTH 900.30 M INCLUDING APPROACHES AND ONE MAJOR BRIDGE ON RIVER ALAKNANDA CONNECTING NH-107 (OLD-109) TO NH-07 (OLD NH-58) ON EPC MODE IN THE 2244/13Yata-NH-10/2022 dated 26.05.2022 30/05/2022 28/05/2022 29/06/2022
Time 15:0Hrs
654 Consultancy services for Supervision Consultant for Operation and Maintenance of Four laning of Parwanoo - Solan section of NH-22 (Now NH-05) from Km 67.000 to Km 106.139, under NHDP Phase-III on EPC basis in the State of Himachal Pradesh. 2022-NHAI-117464-1 12/07/2022 28/05/2022 27/07/2022
Time 15:0Hrs
655 Consultancy services for Supervision Consultant (SC) for Operation and Maintenance of NH-200 (New NH 130) (Package-II) from Km 48.580 to Km 91.026 (Simga-Sargaon).(Total length-42.446 km) of Raipur-Bilaspur Road in the State of Chhattisgarh under NHDP-IV on EPC mode. 11052/RO-Raipur/Tender/AE/Simga-Sargaon 01/06/2022 27/05/2022 11/07/2022
Time 15:0Hrs
656 Independent Engineering Services for the work of Six Laning of Varansi-Aurangabad section of NH-2 from Km 786-00 to Km 978-400 in the state of UP/Bihar on Design, Build, Finance, Operate and Transfer (DBFOT) Toll Basis under NHDP Phase-V 2022-NHAI-117344-1 08/06/2022 27/05/2022 23/06/2022
Time 11:0Hrs
-
657 Project Management Consultancy services for construction of elevated flyover including provision for metro (section from Nashik Phata to Khed of NH-60 (from Km. 12.190 to Km. 42.000)) NHAI/RO/MUM/Pune/ Nashik Phata-Khed/2022/09 27/05/2022 27/05/2022 23/06/2022
Time 15:0Hrs
658 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR CONSTRUCTION OF STRENGTHENING AND WIDENING TO 2-LANE WITH PAVED SHOULDER ON NH-319A FROM KM 0 000 TO KM 45 000 (MOHANIA – CHAUSA ROAD) IN THE STATE OF BIHAR NH-12014/107/2021-RO Patna-Part(1) 25/05/2022 26/05/2022 02/08/2022
Time 16:0Hrs
659 Consultancy Services for Supervision Consultants Services during Operation and Maintenance of Ludhiana to Talwandi Section of NH-95 from Km 85-980 to 170-000 in the State of Punjab 2022-NHAI-117023-1 20/06/2022 25/05/2022 05/07/2022
Time 11:0Hrs
660 Consultancy-services-for-Authoritys-Engineer-for-Supervision-of-Construction-of-Initial-Improvement-works-and-supervision-of-ATMS/TMS-installation-under-Tolling-Operation-and-Maintenance-and-Transfer-of-Palanpur-AbuRoad-Swaroopganj-section(from-km-601-to-km 677)-of-NH-27-in-the-state-of-Rajasthan-Gujarat 2022-NHAI-116906-1 11/06/2022 24/05/2022 06/07/2022
Time 15:0Hrs
661 Consultancy Services for Authoritys Engineer for Supervision of Construction of Initial Improvement works and supervision of ATMS/TMS installation under Tolling, Operation, and Maintenance and Transfer of Kothakota Bypass- Kurnool section (from km 135469 to km 211000) of NH-44 in the state of Telangana 2022/NHAI/116899/1 11/06/2022 24/05/2022 30/08/2022
Time 11:0Hrs
662 Consultancy Services for Authority Engineer for Supervision of Construction of Initial Improvement works supervision of ATMS/TMS installation under Tolling Operation and Maintenance Transfer of Chittorgarh Bypass- Kota section (from km 891-929 to km 1052-429) of NH-27 in the state of Rajasthan 2022-NHAI-116892-1 10/06/2022 24/05/2022 06/07/2022
Time 11:0Hrs
663 CS for AE for Supervision of Construction of Standalone Flyovers and ROB on stretches of NH 31 NH 31C NH 36 and NH 37 in the state of Assam under BMP (Pkg-1 and Pkg-2) on EPC Basis NHAI/Tech/NE/ 10Flyover 1ROB/AE/2022 03/06/2022 23/05/2022 22/06/2022
Time 11:0Hrs
664 Project Management Consultancy services for construction of elevated flyover including provision for metro (section from Nashik Phata to Khed of NH-60 (from Km. 12.190 to Km. 42.000)) NHAI/RO/MUM/Pune/ Nashik Phata-Khed/2022/09 18/05/2022 23/05/2022 22/06/2022
Time 15:0Hrs
665 Supervision Consultancy (SC) Services for DLP/ O&M stage of 2 projects (Item Rate basis projects) & for construction supervision & O&M of 1 project (EPC mode project) in the State of Uttarakhand NHAI/RO-UKD/HDR-DDN Dudhahdari/NH-58 72/SC/2021-22/3rd Call 03/06/2022 21/05/2022 21/06/2022
Time 11:0Hrs
-
666 Consultancy services for Authority’s Engineer for Operation and Maintenance of NH-43 (New NH-30) from Dhamtari - Kanker (Km 81.500 to Km 130.000), Bedma-Dahikonga (Km.180.000 to Km.241.000) & Dahikonga-Jagdalpur (Km.241.000 to Km.298.000) to 2-lanes with paved shoulders in the state of Chhattisgarh under NHDP-IV through EPC mode. 11052/RO-Raipur/Tender/AE/ Dhamtari-Kanker-Bedma-Dahikonga-Jagdalpur 03/06/2022 20/05/2022 11/07/2022
Time 15:0Hrs
667 IE services during O and M stage of Beawar Pali Pindwara Section and Kishangarh Ajmer Beawar section in the State of Rajasthan NHAI/11011/1/Admn/2021-ROJ/ Tender/IE/KAB-BPP/2nd 09/06/2022 20/05/2022 29/06/2022
Time 11:0Hrs
668 Independent Engineer Services during O and M period for Six Laning of Etawah-Chakeri (Kanpur) Section of NH-2 from Km. 323.475 to Km. 483.687 on DBFOT (Toll) Basis under NHDP Phase V in the State of Uttar Pradesh NHAI/NH-19/IE/2022-23 06/07/2022 20/05/2022 18/07/2022
Time 12:0Hrs
669 Consultancy services for Supervision Consultant (SC) for Operation and Maintenance of NH-200 (New NH 130) (Package-III) from Km 91.026 to Km 126.525.(Total length-35.499 km) of Raipur-Bilaspur Road in the State of Chhattisgarh under NHDP-IV on EPC mode. 11052/RO-Raipur/Tender/AE/Sargaon-Bilaspur 03/06/2022 19/05/2022 11/07/2022
Time 15:0Hrs
670 Consultancy Service as Authority Engineer for Supervision of Widening to 2 (Two) Lane with Hard shoulder of Jessami to Akhegwo (Package-1 & 2) from (Design Chainage 283-000 Km to 325-440 Km to 340-160 Km) in the State of Nagaland and Manipur on EPC mode under NH(O)-NE 2022-nhidc-685848-1 18/05/2022 18/05/2022 06/06/2022
Time 11:0Hrs
671 Consultancy Services as Authoritys Engineer for Supervision of (i) Four laning of Jhanji to Demow section of NH-37 from km 491/050 to km 535/250 on EPC mode (ii) 4-laning of NH-37 Section between Demow (km 534/800) to End of Moran Bypass (km 561/700) (iii) Four laning of NH-37 from end of Moran Bypass (km 561/700) to Bogibeel junction (km 580/875) on EPC mode (iv) Construction of Dibrugarh Bypass/ Realignment of NH-37 from Bogibeel Junction at Km 580/875 to Km 596/322 in the state of Assam NHIDCL/Assam/J-D/Re/2022 12/05/2022 17/05/2022 07/06/2022
Time 15:0Hrs
672 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF CONSTRUCTION OF BYPASS AROUND LOHARDAGA TOWN OF NH-143A ON EPC MODE IN THE STATE OF JHARKHAND RW/Ranchi/AP-13/2020-21/JHR 18/05/2022 17/05/2022 25/07/2022
Time 15:0Hrs
673 Procurement of Independent Engineer for Package RSHIP/ADB/T-2/HAM/01 ACE(PPP) PWD Rajasthan Jaipur 3/2022-23 12/05/2022 12/05/2022 31/05/2022
Time 11:0Hrs
674 Consultancy services for AE for Supervision of Construction of Realignment-Pandrass-Pashkyum on road Zozila-Kargil-Leh (NH-1) to 2 lane specifications (Drass Realignment, Kharboo Realignment and Kargil Alignment) under Vijayak (BRO) in UT of Ladakh RW-CH-W(57)-BRO-Ladakh-2022 12/05/2022 12/05/2022 07/07/2022
Time 11:0Hrs
675 Consultancy Services for Supervision Consultant during Operation and Maintenance Period of Varanasi Gorakhpur Section of NH29 from Km 12000 Design Chainage Km 12010 to Km 88000 Design Chainage 84160 PackageII from Sandaha to Birnon in the State of Uttar Pradesh 2022-NHAI-115149-1 13/05/2022 07/05/2022 06/06/2022
Time 11:0Hrs
676 Independent Engineer Services during Operation and Maintenance Period for Four laning of Jhansi-Khajuraho section (Package-I) from km 0.00 to km 76.603 (existing km 108.300 of NH-25 Kanpur-Jhansi Section to km 82.10 of NH-75/76) in the state of UP/MP under NHDP Phase-III on Hybrid Annuity Mode. NHAI/ROMP/CHHP/JK/IE OandM/PKGI/2022 25/05/2022 05/05/2022 13/06/2022
Time 11:0Hrs
677 Consultancy Services of Authoritys Engineer for the following projects (i) Two laned with paved shoulders of Nazibabad-Kotdwar Section of NH-119 from Design Chainage 122-200 to 137-760 (ii) 4 laning of Najibabad Bypass of NH-119 from Km. 105-423 to Km 118-373 (excluding 2-45 Km of NH-74 Bypass) NHAI/11013/SPUR/N-K / Bypass/2022/AE/Re-Invitation/126327 05/05/2022 05/05/2022 07/06/2022
Time 11:0Hrs
678 Authority Engineer/PMC for Supervision of Construction of 1 ROB and 3 Flyovers of National Highway No. 730 at the section from Km 133.230 to Km 134.330, Km 134.550 to Km 135.650, Km 136.200 to Km 137.800 under EPC mode in the State of Uttar Pradesh. 1471/638C-NH Circle /2021-2022 Dated. 29.04.2022 06/05/2022 05/05/2022 04/06/2022
Time 11:0Hrs
679 Widening to 2 lane with paved shoulder from km 58.635 to 99.409 of Kadapa Nellore Border to CS Puram Section of NH 167B and from Km 99.103 to Km 143.320 CS puram to Malakonda section in the state of Andhra Pradesh on EPC RW/NH-12014/15/ 2021-AP/Zone-III/724/AE 06/05/2022 04/05/2022 29/06/2022
Time 15:0Hrs
680 Supervision Consultant (SC) Services for Operation and Maintenance of package AS-03, AS-20, AS-19, AS-02, AS-18, AS-17 AS-16, AS-15, AS-27, AS-26, AS-25,and AS-24, Total 274.152 Km 022-NHAI-114717-1 20/05/2022 04/05/2022 16/06/2022
Time 17:30Hrs
681 Consultancy services for Authority’s Engineer for Supervision of (i) Construction of Two lanning with Hard Shoulder Road of Ukhrul - Toloi - Tadbui section of NH-102A from Design Chainage 50.850 km to 81.870 km (Package-3) in the State of Manipur on EPC Mode (ii) Construction of Two lanning with Hard Shoulder Road of Ukhrul - Toloi - Tadbui section of NH-102A from Design Chainage 81.870 km to 105.825 km (Package-4) in the State of Manipur on EPC Mode NHIDCL/Manipur/AE/UTT (Pkg-3 &4)/NH-102A/2021 12/04/2022 04/05/2022 11/05/2022
Time 15:0Hrs
682 Consultancy Services for AE for Supervision of Widening of existing 2L with PS road to 4L with PS Bathalapalli to Mudigubba Section from Design Ch. Km. 96.300 to 129.300 incl. Bathalapalli Bypass of NH42 in the State of AP through EPC basis RW/NH-12014/26/ 2021-AP/Zone-III/731/AE 06/05/2022 02/05/2022 27/06/2022
Time 15:0Hrs
683 Consultancy Services for Authority’s Engineer for Supervision of Construction of 4 lane access-controlled highway from Samarlakota to Achampeta Junction (from km. 0.000 to Km. 12.250) as a part of Kakinada port to NH-16 connectivity in the State of Andhra Pradesh on EPC mode under Bharatmala Pariyojana 2022-NHAI-114408-1 06/05/2022 29/04/2022 06/09/2022
Time 11:0Hrs
684 Consultancy services for (AE) for supervision of Widening and Strengthening from Km. 15.000 to Km. 58.600 (Bhadewara-Dramandganj section) of National Highway No. 135 C in the state of Uttar Pradesh on (EPC) Mode 530/01 Com B-18/22 dated 21.04.2022 08/05/2022 27/04/2022 26/05/2022
Time 11:0Hrs
685 Consultancy services for (AE) for supervision of Widening and strengthening from km 0.00 to 18.450 (Rajapur- Raipura section) of National Highway No. 731 AG in the state of Uttar Pradesh on EPC Mode.(Length 18.450km). 528/731AG/18-2022 dated 21.04.2022 08/05/2022 27/04/2022 26/05/2022
Time 11:0Hrs
686 Supervision Consultancy (SC) Services for Operation and Maintenance of the stretch from Km.23.000 to Km.108.800 of Hyderabad to Dindi Section of NH765 in the State of Telangana. 113945 10/05/2022 25/04/2022 10/06/2022
Time 15:0Hrs
687 Consultancy services for Authority Engineer for Supervision of Rehabilitation and Upgradation of Nongstoin-Rambrai-Kyrshai road up to Meghalaya-Assam Border from km 0 335 to km 34 039 to 2-Lane under SARDP-NE Phase-A in the state of Meghalaya on EPC mode (Package-I) NHIDCL/Megh./AE/NRK-I/2021 05/04/2022 22/04/2022 13/05/2022
Time 15:0Hrs
688 IE Services for supervision of Chittorgarh Bypass to Kota section (from Km 891.929 to Km 1052.429) of NH 27 in State of Rajasthan on toll operate maintain and transfer basis 2022-NHAI-113574-1 24/05/2022 21/04/2022 06/06/2022
Time 11:0Hrs
689 Independent Engineer Services during Operation and Maintenance Period for 4-Laning of Moradabad-Bareilly Section of NH-24 from Km 149.250 to Km 271.050 in the state of Uttar Pradesh on DBFOT basis under NHDP Phase-III A 11017/1/2022/IE/Tender/PIU-MBD 25/05/2022 21/04/2022 20/06/2022
Time 12:0Hrs
690 CONSULTANCY SERVICES FOR AUTHORITY S ENGINEER FOR SUPERVISION OF Widening to 2 lane with paved shoulders of Siddipet Elkathurthy section from km 69.978 to km 133.619 of NH 765DG in the State of Telangana RW HYD Misc28 NIT AE 2022 23/01dt 20.04.2022 06/05/2022 20/04/2022 06/06/2022
Time 15:0Hrs
691 CONSULTANCY SERVICES FOR AUTHORITY S ENGINEER FOR SUPERVISION OF Widening to 2 lane with paved shoulders of Siddipet Elkathurthy section from km 69.978 to km 133.619 of NH 765DG in the State of Telangana [RW HYD Misc28 NIT AE 2022 23/01dt 20.04.2022 25/04/2022 20/04/2022 06/06/2022
Time 15:0Hrs
692 Consultancy Services For Authority s Engineer For Supervision of Widening to 2 lane with paved shoulders of Medak Siddipet section from km 0.000 to km 69.978 of NH 765DG in the State of Telangana RW/HYD/Misc28 NIT AE 2022-23/04 dt.20.04.2022 27/04/2022 20/04/2022 16/06/2022
Time 15:0Hrs
693 Consultancy Services For Authority s Engineer For Supervision of Widening and improvement of existing carriageway to 2 lane with paved shoulders from km 86.160 to 131.730 of Jangaon Duddeda section of NH 365B in the State of Telangana RW/HYD/Misc28 NIT AE 2022-23/03 dt 20.04.2022 28/04/2022 20/04/2022 08/06/2022
Time 15:0Hrs
694 Consultancy Services For Authority s Engineer For Supervision of Rehabilitation and Up gradation of Valigonda to Thorrur Section to Two Lane with Paved Shoulders from Km 39.180 to Km 108.300 of NH 930P in the State of Telangana RW/HYD/Misc28 NIT AE 2022-23/02dt20.04.2022 28/04/2022 20/04/2022 07/06/2022
Time 15:0Hrs
695 Consultancy services for Authoritys Engineer for Supervision of Improvement of existing road to 2 laning with Hard Shoulders of Maram-Peren section (Package-III length 34.494 km) from Design Chainage km 75-000 to km 109-494 on NH-129A in the State of Manipur on EPC Mode NHIDCL/Manipur/AE/M-P(Pkg-3)/NH-129A/2021 29/03/2022 20/04/2022 27/04/2022
Time 15:0Hrs
696 Independent Engineer (IE) Services for operation and maintenance for the projects (i) 4 Lane divided carriageway of Roorkee-Chutmalpur-Gagalheri, NH-344 (Old NH-73) & Chutmalpur – Ganeshpur, NH-307 (Old NH-72A) in the State of Uttarakhand & Uttar Pradesh under NHDP Phase IV on HAM, (ii) 4 Lane divided carriageway of Gagalheri-Saharanpur-Yamunanagar (UP/Haryana border) section of NH-344 (Old NH-73) Uttar Pradesh & Haryana under NHDP Phase IV on HAM NHAI/RO-UKD/CGRG-GSY/2022 05/05/2022 13/04/2022 12/05/2022
Time 11:0Hrs
697 Independent Engineer (IE) Services for operation and maintenance for the projects (i) 4 Lane divided carriageway of Roorkee-Chutmalpur-Gagalheri, NH-344 (Old NH73) & Chutmalpur – Ganeshpur, NH-307 (Old NH-72A) in the State of Uttarakhand & Uttar Pradesh under NHDP Phase IV on HAM, (ii) 4 Lane divided carriageway of Gagalheri-Saharanpur-Yamunanagar (UP/Haryana border) section of NH-344 (Old NH-73) Uttar Pradesh & Haryana under NHDP Phase IV on HAM NHAI/RO-UKD/CGRG-GSY/2022 09/05/2022 13/04/2022 24/05/2022
Time 11:0Hrs
698 Consultancy Services for Authority Engineer for Supervision of Improvement of 4 lane to 6 lane road and Construction of 4 lane dedicated Port Road for the Port Connectivity Road from Convent Junction to Sheela Nagar Junction in the state of Andhra Pradesh on EPC Mode 2022-NHAI-112851-1 12/04/2022 12/04/2022 06/09/2022
Time 11:0Hrs
699 Project Management Consultancy services for construction of elevated flyover including provision for metro (section from Nashik Phata to Khed of NH-60 (from Km 12.190 to Km 42.000)) NHAI/RO/MUM/PUNE/NK/PMC/2022 13/04/2022 12/04/2022 11/05/2022
Time 11:0Hrs
700 Consultancy Services for Authority’s Engineer for Supervision of Construction of 4-Lane Connectivity to Banbasa ICP at India Nepal border from NH 09 (Old NH-125) (Sitarganj – Tanakpur) at Km 40 near Jagbuda Bridge under Bharatmala Pariyojana on EPC Mode 2022-NHAI-112881-1 19/04/2022 12/04/2022 15/06/2022
Time 11:0Hrs
701 Consultancy Services as Authoritys Engineer for Supervision of (i) 4 laning of Numaligarh to Jorhat section from Km 402.500 to Km 453.00 of NH-37 except construction of Dergaon Bypass from Km 426.80 to Km 437.42 (ii) Dergaon Town to 4 laning from km. 426.800 to km 437.420 on NH-37 in the state of Assam (iii) Four laning of Jorhat to Jhanji Section of NH-37 from Km 453.000 to Km 491.050 (Design Km 453.000 to 490.800) in the state of Assam . NHIDCL/Assam/AE/Numaligarh-Jhanji/2021 30/03/2022 11/04/2022 18/04/2022
Time 15:0Hrs
702 Independent Engineer Services during Operation and Maintenance stage of Six Laning of Agra Etawah Bypass Section of NH 2 from Km. 199.660 to Km. 323.525 under NHDP Phase V in the State of Uttar Pradesh on BOT Toll basis NHAI/PIU/AGRA/Misc./21 18/05/2022 09/04/2022 30/05/2022
Time 11:0Hrs
703 IE services for Tolling Operation Maintenance and Transfer of Palanpur Radhanpur Samakhiyali Sect of NH 27 from Km 589-600 to Km 536-000 in Gujarat (TOT Bundle 5(A-1)) 2022-NHAI-112398-1 12/05/2022 08/04/2022 07/06/2022
Time 11:0Hrs
704 Independent Engineer services for Tolling Operation Maintenance and Transfer of Palanpur- Radhanpur-Samakhiyali Section of NH-27 from Km 536 000 to Km 430100 in the state of Gujarat (TOT Bundle- 5A2) NHAI/AM/TOT/2022-23/IE/TOT 5A2 11/05/2022 08/04/2022 07/06/2022
Time 11:0Hrs
705 Consultancy Services for Authority’s Engineer for Supervision of Construction of four-lane Greenfield Amritsar connectivity for Connection of Amritsar with Delhi-Amritsar-Katra Expressway from Junction with Kapurthala – Sultanpur Lodhi road (NH-703A) near Isharwal village ch.24.000 to MDR Junction at ch. 40.900 Dhunda Village on EPC mode under Bharatmala Pariyojna in the state of Punjab [NHAI/BM/DAKExpressway/Spur/2020/AE/Pkg2] -2nd call NHAI/BM/DAKExpressway/Spur/2020/AE/Pkg2 (2nd Call) 12/04/2022 08/04/2022 09/05/2022
Time 11:0Hrs
706 Consultancy Services for Authority Engineer for Supervision of Construction of Rudraprayag Tunnel of length 900.30 m including approaches and one major bridge on river Alaknanda connecting NH-107 (old-109) to NH-07 (old NH-58) on EPC mode in the of Uttarakhand 1316/13yata-NH-10/2022 dated 16.04.2022 23/04/2022 07/04/2022 23/05/2022
Time 12:0Hrs
707 CONSULTANCY SERVICES AS AUTHORITY’S ENGINEER FOR SUPERVISION OF i Up-gradation to two lane with Paved shoulder from Km. 12 850 to Km 20 300 of 7.450 Km length on Goha-Khellani section and a link road to Goha Village of 2 016 Km on NH 244 in UT of Jammu & Kashmir on EPC mode. ii Up-gradation to two lane with paved shoulder from Km 20 300 to Km29 030 of 8730 Km length on Goha Khellani section on NH 244 in Union Territory of Jammu & Kashmir on EPC mode. iii Construction of Bi-directional Tunnel at NHIDCL/JK/NH-244/G-Krd 83rd Tunnel/AE/2022 13/04/2022 06/04/2022 17/05/2022
Time 15:0Hrs
708 Supervision Consultant (SC) Services for Operation and Maintenance of package AS-17 AS-16 and AS-15 2022/NHAI/112035/1 12/04/2022 04/04/2022 19/05/2022
Time 15:0Hrs
709 Supervision Consultant (SC) Services for Operation and Maintenance of package AS-27 AS-26 AS-25 and AS-24 2022/NHAI/112050/1 13/04/2022 04/04/2022 19/05/2022
Time 15:0Hrs
710 Operation and Maintenance of Four laning of Binjabahal – Tileibani Section, Km.414.000 to Km.491.710 (Design Chainage Km.414.982 to Km.493.300) of NH-6 (New NH-49) in the State of Odisha under NHDP-IV, on Hybrid Annuity Mode- 2nd Call NHAI/13012/56/RO/OD/2022 01/04/2022 29/03/2022 28/04/2022
Time 12:30Hrs
711 Consultancy Services of Authoritys Engineer for Supervision of Road Bakhasar Mavasari fm Km 0 to 32Pt49 Design Length 31pt703 Km existing CL9 to NHDL specifications under 45 TF Project Chetak in Rajasthan and Gujarat in EPC CE(P) CTK/EPC/03/2021-22 29/03/2022 29/03/2022 07/05/2022
Time 11:0Hrs
712 Consultancy services for Authoritys Engineer for supervision of the work Bridge over river Bhagirathi connecting Kalna, Ch.35.447 Km of STKK Road and Shantipur, Ch.96.30 Km of NH-34 in the district of Purba Bardhaman and Nadia, West Bengal. WBPW(R)D/NIB- 10 of SE/WHC-I/2021-2022 08/03/2022 28/03/2022 11/04/2022
Time 14:0Hrs
713 IE service during O and M stage of 2 lane with paved shoulder of NH 70 from Munabao (NH 25E) Sundra Myajlar Dhanan Asutar Ghotaru Tanot under Phase 1 of Bharatmala Pariyojana in the State of Rajasthan on HAM. NHAI/11011/1/Admn/2021-ROJ /Tenders/IE/MT/3rd 20/04/2022 26/03/2022 05/05/2022
Time 11:0Hrs
714 Independent Engineer Services during Operation and Maintenance of 4-6 laning of Kharar-Ludhiana Section of NH-95 from Km 10.185 to Km 86.199 Samrala Chowk and 4 laning of Ladowall Bypass section from km 0.00 to km 17.041 linking NH 95 with NH 1 in State of Punjab on Hybrid Annuity Mode. 2022-NHAI-111256-1 11/04/2022 25/03/2022 23/05/2022
Time 11:0Hrs
715 Supervision Consultancy Services during operation and maintenance of Two Lane with paved shoulder of indo Nepal Border Kakrwhwa to Rudhauli town, section of NH-233 from Km. 0.000 to Km. 65.870 and Rudhauli to Basti Section Km. 65.870 to 122.270 in Uttar Pradesh NHAI/PIU-GKP/SC/21-22/4th call 28/03/2022 25/03/2022 09/05/2022
Time 12:0Hrs
716 Independent Engineer services for 4-laning of Tejajinagar Balwara section of NH-347BG (Indore to Boregaon- Pkg II) Design Ch. 9.000 to Design Ch. 42.400 (Length 33.400 Km) under BMP Phase-I in Madhya Pradesh on HAM 110981 30/03/2022 23/03/2022 19/05/2022
Time 11:0Hrs
717 Supervision Consultancy Services for (i)OM of Borkhedi-Jam-Wadner(ii)Periodical Renewal of Borkhedi–Jam–Wadner and (iii) OM of Wadner–Pimplakhutti, Repairs of Pohana Underpass approaches, Repairs of Service Road at Karanji and Repairs and Rehabilitation of Major Bridge at Km.109.995 on Nagpur-Hyderabad Section of NH-44 in the State of Maharashtra NHAI/RO-NAG/TENDERS/2021-22/35 21/03/2022 21/03/2022 11/04/2022
Time 11:0Hrs
718 Consultancy services for AE for Supervision of Rehabilitation and up-gradation of Manu-Simlung on NH-44A to two lane with paved shoulder in the state of Tripura on EPC basis- (package-II and IV). NHIDCL/Tripura/AE/L-K/V-S/M-s/NH-44A/2020 03/03/2022 21/03/2022 11/04/2022
Time 14:30Hrs
719 Consultancy Services for Authority Engineer for Supervision of Construction of 4 lane Elevated viaduct at km 7.500 (Munshi Pulia) of NH-24A including development of at grade road, service road and junctions on EPC basis in the State of Uttar Pradesh. 704/168C(6)-NH Circle/2021-2022, dt 09.03.2022 06/04/2022 16/03/2022 21/04/2022
Time 11:0Hrs
720 Consultancy Services for Supervision Consultants of Operation & Maintenance of Four Lane Bathinda to Harike section of NH-15 (New NH No. 54) from existing Km 287.615 to Km 166.225 in the State of Punjab. 2022-NHAI-109860-1 11/04/2022 14/03/2022 18/04/2022
Time 11:0Hrs
721 Supervision Consultant (SC) Services for Operation and Maintenance of package AS-03 AS-20 AS-19 AS-02 and AS-18 Total 114.79 Km 2022-NHAI -109688-1 29/03/2022 14/03/2022 28/03/2022
Time 15:0Hrs
722 Supervision Consultant (SC) Services for Operation and Maintenance of package AS-03 AS-20 AS-19 AS-02 and AS-18 Total 114.79 Km 2022-NHAI -109688-1a 29/03/2022 14/03/2022 28/04/2022
Time 15:0Hrs
723 IE for the work of 6 Laning of Varansi Aurangabad sec of NH2 from Km 786 00 to Km 978 400 in UP or Bihar on Design Build Finance Operate and Transfer (DBFOT) Toll Basis under NHDP Phase V 2022-NHAI-109962-1 25/03/2022 14/03/2022 20/04/2022
Time 11:0Hrs
724 Supervision Consultant (SC) Services for Operation and Maintenance of package AS-06 AS-05 AS-04 and AS-28 2022-NHAI-109680-1 22/03/2022 14/03/2022 28/04/2022
Time 15:0Hrs
725 SC services during O and M stage of 4 Lane of Swaroopganj Pindwara Section and Debari to Pratapnagar Section, 2 lane existing Udaipur Bypass from Pratapnagar to Balicha and 4 Lane of Balicha to Kaya Section of in the state of Rajasthan NHAI/11011/ROJ-Tech/ Tenders/SC/SP-DU 26/03/2022 12/03/2022 12/04/2022
Time 11:0Hrs
726 Independent Engineer Services for supervision of Construction of 4 lane Greenfield Jalbehra Shahbad section of NH-152G from km 0 000 to km 22 850 in the state of Haryana (Part of Shahbad – Thol Feeder Route) on Hybrid Annuity Mode under Bharatmala Pariyojna Phase-I 2022-NHAI-109660-1 25/03/2022 11/03/2022 11/04/2022
Time 11:0Hrs
727 Consultancy Services for Authority’s Engineer for Supervision of 4-laning of Jagadhri – Tajewala road section from Yamunanagar bypass (Design Ch - 0 223) to Tajewala (Design Ch 32 300) of NH-907 (Old NH 73A) under NH(O) (Design length 32 523 km)(Pkg-1) in the State of Haryana on EPC Mode 2022-NHAI-109643-1 25/03/2022 11/03/2022 11/04/2022
Time 11:0Hrs
728 Independent Engineer Services for Operation & Maintenance of four lane Jalandhar to Punjab/J&K Border from Km. 4.230 to Km. 117.750/ Km. 4.000 and 4.000 to Km. 16.350 of NH-1A, OMT basis in the State of Punjab, Package OMT-21-A 2022-NHAI-109563-1 31/03/2022 11/03/2022 19/04/2022
Time 11:0Hrs
729 Project Management Consultancy services for JNPT Package V Part 1 NHAIROMUMJNPTVPMC2022 01/04/2022 08/03/2022 21/04/2022
Time 11:0Hrs
730 Consultancy Services for Authority’s Engineer for Supervision of 4- laning of Indore to Raghav Garh section of NH 59 (Indore-Harda package 1 stretch) from MR-10 Junction on NH-3 Bypass Ch.0.250 to Raghav Garh Ch. 26.903 (Length 26.653 Km) under Bharatmala Pariyojana Phase-I (Economic Corridor) in the state of MP on EPC Mode 109099 21/03/2022 08/03/2022 07/04/2022
Time 11:0Hrs
731 Consultancy Services for Supervision Consultant SC for DLP/ OM stage of 2 projects Item Rate basis projects for construction supervision OM of 1 project EPC mode project in the State of Uttarakhand NHAI/ROUKD/HDRDDN Dudhahdari/NH-58 72/SC/2nd 07/03/2022 04/03/2022 04/04/2022
Time 11:0Hrs
732 Consultancy Services as Authority’s Engineer for Supervision of “Four laning of Vairengte – N. Kawnpui section (Package-3, 4, 5 & 6) of NH-306 & NH-6 from Existing Chainage Km 43.000 to Km 126.315 (Design Chainage Km 46.000 to Km 111.850) in the State of Mizoram under Bharatmala Pariyojna on EPC mode” NHIDCL/Mizoram/NH-306 and 6/S-V-S/AE/Pkg-3,4,5&6/2021-22 04/03/2022 04/03/2022 04/04/2022
Time 11:0Hrs
733 Independent Engineer services during Operation and Maintenance Period for 4 laned Talegaon–Amravati (Km.100.000 to Km.166.725) Section of NH-53 on DBFOT basis in the State of Maharashtra–Consultancy Package No.IE-OMNH53NAG-20 NHAI/RO-NAG/TENDERS/2021-22/34 02/03/2022 03/03/2022 30/03/2022
Time 11:0Hrs
734 Consultancy services for Authoritys Engineer for supervision of construction of new 4-Lane -Bridge(Parallel to the existing MG Setu) with its approaches from km 0/000 to km 14/500 across River Ganga on NH -19 at Patna in the state of Bihar on EPC Mode RW/NH-12014/95/2019-Z1 05/03/2022 03/03/2022 04/05/2022
Time 17:0Hrs
735 Consultancy Services of Authority’s Engineer for Construction of 4 lane Greenfield highway from km 134.737 to Km 163.253 Sagar Link Road Berkhedi Sagar under Bharatmala Pariyojana in the State of Madhya Pradesh on EPC mode 108289 22/03/2022 03/03/2022 05/04/2022
Time 11:0Hrs
736 AE/PMC FOR SUPERVI. OF W.and U. to 4lane confi.from km34.90(Bhadohi)to km54.150 and km58.80tokm70.40(JNPR bypass sec.)and to 2lane with P.S from km54.150 tokm58.80andKm70.40(JNPR Bypass sec.)toKm73.134(Jaunpur)of NH135A in the state of U.P.on EPCmode 287/79 com B-18/2022 Date- 02.03.2022 28/03/2022 03/03/2022 04/04/2022
Time 11:0Hrs
737 Consultancy Services for Authority’s Engineer for Supervision of Construction of Two lane with Paved Shoulder/Four laning of Harda-Betul section of NH-47 from Temagaon Ch. km 30.000 to Chicholi Ch. km 80.952 (length-50.952 km) (Harda - Betul Pkg-II) in the state of Madhya Pradesh on EPC Mode. 108130 22/03/2022 02/03/2022 05/04/2022
Time 11:0Hrs
738 Independent Engineer Services during Operation & Maintenance period for 6 laning of Hosur - Krishnagiri section of NH-44 (Old NH-7) from Km.33.130 to Km.93.000 in the state of Tamil Nadu under NHDP Phase V executed as BOT (Toll) under DBFO Pattern NHAI/RO Chennai/IE/O&M/2022/28 25/03/2022 02/03/2022 12/04/2022
Time 13:0Hrs
739 Consultancy Services for Authority’s Engineer for Supervision of Development of six lane access control highway of Bareilly – Ludhiana economic corridor under Bharatmala Pariyojana from Ranipur Barsi Saharanpur district to Sadopur Ambala district Ch. 45.500 to 121.786 of Shamli Ambala section in the state of Haryana on EPC Mode (Package-II) NHAI/BM/ Bareilly–Ludhiana /SA/AE/Pkg-II/2021 17/03/2022 02/03/2022 26/05/2022
Time 11:0Hrs
740 Consultancy Services for Authority’s Engineer for Supervision of Development of six lane access control highway of Bareilly – Ludhiana economic corridor under Bharatmala Pariyojana from Gogwan Jalalpur to Ranipur Barsi (from Ch.(000.600) to 45.500) of Shamli Ambala section in the state of Uttar Pradesh on EPC Mode (Package-I) NHAI/BM/ Bareilly–Ludhiana /SA/AE/Pkg-I/2021 12/03/2022 02/03/2022 04/03/2022
Time 11:0Hrs
741 Consultancy Services for Authority’s Engineer for Supervision of Development of six lane access control highway of Bareilly – Ludhiana economic corridor under Bharatmala Pariyojana from Gogwan Jalalpur to Ranipur Barsi (from Ch.(000.600) to 45.500) of Shamli Ambala section in the state of Uttar Pradesh on EPC Mode (Package-I). NHAI/BM/ Bareilly–Ludhiana /SA/AE/Pkg-I/2021. 12/03/2022 02/03/2022 26/05/2022
Time 11:0Hrs
742 (AE)/PMC Services for Supervision Of Improvement and Up-gradation to 2 Lane with P.Sh. Configuration from Existing km.90.00tokm.130.000(Design length 39.15 km)Package-III of NH-227A (Sikriganj to Bahralganj) in the state of UP on(EPC) basis. 523/427(1)-Yata-NH Circle/2021 Date 24.02.2022 13/03/2022 28/02/2022 28/03/2022
Time 11:0Hrs
743 Consultancy services for Authoritys Engineer for the construction of new 4 lane Bridge (Parallel to existing Vikramshila Setu)from Km 8-920 to Km 13-375 (including approach road 35m in Naugachhia side and 53m in Bhagalpur side) across river ganga on newly decleared NH131B at Bhagalpur in the state of Bihar in EPC Mode RW/NH-12014/75/2020-RO Patna 03/03/2022 28/02/2022 25/04/2022
Time 17:0Hrs
744 Supervision Consultant (SC) Services for (1) Operation and Maintenance of Four lane section of Prayagraj to UP/MP Border of NH-27 (New NH-30) from Km. 4.285 to Km. 45.627 in the state of UP. (2) Operation & Maintenance of Naini Cable Stayed bridge with Approaches from Km. -1.117 to Km. 4.293 on NH-27 (New NH No. 30) at Prayagraj in the State of UP. (3) Maintenance of Prayagraj Bypass Junction - Mungra Badshahpur Section from Km 21.000 to Km 53.170 of NH-319D project in the State of UP NHAI/PIU/Prg./2021-22/10 04/03/2022 26/02/2022 28/03/2022
Time 11:0Hrs
745 AE/PMC Services for Supervision of Improvement and up-gradation to two lane with paved shoulder configuration from existing km55.00tokm90.00(Design length 34.76)of NH227A(Near Chhapia Village to near Sikriganj)in the state of UP on EPC mode Contract. 522/708C(1)/NH Circle Lucknow Dated 24.02.2022 13/03/2022 26/02/2022 28/03/2022
Time 11:0Hrs
746 Consultancy Services for Authority Engineer services for Widening to Six Lane of Existing Four lane Jetpur - Gondal - Rajkot Section from Km 117 600 to Km 185 00 on National Highway No 27 in the state of Gujarat on EPC Mode under Bharatmala Pariyojana NHAI/Guj/Jetpur-Gondal-Rajkot/AE/2022 14/03/2022 25/02/2022 24/03/2022
Time 17:0Hrs
747 Independent Engineer services for Upgradation to Four Lane with paved shoulder of NH 341 from Bhimasar Junction of NH 41 to Anjar Bhuj upto Airport Junction km 0 000 to km 65 478 in the State of Gujarat NHAI/Guj/AnjarBhuj/HAM/2021/IE 15/03/2022 25/02/2022 24/03/2022
Time 17:0Hrs
748 Independent Engineer services for four laning from km 218.500 (Khajuri) to km 259.640 (Wyndhamganj) on NH-75 (Section- V) in the state of Jharkhand on HAM 2022-NHAI-107504-1 28/02/2022 25/02/2022 11/04/2022
Time 11:0Hrs
749 Independent Engineer services for Supervision of Development of Four/Six-lane Access Control Expressway from Design Chainage Km 515.000 to Km 528.300 (Kunjwani to Sidhra Section of NH 44) and from Design Chainage Km 550.900 to Km 566.520 (Domel to Katra Section) on Hybrid Annuity Mode under Bharatmala Pariyojana in the UT of J&K. (Phase II-Package XVII) NHAI/BM/DAKExpressway/2021/PkgXVII/IE 30/03/2022 25/02/2022 28/06/2022
Time 11:0Hrs
750 Independent Engineer services for Supervision of Construction of greenfield connectivity to Jewar International Airport from DND Faridabad Ballabhagh Bypass KMP Link Spur to Delhi Mumbai Expressway on Hybrid Annuity Mode under Bharatmala Pariyojana in the State of Uttar Pradesh and Haryana NHAI/BM/JewarConnectivity/2021/IE 01/04/2022 25/02/2022 04/07/2022
Time 11:0Hrs
751 Independent Engineer Services for Operation & Maintenance of 6-Lane Handia-Rajatalab Section from Km. 712.900 to Km. 785.544 of NH-19 (Old NH-2) in the State of Uttar Pradesh under NHDP-V on Hybrid Annuity Mode 106809 28/02/2022 21/02/2022 23/03/2022
Time 11:0Hrs
752 IE Services for four laning of existing 2 – lane stretches from (a) Bamni to MH/TG Border section of NH-930D and (b) Govindpur to Rajura section of NH-353B in the State of Maharashtra on HAM under NH (O) 2022-NHAI-106403-1 05/03/2022 18/02/2022 17/03/2022
Time 11:0Hrs
753 Independent Engineer Services for Operation & Maintenance of 4- lane divided carriageway of Tindivanam – Ulundurpet section of NH-45 ( New No.32, 132 & 38) from Km.121.000 to Km.193.900 under BOT (Toll) under NHDP-III in the State of Tamil Nadu NHAI/RO Chennai/IE/O&M/NH-45/2021-22/70 26/02/2022 16/02/2022 24/03/2022
Time 17:0Hrs
754 Consultancy Services for Independent Engineer services for Supervision of Development of Six Lane Basanwahi Marangpuri Section of NH 130CD from km 99.500 to km 124.661 of Raipur-Visakhapatnam Economic Corridor in the state of Chhattisgarh on Hybrid Annuity Mode Package CG 3 NHAI/BM/EC/Raipur-Visakhapatnam/Chhattisgarh/IE/Pkg-III/2021 17/02/2022 16/02/2022 28/03/2022
Time 11:0Hrs
755 Independent Engineer services for Four Laning from km 585.930 (Design Chainage 585.820) to km 628.555 (Design Chainage 630.960) of Mydukur – Badvel section of NH-67 on Hybrid Annuity Mode under Bharatmala Pariyojna in the state of Andhra Pradesh NHAI/Tech/AP/Myd-Bad/IE/ 2021-22 16/02/2022 15/02/2022 07/06/2022
Time 11:0Hrs
756 Independent Engineer Services for 6-lane Access Controlled Greenfield Highways from Km 162 500 to Km 203 100 Baswantpur to Singnodi section of NH-150C (Package-IV of Akkalkot-KNT/TS Border) on HAM Mode under Bharatmala Pariyojna 2022 NHAI 105724 1 26/02/2022 14/02/2022 16/03/2022
Time 11:0Hrs
757 Independent Engineer Services for Construction of STRR (West side) NH948A Balagondapalli (Tamil Nadu) to Karnataka/Tamil Nadu border from km 144 170 to km 179 936 in the state of Tamil Nadu on Hybrid Annuity Mode under Bharatmala Pariyojana 2022 NHAI 105555 1 08/03/2022 14/02/2022 14/03/2022
Time 11:0Hrs
758 Project Name Consultancy Services for AE for Supervision of Rehabilitation and upgradation from 2 lane to 2 or 4 lane with paved shoulders of Mulakalacheruvu to Madanapalle section of NH 42 from Km 202050 to Km 245640 Length of 40.460 Km in the State of AP on EPC RW/NH-12014/18/2021-AP/Zone-III/719/AE 08/03/2022 11/02/2022 11/04/2022
Time 15:0Hrs
759 Consultancy Services for AE for Supervision of Rehabilitation and up gradation of existing road from 2 lane to 2 lane with paved shoulders from Km 0 000 to Km 53 590 53 590 Km of Rayachoty to Vempalli section of NH 440 in the State of AP on EPC RW/NH-12014/10/2021-AP/Zone-III/725/AE 08/03/2022 11/02/2022 04/04/2022
Time 15:0Hrs
760 Consultancy Services For Authority Engineer For Supervision of Widening and Strengthening from Km. 0.000 to Km. 35.000 (Mohan Ganj to Autarpur) of NH-731A to two lane paved shoulder in the State of Uttar Pradesh on EPC mode. 201/03ComA(NH731A)pkg1-18/2021 dt 11-02-2022 11/02/2022 11/02/2022 21/03/2022
Time 17:0Hrs
761 Consultancy Services for AE for Supervision of Rehabilitation and upgradation from 2 lane to 2 or 4 lane with paved shoulders of Mulakalacheruvu to Madanapalle section of NH 42 from Km 202050 to Km 245640 Length of 40.460 Km in the State of AP on EPC RW/NH-12014/18/ 2021-AP/Zone-III/719/AE 14/02/2022 11/02/2022 26/03/2022
Time 15:0Hrs
762 Consultancy Services for AE for Supervision of Rehabilitation and up gradation of existing road from 2 lane to 2 lane with paved shoulders from Km 0 000 to Km 53 590 53 590 Km of Rayachoty to Vempalli section of NH 440 in the State of AP on EPC RW/NH-12014/10/ 2021-AP/Zone-III/725/AE 14/02/2022 11/02/2022 26/03/2022
Time 15:0Hrs
763 Independent Engineer services for supervision of Upgradation and Four Laning of Haridwar Bypass Package-1 From Ch. 0.000 (Km 188.100 of NH-58) to Ch. 15.100 (Km 5.100 of NH 74) in the state of Uttarakhand on Hybrid Annuity mode 2022-NHAI-105349-1 15/02/2022 10/02/2022 14/03/2022
Time 11:0Hrs
764 Independent Engineer Services for 6 Lane with Access Controlled Greenfield Highway from km 26 000 to km 97 000 MH/KN Border (Badadal) to Maradgi S Andola section of NH – 150C (Package-II of Akkalkot to KN/TS Border section) on Hybrid Annuity Mode under Bharatmala Pariyojna 2022 NHAI 105372 1 26/02/2022 10/02/2022 14/03/2022
Time 11:0Hrs
765 Independent Engineering Services for Construction of Two Lane with paved Shoulder of Selected Road stretches from Hatwaria to Kaluahi (Ch Km 0 00 – 21 609) NH-227L Saharghat to Rahika (Ch Km 0 00-26 130) NH-227J Rahika to Rampatti (Ch Km 0 00 – 15 000) Madubani Bypass NH-527A & Bideshwarsthan to Bheja (Ch Km 0 00 – 25 915) NH-527A total length of 88 655 km in the state of Bihar 2022-NHAI-105343-1 02/03/2022 10/02/2022 24/03/2022
Time 11:0Hrs
-
766 Independent Engineer Services during Operation and Maintenance of four laning of Phagwara-Rupnagar Section of NH-344A from km 0.000 to km 80.820 in the State of Punjab (Total Length 80.82 Km) 2022-NHAI-105167-1 25/02/2022 09/02/2022 16/03/2022
Time 11:0Hrs
767 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF CONSTRUCTION OF 4 LANE REALIGNMENT OF OLD NH 207 (NEW NH 648) FROM TN/KA BORDER (CH 0 000) TO HOSKOTE (CH 20 900) UNDER BHARATMALA PARIYOJANA AS A PART OF BANGALORE RING ROAD IN THE STATE KARNATAKA ON EPC MODE 2022-NHAI-105540-1 08/03/2022 09/02/2022 14/03/2022
Time 11:0Hrs
768 onsultancy Services for Authoritys Engineer for Supervision of Rehabilitation and upgradation of NH 167AD from Macherla to Dachepalli from Km 0 000 to 43 659 to two lanes with paved shoulders in the state of Andhra Pradesh EPC basis RW/NH-12014/11/ 2021-AP/Zone-III/729/AE-1 08/03/2022 08/02/2022 07/04/2022
Time 15:0Hrs
769 Consultancy Services for Authoritys Engineer for Supervision of Rehabilitation and Up gradation from Km 170 700 Bhadrachalam to Km 234 567 Konta of NH 30 to Two Lane with Paved Shoulders in the State of Andhra Pradesh on EPC mode RW/NH12014/12/ 2021-AP/Zone-III/718/AE 07/03/2022 08/02/2022 24/03/2022
Time 15:0Hrs
770 Consultancy Services for Authoritys Engineer for Supervision of Rehabilitation and Up gradation from Km 170 700 Bhadrachalam to Km 234 567 Konta of NH 30 to Two Lane with Paved Shoulders in the State of Andhra Pradesh on EPC mode W/NH-12014/12/2021-AP/Zone-III/718/AE 08/03/2022 08/02/2022 07/04/2022
Time 15:0Hrs
771 Independent Engineer services for 4-Laning of Urga – Pathalgaon section of NH-130A from design Ch 70-200 to Ch 157-745 under Bharatmala Pariyojana (Raipur – Dhanbad economic corridor) in the State of Chhattisgarh on Hybrid Annuity Mode 2022-NHAI-104934-1 28/02/2022 08/02/2022 04/04/2022
Time 11:0Hrs
772 Consultancy Services for Authoritys Engineer for Supervision of Rehabilitation and Up gradation from Km 170 700 Bhadrachalam to Km 234 567 Konta of NH 30 to Two Lane with Paved Shoulders in the State of Andhra Pradesh on EPC mode RW/NH-12014/12/ 2021-AP/Zone-III/718/AE 10/02/2022 08/02/2022 24/03/2022
Time 15:0Hrs
773 Consultancy Services for Authoritys Engineer for Supervision of Rehabilitation and upgradation of NH 167AD from Macherla to Dachepalli from Km 0 000 to 43 659 to two lanes with paved shoulders in the state of Andhra Pradesh EPC basis RW/NH-12014/11/ 2021-AP/Zone-III/729/AE 10/02/2022 08/02/2022 24/03/2022
Time 15:0Hrs
774 Independent Engineer services for 6-lane Access Controlled Greenfield Highway from Km 97/000 to Km 162/500 Maradgi S Andola to Baswantpur section of NH-150C (Package-III of Akkalkot-KNT-TS Border) on HAM Mode under Bharatmala Pariyojana 2022 NHAI 104988 1 23/02/2022 08/02/2022 10/03/2022
Time 11:0Hrs
775 Authority Engineer services for 6lanning of existing 4 lane from Km 22.300 (Thondupally) to Km 34.144 (Kothur) (Design Length 11.844 Km) on Hyderabad- Banglore Section of NH-44 in the State of Telangana under Bharatmala Pariyojana on EPC Mode. NHAI/HQ/ TS/GM(T)/ DGM(T)/ThonKoth/AE/02-2022 15/02/2022 04/02/2022 15/03/2022
Time 11:0Hrs
776 Independent Engineer services for Construction of Two lane with paved shoulder from Km. 0.0 to Km. 80.0 on NH 548B (Vijayapura-Sankeshwar section) in the state of Karnataka on Hybrid Annuity Mode (HAM) Contract NH-548B-KNT-2021-22-IE 04/02/2022 04/02/2022 28/03/2022
Time 14:0Hrs
777 Independent Engineer Services for Rehabilitation and Upgradation to 2 Lane with Paved Shoulder configuration & Strengthening of Padhar to Bijni section from Km 180 000 to Km 202 815 of NH-154 (Design Length-19 050 KM) of Pathankot-Mandi under NH(O) in HP on HAM basis (Package-VA) NHAI/Pathankot-Mandi/Pkg-VA/IE/HP/2022 NHAI/Pathankot-Mandi/Pkg-VA/IE/HP/2022 07/02/2022 04/02/2022 21/06/2022
Time 11:0Hrs
778 Authority Engineer Services for 6 laning of existing 4 lane stretch of NH-44 on Nagpur-Hyderabad Section in the State of Telangana under Bharatmala Pariyojana on EPC Mode (i) from Kallakal at Km. 454.000 to Gundlapochampally at Km 471.000, (Design Length 17.00 Km) & (ii) from Gundlapochampally at Km. 471.300 to Bowenpally at Km 481.331 (Design Length 10.031 km) NHAI/HQ/TS/GM(T)/DGM(T)/Kal-Bown/2-Pkgs/AE/02-2022 08/02/2022 04/02/2022 15/03/2022
Time 11:0Hrs
779 Consultancy Services for Authority’s Engineer for supervision of Rehabilitation and Up-gradation to 4 Lane configurations & Strengthening of Thanpuri to Paror section from Km 85.135 to Km 100.840 of NH-20 (New NH-154) (Design Length 16.275 KM) of Pathankot-Mandi under NH (O) in H.P (Package-IIC) on EPC mode NHAI/Pathankot-Mandi/Pkg-IIC/EPC/HP/2022 /AE 09/02/2022 04/02/2022 22/06/2022
Time 11:0Hrs
-
780 Consultancy services for Authority Engineer for Supervision of Construction of Two-Lanes with/without paved shoulders from km 000 to km 69 480 (Design) of Sanquelim to Belagavi Section of NH-748AA in the State of Goa and Karnataka on EPC Mode under Bharatmala Pariyojana 2022 NHAI 104528 1 04/03/2022 04/02/2022 14/03/2022
Time 11:0Hrs
781 IE during O and M of 6 laning kishangarh gulabpura Pkg I and Kishangarh Udaipur section Pkg II NHAI/11011/1/Admn/2021-ROJ/ Tenders/IE/KUAI-II/ 28/02/2022 03/02/2022 30/03/2022
Time 11:0Hrs
782 Consultancy Services for Supervision Consultant of Operation and Maintenance of 3 projects under PIU Trivandrum 11203/RO Kerala/Tender Consultants/0138 09/02/2022 03/02/2022 28/02/2022
Time 15:0Hrs
783 Independent Engineer Services for Construction of Four laning of NH-5 from Kaithlighat to Shakral Village (Package I from Km 128 835 to Km 146 300 for Design length – 17.465 Km ) in the state of Himachal Pradesh on HAM Construction of 4 laning of NH-5 from Shakral Village to Dhalli Section (Shimla Bypass Package II from Km 146.300 to Km 156.560 and Shimla connectivity from Km 0.000 to Km 0.725 for Design Length -10.985 km) in Himachal Pradesh on Hybrid Annuity Mode NHAI/Shimla bypass/Pkg-I&II/IE/HP/2022 21/02/2022 03/02/2022 17/05/2022
Time 11:0Hrs
784 Supervision Consultancy Services for construction supervision of Balance works of Widening and Strengthening of existing NH-31C from 2-lane to 4 lane from Shrirampur (Km. 0.000) to Kochugaon (km 30.000) of Bijni to Assam/West Bengal Border Section of NH-31C in Assam on Item rate Basis (2nd call) NHAI/NE/AS-12(Bal)/CSC/E-118956(2nd call) 03/02/2022 02/02/2022 02/03/2022
Time 11:0Hrs
785 Consultancy Services of Authority’ Engineer for the following projects (1) Two laned with paved shoulders of Nazibabad-Kotdwar Section of NH-119 from Design Chainage 122 to 138 (2)4 laning of Najibabad Bypass of NH-119 from Km. 105 423 to Km. 118 373 (excluding 2-45 Km. of NH-74 Bypass) NHAI/11013/N-K & NByepass/2021/AE/126327 08/01/2022 02/02/2022 08/02/2022
Time 15:0Hrs
786 Independent Engineer services for Improvement and Up-gradation to 2 Lane with Paved Shoulder/Four Lane configuration from existing Km130.000 to Km191.000(design km131.500 to Km188.735,Design length 57.235Km)of NH227A in the state of U.P. on HAM basis CE-RO/LKO/IE/NH-227A/2021-22 date.01.02.2022 02/02/2022 01/02/2022 16/01/2023
Time 11:0Hrs
787 Independent Engineer services for Construction of 4-lane green field highway from Km. 35.000 to Km. 49.155 of NH-731A with paved shoulders on Hybrid Annuity Mode in the state of Uttar Pradesh CE-RO/LKO/IE/NH-731A (PKG-II)/2021-22 31.01.2022 01/02/2022 31/01/2022 12/10/2022
Time 11:0Hrs
788 Independent Engineer services for Construction of 4-lane highway with paved shoulders from Km 49.155 to Km 74.700 of NH-731A on Hybrid annuity mode in the state of Uttar Pradesh CE-RO/LKO/IE/NH-731A(Pkg III)/2021-22 31.01.2022 01/02/2022 31/01/2022 31/01/2023
Time 17:0Hrs
789 Independent Engineer services for Four Laning of Mehgama Hansdiha section of NH 133 from existing Km 41-900 to existing Km 93-000 in the State of Jharkhand on Hybrid Annuity mode 2022-NHAI-103702-1 14/02/2022 31/01/2022 06/04/2022
Time 11:0Hrs
790 Independent Engineer services for Four Laning with paved shoulder of section from km 21-110 (Bokaro (Jaina More) on NH-320) to km 53-600 (Gola on NH-320) in the state of Jharkhand on Hybrid Annuity Mode 2022-NHAI-103696-1 14/02/2022 31/01/2022 16/03/2022
Time 11:0Hrs
791 Independent Engineer services for Four Laning with paved shoulder of section from km 53-600 (Gola on NH-320) to km 81-446 (Ormanjhi on NH-320B) in the state of Jharkhand on Hybrid Annuity Mode 2022-NHAI-103684-1 14/02/2022 31/01/2022 16/03/2022
Time 11:0Hrs
792 IE Services for NH stretches under Bundele-1 of TOT projects in Andhra Pradesh (From Anakapalli-Annavaram - Diwancheruvu of NH-16 and from Diwancheruvu - Siddantham - Gundugolanu Sections of NH-216A) 2022-NHAI-103452-1 02/02/2022 29/01/2022 06/04/2022
Time 15:0Hrs
793 Independent Engineering Services for Construction of Four Lane Access Controlled Greenfield National Highway (NH-119D) from village Kalyanpur (Ch 00 000) to Balbhadarpur (Ch 47 000) pkg-03 & Balbhadarpur (Ch 47 000 Km) to Bela Nawada (Ch 89 1 000 km) pkg-04 at NH-119D under Bharatmala Pariyojna in the state of Bihar 2022-NHAI-102872-1 28/01/2022 28/01/2022 03/03/2022
Time 11:0Hrs
-
794 Consultancy Services for Authority Engineer for supervision of Construction of Elevated Corridor in Ranchi city from Km 0.00 to Km 3.260 of NH 75 including down ramp on NH 23 from Km 0.100 to Km 0.600 in the State of Jharkhand on EPC mode 2022 NHAI 103372 1 28/01/2022 28/01/2022 09/03/2022
Time 11:0Hrs
795 Independent Engineer services for Development and Operation of Bikaner-Suratgarh Section of NH-15 (from Km 553/869 of NH-11 to Km 173/000 of NH-15 via Km 10/630 of NH-15)by two Laning with paved shoulder in the state Rajasthan through Public Private Partnership (PPP) on Design, Build, Operate and Transfer (the “DBFOT”) Basis. 02/2021-22 30/01/2022 27/01/2022 24/03/2022
Time 11:0Hrs
796 Authority Engineer (AE)Services during OandM stage of 2 lane with paved shoulders configuration in Jowai-Meghalaya/ Assam Border section of NH-44 from Km 69.200 to Km 173.200 (102.255 Km) in the state of Meghalaya on EPC mode NHAI / J-R/ RFQ/ 2022 04/02/2022 27/01/2022 16/03/2022
Time 17:0Hrs
797 Independent Engineer services for Development and Operation of Sikar-Bikaner Section of NH-11 from Km 340.188 of NH-11 to Km 557.775 of NH-11 via Sikar Bypass and Bikaner Bypass from Km 553.869 of NH-11 to km 267.325 of NH-89 by two laning with paved shoulder in the state Rajasthan through Public Private Partnership (PPP) on Design, Built, Finance, Operate and Transfer (the “DBFOT”) Basis. 01/2021-22 24/02/2022 25/01/2022 24/03/2022
Time 11:0Hrs
798 Consultancy services for Authority’s Engineer for supervision of Operation and Maintenance of NH-43 (New NH-30) from Dahikonga-Jagdalpur (Km.241.000 to Km.298.000) to 2-lanes with paved shoulders in the state of Chhattisgarh under NHDP-IV through EPC mode. 11052/RO-Raipur/Tender/AE/Dahikonga-Jagdalpur 16/02/2022 24/01/2022 10/03/2022
Time 15:0Hrs
799 Consultancy services for Authority’s’s Engineer for supervision of Operation and Maintenance of NH-43 (New NH-30) from Dhamtari - Kanker (Km 81.500 to Km 130.000) to 2-lanes with paved shoulders in the state of Chhattisgarh under NHDP-IV through EPC mode. 11052/RO-Raipur/Tender/AE/Dhamtari-Kanker 16/02/2022 24/01/2022 10/03/2022
Time 15:0Hrs
800 Consultancy services for Authority’s Engineer for Operation and Maintenance of NH-43 (New NH-30) from Bedma-Dahikonga (Km.180.000 to Km.241.000) to 2-lanes with paved shoulders in the state of Chhattisgarh under NHDP-IV through EPC mode. 11052/RO-Raipur/Tender/AE/Bedma-Dahikonga 15/02/2022 24/01/2022 10/03/2022
Time 15:0Hrs
801 Consultancy Services for AE for Supervision of Widening/Improvement to 4 (Four) Lane with Paved Shoulder from. km 581.700 of NH 37 to to km 626.030 of NH-37 on existing Dibrugarh Lahoal - Chabua Bypass in the State of Assam (Package I and II) NHIDCL/Assam/AE/Lahoal- Chabua-1 and 2/2021 31/12/2021 20/01/2022 27/01/2022
Time 15:0Hrs
802 Consultancy Services for Authority Engineer for Supervisiuon of Construction of 2 lane with paved shoulder for the work of Development of remaining section of NH-325(Balotra to Sanderao via Jalore) to 2 lane with paved shoulder configuration in the State of Rajasthan 04/2021-22 20/01/2022 19/01/2022 18/02/2022
Time 11:0Hrs
803 Consultancy Services For Authority Engineer for Supervision of Rehabilitation and Upgradation of L B Nagar to Malkapur Section To 6 Lane Main Carriageway with Service Roads from Km 15 To Km 40 of NH 65 in Telangana RW/HYD/Misc-28/NIT/2021-22/003 dt 17-01-2021 18/01/2022 17/01/2022 24/03/2022
Time 15:0Hrs
804 Independent Engineer Services for Construction of 6-lane Greenfield Southern Ludhiana Bypass from intersection with NH-44 near Village Rajgarh to intersection with Delhi Katra Expressway NE-5 near Village Ballowal km 00 000 to km 25 240 as part of Ludhiana-Ajmer economic corridor on HAM Mode under Bharatmala Pariyojna Phase-I in the state of Punjab 2022-NHAI-101719-1 14/01/2022 14/01/2022 28/02/2022
Time 11:0Hrs
805 Construction of Four Laning of part of Ramban to Banihal Section of NH-1A including Construction of Twin Tube Tunnel (Package-I) (ii) Construction of Four Laning of part of Ramban to Banihal Section of NH-1A (including construction of Twin Tube Tunnel (Package-II) (iii) Construction of Four Laning of part of Ramban to Banihal Section of NH-1A (Package-III)in the UT of Jammu & Kashmir on EPC Mode 2022-NHAI-101896-1 17/01/2022 14/01/2022 07/02/2022
Time 11:0Hrs
806 Supervision Consultancy Services for Operation and Maintenance of Samakhiyali-Santalpur (from Km.339.700 to Km.430.100) and Chadotar to Palanpur (from Km.589.600 to Km.601.000) section of NH-27 in State of Gujarat and preparation of feasibility report and bidding documents for Six Laning of Samakhiyali to Maliya (from Km.265.525 to Km.306.000) section of NH-8A and Six laning of Santalpur to Samakhiyali (Km.339.700 to Km. 430.100) section of NH-27 in State of Gujarat 2022-NHAI-101856-1 28/03/2022 14/01/2022 07/04/2022
Time 11:0Hrs
807 Consultancy Services for Supervision Consultants of Operation & Maintenance of Four Lane with paved side shoulders of Tapa to Bathinda Section Nh-64 (New NH No.7) from existing Km 168.00 to 209.405 in the State of Punjab 2022-NHAI-101517-1 10/02/2022 12/01/2022 24/02/2022
Time 11:0Hrs
808 Independent Engineer(IE) Services for operation and maintenance works and supervision of balance construction works for the projects (i) Pkg-4 (ii) Pkg-5 (iii) Pkg-6 of NH-8E through HAM in the state of Gujarat 2022-NHAI-101148-1 22/02/2022 10/01/2022 09/06/2022
Time 11:0Hrs
809 Independent Engineer Services during Operation and Maintenance period of 5 years for 6 Laning of Delhi Agra section from Km. 20.500 to Km. 200 in the State of Haryana and U.P on Design, Build, Finance Operate and Transfer (DBFOT) basis. 2022-NHAI-101085-1 03/02/2022 08/01/2022 03/03/2022
Time 11:0Hrs
810 Consultancy services for Authoritys Engineer for Supervision of Work of Widening to two Lane with paved shoulder from Design Km 0.000 to Km 49.200 of NH-731B on EPC Mode in the State of Uttar Pradesh. CE-RO/LKO/NH(O)/23/NH-731B/AE (Pkg-I)/2021-22 10/01/2022 06/01/2022 16/01/2023
Time 17:0Hrs
811 Independent Engineer Services for National Highways Stretch under Tolling, Operation, Maintenance & Transfer (TOT)/ O&M (Capacity Augmentation) Projects in the State of Odisha & Andhra Pradesh for the Section Icchapuram – Puintola Section of NH-16 (Old NH-5) from km.419.600 to km.484.000.Independent Engineer Services for National Highways Stretch under Tolling, Operation, Maintenance & Transfer (TOT)/ O&M (Capacity Augmentation) Projects in the State of Odisha & Andhra Pradesh for the Section Ic NHAI/13012/58/RO/OD/2022 10/01/2022 06/01/2022 17/02/2022
Time 11:0Hrs
812 Consultancy service for Authority’s Engineer for supervision of Construction of Elevated Corridor from Km 135.650 to 136.450 on NH 63, from Km 249.00 to 250.050 on NH4 and from km 192.800 to 193.350 on NH 218 for Decongestion of traffic at Rani Chennamma Circle in Hubli City / Taluk in the state of Karnataka on EPC mode. 1657 Dt 06-01-2022 20/01/2022 06/01/2022 09/02/2022
Time 17:0Hrs
813 Consultancy Services of Supervision Consultant (SC) for Operation, Maintenance and Incident Management of the stretch from Km.0.000 to Km.68.000 (Kanaktora – Jharsuguda Section) up to 2-lane with paved shoulder including by-pass at Belpahar at 52nd Km. of NH-200 (from Km.197.300 to Km.265.300 including bypass at 249th Km. of NH-49) and Urgent Repair & Maintenance of Teleibani- Sambalpur section of NH-53 from Km.519.150 to Km.545.176 (Badarama Wildlife Sanctuary Area) in the State of Odisha- 2nd NHAI/13012/23/RO/OD/2022 07/01/2022 05/01/2022 10/02/2022
Time 11:0Hrs
814 Consultancy Services for Authority’s Engineer for Supervision of Operation & Maintenance of four-laning of Ambala-Kaithal section of NH-65 (new NH-152) for Package-1 & 2 from Km 0.000 (Ambala) to Km 95.360 (Kaithal) in the State of Haryana. NHAI/RO/CHD/11011/PD-AMB/Ambala-Kaithal/AE/RFP 23/01/2022 31/12/2021 03/03/2022
Time 11:0Hrs
815 Consultancy services for AE for Supervision of Rehabi and Upgradation to 2 lane with PS from existing km 166.100 to km 192.980 (Design km 146.600 to km 162.800) (Package VII) inclu constr of Bhimber Gali Tunnel (total length of tunnel 1.100 km) under RW/CH/W(53)/JK/2021 31/12/2021 31/12/2021 21/03/2022
Time 11:0Hrs
816 IE services for Construction of 4 Lane Greenfield expressway spur from Delhi Vadodra Greenfield expressway near Bandikui to Jaipur in Bharatmala Pariyojana Phase I on Hybrid Annuity Mode in the state of Rajasthan 2021-NHAI-100049-1 24/01/2022 30/12/2021 07/03/2022
Time 11:0Hrs
817 Independent Engineer Services during Development, Operation and maintenance of Chittorgarh- Neemuch (MP Boarder) NH-79 Section (PWD Km. 183.000 to Km.221.400) or (Design Ch. 183.000 to 227.082) and Nimbahera- Pratapgarh NH- 113 Section (Km. 5.400 to Km. 80.00) or ((Design Ch. 0.000 to 72.915) in the State of Rajasthan Through Public Private Partnership (PPP) on Design, Built, Finance, Operate and Transfer (the “DBFOT”) Basis NIT No. 06/2021-22 SE PWD NH UDAIPUR 10/01/2022 30/12/2021 17/01/2022
Time 11:0Hrs
818 Consultancy Services for SC Trichy Ramanathapuram 17012 02 14 2021 RO Madurai 29/12/2021 28/12/2021 15/02/2022
Time 15:0Hrs
819 Consultancy services for Authoritys Engineer for Supervision of Work of Construction of two lane with paved shoulder from existing Km. 0.000 to Km. 55.610(Design Km. 0.000 to Km. 54.048) (Mardah to Saidpur) of NH-124D on EPC mode in the state of U.P. CE-RO/LKO/NH-124D/AE/2021-22 Dated 28.12.2021 31/12/2021 28/12/2021 22/03/2022
Time 17:0Hrs
820 Consultancy Services of Authority’s Engineer for Four laning of Honnavar Port Connectivity road from km 0.00 (Kasarkod side of Honnavar Port) to km 2.58 (towards NH-66) connecting Honnavar Port with NH-66 at km 196.00 and to improve NH-66 from km 195.00 to km 197.00 to integrate port connectivity road on EPC mode under Bharatmala Phase-1 in the state of Karnataka 2021-NHAI-99852-1 31/01/2022 28/12/2021 09/02/2022
Time 11:0Hrs
821 Consultancy Services for Authoritys Engineer for supervision of Construction of 4lane Elevated Section and atgrade improvements at Begusarai town section of NH-31 from design Chainage 221 047 to 225 302 in Bihar 2021-NHAI-99683-1 06/01/2022 27/12/2021 25/01/2022
Time 15:0Hrs
-
822 Consultancy Services for Supervision Consultant (SC) during Operation and Maintenance Period of Chas- Ramgarh section of NH-23 from km 0.000 to km 78.125 in the State of Jharkhand NHAI/RO/RNC/JH/2021-22/20 15/01/2022 21/12/2021 03/02/2022
Time 11:0Hrs
823 IE services for O and M for 6 lane Chittorgarh Udaipur section of NH-76 and New Greenfield proposed Udaipur Bypass and Udaipur-Ratanpur-Shamlaji section from Km. 287 400 to km. 401.200 of NH 8 in the state of Rajasthan NHAI/11011/1/Admn/2021-ROJ/ Tenders/Proposal- 14/01/2022 17/12/2021 15/02/2022
Time 11:0Hrs
824 Consultancy services for Authoritys Engineer for Supervision of REHABILITATION AND UP-GRADATION TO 2 LANE WITH PAVED SHOULDER FROM EXISTING CHAINAGE KM 102.000 TO KM 134.950 (DESIGN CHAINAGE KM 90.150 TO KM 116.980) (PACKAGE -V) INCLUDING CONSTRUCTIO RW/CH/W(52)/JK/2021 16/12/2021 16/12/2021 21/03/2022
Time 11:0Hrs
825 Supervision Consultancy SC services during O and M stage of 4Lane Varanasi bypass from Km 000 starting point at Km 271 300 of NH-56 to Km 15 250 end point at Km 11 170 of NH29 including 4Laning of NH29 from Km 10 700 to Km 12 000 Package I in the state of UP under NHDP Phase IV in EPC Mode Total Length 16 550 Km 2021-NHAI-98643-1 17/12/2021 16/12/2021 10/01/2022
Time 11:0Hrs
826 Consultancy Services for Authority’s Engineer for Supervision of Construction of four-lane Greenfield Amritsar connectivity for Connection of Amritsar with Delhi-Amritsar-Katra Expressway from Junction with Kapurthala – Sultanpur Lodhi road (NH-703A) near Isharwal village ch.24.000 to MDR Junction at ch. 40.900 Dhunda Village on EPC mode under Bharatmala Pariyojna in the state of Punjab (NHAI/BM/DAKExpressway/Spur/2020/AE/Pkg2) NHAI/BM/DAKExpressway/Spur/2020/AE/Pkg2 13/01/2022 15/12/2021 14/02/2022
Time 11:0Hrs
827 Independent Engineer Services during Development, Operation and maintenance of Chittorgarh- Neemuch (MP Boarder) NH-79 Section (PWD Km. 183.000 to Km.221.400) or (Design Ch. 183.000 to 227.082) and Nimbahera- Pratapgarh NH- 113 Section (Km. 5.400 to Km. 80.00) or ((Design Ch. 0.000 to 72.915) in the State of Rajasthan Through Public Private Partnership (PPP) on Design, Built, Finance, Operate and Transfer (the “DBFOT”) Basis NIT No. 06/2021-22 SE PWD NH Circle UDAIPUR 19/01/2022 15/12/2021 07/02/2022
Time 11:0Hrs
828 Independent Engineering Services for Construction of Four Lane Access Controlled Greenfield National Highway (NH-119D) Package-I from village Amas (on NH-02) (Design Ch 00-000) to village Shivrampur (Design Ch 55-002) pkg-01 & Shivrampur (Ch 55-002 Km) to Ramnagar (Ch 109-324 km) pkg-02, at NH-119D under Bharatmala Pariyojna in the state of Bihar 2021-NHAI-98319-1 07/01/2022 14/12/2021 07/02/2022
Time 11:0Hrs
829 Consultancy services for Authoritys Engineer for Supervision of Work of Widening and Strengthening from Km 0.000 to Km 38.853 of NH-330D(Sitapur to Kurain Section)to two lane with paved shoulder configuration under EPC mode in the State of U.P. CE-RO/LKO/NH-330D/AE/2021-22 Dated 11.12.2021 14/12/2021 11/12/2021 08/02/2022
Time 11:0Hrs
830 Consultancy services for Authority Engineer services for Construction Four Lane Bypasses for Jagatpur Babuganj Unchahar Alapur Bypass and Sai River Bridge and upgradation of carriageway Km 180-200 to 188-700 of Raebareli-Prayagraj section of NH-30 Old NH-24B in the State of Uttar Pradesh on EPC mode under Bharatmala Pariyojna ICR 2021-NHAI-97818-1 17/12/2021 09/12/2021 11/12/2021
Time 11:0Hrs
831 Consultancy Services for Supervision Consultant SC for DLP/ OM stage of 2 projects Item Rate basis projects for construction supervision OM of 1 project EPC mode project in the State of Uttarakhand NHAI/ROUKD/HDRDDN Dudhahdari/NH-58 72/SC/202 20/12/2021 06/12/2021 08/01/2022
Time 11:0Hrs
-
832 Consultancy services for Authoritys Engineer for supervision Rehabilitation and Widening work for 2-lane with paved shouldering of existing National Highway 80 Alignment from 1- Km 70.150 to Km121,025 and 132.895 to 190.150 in the state of Bihar on EPC Mode RW/NH-24035/4/2008-P&M/PIC 23/12/2021 02/12/2021 18/01/2022
Time 16:0Hrs
833 Consultancy services as Authority’s Engineer for Supervision of “Four laning of Vairengte – N. Kawnpui section (Package-3, 4, 5 & 6) of NH-306 & NH-6 from Existing Chainage Km 43.000 to Km 126.315 (Design Chainage Km 46.000 to Km 111.850) in the State of Mizoram under Bharatmala Pariyojna on EPC mode” NHIDCL/Mizoram/NH-306&6/S-V-S/AE/Pkg-3,4,5&6/2021-22 02/12/2021 02/12/2021 17/01/2022
Time 11:0Hrs
834 Consultancy Services for Authoritys Engineer for Supervision of Upgradation of NH 130A Mungeli to Pondi from NH Km 51.600 to Km 77.870 and Km 77.870 to Km 96.970 to two/Four lane with paved shoulders in the state of Chhattisgarh on Engineering Procurement and Construction (EPC) mode 56/CE/NH/TC/44-29/2021 17/12/2021 01/12/2021 11/01/2022
Time 11:0Hrs
835 Consultancy services for Authority Engineer for Supervision of (i) Rehabilitation and Upgradation of Nongstoin-Rambrai-Kyrshai road up to Meghalaya-Assam Border from km 0 335 to km 34 039 to 2-Lane under SARDP-NE Phase-A (Package-I) (ii) Rehabilitation and Upgradation of Nongstoin-Rambrai-Kyrshai road up to Meghalaya-Assam Border from km 35 155 to km 72 863 to 2-Lane under NH (O)- NE in the state of Meghalaya on EPC mode (Package-II) NHIDCL/Megh/AE/NRK-IandII/2021 17/11/2021 23/11/2021 14/12/2021
Time 15:0Hrs
836 Consultancy services for Authority Engineer for Supervision of Improvement/widening to Two laning with earthen shoulder of (i) Nongjri (Design Ch 30-00km) to Maheshkola (Design Ch 55-525km) (R-M-B Package-II) (ii) Stretch from km 55.525 to km 79.680 of Ranikhor- Baghmara Project under SARDP-NE Phase-A (Package-III) (iii)Panda (Design Ch 112-300 km) to Baghmara (Design Ch 129-385 km) (R-M-B Package-VI) on SH-4 section of Ranikor- Maheshkhola-Baghmara Project in the state of Meghalaya on EPC basis NHIDCL/Megh/AE/R-M-B-/Pkg-II, III & VI/SH-4/2021 18/11/2021 23/11/2021 14/12/2021
Time 15:0Hrs
837 Consultancy services for AE for Supervision of Rehabilitation and up-gradation of Lalchara- Kanchanpur via Shivbari section of Manu-Simlung (package-II) and Vaghmun- Simlung on NH-44A in the state of Tripura (Package-IV) NHIDCL/Tripura/AE/L-K/V-S/Manu-Simlung/NH-44A/2020 18/11/2021 23/11/2021 14/12/2021
Time 15:0Hrs
838 Independent Engineer Services during O and M Period for the project of Design Construction Development Finance Operation and Maintenance of Km. 1189 to Km. 1271.455 Old Km. 16.000 to Km. 98.455 on NH No. 44 in the states of UP and MP on BOT Annuity B NHAI/ROMP/IE/GwlJHS/NH44/2021 08/12/2021 15/11/2021 14/12/2021
Time 11:0Hrs
839 Operation and Maintenance of Four laning of Binjabahal – Tileibani Section, Km.414.000 to Km.491.710 (Design Chainage Km.414.982 to Km.493.300) of NH-6 (New NH-49) in the State of Odisha under NHDP-IV, on Hybrid Annuity Mode NHAI/13012/56/RO/OD/2021 12/11/2021 09/11/2021 09/12/2021
Time 11:0Hrs
840 CONSULTANCYSERVICES FOR AE FOR SUPERVISION OF Construction of Two lanning with Hard Shoulder Road of Ukhrul - Toloi - Tadbui section of NH-102A (Package-3 and 4) in the State of Manipur on EPC Mode NHIDCL/Manipur/AE/UTT (Pkg-3 and 4)/NH-102A/2021 29/10/2021 28/10/2021 26/11/2021
Time 15:0Hrs
841 AE FOR SUPERVISION “REHABILITATION AND UP-GRADATION TO 2 LANE WITH PAVED SHOULDER FROM EXISTING CHAINAGE KM 134.950 TO KM 166.100 (DESIGN CHAINAGE KM 116.980 TO KM 146.700) (PKG-VI) A-P RD (NH-144A) IN THE UT OF J&K PROJECT SAMPARK, (BRO)”ON EPC MODE SPK/AE/AP RD/PKG-VI/02/2021-22 25/10/2021 25/10/2021 15/02/2022
Time 11:0Hrs
842 Consultancy services as Authority’s Engineer for Supervision of “Four laning of Vairengte – N. Kawnpui section (Package-3, 4, 5 & 6) of NH-306 & NH-6 from Existing Chainage Km 43.000 to Km 126.315 (Design Chainage Km 46.000 to Km 111.850) in the State of Mizoram under Bharatmala Pariyojna on EPC mode” NHIDCL/Mizoram/NH-306 & NH-6/S-V-S/AE/Pkg-3,4,5&6/2021-22 25/10/2021 22/10/2021 29/11/2021
Time 11:0Hrs
843 Independent Engineer Services for Operation & Maintenance of Allahabad Bypass (Including Ganga Bridge PKG ABP-1) from Km.158.000 (628.753) to Km. 242.708 (713.461) of NH-19 (Old NH-2) in the State of Uttar Pradesh under NHDP-V on OMT Basis NHAI/PIU/Prg./2021-22/06 29/10/2021 20/10/2021 11/01/2022
Time 11:0Hrs
844 Consultancy services for AE for Supervision of Widening to 2 (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 (PKG-IV, V, VI and VII) in the State of Manipur -2nd Call NHIDCL/Manipur/AE/I-J (Pkg- 4,5, 6 7)/NH-37/2021 18/10/2021 12/10/2021 28/12/2021
Time 15:0Hrs
845 Consultancy services for AE for Supervision of Improvement of existing road to 2 laning with Hard Shoulders of Maram-Peren section (Package-III) in the State of Manipur on EPC Mode - 2nd Call NHIDCL/Manipur/AE/M-P (Pkg-3)/NH129A/2021 22/10/2021 12/10/2021 16/11/2021
Time 15:0Hrs
846 Consultancy Services for SC Madurai Ramanathapuram 17012 02 13 2021 RO Madurai 05/10/2021 25/09/2021 01/12/2021
Time 15:0Hrs
847 CONSULTANCY SERVICES AS AE FOR SUPERVISION OF Construction of a 4 lane flyover with paved shoulder configuration for along with service road on Jammu-Akhnoor road section of NH-144A in UT of J and K (P-I and IIIB) NHIDCL/JK/NH-144A/ JA(PI and IIIB)/AE/2021-22 01/10/2021 24/09/2021 11/04/2022
Time 11:0Hrs
848 Consultancy services for Authority’s Engineer for Supervision of CONSTRUCTION OF SIX LANE LINK ROAD (NH-166S) WITH PAVED SHOULDER CONFIGURATIFON TO MOPA AIRPORT IN THE STATE OF GOA ON EPC MODE 2021-22/WD-VII(NH)/PWD/ASW/15 dt 20.09.2021 20/09/2021 20/09/2021 15/12/2021
Time 17:0Hrs
849 Consultancy Services for Authoritys Engineer for Supervision of Upgradation of NH 130A Mungeli to Pondi from NH Km 51.600 to Km 77.870 and Km 77.870 to Km 96.970 to two/Four lane with paved shoulders in the state of Chhattisgarh on Engineering Procurement and Construction (EPC) mode 42/CE/NH/TC/44-21/2021 08/09/2021 13/09/2021 28/10/2021
Time 15:0Hrs
850 Consultancy services for AE for Supervision of Improvement of existing road to 2 laning with Hard Shoulders of Maram-Peren section (Package-III) from Design Chainage km 75.000 to km 109.494 on NH-129A in Manipur NHIDCL/Manipur/AE/M-P (Pkg-3)/NH-129A/2021 29/09/2021 13/09/2021 12/10/2021
Time 15:0Hrs
851 CONSULTANCY SERVICES FOR AE FOR SUPERVISION OF (i) Widening/Improvement to 2 (Two) Lane with Earthen Shoulder of Langdang/Choithar to Marrem Khullen (PKG-5 and 6) of Yaingangpokpi to Jessami Road (NH 202) in the state of Manipur NHIDCL/Manipur/AE/Y-J(Pkg- 5 and6)/NH-202/2021 27/09/2021 10/09/2021 11/10/2021
Time 15:0Hrs
852 CONSULTANCY SERVICES FOR AE FOR SUPERVISION OF Widening to 2 (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 (PKG-IV,V,VI,VII) in the State of Manipur NHIDCL/Manipur/AE/I-J (Pkg- 4, 5, 6 and 7)/NH-37/2021 28/09/2021 10/09/2021 11/10/2021
Time 15:0Hrs
853 CONSULTANCY SERVICES FOR AE FOR SUPERVISION OF Construction of New Two-Lane Bridge with its approaches across River Brahmaputra on NH-17 at Jogighopa in the State of Assam (2nd call) NHIDCL/ASSAM/2020-21 /AE/JogiBridge/197510 20/09/2021 10/09/2021 18/10/2021
Time 15:0Hrs
854 Consultancy services for Authority’s Engineer for Supervision of (i) Rehabilitation and Upgradation of Nongstoin-Rambrai-Kyrshai road up to Meghalaya-Assam Border to 2-Lane under SARDP-NE Phase-A in the state of Meghalaya on EPC mode (Package-I) (ii) Rehabilitation and Upgradation of Nongstoin-Rambrai-Kyrshai road up to Meghalaya-Assam Border (PKG-II) to 2-Lane under NH (O)- NE in the state of Meghalaya on EPC mode NHIDCL/Megh/AE/NRK-I and II/2021 10/09/2021 08/09/2021 21/10/2021
Time 15:0Hrs
855 Consultancy services for Authority’s Engineer for Supervision of Improvement/widening to Two laning with earthen shoulder of Nongjri to Maheshkola (R-M-B Package-II III & VI) on SH-4 section of Ranikor- Maheshkhola-Baghmara Project in the state of Meghalaya on EPC basis NHIDCL/Megh/AE/R-M-B/Pkg-II III&VI/SH-4/2021 13/09/2021 08/09/2021 21/10/2021
Time 15:0Hrs
856 CONSULTANCY SERVICES AS AUTHORITY’S ENGINEER FOR SUPERVISION OF Up-Gradation to intermediate lane of NH301 Kargil-Zanskar in the UT of Ladakh on EPC mode (Package-IV/V/VI/VII) NHIDCL/Ladakh/NH-301/K-Z/AE(RE-Invite) (P-IV/V/VI & VII)/2021-22 30/08/2021 30/08/2021 22/09/2021
Time 11:0Hrs
857 CONSULTANCY SERVICES AS AUTHORITYS ENGINEER FOR SUPERVISION OF Construction and Upgradation of Khellani – Khanabal-Alstop section of NH-244-44 (P6 and 7) Strengthening and upgradation of baramulla-Gulmarg Section of Nh-701 A in Jammu and Kashmir in the Union Territory of Jammu and Kashmir on EPC mode NHIDCL/JK/NH-244-44 and 701A/K-K67 BG/2021-22(Re invite) 05/09/2021 27/08/2021 16/09/2021
Time 11:0Hrs
858 CONSULTANCY SERVICES AS AUTHORITY’S ENGINEER FOR SUPERVISION OF Widening/Up-Gradation to 2 lane with Paved shoulder of NH301 Kargil-Zanskar in the UT of Ladakh on EPC mode (Package-I/II/III/VIII) NHIDCL/K-Z/AE(Re-Invite) (P-I/II/III /VIII)/2021-22 27/08/2021 26/08/2021 22/09/2021
Time 11:0Hrs
859 CS for Authoritys Engineer for Supervision of the work Rehabilitation and Upgradation of NH-167B from km 143/320 (Malakonda) to 189/050 (Singarayakonda) (on NH16) to two lane with paved shoulders in Andhra Pradesh through EPC mode SENHVJA/41/2021-22 DT.17.08.2021 24/09/2021 24/08/2021 18/10/2021
Time 15:0Hrs
860 CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF CONSTRUCTION OF 2 LANE PAVED SHOULDERS TIRORA GONDIA AND AMGAO GONDIA IN THE STATE OF MAHARASHTRA NIT-04/2021-22 18/08/2021 20/08/2021 06/09/2021
Time 17:0Hrs
861 Consultancy services for Authority’s Engineer for Supervision of (i) Widening/Improvement to 4 (Four) Lane with Paved Shoulder of Daboka Dimapur stretch from km 113 300 to km 146 250 (Design Chainage 113 830 to 145 712) of Kwaram Taro Village – Manja Section - (Package-6) of NH-29 in the state of Assam on EPC mode and (ii) Widening/Improvement to 4 (Four) Lane with Paved Shoulder from KM 146 250 to Km 157 460 (Design Chainage145 712 to 156 502) of DillaiLahorijan (Package-7) of NH 29 in Assam NHIDCL/Assam / NH-29/Dab- Man/Pkg 6 and7/AE/199769 26/08/2021 20/08/2021 18/09/2021
Time 14:30Hrs
862 Consultancy Services for AE for Supervision of Construction of 4-Lane Panchgram Bypass and Construction of Four Lane Badarpur Bypass at Kandigram Chaita Village in the State of Assam NHIDCL/Assam/AE/Panchgram- Badarpur Bypass/199712 25/08/2021 19/08/2021 16/11/2021
Time 15:0Hrs
863 test by adil test777 16/08/2021 16/08/2021 31/08/2024
Time 15:0Hrs
864 Consultancy services as Authority’s Engineer for Supervision of Four laning of Vairengte – N. Kawnpui section (Package-3, 4, 5 and 6) of NH-306 & NH-6 from Existing Chainage Km 43.000 to Km 126.315 (Design Chainage Km 46.000 to Km 111.850) in the State of Mizoram under Bharatmala Pariyojna on EPC mode NHIDCL/Mizoram/NH-306 & 6/S-V-S/AE/Pkg-3,4,5&6/2021-22 23/08/2021 14/08/2021 04/10/2021
Time 11:0Hrs
865 Selection of Authoritys Engineers (AE) for supervision of construction of bypass for providing Interconnectivity amongst National Highways (NHs) arround the pratapghar city (Pratapgarh Bypass ) on EPC Mode in the state of Uttar Pradesh 2480/160A-Yata-NH-Circle/2021 Dated 04.08.2021 11/08/2021 11/08/2021 14/09/2021
Time 11:0Hrs
866 SC services of Trichy Madurai of NH45B 2021 NHAI 83746 1 12/08/2021 02/08/2021 01/09/2021
Time 15:0Hrs
867 AE Services of Thanjavur Pudukottai Thirumayam Manamadurai 17012 02 09 2021 RO Madurai 12/08/2021 29/07/2021 07/09/2021
Time 17:0Hrs
868 AE services of Tuticorin Tirunelveli NHAI 17012 02 10 2021 RO Madurai 12/08/2021 29/07/2021 08/09/2021
Time 17:0Hrs
869 IE Services of Trichy Karur 2021-NHAI-83455-1 29/07/2021 29/07/2021 30/08/2021
Time 18:0Hrs
870 Consultancy services as AE for Supervision of Construction of (i) Connecting road from Z-Morh Tunnel to Zojila Tunnel and (ii) 14.150 km long bi-directional tunnel across Zojila Pass on Sonamarg-Kargil section of NH-01 in the UT of J and K and Ladakh NHIDCL/JK/NH-01/Zojila /AE(Re-invite)/2021-22 25/07/2021 25/07/2021 24/08/2021
Time 11:0Hrs
871 Consultancy Services of Supervision Consultant (SC) for Operation, Maintenance and Incident Management of the stretch from Km.0.000 to Km.68.000 (Kanaktora – Jharsuguda Section) up to 2-lane with paved shoulder including by-pass at Belpahar at 52nd Km. of NH-200 (from Km.197.300 to Km.265.300 including bypass at 249th Km. of NH-49) and Urgent Repair & Maintenance of Teleibani- Sambalpur section of NH-53 from Km.519.150 to Km.545.176 (Badarama Wildlife Sanctuary Area) in the State of Odisha-Reg NHAI/13012/53/RO/OD/2021 06/09/2021 21/07/2021 16/09/2021
Time 11:0Hrs
872 Consultancy services for Authority’s Engineer for Supervision of (i) Improvement and Widening to two lane with paved shoulder of Manu - Simlung section of NH-44A (Package-II) (ii) Rehabilitation and up-gradation of road of Vaghmun- Simlung section (Package-IV) in the state of Tripura. NHIDCL/Tripura/AE/L-K/V-S/Manu-Simlung/NH-44A/202 16/08/2021 13/07/2021 09/09/2021
Time 14:30Hrs
873 Consultancy Services for Authority’s Engineer for Supervision of Construction of 4 lane Connector from Delhi-Meerut Expressway (Km. 50.000 of Package-IV) to Km. 8.520 of NH-235 in the State of Uttar Pradesh on EPC Basis (Length-14.600 Km) under Bharatmala Pariyojana 2021-NHAI-82005-1 19/07/2021 13/07/2021 14/09/2021
Time 11:0Hrs
874 Consultancy services for Authoritys Engineer for Supervision of Construction Of 4 Lane Flyover At Nagpur Rto Chowk To Nagpur University Campus From Ch 2/250 To 5/100 and 4 lane flyover at wadi/midc junction from km 8/360 to km 10/300 On NH 53 In State Of Maharashtra On Epc Mode RW/NH-12014/72/2020-21 28/07/2021 13/07/2021 17/09/2021
Time 17:0Hrs
875 Consultancy services for Authoritys Engineer for supervision Rehabilitation and Widening work for 2-lane with paved shouldering of existing National Highway 80 Alignment from 1- Km 70.150 to Km121,025 and 132.895 to 190.150 in the state of Bihar on EPC Mode 2021-MoRTH-637959-1 12/08/2021 09/07/2021 13/09/2021
Time 16:0Hrs
876 Consultancy services for Authoritys Engineer for Supervision of Upgradation/ Reconstruction to two lane with paved shoulders/ four lane configuration (Package No Nashik IV) – Nhavra – Inamgaon – Kaashti – Shrigonda – Jalgaon – Jamkhed of SH-55 (Now New NH-548D) in the state of Maharashtra Secton – 2 Adhalgaon to Jamkhed from km 132-600 to km 195-375 RW/NH-12014/02/2020-21 04/08/2021 05/07/2021 03/09/2021
Time 17:0Hrs
877 Consultancy services for Authoritys Engineer for Supervision of Rehabilitation & Up-gradation of Amboli Junction (Design Ch 71-530) to Ajara (Design Ch 100-835) section and section of Ajara (100-835) to Sankeshwar (132-958) of Newly declared NH No 548H Raod Network with NH-66 near Banda-Amboli-Ajara-Gadhinjia) to NH-48 near Sankeshwar to two lane with paved shoulder in the state of Maharashtra on Engineering Procurement & Construction (EPC) Mode RW/NH-12014/70/2020-21 04/08/2021 05/07/2021 03/09/2021
Time 17:0Hrs
878 CONSULTANCY SERVICES FOR AE FOR SUPERVISION OF Construction of New Two-Lane Bridge across River Brahmaputra on NH-17 at Jogighopa in the State of Assam on EPC mode NHIDCL/ASSAM/2020 -21/AE/JogiBridge 08/08/2021 05/07/2021 25/08/2021
Time 15:0Hrs
879 Consultancy Services for Authority Engineer for supervision of Balance works of rehabilitation and upgradation of Nakrekal to Nagarjunasagar section of NH-565 to 2L with PS/4L from km 1 to km 86 under NH(O) for the year 2020-21 in the state of Telangana on EPC Basis RW/HYD/Misc-28/NIT/2021-22/001 dt 29.06.2021 01/07/2021 05/07/2021 23/08/2021
Time 15:0Hrs
880 CONSULTANCY SERVICES AS AUTHORITY’S ENGINEER FOR SUPERVISION OF Up-Gradation to intermediate lane of NH301 Kargil-Zanskar in the UT of Ladakh on EPC mode (Package-IV/V/VI/VII) NHIDCL/Ladakh/NH-301/K-Z/AE (P-IV/V/VI & VII)/2021-22 04/07/2021 04/07/2021 25/08/2021
Time 11:0Hrs
881 Consultancy services as Authority’s Engineer for Supervision of Up-gradation to 2 lane with Paved shoulders of Tuivai – Keifang road, NH-102B of Aizawl – Imphal Economic Corridor from Existing Chainage Km 0.000 (Bridge across Tuivai River at Manipur Mizoram Border) to Km 119.108 (Near Keifang Village) (Design Chainage Km 0.000 to Km 98.579) (Package-I, II & III) in the State of Mizoram under Bharatmala Pariyojna on EPC mode NHIDCL/Mizoram/NH-102B/AE/2021-22 06/07/2021 02/07/2021 02/08/2021
Time 11:0Hrs
882 CONSULTANCY SERVICES FOR AE FOR SUPERVISION OF (i) Construction of two lanes with paved shoulders road from Tamenglong to Mahur (NH-137) in the State of Manipur (Package-5 and 6) on EPC mode. NHIDCL/Manipur/AE/TMP-5 and 6/2021 04/08/2021 01/07/2021 20/08/2021
Time 15:0Hrs
883 CONSULTANCY SERVICES AS AUTHORITY’S ENGINEER FOR SUPERVISION OF Widening/Up-Gradation to 2 lane with Paved shoulder of NH301 Kargil-Zanskar in the UT of Ladakh on EPC mode (Package-I/II/III/VIII) NHIDCL/Ladakh/NH-301/K-Z/AE (P-I/II/III /VIII)/2021-22 30/06/2021 30/06/2021 18/08/2021
Time 11:0Hrs
884 CONSULTANCY SERVICES AS AUTHORITYS ENGINEER FOR SUPERVISION OF Construction and Upgradation of Khellani – Khanabal-Alstop section of NH-244 (P6 and 7). Strengthening and upgradation of baramulla-Gulmarg Section of Nh-701 A in Jammu and Kashmir. NH-244 in the Union Territory of Jammu and Kashmir on EPC mode (Pkg –III IV V). NHIDCL/JK/NH-244-44 and 701 A/K-K67BG)/2021-22 30/06/2021 30/06/2021 25/08/2021
Time 11:0Hrs
885 Consultancy services for Authoritys Engineer for Supervision of Upgradation of PACKAGE-I Jhalmala To Sherpar From Km 30.600 To Km 67.800 And PACKAGE-II Sherpar To Kohka From Km 67.880 To Km 114.860 Of NH-930 To Two Lane With Paved Shoulders With Flexible Pavement In The State Of Chhattisgarh On EPC Mode. 41/CE/NH/TC/44-20/2021 13/07/2021 29/06/2021 01/09/2021
Time 11:0Hrs
886 Consultancy Services For Authoritys Engineer For Supervision Of Upgradation Of Package-I Abhanpur To Paund Section From Km 0.000 To Km 40.380 And Package-IV Madangmuda-Deobhog-Odisha Border From Km 168.800 To Km 196.400 Of National Highway 130C To Two Lane With Paved Shoulders With Flexible Pavement In The State Of Chhattisgarh On EPC Mode 40/CE/NH/TC/44-19/2021 14/07/2021 29/06/2021 01/09/2021
Time 11:0Hrs
887 CONSULTANCY SERVICES AS AUTHORITYS ENGINEER FOR SUPERVISION OF Construction and Upgradation to 2 lane with paved shoulder on Khellani – Kishtwar –Chattroo section on NH-244 in the Union Territory of Jammu and Kashmir on EPC mode (Pkg –III IV V). NHIDCL/JK/NH-244/K-K/AE(P345)/2021-22 30/06/2021 29/06/2021 04/08/2021
Time 11:0Hrs
888 Authority engineer/PMC for Supervision of Construction of Four Lane Elevated Viaduct from Km 4.634 to Km 6.345 on NH-24A including Retaining Wall, service lane, at Grade Road and improvement of junctions in the State of Uttar Pradesh on EPC mode 1773/168C(3)-NH Circle/2021, dated-11.06.2021 24/06/2021 21/06/2021 14/07/2021
Time 11:0Hrs
889 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF CONSTRUCTION OF RUDRAPRAYAG TUNNEL OF LENGTH 900.30 M INCLUDING APPROACHES AND ONE MAJOR BRIDGE ON RIVER ALAKNANDA CONNECTING NH-107 (OLD-109) TO NH-07 (OLD NH-58) ON EPC MODE IN THE STATE OF UTTARAKHAND 1846(1)/13याता-रा०मा०-10/2021 date 01.06.2021 13/06/2021 05/06/2021 24/08/2021
Time 15:0Hrs
890 Consultancy services for Authoritys Engineer for supervision of construction of new 4-Lane -Bridge(Parallel to the existing MG Setu) with its approaches from km 0/000 to km 14/500 across River Ganga on NH -19 at Patna in the state of Bihar on EPC Mode RW/NH-12014/95/2019/BR/Z-1 09/06/2021 20/05/2021 19/07/2021
Time 16:0Hrs
-
891 Consultancy Services as AE for Supervision of Construction of Uni-Directional Khellani Tunnel and Construction and Upgradation to 2 lane with paved shoulder from on Khellani-Kishtwar-Chattroo of NH- 244 in Jammu and Kashmir (Package-I and II) NHIDCL/JK/NH-244/G-K-K/AE (GK3 KK1 KK2)/2021-22 17/05/2021 17/05/2021 23/06/2021
Time 11:0Hrs
892 CONSULTANCY SERVICES AS AE FOR SUPERVISION OF Construction and Upgradation to 2-lane /4lane with paved shoulder from Vailoo to Donipawa of 27/943 km (Pkg-VI) and Donipawa to Ashajipora of 8/470km in Jammu and Kashmir (Pkg - VII) NHIDCL/JK/NH-244/ K-K/AE(P 6-7)/2021-22 17/05/2021 17/05/2021 23/06/2021
Time 11:30Hrs
893 Consultancy services as Authority’s Engineer for Supervision of Up-gradation to 2 lane with paved shoulders of Dulte - Champhai road (International Corridor) of NH-6 from Design Chainage Km 54.400 to Km 111.580 (Package-I - II and III) in the State of Mizoram under Bharatmala Pariyojna on EPC mode NHIDCL/Mizoram/NH-6/ IC/AE/2021-22 06/05/2021 06/05/2021 14/06/2021
Time 11:0Hrs
894 Consultancy services as Authority’s Engineer for Supervision of Construction of 2 laning with hard shoulder configuration of Lunglei – Chhumkhum - Tlabung road of NH-302 from Design Chainage Km 0.000 to km 74.950 (Package- A and B) in the State of Mizoram under Bharatmala Pariyojna on EPC mode NHIDCL/Mizoram/NH302/AE/2021-22 03/05/2021 03/05/2021 02/06/2021
Time 11:0Hrs
895 Independent Engineer services during Operation and Maintenance Period for (i) ) 4-laned Mahagaon - Yavatmal Section of NH-361 (ii) 4-laned Yavatmal - Wardha Section of NH-361 (iii) 4-laned Wardha – Butibori Section of NH-361 on Hybrid Annuity Mode in the State of Maharashtra–Consultancy Package No.IE-OMNH361NAG-18 NHAI/RO-NAG/TENDERS/2021-22/03 28/04/2021 28/04/2021 02/06/2021
Time 11:0Hrs
896 Independent Engineer services during Operation and Maintenance Period for 4–laned from Nagpur–Kondhali (Km.9.200 to Km.50.000) Section of NH-53 (Old NH-6) on BOT basis in the State of Maharashtra–Consultancy Package No.IE-OMNH-361NAG-19 NHAI/RO-NAG/TENDERS/2021-22/05 28/04/2021 28/04/2021 02/06/2021
Time 11:0Hrs
897 Consultancy services for Authority Engineer for Supervision of (i) Widening/Improvement to 4 (Four) Lane with Paved Shoulder from of Tulungia- Jogighopa Bridge Approach Section (Package-5) of Bilasipura- Guwahati road (NH-17) (ii) Widening/Improvement to 4 (Four) Lane with Paved Shoulder of the Sagunbashi forest (near Nichinta) Bypass to the starting of Krishnai Bypass Section (Package-7) of Bilasipura- Guwahati road (NH 17) in the state of Assam on EPC mode NHIDCL/Assam/Bil-Ghy/AE /Pkg-5 and 7/195538 23/04/2021 23/04/2021 17/06/2021
Time 15:0Hrs
898 Consultancy services for Authority Engineer for Supervision of Widening/Improvement to 4 (Four) Lane with Paved Shoulder of Parokhuwa – Dokmoka Section(Package 2) of NH 29 in the state of Assam on EPC mode NHIDCL/Assam/AE/Dab-Man/ Pkg-2/NH-29/195582 23/04/2021 23/04/2021 17/06/2021
Time 15:0Hrs
899 Consultancy services for Authority’s Engineer for Supervision of Widening/Improvement to 4 (Four) Lane with Paved Shoulder of Daboka - Khatkhati stretch of NH-29 of Package 5 starting from Near Ganpath Gaur Gaon at Km 95 400 to Kwaram Taro village at Km 113 330 (Design KM 96 400 to Km 113 830) in the state of Assam on EPC mode NHIDCL/Assam/AE/Dab-Man/Pkg-5/NH-29/195592 22/04/2021 22/04/2021 17/06/2021
Time 15:0Hrs
900 CONSULTANCY SERVICES FOR AE FOR SUPERVISION OF Improvement of existing road to 2 laning with Hard Shoulders of Maram- Peren section (Package-IA IB IIA and IIB) on NH-129A in the State of Manipur NHIDCL/Manipur/AE/MP(Pkg-1A 1B 2A 2B)/NH-129A/2020 22/04/2021 19/04/2021 09/06/2021
Time 15:15Hrs
901 Independent Engineer Services during Operation and Maintenance of Jodhpur – Pali Section of NH-65 from Km. 308.000 to Km.366.000 and including Bypass to Pali starting from Km. 366.000 of NH-65, Connecting NH - 14 at Km. 114.000 in the state of Rajasthan through Public Private Partnership (PPP) on Design, Built, Finance, Operate and Transfer Basis stage of selected road stretches under BOT projects in the State of Rajasthan 2021 MoRTH 625657 1 19/04/2021 17/04/2021 05/05/2021
Time 11:0Hrs
902 CONSULTANCY SERVICES FOR AUTHORITY ENGINEER FOR SUPERVISION FOR Rehabilitation and upgradation of Askot Lipulekh on EPC basis for Phase I Design Chainage Km 21.330 to Km 56.935 under Project Hirak of BRO in the State of Uttarakhand under Bharatmala 2021MoRTH6269961 16/04/2021 16/04/2021 09/07/2021
Time 11:0Hrs
903 CONSULTANCY SERVICES FOR AE FOR SUPERVISION OF Widening to 2 (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 (PKG- 1,2 and 3) and Construction of 4-Lane Bridge over Irang River on Imphal- Jiribam road in the State of Manipur NHIDCL/Manipur /AE/IJ(Pkg-1,2,3) IB/2021 22/04/2021 13/04/2021 11/06/2021
Time 15:0Hrs
904 CS for AE for Supervision of Widening to 2 (Two) Lane with Hard shoulder of Churachandpur to Tuivai section of NH 102B (PKG-3) in the State of Manipur on EPC mode NHIDCL/Manipur/AE/ CT(Pkg-3) /NH-102B/2021 26/04/2021 13/04/2021 11/06/2021
Time 15:0Hrs
905 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF CONSTRUCTION OF RUDRAPRAYAG TUNNEL OF LENGTH 900.30 M INCLUDING APPROACHES AND ONE MAJOR BRIDGE ON RIVERALAKNANDA CONNECTING NH-107 (OLD-109) TO NH-07 (OLD NH-58) ON EPC MODE IN THE STATE OF UTTARAKHAND 1372/13Yata-NH-10/2021 dated 26.03.2021 27/03/2021 27/03/2021 01/06/2021
Time 11:0Hrs
906 Authority’s Engineer for “Improvement and Widening to two lane with paved shoulder of Kailashahar - Khowai section of NH-208 in the state of Tripura on Engineering, Procurement & Construction (EPC) mode - starting near Kirtanthali (near Kailashahar town) at km 21.100 and ending near Ganki in Khowai district at km 101.300 (Package-I, II, III, IV & V) under JICA ODA loan Phase-IV on Engineering, Procurement, Construction (EPC) Mode NHIDCL/Tripura/AE/NH-208/Kail-Khowai/JICA/2020 24/03/2021 18/03/2021 12/04/2023
Time 14:30Hrs
907 pfff Ten 76fd 12/03/2021 11/03/2021 31/03/2021
Time 15:0Hrs
908 Sample Project Sample Project 03/03/2021 01/03/2021 31/03/2025
Time 15:0Hrs
909 Consultancy services for Authority’s Engineer for Supervision of i) fConstruction of 2 Laning with Hard Shoulder of Peren – Dimapur section(Length – 17.384 Km) (Pkg – III) (ii) Construction of 2 Laning with Hard Shoulder of Peren – Dimapur section (Pkg – IV) (iii) Construction of 2 Laning with Hard Shoulder of Peren – Dimapur section on NH – 129A from Design Km 173.850 to Km 190.850 (Length – 17.00 Km) in the state of Nagaland on EPC mode (Pkg – V) under NH(O) - TSP NHIDCL/Nagaland/AE/Peren Dimapur 345/2020 24/02/2021 24/02/2021 30/07/2025
Time 11:17Hrs
910 Consultancy services for AE for Supervision of (i) Construction of 2-lane Chisopani Traffic Tunnel of length 250 m (ii) Special protection work on rehabilitation and restoration of sliding/sinking zone on NH-10 (Rangpo to Ranipool section) 614224 08/03/2021 04/02/2021 19/04/2021
Time 15:0Hrs
911 tend2021 2021 Ae 22/02/2021 01/02/2021 28/02/2021
Time 15:0Hrs
912 Consultancy services for Authoritys Engineer for Supervision of Construction of two lane with paved shoulders road of Tamenglong to Muhur in the state of Manipur (PKG-1,2,3 and 4) on EPC mode NHIDCL/Manipur/ T-M(Pkg1-4)/AE 31/03/2021 27/01/2021 19/04/2021
Time 15:0Hrs
©2014 | All right Reserved