| S.No |
Project Name |
Tender No |
Tender Date |
Tender Start Date |
Tender End Date |
Document |
| 1 |
aaaaaaa |
2 |
01/09/2025 |
01/09/2025
|
30/09/2025
Time
15:0Hrs
|
|
| 2 |
1234 |
32423 |
24/10/2024 |
24/10/2024
|
31/10/2024
Time
15:0Hrs
|
|
| 3 |
ghgfhgfh |
bvnvbryr |
18/09/2024 |
17/09/2024
|
30/09/2024
Time
15:0Hrs
|
|
| 4 |
fsdfsdfsd dfgfdgdf |
aa2sdfsfsf |
02/07/2024 |
02/07/2024
|
31/07/2024
Time
15:0Hrs
|
|
| 5 |
test123543654 |
697896456 |
23/07/2024 |
01/07/2024
|
31/07/2024
Time
15:0Hrs
|
|
| 6 |
June 2024 |
June 2024 |
03/06/2024 |
02/06/2024
|
30/06/2025
Time
15:0Hrs
|
|
| 7 |
xxcvx |
dsfsd |
03/05/2024 |
01/05/2024
|
31/05/2024
Time
15:0Hrs
|
|
| 8 |
gfhdhdfghdfgh |
4535345 |
26/03/2024 |
04/03/2024
|
26/03/2024
Time
15:0Hrs
|
|
| 9 |
egxdgvdzfsgdfg |
45656845536 |
26/03/2024 |
04/03/2024
|
27/05/2024
Time
15:0Hrs
|
|
| 10 |
newaaaproject |
56456456345 |
26/03/2024 |
03/03/2024
|
26/03/2024
Time
15:0Hrs
|
|
| 11 |
CONSULTANCY SERVICES FOR PREPARATION OF DPR FOR GRADE SEPRATED STRUCTURE WITH SLIP ROAD AT KM 0/00 (SHAHPURA JUNCTION) AND KM 86 (KATI GHATI ALWAR) OF SHAHPURA-ALWAR RAMGARH-NUH ROAD NH-248A |
NIT 12/2023-24 EE PWD NH Dn-I, Jaipur |
09/01/2024 |
09/01/2024
|
22/01/2024
Time
18:0Hrs
|
|
| 12 |
Consultancy services for preparation of Detailed Project Report (DPR)based feasibility report for construction of Flyover at Km 99.400 of NH 730 (Major Junction with state highway-93)in the State of Uttar Pradesh. |
33/1Tender Cashier (LMP)/23-24 dt 03.01.2024 |
11/01/2024 |
05/01/2024
|
01/02/2024
Time
11:0Hrs
|
|
| 13 |
Consultancy Services for Preparation of Detailed Project Report for intermittent Two Lane plus Paved Shoulder stretches to Four Lane in between Design Km 148.589 (Existing Km 235.070) (Vailoo) to Design Km 176.532 (Existing Km (263.070) Donipawa of 8.643 Km Length on Khellani-Khanabal Section of NH-244 in the UT of Jammu and Kashmir |
NHIDCL/J&K/DPR/Khellani-Khanabal/PKg-VI |
08/01/2024 |
05/01/2024
|
19/02/2024
Time
11:0Hrs
|
|
| 14 |
Consultancy Services for preparation of Detailed Project Report (DPR) based feasibility report for 4 laning of NH-334DD (Hamidpur-jewar-Jhajhar-kakod-Bulandshahr Road) & for connectivity of NH-334DD effected due to construction of Jewar Airport on existing alignment at Km.11.200 to Km.13.600 of the NH-334DD (Hamidpur-jewar-Jhajhar-kakod-Bulandshahr Road) in the state of Uttar Pradesh. |
47/354Com-NHC/24 Dt. 03.01.2024 |
05/01/2024 |
05/01/2024
|
01/02/2024
Time
11:0Hrs
|
-
|
| 15 |
Consultancy Services for Preparation of Detailed Project Report for Construction of Four Lane ROB at Km 48.596 from Gaya to Biharsharif Section of NH 120 (Old NH 82) in State of Bihar. |
4-NH/BIHARSHARIF2/DPR/2023-24 |
05/01/2024 |
05/01/2024
|
06/02/2024
Time
11:0Hrs
|
|
| 16 |
Consultancy Services for Preparation of Detailed Project Report for Construction of Monigong-Dile Duting and Henkar- Tabeyongkong and Bruni-Balchida road approved under ICBR(PH-III) project in the State of Arunachal Pradesh(Total length 60 Km)( Package-II)-(2nd Call) |
NHIDCL/Ar. Pr./DPR/ICBR-III/ M-D,H-T,B-B/(P(2)/233 |
08/01/2024 |
04/01/2024
|
06/02/2024
Time
15:0Hrs
|
|
| 17 |
ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FEASIBILITY STUDY (FS) AND DETAILED PROJECT REPORT (DPR) ON EPC MODE FOR CONSTRUCTION OF ROAD TAPA-HUSH-DILLE GG (NEW ALIGNMENT) FROM KM 0.00 TO KM 58.00 (NET LENGTH 58.00 KMS) GREEN FIELD ALIGNMENT TO NHSL SPECIFICATIONS IN THE AOR OF 85 RCC UNDER 756 BRTF PROJECT ARUNANK IN THE STATE OF ARUNACHAL PRADESH (3rd CALL) |
ANK/NIT-05/2023-24 3rd Call |
30/12/2023 |
30/12/2023
|
22/01/2024
Time
15:0Hrs
|
|
| 18 |
Preparation of Detailed Project report for 4 laning from km. 25.00 (Bettiah) to km. 94.00 (Mangalpur) with Flyover at Station Chowk Bettiah in km. 25.600 of NH 727 for the year 2023_24 in the State of Bihar.) |
NH/MOT/DPR/01/2023-24 |
27/12/2023 |
28/12/2023
|
29/01/2024
Time
11:0Hrs
|
|
| 19 |
Consultancy Services for Preparation of Detailed Project Report and providing Pre-Construction activities and Land Acquisition for Construction of 4-lane from Chainage 15.000 to Chainage 61.500 on NH-334A in the State of Uttarakhand. |
2023_MoRTH_786948_1 |
26/12/2023 |
26/12/2023
|
05/02/2024
Time
15:0Hrs
|
|
| 20 |
Consultancy Services for Preparation of Detailed Project Report including LA andother clearances for Construction of Singheshwar Bypass on NH-131(106) in theState of Bihar |
10/NH-MADHEPURA/2023-24 |
29/12/2023 |
15/12/2023
|
29/01/2024
Time
16:0Hrs
|
|
| 21 |
Preparation of DPR for Rehabilitation/Up gradation of Jalna Sindkhrd Raja Mehakar Malegaon Karanja Deogaon Pulgaon section to 2 lane Paved shoulder standard from Design Km Ch.100/00 to 186/00 (Total length of the project 91.80 km) section of NH 753C on EPC mode in the state of Maharashtra. |
14/EENH/AMT/2023-24 |
20/12/2023 |
14/12/2023
|
04/01/2024
Time
17:30Hrs
|
|
| 22 |
Preparation of DPR for Rehabilitation/Up gradation of Jalna Sindkhrd Raja Mehakar Malegaon Karanja Deogaon Pulgaon section to 2 lane Paved shoulder standard from Design Km Ch.00/00 to 100/00 (Total length of the project 107.150 km) section of NH 753C on EPC mode in the state of Maharashtra. |
13/EENH/AMT/2023-24 |
20/12/2023 |
14/12/2023
|
04/01/2024
Time
17:30Hrs
|
|
| 23 |
Consultancy Services for four Lanning of NH 123(507) from Herbertpur to Kalsi (Ch. 0.00 to 16.00). |
2023_MoRTH_784961_1 |
21/12/2023 |
14/12/2023
|
29/01/2024
Time
15:0Hrs
|
|
| 24 |
Preparation of DPR for Rehabilitation Up gradation of Jalna Sindkhed Raja Mehakar malegaon Karanja Deogaon Pulgaon road section to 2Lane Paved shoulder standards from Design km Ch. 186.00 to 287.350 (Total length of the project 101.350 km) section o |
15/EENH/AMT/2023-24 |
15/12/2023 |
14/12/2023
|
04/01/2024
Time
17:30Hrs
|
|
| 25 |
Consultancy Services for preparation of DPR for upgradation of single lane to 2-lane and tunneling of existing alignment- realignment from Chainage 68.600 to 75.00 of NH-107 Sitapur- Sonprayag Gaurikund Section in the State of Uttarakhand. |
2023_MoRTH_784810_1 |
19/12/2023 |
13/12/2023
|
25/01/2024
Time
15:0Hrs
|
|
| 26 |
Consultancy Services for preparation of DPR for widening to 2 Lane configuration of NH-309B (Almora-Panar) including connectivity to proposed Almora Bypass on NH-87Ext. in the State of Uttarakhand. |
2023_MoRTH_784251_1 |
18/12/2023 |
12/12/2023
|
22/01/2024
Time
15:0Hrs
|
|
| 27 |
Consultancy Services for Project Management including preparation of Detailed Project Report of Selected stretches corridors of Road Networks in the State of Maharashtra for Upgradation to Two lanes with paved shoulders Four lane configuration of Ma |
2023-MoRTH-784713-1 |
16/12/2023 |
11/12/2023
|
05/01/2024
Time
17:30Hrs
|
|
| 28 |
Consultancy Services for Project Management including preparation of Detailed Project Report of Selected stretches corridors of Road Networks in the State of Maharashtra for Upgradation Four lane and above configuration of The Highway starting from |
2023-MoRTH-784715-1 |
16/12/2023 |
11/12/2023
|
05/01/2024
Time
17:30Hrs
|
|
| 29 |
Consultancy Services for Preparation of Detailed Project Report DPR for Widening to 4L from km 235.00 to km 300.300 of Nayagarh- Khordha on NH-57 in the State of Odisha. Bid reference no 01-ROBBSR-2023-24-DPR |
01-ROBBSR-2023-24-DPR |
30/11/2023 |
11/12/2023
|
16/01/2024
Time
12:0Hrs
|
|
| 30 |
Consultancy Services for preparation of Feasibility Study and Detailed Engineering Report for Construction of Two lane with paved shoulder for Rajgarh Bypass connecting NH-52 to NH-709 Extn in the State of Rajasthan |
NIT No. 01/2023-24 EE PWD NH CHURU |
08/12/2023 |
08/12/2023
|
03/01/2024
Time
17:0Hrs
|
|
| 31 |
Consultancy Services for Preparation of Detailed Project Report for Construction of Slope protection works including Rock-fall protection and Landslide mitigation measures from km 123.840 to km 166.700 of NH-29 Dimapur –Kohima 4 laning project under SARDP-NE Project in the State of Nagaland |
2023_NHIDC_783993_1 |
06/12/2023 |
06/12/2023
|
13/01/2024
Time
15:0Hrs
|
|
| 32 |
Carrying out Survey, geotechnical investigation and preparation of gads, boq, Detailed designing, working drawings, detailed estimates INCLUDING required modifications during consultancy Service for project Management Phase including preparation of Detailed Project Report of Development of Faridabad Noida (FNG) 6-Lane corridor alignment &Including major bridge over River Yamuna connecting sector -168 & 167-A, Noida with Sector-89 via Lalpur village in district Faridabad |
2023 HRY 333913 1 |
06/12/2023 |
06/12/2023
|
04/01/2024
Time
17:0Hrs
|
|
| 33 |
Appointment of PMC for preparation of Detailed Project Report of 4L PS Padruna Bypass, completion of Pre construction activity and Project supervision as Independent Engineer of 4L PS/2L PS work of NH727 from 0.000 to 46.500 in the state of Uttar Pradesh |
CE-RO/LKO/PMC/NH-727/2023-24 dt. 06.12.2023 |
08/12/2023 |
06/12/2023
|
08/01/2024
Time
15:0Hrs
|
|
| 34 |
Consultancy Services for Preparation of Detailed Project Report and providing Pre-construction activities for connecting National Waterway - 2 at Dhubri to NH - 127B in the State of Assam(4th Call) |
NHIDCL/2022-23/AS/Dhubri/DPR /NW-2/NH-127B/C4 |
14/12/2023 |
05/12/2023
|
26/12/2023
Time
15:0Hrs
|
|
| 35 |
RETENDER FOR SURVEY, INVESTIGATION AND PREPARATION OF DPR THROUGH CONSULTANCY FOR CONSTRUCTION / IMPROVEMENT OF EXISTING ROAD KHAB- NAMGIA-CHUPPAN- SHIPKILA FROM CL-9 TO NHDL SPECIFICATION FROM KM 0.00 TO KM 31.430 ( INCLUDING APPROACH ROAD TO KHAB OF LENGTH 3.000 KM) KM 0.000 RECKONED FROM KM 433.265 NH-05 OF HINDUSTAN-TIBBET ROAD UNDER 68 RCC / 759 BRTF UNDER PROJECT DEEPAK IN HIMACHAL PRADESH |
CE(P) DPK/07/2023-24 |
20/12/2023 |
05/12/2023
|
22/01/2024
Time
16:0Hrs
|
|
| 36 |
IMPROVEMENT OF ROAD GEOMETRICS INCLUDING CONSTRUCTION OF BRIDGES VIADUCTS ETC IN BETWEEN KM 268 TO KM 391 OF ZOZILA KARGIL LEH ROAD NH 1 UNDER PROJECT VIJAYAK IN UT OF LADAKH |
O/CH/SR/W(18)/Ladakh/2022 |
02/12/2023 |
30/11/2023
|
01/01/2024
Time
12:0Hrs
|
|
| 37 |
Consultancy Services for Feasibility study and Preparation of Detailed Project Report including LA and Other Clearance for Construction of W and S to 2 Lane with paved shoulder from Km 41 to Km 92 of NH 2C (New NH-119) in the State of Bihar. |
06-NH/GAYA/DPR/2023-24 |
04/12/2023 |
30/11/2023
|
18/01/2024
Time
17:0Hrs
|
|
| 38 |
Consultancy Services for Feasibility study and Preparation of Detailed Project Report including LA and Other Clearance for 4 Laning of Arwal to Biharsharif from km 0.00 to km 89.00 of NH 110(New NH 33) in the State of Bihar. |
07-NH/GAYA/DPR/2023-24 |
04/12/2023 |
30/11/2023
|
18/01/2024
Time
17:0Hrs
|
|
| 39 |
Consultancy Services for Feasibility study and Preparation of Detailed Project Report including LA and Other Clearance for 4- Laning of Kujapi (Gaya) to Panchanpur (Gaya) from Km 103.865 to Km 118 of NH-120 and Dobhi to Gosaidih from Km 0.00 to Km 13.00 of NH-99(New NH-22) in the State of Bihar. |
07-NH/GAYA/DPR/2023-2024 |
05/12/2023 |
30/11/2023
|
18/01/2024
Time
17:0Hrs
|
|
| 40 |
Consultancy services for the preparation of Feasibility studies and Detailed project report for the work of Rehabilitation, Upgradation & Widening of existing Highway to 2 Lane with Paved Shoulder of Shegaon - Sangrampur from Km. 55/000 to Km. 88/000 (Length=33 Km) of NH 161G in Buldhana district in the State of Maharashtra. |
2023_MoRTH_782729_1 |
08/12/2023 |
28/11/2023
|
26/12/2023
Time
17:30Hrs
|
|
| 41 |
Consultancy services for Preparation of Detailed Project Report for Rehabilitation & Up gradation of Sangrampur MP Border section of NH-161G to Two lane configuration in Buldhana district in the State of Maharashtra (Length30.00 Km). |
2023_MoRTH_782732_1 |
08/12/2023 |
28/11/2023
|
26/12/2023
Time
17:30Hrs
|
|
| 42 |
Consultancy Services for Preparation of Feasibility/DPR for Construction of4-Lane ROB to “Rampur-Alamatti-Kudalasangam LC No.54 including approaches in the state of Karnataka |
ENHD/VJP/DPR/LC54/TENDER/2023-24/1309 |
28/11/2023 |
28/11/2023
|
12/12/2023
Time
17:30Hrs
|
|
| 43 |
Consultancy Services for Preparation of Feasibility/DPR for Construction of 2-Lane ROB to “Banashankri- Lakmapur -Km 9.50 (Near Lakmapur Village) LC No.28 including approaches in the state of Karnataka |
ENHD/VJP/DPR/LC-28/TENDER/2023-24/1308 |
28/11/2023 |
28/11/2023
|
12/12/2023
Time
17:30Hrs
|
|
| 44 |
Consultancy Services for Project Management including preparation of Detailed Project Report of Selected stretches corridors of Road Networks in the State of Maharashtra for Upgradation to Two lanes with paved shoulders Four lane configuration of Mal |
2023-MoRTH-782648-1 |
02/12/2023 |
25/11/2023
|
09/12/2023
Time
17:55Hrs
|
|
| 45 |
Consultancy Services for Preparation of Detailed Project Report for Construction of Basam-Thathi-Amaha and Bruni-Lama Camp-Kangri Road Approved under ICBR (PH-III) Project in the State of Arunachal Pradesh (Total length 86 Km) ( Package-V) |
NHIDCL/ICBR-III/DPR/B-T-A B-LC-K/P-V/ |
24/11/2023 |
23/11/2023
|
04/01/2024
Time
15:0Hrs
|
|
| 46 |
Consultancy services for feasibility study detailed project report survey and preparation of land plan for upgradation of NH69 to Four Lane from Chikkaballapur to Mulbagal ie From Km 401 300 to 483 591 including realignment for Chikkaballapurtown |
RW/BNG/NH-69/Consulatncy /Km.401-483/78/2023 |
23/11/2023 |
23/11/2023
|
11/01/2024
Time
15:0Hrs
|
|
| 47 |
Preparation of Detailed Project Report for 2 lane paved shoulder for forest section ch 10.800 to 118.000 of Sangrampur MP Border road section of NH 161 G length 7.2 km |
2023_MoRTH_776436_1 |
20/11/2023 |
20/11/2023
|
28/11/2023
Time
17:30Hrs
|
|
| 48 |
Consultancy Services for Project Management including preparation of Detailed Project Report of Selected stretches-corridors of Road Networks in the State of Maharashtra for Upgradation to Two lanes with paved shoulders-Four lane configuration of NH-211 Tuljapur Naldurg Road NH-652 Km 0.00 to 30.884 (Length = 30.8840 km) (On Risk and Cost basis) |
NO/NHD/TC/3067/2023 |
26/12/2023 |
20/11/2023
|
08/01/2024
Time
15:0Hrs
|
|
| 49 |
Consultancy services for feasibility study DPR survey and preparation of land plan for Widening to two lane with paved shoulder from Km 86.2 (Charmadi Ghat) to Km 99.2 (Kottighere) & Km 113.71 (Mudigere Hand Post) to Km 194.555 (Banavara) of NH-73 in the State of Karnataka |
RW/BNG/NH 234/Km 86-99/72/2022 |
17/11/2023 |
17/11/2023
|
13/12/2023
Time
15:0Hrs
|
|
| 50 |
Consultancy services for Preparation of Detailed Project Report and Feasibility study for Construction of Animal Underpasses 6 Nos on Nilajphata - Pauni- Adyal- Bhandara road on NH-247 as a Wildlife Mitigation Plan in KM 109.790 to Km 163.050 in State of Maharashtra. |
24/EENH/NGP/2023-24/2nd call/ 5021 |
24/11/2023 |
16/11/2023
|
30/11/2023
Time
17:0Hrs
|
|
| 51 |
Project Management Consultancy Services for Construction of Bageshwar bypass including 2- Lane Tunnel with approaches across the Bageshwar Hills in market area (Existing Km Stone 130 to Existing km Stone 136 of NH-309A) (Total length of bypass 2.2 km including 1.05 Km tunnel) in the State of Uttarakhand. |
2023-MoRTH-780418-1 |
10/11/2023 |
14/11/2023
|
02/01/2024
Time
15:0Hrs
|
|
| 52 |
ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FEASIBILITY STUDY (FS) AND DETAILED PROJECT REPORT (DPR) ON EPC MODE FOR CONSTRUCTION OF ROAD TAPA-HUSH-DILLE GG (NEW ALIGNMENT) FROM KM 0.00 TO KM 58.00 (NET LENGTH 58.00 KMS) GREEN FIELD ALIGNMENT TO NHSL SPECIFICATIONS IN THE AOR OF 85 RCC UNDER 756 BRTF PROJECT ARUNANK IN THE STATE OF ARUNACHAL PRADESH (2nd Call) |
ANK/NIT-05/2023-24 2nd Call |
13/11/2023 |
14/11/2023
|
26/12/2023
Time
12:0Hrs
|
|
| 53 |
ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FEASIBILITY STUDY (FS) AND DETAILED PROJECT REPORT (DPR) ON EPC MODE FOR CONSTRUCTION OF ROAD NACHO-BANGTE-NEYING (NEW ALIGNMENT) FROM KM 0.00 TO KM 57.00 (NET LENGTH 57.00 KMS) GREEN FIELD ALIGNMENT TO NHSL SPECIFICATIONS IN THE AOR OF 77 RCC UNDER 23 BRTF PROJECT ARUNANK IN THE STATE OF ARUNACHAL PRADESH |
ANK/NIT-22/2023-24 |
13/11/2023 |
14/11/2023
|
05/01/2024
Time
12:0Hrs
|
|
| 54 |
ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FEASIBILITY STUDY (FS) AND DETAILED PROJECT REPORT (DPR) ON EPC MODE FOR CONSTRUCTION OF ROAD PHULLE-WASI-DHARMU-SANGIA (NEW ALIGNMENT) FROM KM 13.500 TO KM 40.00 (NET LENGTH 26.50 KMS) GREEN FIELD ALIGNMENT TO NHSL SPECIFICATIONS IN THE AOR OF 85 RCC UNDER 756 BRTF PROJECT ARUNANK IN THE STATE OF ARUNACHAL PRADESH |
ANK/NIT-23/2023-24 |
13/11/2023 |
14/11/2023
|
05/01/2024
Time
12:0Hrs
|
|
| 55 |
ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FEASIBILITY STUDY (FS) AND DETAILED PROJECT REPORT (DPR) ON EPC MODE FOR CONSTRUCTION OF ROAD SEMAI-BASKAR-KAWACHI (NEW ALIGNMENT) FROM KM 54.873 TO KM 90.00 (NET LENGTH 35.127 KMS) GREEN FIELD ALIGNMENT TO NHSL SPECIFICATIONS IN THE AOR OF 119 RCC UNDER 756 BRTF PROJECT ARUNANK IN THE STATE OF ARUNACHAL PRADESH |
ANK/NIT-24/2023-24 |
13/11/2023 |
14/11/2023
|
05/01/2024
Time
12:0Hrs
|
|
| 56 |
ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FEASIBILITY STUDY (FS) AND DETAILED PROJECT REPORT (DPR) ON EPC MODE FOR CONSTRUCTION OF ROAD TAPA-KARU-SERING-BAGAN (NEW ALIGNMENT) FROM KM 0.000 TO KM 68.00 (NET LENGTH 68.000 KMS) GREEN FIELD ALIGNMENT TO NHSL SPECIFICATIONS IN THE AOR OF 85 RCC UNDER 756 BRTF PROJECT ARUNANK IN THE STATE OF ARUNACHAL PRADESH |
ANK/NIT-25/2023-24 |
13/11/2023 |
14/11/2023
|
05/01/2024
Time
12:0Hrs
|
|
| 57 |
PREPARATION OF RECCE SURVEY DETAILED PROJECT REPORT (DPR) THROUGH CONSULTANCY FOR CONSTRUCTION OF ROAD TAWANG- WOMINGLA- KUMROTSAR (APPX NET LENGTH 40 KMS) FROM KM 0.00 TO KM 33.390 CL-5 TO NHSL AND FROM KM 33.390 TO KM 40.00 NEW TRACK TO NHSL SPECIFICATIONS UNDER GS LTRoWP 2023-24 UNDER 125 RCC/ 763 BRTF (P) VARTAK IN TAWANG DISTRICT OF ARUNACHAL PRADESH. |
CE(P)/VTK/NIT/26/2023-24 |
10/11/2023 |
11/11/2023
|
27/11/2023
Time
12:0Hrs
|
|
| 58 |
Consultancy services for feasibility study detailed project report survey and preparation of land plan for widening to four lane from Km 0.00 to Km 71.6 of NH275 Mani Mysore Bangalore section in the State of Karnataka |
RW/BNG/NH-275/Km.0-71.6 /42/2023 |
10/11/2023 |
10/11/2023
|
13/12/2023
Time
15:0Hrs
|
|
| 59 |
PREPARATION OF DETAILED PROJECT REPORT (DPR) FOR CONSTRUCTION OF ROAD NEW MELLING- DAMTENG FROM KM 0.000 TO KM 22.000 TO NHSL SPECIFICATIONS IN SECTOR OF 120 RCC /763 BRTF /PROJECT VARTAK |
CE(P)/VTK/NIT/05/2023-24 |
10/11/2023 |
10/11/2023
|
26/12/2023
Time
13:0Hrs
|
|
| 60 |
Consultancy Services for Preparation of Detailed Project Report for Construction of Four Lane ROB at Km 48.596 from Gaya to Biharsharif Section of NH 120 (Old NH 82) in State of Bihar. |
02-NH/BIHARSHARIF/DPR/2023-24 |
08/11/2023 |
08/11/2023
|
15/12/2023
Time
11:0Hrs
|
|
| 61 |
Consultancy Services for preparation of Detailed Project Report (DPR) for Construction of new 2Lane/4Lane Major bridges at km 3,500 on Kali River, km 39.840 on Ganga River, km 53.250 on Ram Ganga River and 03 Minor Bridges at km 31.425, km 31.710, km 44.665 and 01 ROB at km 36.645 of NH730C in the state of Uttar Pradesh. |
CE-RO/LKO/DPR/2023-24 Dt. 07.11.2023 |
15/11/2023 |
07/11/2023
|
03/01/2024
Time
15:0Hrs
|
|
| 62 |
Consultancy services for preparation of DPR for 4 no of Projects in the state of Odisha |
NHAI/13012/139/RO/OD/2851/2023 |
01/12/2023 |
07/11/2023
|
11/12/2023
Time
11:0Hrs
|
|
| 63 |
Consultancy Services for Preparation of Detailed Project Report and providing Pre-Construction activities and Land Acquisition for Construction of 4-lane from Chainage 15.000 to Chainage 61.500 on NH-334A in the State of Uttarakhand. |
2023_MoRTH_778731_1 |
07/11/2023 |
01/11/2023
|
15/12/2023
Time
11:0Hrs
|
|
| 64 |
Consultancy services for Preparation of Detailed Project Report for Rehabilitation and Up gradation 4L Standard Of Patur Balapur Shegaon NH 161G (Design Km 0.000 to Km 33.200 and Design Km 36.600 to Km54.800) (Total length 51.400 KM) in the state of Maharashtra on EPC Mode- |
2023_MoRTH_778513_1 |
07/11/2023 |
30/10/2023
|
28/11/2023
Time
17:30Hrs
|
|
| 65 |
Consultancy services for Preparation of Detailed Project Report including LA and Other clearances for Construction of Bridges over Kataiya Hydel tail race & canal on NH-131(106) in the State of Bihar |
06/NH-MADHEPURA/2023-24 (2) |
04/11/2023 |
27/10/2023
|
11/12/2023
Time
16:0Hrs
|
|
| 66 |
Consultancy Services for Preparation of Feasibility/DPR for Construction of 2-Lane ROB to “Banashankri- Lakmapur -Km 9.50 (Near Lakmapur Village) LC No.28 including approaches in the state of Karnataka |
ENHD/VJP/DPR/LC28/TENDER/2023-24/1115 |
27/10/2023 |
27/10/2023
|
16/11/2023
Time
17:30Hrs
|
|
| 67 |
Consultancy Services for Preparation of Feasibility/DPR for Construction of4-Lane ROB to “Rampur-Alamatti-Kudalasangam LC No.54 including approaches in the state of Karnataka |
ENHD/VJP/DPR/LC54/TENDER/2023-24/1116 |
30/10/2023 |
27/10/2023
|
16/11/2023
Time
17:30Hrs
|
|
| 68 |
Consultancy Services for Preparation of Detailed Project Report including LA and other clearances for Construction of Singheshwar Bypass on NH-131(106) in the State of Bihar |
06/NH-MADHEPURA/2023-24 |
01/11/2023 |
27/10/2023
|
11/12/2023
Time
16:0Hrs
|
|
| 69 |
Consultancy Services for Preparation of Feasibility/DPR for Construction of 2-Lane ROB to “Banashankri- Lakmapur -Km 9.50 (Near Lakmapur Village) LC No.28 including approaches in the state of Karnataka |
ENHD/VJP/DPR/LC28/TENDER/2023-24/1308 |
28/11/2023 |
27/10/2023
|
16/11/2023
Time
17:30Hrs
|
|
| 70 |
Consultancy services for Preparation of Detailed Project Report including LA and Other clearances for Construction of Bridges over Kataiya Hydeltail race & canal on NH-131(106) in the State of Bihar |
06/NH-MADHEPURA/2023-24 (2) |
30/11/2023 |
27/10/2023
|
11/12/2023
Time
16:0Hrs
|
|
| 71 |
RETENDER FOR ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FS AND DPR FOR CONSTRUCTION OF ROAD GUMPA SIMBI H/SPRING JACHEP FROM KM 0.00 TO 69.00 TO NHSL SPECIFICATIONS UNDER 116 RCC/48 BRTF PROJECT UDAYAK IN ARUNACHAL PRADESH STATE |
CE (P) Udayak/DPR Consultancy/14/2023-24 |
26/10/2023 |
26/10/2023
|
28/11/2023
Time
12:0Hrs
|
|
| 72 |
Consultancy Services for preparation of Detailed Project Report for Construction of 2-lane Tunnel between Sonprayag (NH-107) & Kalimath (SH-96) including approach road up to Chunni Bend on NH- 107A (Total length23 km including 7 km of Tunnel) in the State of Uttarakhand. |
2023_MoRTH_777808_1 |
06/11/2023 |
25/10/2023
|
07/12/2023
Time
15:0Hrs
|
|
| 73 |
Consultancy services for Preparation of Fesibility study & Preparation of Detailed Project Report including LA & Other clearances for construction of DPR work for Byepass/ Realignment of Spur to Balia of NH-120 in the State of Bihar. |
05-NH/GAYA/DPR/2023-24 |
26/10/2023 |
20/10/2023
|
19/12/2023
Time
17:0Hrs
|
|
| 74 |
SURVEY, INVESTIGATION AND PREPARATION OF DPR THROUGH CONSULTANCY FOR CONSTRUCTION / IMPROVEMENT OF EXISTING ROAD KHAB- NAMGIA-CHUPPAN- SHIPKILA FROM CL-9 TO NHDL SPECIFICATION FROM KM 0.00 TO KM 31.430 ( INCLUDING APPROACH ROAD TO KHAB OF LENGTH 3.000 KM) KM 0.000 RECKONED FROM KM 433.265 NH-05 OF HINDUSTAN-TIBBET ROAD UNDER 68 RCC / 759 BRTF UNDER PROJECT DEEPAK IN HIMACHAL PRADESH |
CE (P) DPK-07/2023-24 |
26/10/2023 |
20/10/2023
|
23/11/2023
Time
16:0Hrs
|
|
| 75 |
ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FEASIBILITY STUDY (FS) AND DETAILED PROJECT REPORT (DPR) FOR CONSTRUCTION OF ROAD HAYULIANG-CHAGLOHAGAM FROM KM 0.00 TO 57.75 (NET LENGTH 57.75 KM) TO NHSL SPECIFICATIONS UNDER 116 RCC/48 BRTF PROJECT UDAYAK IN ARUNACHAL PRADESH STATE |
CE (P) Udayak/DPR Consultancy/16/2023-24 |
18/10/2023 |
19/10/2023
|
29/11/2023
Time
12:0Hrs
|
|
| 76 |
Consultancy services for Preparation of Detailed Project Report and Feasibility study for Construction of Animal Underpasses (6 Nos) on Nilajphata - Pauni- Adyal- Bhandara road on NH-247 as a Wildlife Mitigation Plan in KM 109.790 to Km 163.050 in State of Maharashtra. |
24/EENH/NGP/2023-24 |
09/11/2023 |
18/10/2023
|
13/11/2023
Time
17:0Hrs
|
|
| 77 |
Independent Engineer Services for Construction of 4-Laning with Paved Shoulder of Bijni to Mandi Section from existing Km 202.815 to Km 208.000 of NH-20 (New NH-154) (Design Length 5.357 Km) including construction of Twin Tube Tunnel for a length of 3.500 Km of Pathankot-Mandi under NH(O) in Himachal Pradesh on Hybrid Annuity Mode basis (Package-VB)- |
... |
26/10/2023 |
12/10/2023
|
26/10/2023
Time
15:0Hrs
|
|
| 78 |
Consultancy Services for Preparation of Detailed Project Report for Single Lane NH specifications of Chanhgchenmo to Tsogtsalu Road including Tunnel in the Union Territory of Ladakh |
NHIDCL/Ladakh/DPR/Chanhgchenmo-Tsogtsalu/2023-24 |
12/10/2023 |
11/10/2023
|
18/12/2023
Time
11:0Hrs
|
|
| 79 |
Consultancy Services for Preparation of Feasibility Report cum Detail Engineering report for NH 927A starting from Swaroopganj -Kotra- Kherwara From Km. 0/0 to 148/100, Dungarpur bypass km. 166/320 to 175/480 Talwara Bypass 248/780 to 251/660 and Banswara bypass 257/730 to 274/200 |
06/2023-24 |
13/10/2023 |
11/10/2023
|
21/12/2023
Time
11:0Hrs
|
|
| 80 |
Consultancy Services for Preparation of Detailed Project Report for 4/6 lanes /4/6 lane with Paved Shoulder configuration for the stretch of Gwalior-Bhind upto MP/UP Border (NH-92), Total length 108 Km in the State of Madhya Pradesh |
775356 |
15/10/2023 |
09/10/2023
|
20/11/2023
Time
17:30Hrs
|
|
| 81 |
ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FEASIBILITY STUDY (FS) AND DETAILED PROJECT REPORT (DPR) FOR CONSTRUCTION OF ROAD ALO – TAPOLA FROM KM 0.00 TO KM 23.00 (NET LENGTH 23.00 KMS) GREEN FIELD ALIGNMENT TO NHSL SPECIFICATIONS IN THE AOR OF 62 RCC UNDER 752 BRTF PROJECT UDAYAK IN THE STATE OF ARUNACHAL PRADESH |
CE (P) Udayak/DPR Consultancy/05/2023-24 |
08/10/2023 |
07/10/2023
|
17/11/2023
Time
12:0Hrs
|
|
| 82 |
Consultancy Services for four lanning of NH-123(507) from Herbertpur to Kalsi Ch. 0.00 to 16.00. |
2023_MoRTH_774629_1 |
02/11/2023 |
05/10/2023
|
20/11/2023
Time
11:0Hrs
|
|
| 83 |
Consultancy Services for Preparation of Feasibility/DPR for Construction of ROB to level crossing No.800A Kolar- Malur- Hosur Road at Km 313.200 on SH-17 |
LC800ANIT10 |
05/10/2023 |
05/10/2023
|
19/10/2023
Time
16:0Hrs
|
|
| 84 |
Consultancy Services for Preparation of Feasibility/DPR for Construction of ROB to level crossing No.39 in Chikkaballapura town limit Bagepalli Bangalore Road (Old NH-07) at Km 510.50 (near old RTO office) |
EE/NHD/BNG/AE-1/LC39/NIT10/2023-24 |
05/10/2023 |
05/10/2023
|
19/10/2023
Time
16:0Hrs
|
|
| 85 |
consultancy services for Preparation of DPR including detailed Geological, Geotechnical and Topographical Surveys Investigations and Design of Cost Effective and Suitable remedial measures for prevention of landslides rockfall in identified locations approx. 27 Nos from KIRATPUR TO PANDOH on Kiratpur Manali Section of NH-21 in the State of Himachal Pradesh |
2023_NHAI_169598_1 |
11/10/2023 |
04/10/2023
|
21/12/2023
Time
11:0Hrs
|
|
| 86 |
Consultancy Services for Preparation of DPR including detailed Geological, Geotechnical and Topographical Surveys/Investigations and Design of Cost Effective and Suitable remedial measures for prevention of landslides/rockfall in identified locations (approx. 18 Nos) from PANDOH TO MANALI on Kiratpur-Manali Section of NH-21 in the State of Himachal Pradesh. |
2023_NHAI_169582_1 |
11/10/2023 |
04/10/2023
|
30/11/2023
Time
11:0Hrs
|
|
| 87 |
Consultancy Services for preparation of DPR for upgradation of single lane to 2 lane and tunneling of existing alignment realignment from Chainage 68.600 to 75.00 of NH 107 Sitapur Sonprayag Gaurikund Section in the State of Uttarakhan |
2023_MoRTH_773809_1 |
26/10/2023 |
28/09/2023
|
20/11/2023
Time
15:0Hrs
|
|
| 88 |
Project Management Consultancy Services for Construction of 2 Lane bypass at the Lohaghat Hills in market area Start of bypass Km 136.325 of NH09 End of bypass km 142 of |
2023-MoRTH-773398-1 |
31/10/2023 |
27/09/2023
|
17/11/2023
Time
15:0Hrs
|
|
| 89 |
CS for preparation and approval of Detailed Design and Drawing of Various Standard Spans of ROB with Standard Deck Config of 2Lane one way and 3Lane one way including Proof checking from IITs/NITs and Approval from (RDSO Lucknow) |
NHAI/HQ/ROB/RFP/2023 |
29/09/2023 |
27/09/2023
|
23/11/2023
Time
11:0Hrs
|
|
| 90 |
ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FEASIBILITY STUDY (FS) AND DETAILED PROJECT REPORT (DPR) FOR CONSTRUCTION OF ROAD GUMPA-SIMBI-H/SPRING-JACHEP FROM KM 0.00 TO 69.00 (NET LENGTH 69.00 KM) TO NHSL SPECIFICATIONS UNDER 116 RCC/48 BRTF PROJECT UDAYAK IN ARUNACHAL PRADESH STATE |
CE (P) Udayak/DPR Consultancy/14/2023-24 (2023_BRO_620172_1) |
23/09/2023 |
25/09/2023
|
16/10/2023
Time
12:0Hrs
|
|
| 91 |
Consultancy Services for Preparation of Feasibility study/DPR for Construction of flyover in Hubli City from Kittur Channamma Circle to Bidnal Cross of old NH-4 (Extended Bangalore Arm) in the State of Karnataka-2nd Call |
EENH/HBL/1198/Bangalore arm |
26/09/2023 |
25/09/2023
|
09/10/2023
Time
17:0Hrs
|
|
| 92 |
Consultancy Services for Preparation of Feasibility/DPR for Construction of ROB/RUB to Kallipalya-Prabhuvanahalli road at Km.1.00 of Tumkur Taluk, Tumkur District, LC No. 48 |
ENHDT/AE/DPR/LC48/23-24/475 |
19/09/2023 |
24/09/2023
|
16/10/2023
Time
16:0Hrs
|
|
| 93 |
ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FEASIBILITY STUDY (FS) AND DETAILED PROJECT REPORT (DPR) FOR CONSTRUCTION OF ROAD MALINYE-BALUA-KAPUDA (NET LENGTH 78.00 KMS) GREEN FIELD ALIGNMENT TO NHSL SPECIFICATIONS IN THE AOR OF 62 RCC UNDER 752 BRTF PROJECT UDAYAK IN THE STATE OF ARUNACHAL PRADESH |
CE (P) Udayak/DPR Consultancy/01/2023-24 (2023_BRO_619693_1) |
24/09/2023 |
21/09/2023
|
02/11/2023
Time
12:0Hrs
|
|
| 94 |
Consultancy Services for Preparation of DPR for suggesting suitable engg. measures/solution in the rock sliding reach of Km.12.85 to Km14.10 and Km 26.00 to Km 28.25 for Upgradation to 2L PS configuration from Kundal to Jhadol sec. NH-58E on EPC mode |
04/2023-24 SE PWD NH Circle |
16/10/2023 |
21/09/2023
|
30/10/2023
Time
11:0Hrs
|
|
| 95 |
Consultancy Services for Preparation of Feasibility/DPR for Construction of 2-Lane ROB to “Banashankri- Lakmapur -Km 9.50 (Near Lakmapur Village) LC No.28 including approaches in the state of Karnataka |
ENHD/VJP/DPR/TENDER/2023-24/903 |
25/09/2023 |
20/09/2023
|
16/10/2023
Time
17:30Hrs
|
|
| 96 |
Consultancy Services for Preparation of Feasibility/DPR for Construction of4-Lane ROB to “Rampur-Alamatti-Kudalasangam LC No.54 including approaches in the state of Karnataka |
ENHD/VJP/DPR/TENDER/2023-24/904 |
25/09/2023 |
20/09/2023
|
16/10/2023
Time
17:30Hrs
|
|
| 97 |
Consultancy for Feasibility study and DPR of 4 Laning from Km 0 Paswan Chowk to Km 58.450 Mushrigharari except Km 11.00 to Km 13.05 4Lane ROB Portion and Km30 to Km35 Proposed 2 Lane with PS Jandaha Bazar Bypass of existing section of NH322 in Bihar. |
03-NH/Gulzarbagh/DPR/2023-24 |
26/09/2023 |
20/09/2023
|
21/11/2023
Time
17:0Hrs
|
|
| 98 |
CONSUTANCY SERVICES FOR FEASIBILITY STUDY, PREPARATION OF DETAILED PROJECT REPORT(DPR) AND PROVIDING PRECONSTRUCTION SERVICES IN RESPECT OF ALONG-YINGKIONG ROAD BETWEEN KM 40.00 TO KM 65.00 (INDICATIVE LENGTH 25.00 KM) FOR CONSTRUCTION AND UPGRADATION FROM CL-09 TO NHDL SPECIFICATION UNDER 1448 BCC/761 BRTF IN AOR OF (P) BRAHMANK |
CE(P)BMK/06/2023-24 |
15/09/2023 |
16/09/2023
|
08/12/2023
Time
11:0Hrs
|
|
| 99 |
Consultancy Services for Preparation of Feasibility/DPR for Construction of RUB to Nagendra Colony to Bommanakatte Road at Shivamogga Corporation Limit ,Shivamogga District, LC No. 50 (Sl No12) |
EE/NHD/SMG/AE1/NIT1/LC50/1029 |
16/09/2023 |
16/09/2023
|
26/10/2023
Time
16:0Hrs
|
|
| 100 |
Consultancy Services for Preparation of Feasibility/DPR for Construction of ROB to SH-26 Halageri-Halkal Road Near Arasalu at Hosanagara Taluk,Shivamogga District, LC No. 92 (Sl No20) |
EE/NHD/SMG/AE1/NIT2/LC92/1030 |
16/09/2023 |
16/09/2023
|
26/10/2023
Time
16:0Hrs
|
|
| 101 |
Consultancy Services for Preparation of Feasibility study and Detailed Project Report for Construction of 4-laning in Km 0 to 141 (Bariarpur to Bishunpur) of NH-333 with land acquisition in the State of Bihar |
NIT NO. 06/NH-LAKHISARAI/2023-24 |
15/09/2023 |
15/09/2023
|
09/11/2023
Time
17:0Hrs
|
|
| 102 |
CONSULTANCY SERVICES FOR FEASIBILITY STUDY, PREPARATION OF DETAILED PROJECT REPORT (DPR) AND PROVIDING PRECONSTRUCTION SERVICES IN RESPECT OF TUTING-MUIRBE-BANE ROAD (INDICATIVE LENGTH 72.0 KM) GREEN FIELD ALIGNMENT FOR CONSTRUCTION AND UPGRADATION TO NHSL SPECIFICATION UNDER 1448 BCC/761 BRTF IN AOR OF (P) BRAHMANK IN ARUNACHAL PRADESH. |
CE(P)BMK/05/2023-24 |
14/09/2023 |
14/09/2023
|
13/11/2023
Time
11:30Hrs
|
|
| 103 |
Consultancy Services for Preparation of Feasibility-DPR for Construction of ROB-RUB to Maidala-Aregujjanahalli road at Km.3.00 of Tumkur Taluk, Tumkur District, LC No. 35 |
ENHDT/AE/DPR/LCs/2023-24/475 |
15/09/2023 |
14/09/2023
|
16/10/2023
Time
16:0Hrs
|
|
| 104 |
ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FEASIBILITY STUDY (FS) AND DETAILED PROJECT REPORT (DPR) ON EPC MODE FOR CONSTRUCTION OF ROAD TAPA-HUSH-DILLE GG (NEW ALIGNMENT) FROM KM 0.00 TO KM 58.00 (NET LENGTH 58.00 KMS) GREEN FIELD ALIGNMENT TO NHSL SPECIFICATIONS IN THE AOR OF 85 RCC UNDER 756 BRTF PROJECT ARUNANK IN THE STATE OF ARUNACHAL PRADESH |
ANK/NIT-05/2023-24 |
11/09/2023 |
11/09/2023
|
03/11/2023
Time
12:0Hrs
|
|
| 105 |
PREPARATION OF (DPR) THROUGH CONSULTANCY FOR CONSTRUCTION OF ROAD TAWANG WOMINGLA KUMROTSAR FROM KM 0.00 TO KM 33.390 CL 5 TO NHSL AND FROM KM 33.390 TO KM 40.00 NEW TRACK TO NHSL UNDER 763 BRTF (P) VARTAK IN TAWANG DISTRICT OF ARUNACHAL PRADESH |
CE(P)/VTK/26/2023-24 |
11/09/2023 |
11/09/2023
|
25/10/2023
Time
12:0Hrs
|
|
| 106 |
PREPARATION OF (DPR) THROUGH CONSULTANCY FOR CONSTRUCTION OF ROAD TAWANG WOMINGLA KUMROTSAR FROM KM 0.00 TO KM 33.390 CL 5 TO NHSL AND FROM KM 33.390 TO KM 40.00 NEW TRACK TO NHSL UNDER 763 BRTF (P) VARTAK IN TAWANG DISTRICT OF ARUNACHAL PRADESH |
CE(P)/VTK/26/2023-24 |
05/12/2023 |
11/09/2023
|
27/12/2023
Time
12:0Hrs
|
-
|
| 107 |
Consultancy Services for Preparation of DPR’s for various work on NH -89, NH – 62 & NH – 65 Construction of LHS at level crossing (LC No. 64) (Manasar Phatak) at Km 172.990 on NH-65 Construction of LHS at level crossing (LC No. C-61) (Bikaner Phatak) km 165.550 on NH-89 Construction of LHS at level crossing (LC No. C-06) at Deshnok km 248.820 on NH-62 Construction of Low height subway/RUB Near Proposed ROB at Railway Km. 503/0-1 (LC No-85) on NH-89 |
07/2023-24 |
12/09/2023 |
08/09/2023
|
18/09/2023
Time
13:0Hrs
|
|
| 108 |
As Per RFP |
Re NIT. 13/NH-Bhagalpur/2023-24 |
08/09/2023 |
08/09/2023
|
18/10/2023
Time
17:0Hrs
|
|
| 109 |
Consultancy Services for preparation of Detailed Project Report (DPR) for 2-laning of Lazu- Wakka -Khanu & Konsa – Longding Road (Approx. 120 km) in the State of Arunachal Pradesh / Assam. |
RW/Ar.P/DPR/LWKKL/2022-23/RO-Ita / |
04/09/2023 |
04/09/2023
|
11/10/2023
Time
11:0Hrs
|
|
| 110 |
Consultancy Service for Preparation of Feasibility Study and Detailed Project Report for development of existing road to 4-Lane with paved shoulder of Barapani - Shillong Road (NH-06) from Km 61.800 to Km 78.000 alongwith bridge at Umiam Dam in Meghalaya for execution on EPC Mode |
NHIDCL/Meghalaya/DPR/ Shillong-Barapani(4L)/2023 |
05/09/2023 |
04/09/2023
|
06/10/2023
Time
15:0Hrs
|
|
| 111 |
Consultancy Services for preparation of (DPR) for Construction of new 2 Lane/4- Lane Major bridges atkm3.500 on Kali River,km39.840 on Ganga River and 03 Minor Bridges at km31.425,km31.710, km44.665 and 01 ROB at km36.645 of NH730C in the state of UP |
CE-RO/LKO/DPR/2023-24 Dated.01.09.2023 |
22/09/2023 |
04/09/2023
|
16/10/2023
Time
11:0Hrs
|
|
| 112 |
Consultancy Services for Preparation of Detailed Project Report for Four / Six laning of Dindigul-Theni-Kumili Section of NH-183 in the State of Tamil Nadu |
NHAI/17011/02/20/2023/RO Madurai |
04/10/2023 |
04/09/2023
|
26/10/2023
Time
10:0Hrs
|
|
| 113 |
Consultancy Services for preparation of Detailed Project Report for Construction of 2-lane Tunnel between Sonprayag NH-107 and Kalimath (SH-96) including approach road up to Chunni Bend on NH-107A Total length23 km including 7 km of Tunnel in the State of Uttarakhand. |
2023_MoRTH_769168_1 |
30/08/2023 |
30/08/2023
|
13/10/2023
Time
15:0Hrs
|
|
| 114 |
Consultancy Services for preparation of Detailed Project Report (DPR) for capacity augmentation of various selected stretches on National Highways in the State of Madhya Pradesh. (Package-01) |
CE-RO/BPL/DPR-1/2023-24 |
08/09/2023 |
30/08/2023
|
08/11/2023
Time
17:30Hrs
|
|
| 115 |
Consultancy Services for preparation of Detailed Project Report (DPR) for capacity augmentation of various selected stretches on National Highways in the State of Madhya Pradesh. (Package-02) |
CE-RO/BPL/DPR-2/2023-24 |
08/09/2023 |
30/08/2023
|
08/11/2023
Time
17:30Hrs
|
|
| 116 |
Consultancy services for Preparation of Detailed Project Report including LA and Other clearances for Construction of Bridges over Kataiya Hydel tail race & canal on NH-131(106) in the State of Bihar |
NIT No. 01/NH-MADHEPURA/2023-24 (2) |
09/09/2023 |
28/08/2023
|
19/10/2023
Time
17:0Hrs
|
|
| 117 |
Consultancy Services for Preparation of Detailed Project Report including LA and other clearances for Construction of Singheshwar Bypass on NH-131(106) in the State of Bihar |
NIT no. 01/NH-MADHEPURA/2023-24 |
05/09/2023 |
28/08/2023
|
19/10/2023
Time
17:0Hrs
|
|
| 118 |
Consultancy Services for Preparation of Feasibility/DPR for Construction of RUB at Karwar-Kaiga Ilkal Road km 247/000 ( Gadag town ) Gadag Tq Gadag Dist-2nd call |
999/3 Dt.22.08.2023 |
28/08/2023 |
28/08/2023
|
11/09/2023
Time
17:0Hrs
|
|
| 119 |
Consultancy Services for Preparation of Feasibility/DPR for Construction of ROBs to level crossing No.45 to 2 lane on Halligudi-Timmapur MDR Road at Mundargi taluk Gadag District-2nd call |
999/8 Dt.22.08.2023 |
28/08/2023 |
28/08/2023
|
11/09/2023
Time
17:0Hrs
|
|
| 120 |
Consultancy Services for Preparation of Feasibility/DPR for Construction of ROBs to level crossing No.43 to 2 lane on Timmapur-Harlapur MDR at Gadag taluk Gadag district-2nd call |
999/9 Dt.22.08.2023 |
28/08/2023 |
28/08/2023
|
11/09/2023
Time
17:0Hrs
|
|
| 121 |
Consultancy Services for Preparation of Detailed Project Report for Construction of Tungri-Mathow-Dubbin-Dishing-Debrik Road Approved under ICBR (PH-III) Project in the State of Arunachal Pradesh (Total length 84.00 Km) ( Package-I |
NHIDCL/Ar.Pr./DPR/ICBR- III/T-D/P-I/2022-23 |
29/08/2023 |
25/08/2023
|
11/10/2023
Time
15:0Hrs
|
|
| 122 |
Consultancy Services for Preparation of Detailed Project Report for Construction of Monigong-Dile Duting & Henkar- Tabeyongkong Road Approved under ICBR (PH-III) Project in the State of Arunachal Pradesh (Total length 38.00 Km) ( Package-II) |
NHIDCL/Ar.Pr./DPR/ICBR- III/M-T/Pkg-II/2023 |
29/08/2023 |
25/08/2023
|
11/10/2023
Time
15:0Hrs
|
|
| 123 |
Consultancy Services for preparation of Detail Engineering Report for i) Two lane to Four lane for Suratgarh Sriganganagar section of NH 62 from Km 175.0 to Km 250.9 ii) Flyover at Manaksar Circle on NH 62, Suratgarh iii) Intersection design and safety audit of IGNP Bridge service lane at Km 157.067 of Bikaner-Suratgarh section on NH 62 in the State of Rajasthan |
NIT NO. 06/2023-24 EE PWD NH BIKANER |
25/08/2023 |
25/08/2023
|
11/10/2023
Time
17:0Hrs
|
|
| 124 |
Consultancy Services for preparation of Detail Engineering Report for Ghaggar Bridge at Km 176.100 on NH 62 in the state of Rajasthan |
NIT NO. 07/2023-24 EE PWD NH BIKANER |
26/08/2023 |
25/08/2023
|
05/09/2023
Time
17:0Hrs
|
|
| 125 |
Consultancy Services for Preparation of Detailed Project Report for Construction of Tuting-(Kunging) Kahebingo-Taphuk, Jorging –DBGG-2590 & DBGG-Nape,Road Approved under ICBR (PH-III) Project in the State of Arunachal Pradesh (Total length 114.00Km) ( Package-III) |
NHIDCL/Ar.Pr./DPR/ICBR-III/T- 2590-D-N/Pkg-III/20 |
31/08/2023 |
25/08/2023
|
11/10/2023
Time
15:0Hrs
|
|
| 126 |
Consultancy Services for Preparation of Detailed Project Report for Construction of Bruni-Balchida Road Approved under ICBR (PH-III) Project in the State of Arunachal Pradesh (Total length 22.00Km) ( Package- IV) |
NHIDCL/Ar.Pr./DPR/ ICBR- III/B-B/Pkg-IV/2023 |
31/08/2023 |
25/08/2023
|
11/10/2023
Time
15:0Hrs
|
|
| 127 |
Construction of 4/6-lane Ring Road / Bypass (300Km) to decongest NH-66 in the State of Goa. |
RO/MUM/AP/Goa/2023-24/5/NH-66/DPR |
12/09/2023 |
24/08/2023
|
15/01/2024
Time
11:0Hrs
|
|
| 128 |
“Consultancy Services for Preparation of Feasibility/DPR for Construction of ROB’s/RUB’s to “Annigeri- Hallikeri-Ibrahimpur MDR from Km 0.00 to Km 15.20 at 2lane chainage k.m. 1.20 (near Annigeri Railway Gate) at LC 19 in Annigeri taluk.”2nd call |
EENH/HBL/999/4/Annigeri |
28/08/2023 |
22/08/2023
|
11/09/2023
Time
17:0Hrs
|
|
| 129 |
Consultancy Services for Preparation of Feasibility/DPR for Construction of ROBs to level crossing No.15 to 2 lane on Sindhanur-Hemmadaga SH-30 at Km.131.00 in Near Mallapur Village Ron taluk Gadag district,2nd call |
999/1 Dt.22.08.2023 |
28/08/2023 |
22/08/2023
|
11/09/2023
Time
17:0Hrs
|
|
| 130 |
“Consultancy Services for Preparation of Feasibility/DPR for Construction of ROB’s/RUB’s to “Motebennur- Khurdh Kodihalli MDR Road 4lane on Km 1.00 at LC 229 in Byadagi taluk Haveri District”2nd Call |
EENH/HBL/999/7/Motebennur |
28/08/2023 |
22/08/2023
|
11/09/2023
Time
17:0Hrs
|
|
| 131 |
Consultancy Services for Preparation of Feasibility/DPR for Construction of ROBs to level crossing No.24 to 2 lane on Hole alur Somankatti Melamath Asuti road at Km.0.00 in Near Hole Alur Ron taluk Gadag District-2nd call |
999/2 Dt.22.08.2023 |
28/08/2023 |
22/08/2023
|
11/09/2023
Time
17:0Hrs
|
|
| 132 |
“Consultancy Services for Preparation of Feasibility/DPR for Construction of RUB/ROB’s to “Widening of existing RUB 4lane on Khanapur Talaguppa SH-93 at Km 37.65 in Alnavar taluka Dharwad District .” 2ndCall |
EENH/HBL/999/5/khanapur |
28/08/2023 |
22/08/2023
|
11/09/2023
Time
17:0Hrs
|
|
| 133 |
Consultancy Services for Preparation of Feasibility study /DPR for Construction of ROB to two lane on Kalmala-Shiggaon SH-23 road at km.169.00 of Koppal Taluk, Koppal District for LC No. 68-2nd call |
999/6 Dt.22.08.2023 |
24/08/2023 |
22/08/2023
|
11/09/2023
Time
16:0Hrs
|
|
| 134 |
Consultancy Services for Preparation of Feasibility - DPR for Construction of ROB-RUB to Mandya- Hadagali Road SH-47 at km. 259.850 of Holalkere Taluk Chitradurga District, LC No. 174 |
ENHDCTA/AE/ROBLC174/2023-24/364 |
21/08/2023 |
21/08/2023
|
08/09/2023
Time
15:0Hrs
|
|
| 135 |
CONSULTANCY SERVICES FOR PREPARATION OF DPR FOR CONSTRUCTION OF ROAD KALARUS- SONA PINDI GALI FROM CL-5 TO NHSL (PS) FROM KM 0.00 TO KM 34.68 (NET LENGTH 34.68 KM UNDER 109 RCC/ 32 BRTF (P) BEACON IN J&K (UT). |
CE (P) BCN/EPC/Consultancy/09/2023-24 |
21/08/2023 |
21/08/2023
|
11/09/2023
Time
12:0Hrs
|
|
| 136 |
Consultancy services for Preparation of DPR for construction/improvement of road Baghbella-Toli-Nagina from CL-5 to NHSL (PS) from km 0.00 to km 20.460 (Net length 20.460 kms) under AOR of 109 RCC/32 BRTF/ (P) Beacon in Jammu & Kashmir (UT). |
CE (P) BCN/Consultancy/10/2023-24 |
21/08/2023 |
21/08/2023
|
11/09/2023
Time
12:0Hrs
|
|
| 137 |
ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FEASIBILITY STUDY (FS) AND DETAILED PROJECT REPORT (DPR) FOR CONSTRUCTION OF THE FOLLOWING ROADS IN THE AOR OF 116 RCC/48 BRTF UNDER PROJECT UDAYAK IN ARUNACHAL PRADESH STATE PART-I HAYULIANG-GLOTHANG LA DU DAKHRU-KUNDAO ROAD FROM KM 0.00 TO KM 107.00 (NET LENGTH 107.00 KMS) TO NHSL SPECIFICATIONS & PART-II KIBITHU-KUNDAO ROAD FROM KM 0.00 TO KM 52.00 (NET LENGTH 52.00 KMS) TO NHSL SPECIFICATIONS |
CE (P) Udayak/DPR Consultancy/10/2023-24 |
07/08/2023 |
20/08/2023
|
27/10/2023
Time
12:0Hrs
|
|
| 138 |
Consultancy Services for Preparation of Feasibility/DPR for Construction of ROB/RUB to Kumuta-Kadamadagi Road at Haliyar km. 261.60 of Chitradurga Taluk, Chitradurga District, LC No. 15 |
ENHDCTA/AE2/ROBLC15/2023-24/363 |
19/08/2023 |
19/08/2023
|
07/09/2023
Time
16:0Hrs
|
|
| 139 |
Consultancy Services for preparation of Detail Engineering Report for Ghaggar Bridge at Km 176.100 on NH 62 in the state of Rajasthan |
NIT NO. 04/2023-24 EE PWD NH BIKANER |
17/08/2023 |
17/08/2023
|
23/08/2023
Time
17:0Hrs
|
|
| 140 |
ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FEASIBILITY STUDY (FS) AND DETAILED PROJECT REPORT (DPR) ON EPC MODE FOR CONSTRUCTION OF ROAD MOREH-THINGPAI-NEW SAMATHAL (M-T-N-S) FROM KM 45.00 TO KM 85.00 (NEW SAMATHAL) (APPROX) TO NHSL SPECIFICATION UNDER 25 BRTF/PROJECT SEWAK IN MANIPUR STATE (SECOND CALL) |
CE (P)/SWK/DPR CONSULTANCY/03/2023-24 (Second Call) |
08/08/2023 |
14/08/2023
|
29/09/2023
Time
11:0Hrs
|
|
| 141 |
(i) Consultancy services for preparation of DPR for widening to four lane from Km 69/750 to Km 75/750 of NH-552 Extn. and plantation, street lighting and road safety works from Km 0/00 to Km 28/00 on NH-248 & (ii) Consultancy services for preparation of DPR for grade separated structure with slip road at Achrol from km 11/00 to km 12/00 of NH-248 |
2023-MoRTH-765233-1 |
05/08/2023 |
04/08/2023
|
04/09/2023
Time
18:0Hrs
|
|
| 142 |
Consultancy Services for Preparation of DPR’s for various work on NH -89, NH – 62 & NH – 65 Construction of LHS at level crossing (LC No. 64) (Manasar Phatak) at Km 172.990 on NH-65 Construction of LHS at level crossing (LC No. C-61) (Bikaner Phatak) km 165.550 on NH-89 Construction of LHS at level crossing (LC No. C-06) at Deshnok km 248.820 on NH-62 Construction of Low height subway/RUB Near Proposed ROB at Railway Km. 503/0-1 (LC No-85) on NH-89 |
03/2023-24 |
14/08/2023 |
02/08/2023
|
23/08/2023
Time
12:0Hrs
|
|
| 143 |
PREPARATION OF DETAILED PROJECT REPORT (DPR) FOR CONSTRUCTION OF ROAD NEW MELLING DAMTENG FROM KM 0.000 TO KM 22.000 TO NHSL SPECIFICATIONS IN SECTOR OF 120 RCC/763 BRTF/PROJECT VARTAK |
CE (P) VTK/EPC/NIB-05 OF 2023 - 24 |
24/08/2023 |
28/07/2023
|
11/09/2023
Time
18:0Hrs
|
|
| 144 |
Consultancy Services for Preparation of Feasibility study/DPR for Construction of flyover in Hubli City from Kittur Channamma Circle to Bidnal Cross of old NH-4 (Extended Bangalore Arm) in the State of Karnataka |
EENH/HBL/779/Extended bangalore Arm |
26/07/2023 |
25/07/2023
|
16/08/2023
Time
16:0Hrs
|
|
| 145 |
Consultancy Services for Preparation of Feasibility/DPR for Construction of ROBs to level crossing No.24 to 2 lane on Hole alur Somankatti Melamath Asuti road at Km.0.00 in Near Hole Alur Ron taluk Gadag Disttrict |
EENH/HBL/753/Holealur |
26/07/2023 |
24/07/2023
|
16/08/2023
Time
17:0Hrs
|
|
| 146 |
Consultancy Services for Preparation of Feasibility/DPR for Construction of ROBs to level crossing No.45 to 2 lane on Halligudi-Timmapur MDR Road at Mundargi taluk Gadag District |
EENH/HBL/753/8 |
27/07/2023 |
24/07/2023
|
16/08/2023
Time
17:0Hrs
|
|
| 147 |
Consultancy Services for Preparation of Feasibility/DPR for Construction of ROBs to level crossing No.43 to 2 lane on Timmapur-Harlapur MDR at Gadag taluk Gadag district |
EENH/HBL/753/9 |
27/07/2023 |
24/07/2023
|
16/08/2023
Time
17:0Hrs
|
|
| 148 |
Consultancy Services for Preparation of Feasibility/DPR for Construction of ROB’s/RUB’s to Motebennur- Khurdh Kodihalli MDR Road 4lane on Km 1.00 at LC 229 in Ranebennur taluk Haveri District |
EENH/HBL/753/7/Motebennur |
27/07/2023 |
24/07/2023
|
16/08/2023
Time
17:0Hrs
|
|
| 149 |
Consultancy Services for preparation of Detailed Project Report and for Pre-Construction activities towards Construction of 4-lane Tunnel Connectivity across River Brahmaputra between Gohpur (on NH-15) and Numaligarh (on NH-715) in the State of Assam. |
NHIDCL/ASSAM/ 2023-24/G-NG/Tunnel/DPR/ |
29/07/2023 |
24/07/2023
|
14/08/2023
Time
15:0Hrs
|
|
| 150 |
Consultancy Services for Preparation of Feasibility/DPR for Construction of RUB/ROB’s to “Widening of existing RUB 4lane on Khanapur Talaguppa SH-93 at Km 37.65 in Alnavar taluka Dharwad District |
EENH/HBL/753/5/Khanapur Talaguppa |
29/07/2023 |
24/07/2023
|
16/08/2023
Time
17:0Hrs
|
|
| 151 |
Consultancy Services for Preparation of Feasibility/DPR for Construction of RUB at Karwar-Kaiga Ilkal Road km 247.000 ( Gadag town ) |
EENH/HBL/753/3/karwar Kaiga Ilkal |
31/07/2023 |
24/07/2023
|
16/08/2023
Time
17:0Hrs
|
|
| 152 |
Consultancy Services for Feasibility Study, Preparation of DPR and providing pre-construction services for Construction of 2nd Tube Uni-directional Zojila Tunnel (13.14 km) of NH-1 in the under UT of Jammu and Kashmir -2nd Call. |
NHIDCL/JK/NH-1/Zojila 2nd Tube Tunnel/DPR /2023 |
22/07/2023 |
24/07/2023
|
16/08/2023
Time
15:0Hrs
|
|
| 153 |
Consultancy Services for Preparation of Feasibility study /DPR for Construction of ROB/RUB to two lane on Kalmala-Shiggaon SH-23 road at km.169.00 of Koppal Taluk, Koppal District for LC No. 68. |
753 Dt.20.07.2023 |
24/07/2023 |
24/07/2023
|
16/08/2023
Time
17:0Hrs
|
|
| 154 |
Consultancy Services for Preparation of Feasibility/DPR for Construction of ROBs/RUBs to Annigeri- Hallikeri-Ibrahimpur MDR from Km 0.00 to Km 15.20 at 2lane chainage k.m. 1.20 (near Annigeri Railway Gate) at LC 19 in Annigeri taluk |
EENH/HBL/753/4/Annigeri |
24/07/2023 |
24/07/2023
|
16/08/2023
Time
17:0Hrs
|
|
| 155 |
Consultancy Services for Preparation of Feasibility/DPR for Construction of ROBs to level crossing No.15 to 2 lane on Sindhanur-Hemmadaga SH-30 at Km.131.00 in Near Mallapur Village Ron taluk Gadag district . |
EENH/HBL/753/1Mallapur |
24/07/2023 |
24/07/2023
|
16/08/2023
Time
17:0Hrs
|
|
| 156 |
Consultancy Services for Preparation of Feasibility studies, General Arrangement Drawing ( G.A.D.) and Detailed Geotechnical Investigation by taking trial Bores for Chandrapur City Bypass and Construction of Road Over Bridge ( R.O.B. ) over Gondia Ch |
03/EENH/GAD/2023-24 |
19/07/2023 |
19/07/2023
|
04/08/2023
Time
17:0Hrs
|
|
| 157 |
Consultancy services for the preparation of Feasibility studies and Detailed project report for the work of Construction of Major Bridge with Approaches (Alongwith Land Acquisition) Total Length 3.90 Km across Wainganga River near Hardoli village |
NIT02/EENH/GAD/2023-24 |
17/07/2023 |
17/07/2023
|
04/08/2023
Time
18:0Hrs
|
|
| 158 |
Consultancy Services for Preparation of DPR for various work on NH 89 NH 62 and NH 65. Construction of LHS at level crossing LC No 64 Manasar Phatak at Km 172.990 on NH 65 in Nagaur City in the state of Rajasthan. 2 Construction of LHS at level cros |
02/2023-24 |
19/07/2023 |
10/07/2023
|
31/07/2023
Time
12:0Hrs
|
|
| 159 |
Consultancy Services for Preparation of Detailed Project Report and providing Pre-construction activities for connecting National Waterway - 2 at Dhubri to NH - 127B in the State of Assam. (3rd Call) |
NHIDCL/2022-23/AS/Dhubri /DPR/NW-2/NH-127B/C3 |
07/08/2023 |
07/07/2023
|
21/08/2023
Time
15:0Hrs
|
|
| 160 |
Consultancy Service for Preparation of Feasibility Study and Detailed Project Report for development of existing road to 4-Lane with paved shoulder of Barapani - Shillong Road (NH-06) from Km 61.800 to Km 78.000 alongwith bridge at Umiam Dam in Meghalaya for execution on EPC Mode |
2023-NHIDC-760150-1 |
11/07/2023 |
03/07/2023
|
10/08/2023
Time
15:0Hrs
|
|
| 161 |
ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FEASIBILITY STUDY (FS) AND DETAILED PROJECT REPORT (DPR) FOR CONSTRUCTION OF ROAD MALINYE-BALUA-KAPUDA (NET LENGTH 78.00 KMS) GREEN FIELD ALIGNMENT TO NHSL SPECIFICATIONS IN THE AOR OF 62 RCC UNDER 752 BRTF PROJECT UDAYAK IN THE STATE OF ARUNACHAL PRADESH |
2023_BRO_606254_1 |
09/07/2023 |
01/07/2023
|
12/08/2023
Time
12:0Hrs
|
|
| 162 |
Consultancy Services for preparation of DPR for Construction of Spur to Bodhgaya and Rajgir from Amas- Darbhanga Corridor of NH-119D in the state of Bihar |
NHAI/BIHAR/DPR/BODHGAYA-RAJGIRSPUR/2023 |
01/08/2023 |
28/06/2023
|
11/08/2023
Time
11:0Hrs
|
|
| 163 |
Consultancy Services for preparation of DPR for Construction of Spur to Bodhgaya and Rajgir from Amas- Darbhanga Corridor of NH-119D in the state of Bihar. |
NHAI/Bihar/DPR/BodhgayaRajgirSpur/2023 |
02/08/2023 |
28/06/2023
|
11/08/2023
Time
15:0Hrs
|
|
| 164 |
Consultancy Services for Preparation of DPR for various work on NH 89 (new NH 58) section of NH 89.(junction of SH 63 and kuchera Bypass) of NH 89 |
01 / 2023-24 |
04/07/2023 |
27/06/2023
|
30/07/2025
Time
11:17Hrs
|
|
| 165 |
Consultancy Services for Preparation of Detailed Project Report and providing services for Pre-Construction activities in respect of Provisioning of 4 lane Bridge over river Kushiyara (approx. Length 300 m) and its approaches between Karimganj, Assam (India) and ZakiganjUpazila (Sylhet district, Bangladesh) (approximate length of 900 m) -3rd Call |
NHIDCL/HQ/DPR/KarimganjZakiganj/2022 |
27/06/2023 |
27/06/2023
|
25/07/2023
Time
15:0Hrs
|
|
| 166 |
“Consultancy Services for Preparation of Detailed Project Report and providing services for pre-construction activities in respect of “Rehabilitation and Resettlement of sinking zones and sliding zones between Km 368.000 To Km 468.000 (NH-07) and construction of tunnel at Pagal Nallah location (near Km 454.300 to Km 454.870 of NH07) in the state of Uttarakhand” |
2023_NHIDC_759355_1 |
03/08/2023 |
26/06/2023
|
10/10/2023
Time
15:0Hrs
|
|
| 167 |
Consultancy Services for preparation of Detailed Project Report and for Pre- Construction activities towards Construction of 4-lane Tunnel Connectivity across River Brahmaputra between Gohpur (on NH-15) and Numaligarh (on NH- 715) in the State of Assam. |
NHIDCL/ASSAM/2023-24/G-NG/Tunnel/DPR |
22/06/2023 |
23/06/2023
|
10/07/2023
Time
16:0Hrs
|
|
| 168 |
Consultancy services for Authoritys Engineer for Supervision of Work of widening to four lane rigid pavement configuration from Km 90.00toKm 100.8 on NH96(Km 42.0 to Km 53.0 as per new NH-330), design length 11.3 Km under EPC mode in the state of U.P |
1649/167 Yata(1)-NH Circle/2023-24 dt.19.06.2023 |
21/06/2023 |
19/06/2023
|
03/08/2023
Time
15:0Hrs
|
|
| 169 |
Consultancy Services for Feasibility Study, Preparation of DPR and providing pre-construction services for Construction of Twin Tube Uni-directional Tunnel under Ganesh top hill on Khanabal-Baltal section of NH-501 in Jammu and Kashmir |
NHIDCL/JK/NH-501/ Sheshnag Tunnel/DPR /2022-23 |
25/05/2023 |
19/06/2023
|
14/08/2023
Time
15:0Hrs
|
|
| 170 |
ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FEASIBILITY STUDY (FS) AND DETAILED PROJECT REPORT (DPR) ON EPC MODE FOR CONSTRUCTION OF ROAD MOREH-THINGPAI-NEW SAMATHAL (M-T-N-S) BETWEEN KM 45.00 TO KM 85.00 (NEW SAMATHAL) TO NHSL SPECIFICATION UNDER 25 BRTF/PROJECT SEWAK IN MANIPUR STATE |
CE (P)/SWK/DPR CONSULTANCY/03/2023-24 |
08/06/2023 |
15/06/2023
|
15/07/2023
Time
12:0Hrs
|
|
| 171 |
PMC for FS Prep of DPR Provid Pre Construction Activts nd Constn Supervn for Constn of Highway Tunnel of 6.12 km inclg approaches across Sadhana Pass betwn Km 79.50 nd Km 102.10 on Rafiabad Kupwara Chowkibal Tangdhar Chamkot Road NH 701 in JK |
RW/CH/W(37)/JK/2023 |
14/06/2023 |
14/06/2023
|
17/10/2023
Time
15:0Hrs
|
|
| 172 |
CONSUTANCY SERVICES FOR FEASIBILITY STUDY,PREPARATION OF DETAILED PROJECT REPORT(DPR) AND PROVIDING PRECONSTRUCTION SERVICES IN RESPECT OF YINGKIONG-JIDU-BISHING ROAD GREEN FIELD ALIGNMENT (INDICATIVE LENGTH 160.0 KM) FOR CONSTRUCTION AND UPGRADATION TO NHSL SPECIFICATION UNDER 1448 BCC/761 BRTF IN AOR OF (P) BRAHMANK |
CE(P) BMK/EPC-02/2023-24 |
19/06/2023 |
14/06/2023
|
11/08/2023
Time
11:0Hrs
|
|
| 173 |
RETENDER FOR CONSULTANCY SERVICES FOR PREPARATION OF DETAILED PRJECT REPORT AND PROVIDING PRE-CONSTRUCTION ACTIVITIES FOR CONSTRUCTION OF HIGHWAY TUNNEL BETWEEN KM 10.250 TO KM 10.650 ON MAR UNDER 108 RCC / 759 BRTF / PROJECT DEEPAK IN THE STATE OF Himachal Pradesh |
CE (P) DPK/03/2023-24 |
13/06/2023 |
13/06/2023
|
31/08/2023
Time
17:0Hrs
|
|
| 174 |
ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FEASIBILITY STUDY (FS) AND DETAILED PROJECT REPORT (DPR) FOR CONSTRUCTION OF ROAD ALO – TAPOLA FROM KM 0.00 TO KM 23.00 (NET LENGTH 23.00 KMS) GREEN FIELD ALIGNMENT TO NHSL SPECIFICATIONS IN THE AOR OF 62 RCC UNDER 752 BRTF PROJECT UDAYAK IN THE STATE OF ARUNACHAL PRADESH |
CE (P) Udayak/DPR Consultancy/05/2023-24 |
14/06/2023 |
12/06/2023
|
24/07/2023
Time
12:0Hrs
|
|
| 175 |
Consultancy Services for Preparation of Feasibility Report cum Detail Engineering report for NH 927A starting from Swaroopganj -Kotra- Kherwara From Km. 0/0 to 148/100, Dungarpur bypass km. 166/320 to 175/480 Talwara Bypass 248/780 to 251/660 and Banswara bypass 257/730 to 274/200 in the State of Rajasthan |
NIT 01/2022-23 SE PWD |
20/06/2023 |
05/06/2023
|
16/08/2023
Time
11:0Hrs
|
-
|
| 176 |
Consultancy Services for Preparation of DPR for suggesting suitable engg. measures/solution in the rock sliding reach of Km.12.85 to Km14.10 and Km 26.00 to Km 28.25 for Upgradation to 2L PS configuration from Kundal to Jhadol sec. NH-58E on EPC mode |
02/2023-24 SE PWD NH Circle |
28/06/2023 |
05/06/2023
|
16/08/2023
Time
11:0Hrs
|
|
| 177 |
Consultancy Services for preparation of Detailed Project Report (DPR) for stretches Lumla to Neliya (border) (Length - 100 Km) in the State of Arunachal Pradesh. |
NHIDCL/Arunachal/DPR/ Inter-corridor/L-N/2023 |
14/06/2023 |
01/06/2023
|
11/07/2023
Time
15:0Hrs
|
|
| 178 |
Consultancy Services for preparation of Detailed Project Report (DPR) for stretches Jang to Lumla (Length - 60 Km) in the State of Arunachal Pradesh. |
NHIDCL/Arunachal/DPR/ Inter-corridor/2023 |
13/06/2023 |
01/06/2023
|
11/07/2023
Time
15:0Hrs
|
|
| 179 |
Consultancy Services for preparation of Detailed Project Report (DPR) for stretches Kamenbari to Tenga (Length - 60 Km) in the State of Arunachal Pradesh on fixed cost cum quality basis. |
NHIDCL/Arrunachal/DPR/Inter-corridor/2023 |
08/06/2023 |
01/06/2023
|
11/07/2023
Time
15:0Hrs
|
|
| 180 |
Consultancy Services for preparation of Detailed Project Report (DPR) for capacity augmentation of various selected stretches on National Highways in the State of Tamil Nadu (Package-III) |
ROChennaiMoRTH12014DPR12AP2023 |
31/05/2023 |
30/05/2023
|
20/07/2023
Time
11:30Hrs
|
|
| 181 |
Consultancy Services for preparation of Detailed Project Report for upgradation of existing single road to 2-lane configuration from Churachandpur to Tipaimukh section of NH-02 in the State of Manipur |
NHIDCL/Manipur/DPR/NH-02/Ccpur to Tipaimukh/2023 |
29/05/2023 |
29/05/2023
|
12/07/2023
Time
15:0Hrs
|
|
| 182 |
Consultancy Services for preparation of DPR for widening to 2 Lane configuration of Chamoli Kund Section km 0 to km 84 of National Highway 107A in the State of Uttarakhand |
2023_MoRTH_755196_1 |
29/05/2023 |
27/05/2023
|
10/07/2023
Time
15:0Hrs
|
|
| 183 |
Consultancy Services for Preparation of Detailed Project Report for Tunnel Car Parking at (i) Near GMVN Guest House, Nala Guptkashi (NH-109) (ii) Near Sersi (NH-109), Ukhimath (iii) Gangnani Hot Water Spring (NH-34), Uttarkashi and (iv) Gangotri Dham (NH-34), Uttarkashi in the State of Uttarakhand. |
NHIDCL/TCP/DPR/UK/2023 |
24/05/2023 |
25/05/2023
|
17/07/2023
Time
15:0Hrs
|
|
| 184 |
Consultancy services for, feasibility study, detailed project report, survey and preparation of land plan for widening of existing 2 lane to 2 lane with paved shoulders from Km. 64.00 to Km.90.00 of NH-52 (Old NH-63) (Yellapura to Sangatigikoppa) on Ankola-Gooty section in the State of Karnataka |
RW/BNG/NH-52(old NH-63)/Km.64-90/149/2023 |
22/05/2023 |
22/05/2023
|
30/06/2023
Time
16:0Hrs
|
|
| 185 |
Consultancy services for, feasibility study, detailed project report, survey and preparation of land plan for Construction of new bypass at yellapur town on NH-52 (old NH-63) Ankola-Gooty section in the State of Karnataka |
RW/BNG/NH-52//Km.64-73/151/2023 |
22/05/2023 |
22/05/2023
|
30/06/2023
Time
16:0Hrs
|
|
| 186 |
Consultancy Services for preparation of Feasibility cum DPR for development of various Port Connectivity stretches under Port Connectivity Master Plan (Package-1) (2nd Call) |
2023-NHAI-154594-1 |
22/05/2023 |
18/05/2023
|
20/06/2023
Time
11:0Hrs
|
|
| 187 |
Consultancy services for preparation of DPR for various stretches in the state of Gujarat |
NHAI/HQ/GJ/DPR/2023-24/Lot-1/efile 204274 |
21/05/2023 |
18/05/2023
|
03/07/2023
Time
11:0Hrs
|
|
| 188 |
Consultancy service for preparation of Detailed Project Report (DPR) for 4 Lanning of NH-17 (new) and NH-317 (new) from km 710.00 (Telipara) to km 718.00 (Birpara) of old NH-31 and km 157.835 (Birpara) to km 225.428 (near Salsalabari) of old NH-31C (total length 75.593 km) in the district of Jalpaiguri and Alipurduar, West Bengal. |
WBPW_Rd/EE/NHD-IX/eRFP-3/23-24 |
24/05/2023 |
18/05/2023
|
03/08/2023
Time
17:0Hrs
|
|
| 189 |
Consultancy service for preparation of Detailed Project Report (DPR) for Widening/Upgradation to 2L-PS of NH-717 (new) from km 634.00 (Chalsa) to km 674.175 (Maynaguri) of old NH-31 (total length 40.175 km) in the district of Jalpaiguri, West Bengal. |
WBPW_Rd/EE/NHD-IX/eRFP-2/23-24 |
24/05/2023 |
18/05/2023
|
03/08/2023
Time
17:0Hrs
|
|
| 190 |
Consultancy Service for preparation of Detailed Project Report (DPR) for 4-Lanning of NH-17 (New) from Km 604.00 (Near Ellenbari) to Km 634.00 (Chalsa) of Old NH-31 and Km 105.00 (Chalsa) to Km 145.632 (Telipara) of Old NH-31C (Total Length-70.632 Km) in the District of Jalpaiguri, West Bengal. |
WBPW_Rd/EE/NHD-IX/eRFP-1/23-24 |
23/05/2023 |
18/05/2023
|
03/08/2023
Time
17:0Hrs
|
|
| 191 |
CONSULTANCY SERVICES FOR FEASIBILITY STUDY, PREPARATION OF DETAILED PROJECT REPOR (DPR) AND PROVIDING PRECONSTRUCTION SERVICES IN RESPECT OF MIGGING-JORGING ROAD (INDICATIVE LENGTH 112.00 KM) GREEN FIELD ALIGNMENT FOR CONSTRUCTION AND UPGRADATION TO NHSL SPECIFICATIONS UNDER 105 RCC/761 BRTF IN AOR OF (P) BRAHMANK IN ARUNACHAL PRADESH |
CE(P)BMK-EPC-01/2023-24 |
22/05/2023 |
15/05/2023
|
15/07/2023
Time
11:0Hrs
|
|
| 192 |
Consultancy Services for Preparation of Detailed Project Report for 2 laning of Lunglei Bypass on western side of Lunglei town in the State of Mizoram |
NHIDCL/Mizoram/DPR/Lunglei-bypass/2022-23 |
17/05/2023 |
15/05/2023
|
28/06/2023
Time
11:0Hrs
|
|
| 193 |
ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FEASIBILITY STUDY (FS) AND DETAILED PROJECT REPORT (DPR) FOR CONSTRUCTION OF ROAD MALINYE-BALUA-KAPUDA (NET LENGTH 78.00 KMS) GREEN FIELD ALIGNMENT TO NHSL SPECIFICATIONS IN THE AOR OF 62 RCC UNDER 752 BRTF PROJECT UDAYAK IN THE STATE OF ARUNACHAL PRADESH |
CE (P) Udayak/DPR Consultancy/01/2023-24 (2023_BRO_594330_1) |
10/05/2023 |
13/05/2023
|
24/06/2023
Time
12:0Hrs
|
|
| 194 |
PMC for FS prep of DPR providing pre construction activities nd Construction supervision for Construction of Highway Tunnel of 5.5 Km inclg approaches across Pir Panjal Range betwn Km 75.00 nd Km 80.50 on Poonch Uri Road in JK |
RW/CH/W(38)/JK/2023 |
09/05/2023 |
09/05/2023
|
03/06/2023
Time
17:0Hrs
|
|
| 195 |
Consultancy Services for Preparation of Feasibility study and Preparation of DPR including LA and Other Clearance for Construction of W S to 2Lane with paved shoulder from Km 41 to Km 92 of NH119 Old NH2C in the State of Bihar |
04-NH/GAYA/DPR/2023-24 |
22/05/2023 |
08/05/2023
|
21/07/2023
Time
17:0Hrs
|
|
| 196 |
PMC for FS Prep of DPR Provid Pre Construction Activts nd Constn Supervn for Constn of Highway Tunnel of 6.12 km inclg approaches across Sadhana Pass betwn Km 79.50 nd Km 102.10 on Rafiabad Kupwara Chowkibal Tangdhar Chamkot Road NH 701 in JK |
RW/CH/W(37)/JK/2023 |
08/05/2023 |
08/05/2023
|
03/06/2023
Time
17:0Hrs
|
|
| 197 |
Consultancy services for preparation of Detailed Project Report for the work of Rehabilitation and Upgrading 2 lane with Paved Shoulders Configuration and Strengthening of Purulia-Dhanbad Road Section up to Bengal-Jharkhand Border (Km. 0.0 to 10.00) of NH-218 in the State of West Bengal. |
EE/NHD-IV/NIT/DPR/2023-24/01 |
12/05/2023 |
08/05/2023
|
25/07/2023
Time
18:0Hrs
|
|
| 198 |
Consultancy service for preparation of Detailed Project Report (DPR) for 4 Lanning of NH 31C (New NH 327) from Km. 0.00 (West Bengal/Bihar Border) to Km. 32.00 (Bagdogra) in the district of Darjeeling, West Bengal. |
MORTH/RO-KOL/NIT/DPR/23-24/08 |
04/05/2023 |
04/05/2023
|
26/06/2023
Time
15:0Hrs
|
|
| 199 |
Pre. of DPR incl. LAand Other Clearances for Cons. ofroad from 2Lane to 4Lane ofa.Arwal to Biharsharif from Km 0 to Km 89 of New NH33b.Kujapi Gaya to Panchanpur from Km 103 to 118 of NH120 c.Dhobhi to Gosaindih from Km 0 to 13 of NH22 in Bihar |
03-NH/GAYA/DPR/2023-24 |
22/05/2023 |
04/05/2023
|
18/07/2023
Time
17:0Hrs
|
|
| 200 |
Preparation of DPR a.Const. of ROB in km55 of NH33 at Rly underpass Bridge No 69 Near Arwal More at Jehanabad b.Const. of ROB in km 200.650 of NH120 at Rly LC No 46B T Near Bikramganj c.Const of ROB in km 243.900 of NH120 at Rly Dumrown Near Dumrown |
02-NH/GAYA/DPR/2023-24 |
16/05/2023 |
03/05/2023
|
16/06/2023
Time
17:0Hrs
|
|
| 201 |
Consultancy Services for Preparation of Detailed Project Report and providing pre-Construction services from –(i) Silchar ISBT (Start point of Silchar Bypass) to junction of NH-37 & NH-6 at Dhaleshwari, (ii) End of proposed Badarpur bypass to Churaibari (Assam-Tripura Border) (iii) Spur from NH -8 near Karimganj to Sutarkandi. |
NHIDCL/Assam/DPR/ Silchar/Churaibari/2023 |
30/05/2023 |
01/05/2023
|
14/06/2023
Time
15:0Hrs
|
|
| 202 |
Consultancy Services for Preparation of Detailed Project Report and providing Pre-construction activities for port connectivity between (i) National Waterway – 2 at Dhubri to NH - 127B,(ii) National Waterway-16 at Badarpur to NH-37 & (iii) National Waterway-16 at Karimganj to NH-37 in the State of Assam. |
NHIDCL/2022-23/AS/Dhubri/ DPR/NW-2/NH-127B |
14/06/2023 |
01/05/2023
|
14/06/2023
Time
15:0Hrs
|
|
| 203 |
Consultancy Services for DPR for Construction of 6 lanes elevated corridor and deve. of road, Prabhat Chouraha to Ratnagiri Tiraha, ITI Tirah to Chetak Bridge, Gautam nagar to Veersawarker setu, CSIR AMPRI to Misrod section of NH-46 L-18.20 Km in MP |
751151 |
29/04/2023 |
29/04/2023
|
01/06/2023
Time
17:30Hrs
|
|
| 204 |
CONSULTANCY SERVICES FORPREPARATION OF DPR FOR CONSTRUCTION OF ROAD FROM ASHA CHEEMA GURDALIGALI APHARWAT SARSON ANITA TRISTAR FROM KM 0.00 TO KM 61.25 TO NHSL WITH PAVED SHOULDER SPECIFICATIONS UNDER 99 RCC / 760 BRTF PROJECT BEACON IN J&K (UT) |
CE (P) BCN/Consultancy/06/2023-24 |
27/04/2023 |
27/04/2023
|
05/06/2023
Time
12:0Hrs
|
|
| 205 |
Consultancy Services for Preparation of Detailed Project Report and providing pre-Construction services in respect to following (i) Up-gradation to 2/4/6 lane from km 343 (Kumarghat) to km 397 (Ambassa) and from km 422 (Mugiakami) to km 456.5 (Champaknagar), (Total Length 88.5 km) on Churaibari to Agartala road section on NH-08 in the State of Tripura on EPC basis. (ii) 2/4 lane of Eastern Agartala Bypass ( Lembucherra-Khayerpur) (Approximate Length 10 Km) in the State of Tripura on EPC basis |
NHIDCL/Tripura/NH-08/DPR/C-A /2023 |
28/04/2023 |
21/04/2023
|
12/06/2023
Time
15:0Hrs
|
|
| 206 |
CS for preparation and approval of Detailed Design and Drawing of Various Standard Spans of ROB with Standard Deck Config of 2Lane one way and 3Lane one way including Proof checking from IITs/NITs and Approval from (RDSO Lucknow) |
NHAI/HQ/ROB/ RUB/RFP/2023 |
19/05/2023 |
17/04/2023
|
08/06/2023
Time
11:0Hrs
|
|
| 207 |
Consultancy Services for preparation of Detailed Project Report for construction of 2 lane 4 lane ROB in lieu of Level Crossing no.KK 26 Railway Ch. Km 109 20 21 at Existing Ch Km 37.003 of NH 516E in the State of Andhra Pradesh |
SE-RO/VJY/DPR/ROB/PIU-ARAKU |
18/04/2023 |
12/04/2023
|
05/06/2023
Time
17:0Hrs
|
|
| 208 |
Consultancy services for the preparation of Feasibility studies and Detailed project report for the work of Rehabilitation Upgradation an Widening of existing Highway to 2Lane 4 Lane with Paved Shoulder from Km. 55.800 to Km. 113.650 (Length 57.8 |
NIT01/NHDGAD/2023-24 |
12/05/2023 |
11/04/2023
|
22/05/2023
Time
17:0Hrs
|
|
| 209 |
“Consultancy Services for Preparation of Detailed Project Report and providing services for pre-construction activities in respect of “Widening and Up-gradation of existing carriageway into 2-lane with paved shoulder configuration from (a) Rongli, Sikkim to Jhalong, West Bengal (Missing link-Greenfield) (b) Rangpo (Km 52.300 of NH-10) to Rorathang (Km 8.023 of NH-717A) in the State of Sikkim and (c) Treatment/ Restoration of newly developed sinking zone between Km 0.00 (Rhenock) to Km 26.706 (Ro |
2023_NHIDC_748653_1 |
20/04/2023 |
10/04/2023
|
08/06/2023
Time
15:0Hrs
|
|
| 210 |
“Consultancy Services for Preparation of Detailed Project Report and providing services for pre-construction activities in respect of “Widening and Up-gradation of existing carriageway into 2-lane with paved shoulder configuration from Lavamore (Km 61.10) to Start of Pedong Bypass (Km 79.700) and from Reshi (Km 96.254) to Rhenock (Km 101.554) along NH-717A & from Rhenock (Km 0.00) to Rongli Bazaar (Km 15.300) along NH-717B in the States of Sikkim and West Bengal |
2023_NHIDC_748458_1 |
18/04/2023 |
06/04/2023
|
05/06/2023
Time
15:0Hrs
|
|
| 211 |
PMC for preparation of Detailed Project Report, Pre construction activity and supervision for the work of Upgradation from Km. 220.048 to km 305.820 of NH-35 old ch.km 400.858 to km 486.775 of NH-76E to 4L PS. Standard. |
CE-RO/LKO/PMC/NH-35(76E) /2022-23 dt. 27.03.2023 |
29/03/2023 |
27/03/2023
|
23/05/2023
Time
17:0Hrs
|
|
| 212 |
PMC for FS prep of DPR providing pre construction activities nd Construction supervision for Construction of Highway Tunnel of 5.5 Km inclg approaches across Pir Panjal Range betwn Km 75.00 nd Km 80.50 on Poonch Uri Road in JK |
RW/CH/W(38)/JK/2023 |
25/03/2023 |
25/03/2023
|
17/04/2023
Time
15:0Hrs
|
|
| 213 |
PMC for FS Prep of DPR Provid Pre Construction Activts nd Constn Supervn for Constn of Highway Tunnel of 6.12 km inclg approaches across Sadhana Pass betwn Km 79.50 nd Km 102.10 on Rafiabad Kupwara Chowkibal Tangdhar Chamkot Road NH 701 in JK |
RW/CH/W(37)/JK/2023 |
25/03/2023 |
25/03/2023
|
17/04/2023
Time
15:0Hrs
|
|
| 214 |
Preparation of Detailed Project Report for construction of bridge including approaches across Giri River on Paonta Sahib Gumma Fediz section of National Highway NH 707 old no. NH 72 B from km 14.200 to km 18.000 in the State of HP Distt. Sirmaur |
MoRTH PIU-P.S./DPR/KD-MB/22-23/2074 |
06/04/2023 |
24/03/2023
|
15/05/2023
Time
11:0Hrs
|
|
| 215 |
Consultancy services for Feasibility study and Preparation of detailed project report including LA and other clearances for construction of Jehanabad Bypass connecting NH33 and NH 83 in the State of Bihar |
2023_MoRTH_747610_1 |
17/04/2023 |
24/03/2023
|
08/05/2023
Time
17:0Hrs
|
-
|
| 216 |
Consultancy Services for Preparation of Detailed Project Report for 2 laning of Lunglei Bypass on western side of Lunglei town in the State of Mizoram |
NHIDCL/Mizoram/DPR/Lunglei bypass/2022-23 |
22/03/2023 |
20/03/2023
|
08/05/2023
Time
11:0Hrs
|
|
| 217 |
Consultancy Services for preparation of Detail Engineering report for ROB proper Construction of Bow String type girders in railway portion from ROB chainage 1 696 to chainage 1 871 Total length 175 m at km 30 on NH l62E Pali Nadol Section Crossing the Falna Marwar Railway Section at LC No C 67 near Somesar in the state of Rajasthan |
02/2022-23/EENHPALI |
23/03/2023 |
13/03/2023
|
30/03/2023
Time
18:0Hrs
|
|
| 218 |
Consultancy Services for preparation of Detailed Project Report (DPR) for various safety measures, towards Zero Fatality Corridor, on Chilakaluripeta to Nellore section of NH-16 from Km.1182.802 to Km.1366.547 in the state of Andhra Pradesh. |
2023-NHAI-148301-1 |
19/04/2023 |
08/03/2023
|
17/07/2023
Time
15:0Hrs
|
|
| 219 |
PMC work of (A) RAJIM BYPASS FROM CH. 11.840 TO CH. 21.180 OF NH-130C (B) PAUND TO DHAVALPUR FROM CH. 40.400 TO CH. 99.800 OF NH-130C (C) DHAVALPUR TO MADANGMUDA FROM CH. 99.800 TO CH. 168.800 OF NH-130C (D) 4-LANE ROB CONSTRUCTION IN KM. 6.850 NEAR VILLAGE MANIKCHAURI OF NH-130C (E) 4-LANE ROB CONSTRUCTION IN KM. 16.200 NEAR NAVAPARA (RAJIM) OF NH-130C in the state of Chhattisgarh. |
01, 02, 03 & 04/ RO/CG/NH/2022-23/East-II/PMC/2 |
06/03/2023 |
07/03/2023
|
13/06/2023
Time
13:0Hrs
|
|
| 220 |
AS Per NIT/RFP |
RE-NIT NO. 08/NH-BHAGALPUR/2022-23 DT. 06.03.2023 |
06/03/2023 |
06/03/2023
|
19/04/2023
Time
11:0Hrs
|
|
| 221 |
Consultancy Services for Preparation of DPR including detailed Geological, Geotechnical and Topographical Surveys/Investigations and Design of Cost Effective and Suitable remedial measures for prevention of landslides/rockfall in identified locations (approx. 45 Nos) on Kiratpur-Manali Section of NH-21 in the State of Himachal Pradesh |
2023 NHAI 148103 1 |
10/03/2023 |
06/03/2023
|
18/04/2023
Time
11:0Hrs
|
|
| 222 |
PMC work of GHODARI (NADI MOD)- MAHASAMUND-BAGBAHARA-TEMRI-ODISHA BORDER FROM EXISTING CH. 0.000 TO CH. 65.900 Km. of NH-353. (A) TELANGANA BORDER -BHOPALPATNAM- JAGDALPUR ROAD FROM KM. 287.000 TO KM. 504.000 ON NH-63 (B) JAGDALPUR-DHANPUNJI ROAD FROM KM. 299.00 TO 317.800 ON NH-63 (C) DANTEWADA BYPASS ON NH-163A in the state of Chhattisgarh. |
01, 02, 03 & 04/ RO/CG/NH/2022-23/East-II/PMC/4 |
06/03/2023 |
03/03/2023
|
13/06/2023
Time
13:0Hrs
|
|
| 223 |
PMC work of GHODARI (NADI MOD)- MAHASAMUND-BAGBAHARA-TEMRI-ODISHA BORDER FROM EXISTING CH. 0.000 TO CH. 65.900 Km. of NH-353 in the state of Chhattisgarh. |
01, 02, 03 & 04/ RO/CG/NH/2022-23/East-II/PMC/3 |
07/03/2023 |
03/03/2023
|
13/06/2023
Time
13:0Hrs
|
|
| 224 |
Consultancy Services for preparation of Detailed Project Report for construction of Kawardha Bypass of National Highways-12A with Two/Four lane with paved shoulder configuration in the state of Chhattisgarh |
01/ RO/CG/NH/2022-23/East-II/DPR |
03/03/2023 |
03/03/2023
|
13/06/2023
Time
13:0Hrs
|
|
| 225 |
PREPARATION OF DETAILED PROJECT REPORT, PRE CONSTRUCTION ACTIVITY AND PROJECT SUPERVISION FOR THE WORK OF RECONSTRUCTION/UP-GRADATION OF SELECTED STRETCHES/CORRIDORS OF NATIONAL HIGHWAYS TO TWO/FOUR LANE WITH PAVED SHOULDER CONFIGURATION Pkg-1 |
01, 02, 03 & 04/ RO/CG/NH/2022-23/East-II/PMC |
06/03/2023 |
03/03/2023
|
13/06/2023
Time
13:0Hrs
|
|
| 226 |
CS for DPR for CONSTN OF AVALANCHE GALLERY CONTROL STRUCTS TO ACHIEVE ALL WEATHER CONNECTIVITY BETWN EASTERN PORTAL OF ZOZILA TUNNEL TO KARGIL ND IMP OF ROAD GEOMETRICS INCLG CONSTN OF BRIDGES VIADS ETC KM108 TO KM268 OF ZOZILA KARGIL LEH ROAD NH1 |
RW/SR/WORKS(18)/LADAKH/2022 |
02/03/2023 |
02/03/2023
|
17/03/2023
Time
15:0Hrs
|
|
| 227 |
IMPROVEMENT OF ROAD GEOMETRICS INCLUDING CONSTRUCTION OF BRIDGES VIADUCTS ETC IN BETWEEN KM 268 TO KM 391 OF ZOZILA KARGIL LEH ROAD NH 1 UNDER PROJECT VIJAYAK IN UT OF LADAKH |
RW/SR/Works(18)/Ladakh/2022/PI |
02/03/2023 |
02/03/2023
|
17/03/2023
Time
15:0Hrs
|
|
| 228 |
PMC for FS Prep of DPR Provid Pre Construction Activts nd Constn Supervn for Constn of Highway Tunnel of 6.12 km inclg approaches across Sadhana Pass betwn Km 79.50 nd Km 102.10 on Rafiabad Kupwara Chowkibal Tangdhar Chamkot Road NH 701 in JK |
RW CH/W(37)/JK/2023 |
01/03/2023 |
01/03/2023
|
24/03/2023
Time
17:0Hrs
|
|
| 229 |
PMC for FS prep of DPR providing pre construction activities nd Construction supervision for Construction of Highway Tunnel of 5.5 Km inclg approaches across Pir Panjal Range betwn Km 75.00 nd Km 80.50 on Poonch Uri Road in JK |
RW/CH/W(38)/JK/2023 |
01/03/2023 |
01/03/2023
|
24/03/2023
Time
17:0Hrs
|
|
| 230 |
Consultancy Services for preparation of Detailed Project Report (DPR) for stretches (i) Kamenbari to Tenga (ii) Jang to Lumla and (iii) Lumla to Neliya (border) in the State of Arunachal Pradesh. |
NHIDCL/Arunachal/DPR/Inter-corridor/2023 |
15/03/2023 |
27/02/2023
|
10/04/2023
Time
15:0Hrs
|
|
| 231 |
Project management consultancy services for 4/6 laning of Mumbai-Pune NH-48 from Shilphata (Km. 131/200 To Nigadi (KM 20/400) INCLUDING IMPROVEMENT OF BLACK SPOTS, ROAD SAFETY IMPROVEMENT AND FINANCIAL ANALYSIS. |
No. RO/MUM/PMC-1/2022-23 |
30/03/2023 |
22/02/2023
|
08/05/2023
Time
17:0Hrs
|
|
| 232 |
Consultancy Services for Preparation of Detailed Project Report for rehabilitation and upgradation of NH-52 stretch in Autram Ghat Section (from Km.375 to Km.390) part of Aurangabad–Dhule section of NH-52 in the State of Maharashtra-3rd call |
NHAI/RO-NAG/TENDERS/2022-23/38 |
22/02/2023 |
22/02/2023
|
23/03/2023
Time
11:0Hrs
|
|
| 233 |
Consultancy Services for Feasibility Study and Preparation of DPR for Widening and Strengthening to 2-Lane with Paved Shoulder in Km 0 to 115 (Bariyarpur to Vamdah) of NH-333 with land acquisition in the State of Bihar. |
RE-NIT NO. 10/NH-LAKHISARAI/2022-23 |
16/02/2023 |
16/02/2023
|
01/04/2023
Time
17:0Hrs
|
|
| 234 |
Consultancy Services for preparation of Detailed Project Report (DPR) for 2-laning of Itakhola (on NH-15) - Seijosa - Pakke Kessang (on NH-13) Road (Approx. 80 km) in the State of Arunachal Pradesh / Assam. |
RW/Ar.P/DPR/ISPK/2022-23/RO-Ita |
13/02/2023 |
13/02/2023
|
16/03/2023
Time
11:0Hrs
|
|
| 235 |
Consultancy Services for preparation of Detailed Project Report (DPR) for 2-laning of Seppa - Chayangtajo Road (Approx. 81 km) in the State of Arunachal Pradesh / Assam. |
RW/Ar.P/DPR/SCT/2022-23/RO/Ita/ |
13/02/2023 |
13/02/2023
|
16/03/2023
Time
11:0Hrs
|
|
| 236 |
Project Management Consultancy Services for Construction of Construction of Twin Tube Uni-directional Tunnel (10.8 km) under Ganesh top hill including approaches from D.ch. 60.400 ( Chandanwadi) to D.Ch. 82.700 ( Near Sangam Top ) on Khanabal-Baltal section of NH-501 in the under UT of Jammu & Kashmir on EPC mode. |
NHIDCL/J&K/NH-501/Sheshnag Tunnel/PMC /2022-23 |
25/01/2023 |
13/02/2023
|
11/04/2023
Time
15:0Hrs
|
|
| 237 |
Feasibility study Land Acquisition and preparation of DPR for i Construction of Bypass in south east Direction of Darbhanga. ii Baheri Spur of NH 527E iii km 104 Bhitha More to KM 217 Naraharia of NH104 |
06/NH/Jainagar/2022-23 |
03/03/2023 |
10/02/2023
|
13/04/2023
Time
15:0Hrs
|
|
| 238 |
Preparation of Detailed Project Report, Pre construction activities and Project Supervision of various selected stretches from Km 221/800 to Km 290/200 of NH- 41 (Naliya Jn to Narayan Sarovar)the State of Gujarat. |
2023_MoRTH_739504_1 |
09/02/2023 |
09/02/2023
|
02/05/2023
Time
17:0Hrs
|
|
| 239 |
Preparation of Detailed Project Report, Pre construction activities and Project Supervision of various selected stretches Km 61/658 to Km 105/00 of NH- 953 (Ahwa to Maharastra Border hilly section) in the State of Gujarat. |
2023_MoRTH_739512_1 |
09/02/2023 |
09/02/2023
|
02/05/2023
Time
17:0Hrs
|
|
| 240 |
Preparation of Detailed Project Report, Pre construction activities and Project Supervision of various selected stretches from Km 62/00 to Km 92/320 and Km 115/320 to Km 160/320 of NH-58 (Vadali to Palanpur) including Vadgam Bypass, Vadali Bypass and Chansol Bypass in the State of Gujarat. |
2023_MoRTH_739346_1 |
08/02/2023 |
09/02/2023
|
02/05/2023
Time
17:0Hrs
|
|
| 241 |
PMC services for Widening to 4 lane of NH 105 from Km 35 00 to 66 275 of Nalagarh to Swarghat road in the State of Himachal Pradesh |
RO/HP/Works (292)/2022-23/1012 |
09/02/2023 |
08/02/2023
|
17/04/2023
Time
15:0Hrs
|
|
| 242 |
PMC for Widening to 4 lane of NH 503 Extn from Km 0 to 28 900 Amb to Una and Widening to 4lane of NH 70 New 03 Jallandhar Hoshiarpur Gagret Amb Nadaun Hamirpur TauniDevi Sarkaghat Mandi road from Km. 58 400 to 114 PB HP border to Nadaun in the HP |
RO/HP/Works (293)/2022-23/1016 |
10/02/2023 |
08/02/2023
|
25/03/2023
Time
15:0Hrs
|
|
| 243 |
Project Management Consultancy Services for construction of Highway 2 lane Tunnel including approaches across the Nahan Town on Nahan Sarahan Kumarhatti Road NH 907A from Km 0 00 to Km 5 00 in the State of Himachal Pradesh |
RO/HP/Works (266)/2022-23/997 |
09/02/2023 |
06/02/2023
|
25/03/2023
Time
15:0Hrs
|
|
| 244 |
Consultancy Services for preparation of Detailed Project Report (DPR) for 2-laning of Lazu- Wakka -Khanu & Konsa – Longding Road (Approx. 120 km) in the State of Arunachal Pradesh / Assam. |
RW/Ar.P/DPR/LWKKL/2022-23/RO-Ita / |
27/01/2023 |
27/01/2023
|
16/03/2023
Time
11:0Hrs
|
|
| 245 |
Consultancy Services for Preparation of Detailed Project Report and providing services for Pre-Construction activities in respect of Provisioning of 4 lane Bridge over river Kushiyara (approx. Length 300 m) and its approaches between Karimganj, Assam (India) and Zakiganj Upazila (Sylhet district, Bangladesh) (approximate length of 900 m).-2nd Call |
NHIDCL/HQ/DPR/Karimganj-Zakiganj/2022 |
06/02/2023 |
24/01/2023
|
09/03/2023
Time
15:0Hrs
|
|
| 246 |
Consultancy Services for Preparation of Detailed Project Report for 2 lanes/2 lane with paved shoulder configuration of stretch of NH-552 Extn, NH-347C, NH-135BD, and NH-135BB Total length162 Km in the state of Madhya Pradesh |
RO/Bhopal/NH/DPR/01/2022-23 |
28/01/2023 |
21/01/2023
|
07/03/2023
Time
17:30Hrs
|
|
| 247 |
Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for “Construction of 2nd Tube Uni-directional Zojila Tunnel (13.14 km) from D.ch. 16.80 to D.Ch. 30.50 of NH-1 in the under UT of Jammu & Kashmir |
NHIDCL/J&K/NH-1/Zojila 2nd Tube Tunnel/DPR /2023 |
16/01/2023 |
21/01/2023
|
01/05/2023
Time
15:0Hrs
|
|
| 248 |
Consultancy Services for preparation of Detailed Project Report (DPR) for 2-laning of Kanubari – Hukanjuri – Deomali – Margherita Road (Approx. 110 km) in the State of Arunachal Pradesh / Assam. |
RW/Ar.P/DPR/KHDM/2022-23/RO-Ita |
20/01/2023 |
20/01/2023
|
16/03/2023
Time
11:0Hrs
|
|
| 249 |
Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for “2-lane with Paved Shoulder of NH-configuration for Baramulla-Gulmarg Road (approx length 42 Km)” in the UT of Jammu & Kashmir. |
NHIDCL/JK/DPR /Baramulla Gulmarg (2L)/2022-23 |
23/12/2022 |
18/01/2023
|
09/02/2023
Time
15:0Hrs
|
|
| 250 |
PMC Service for Construction of Highway 2- Lane Tunnel including approaches across the Bageshwar Hills in market area km 130 to km 136 of Rameshwar-Almora of NH-309A in the State of Uttarakhand |
RO/UK/BAGHESWAR TUNNEL/01 |
16/01/2023 |
16/01/2023
|
02/03/2023
Time
11:0Hrs
|
|
| 251 |
Consultancy Services for Preparation of Detailed Project Report and providing Pre- Construction activitiesfor connecting National Waterway - 2 at Dhubri to NH - 127B in the State of Assam. (2nd Call) |
NHIDCL/2022-23/AS /Dhubri/DPR/NW2-NH127B/C2 |
10/12/2022 |
16/01/2023
|
23/01/2023
Time
15:0Hrs
|
|
| 252 |
Consultancy Services for Preparation of Detailed Project Report (DPR) for 2-laning of Changlang -Khimiyang -Lazu Road (Approx. 100 km) in the State of Arunachal Pradesh |
2023_MoRTH_734234_1 |
11/01/2023 |
11/01/2023
|
16/03/2023
Time
11:0Hrs
|
|
| 253 |
Consultancy services for, feasibility study, detailed project report, survey and preparation of land plan for widening to four lane from 100.00 to 106.00 & Km.112.800 to Km. 127.160 of NH-63 Ankola-Gooty section in the State of Karnataka |
RW/BNG/NH-63/Km 100-106/146/2022 |
10/01/2023 |
10/01/2023
|
20/02/2023
Time
16:0Hrs
|
|
| 254 |
CS for DPR for CONSTN OF AVALANCHE GALLERY CONTROL STRUCTS TO ACHIEVE ALL WEATHER CONNECTIVITY BETWN EASTERN PORTAL OF ZOZILA TUNNEL TO KARGIL ND IMP OF ROAD GEOMETRICS INCLG CONSTN OF BRIDGES VIADS ETC KM108 TO KM268 OF ZOZILA KARGIL LEH ROAD NH1 |
2023_MoRTH_733085_1 |
10/01/2023 |
10/01/2023
|
23/02/2023
Time
11:0Hrs
|
|
| 255 |
IMPROVEMENT OF ROAD GEOMETRICS INCLUDING CONSTRUCTION OF BRIDGES VIADUCTS ETC IN BETWEEN KM 268 TO KM 391 OF ZOZILA KARGIL LEH ROAD NH 1 UNDER PROJECT VIJAYAK IN UT OF LADAKH |
RW/SR/Works(18)/Ladakh/2022/PI |
10/01/2023 |
10/01/2023
|
23/02/2023
Time
17:0Hrs
|
|
| 256 |
Consultancy services for, feasibility study, detailed project report, survey and preparation of land plan for Construction of New 4lane Bypass to Hubballi-Dharwad cities connecting NH-218(Near Kusugal) and NH-48(Near Narendra) in the State of Karnataka |
RW/BNG/NH-218/NEW BYPASS/108/2022 |
09/01/2023 |
09/01/2023
|
20/02/2023
Time
16:0Hrs
|
|
| 257 |
Consultancy Services for preparation of Detailed Project Report (DPR) for decongestion / bypass of NH-515 in Pasighat town (approx. 10Km) under Road Safety in the State of Arunachal Pradesh. |
Ar.P/RSA/Pasighat Bypasss/2022-23/RO-Ita |
09/01/2023 |
06/01/2023
|
02/02/2023
Time
11:0Hrs
|
|
| 258 |
PMC for preparation of Detailed Project Report, Pre construction activity and supervision for the work of Elevated corridor from Ramadevi to Gol Chauraha on NH-91 in the state of U.P. |
CE-RO/LKO/PMC/Lot-VII/2022-23 Dated.04.01.2023 |
06/02/2023 |
04/01/2023
|
24/02/2023
Time
11:0Hrs
|
|
| 259 |
PMC services for construction of Double Lane Highway Tunnel across Fotula top on Zojila-Kargil-Leh road under Project Vijayak in UT of Ladakh |
2022_MoRTH_725875_1 |
02/01/2023 |
02/01/2023
|
02/02/2023
Time
15:0Hrs
|
|
| 260 |
PMC services for construction of 2.50 km long road Tunnel across Namik La Pass on road Zojila-Kargil- Leh under Project Vijayak in UT of Ladakh |
2022_MoRTH_726039_1 |
02/01/2023 |
02/01/2023
|
02/02/2023
Time
15:0Hrs
|
|
| 261 |
Consultancy Services for preparation of Feasibility Study and Detailed Project Report and providing preconstruction services for Rehabilitation Upgradation of existing road to 2 lane 4lane with paved shoulders configuration of Mohol Kurul Kamati Kanbas Achegaon Walsang Dhotri Musti Tandulwadi NH 465 Km 0.00 to 107.600 Length 107.600 km Approx District Solapur in the State of Maharashtra |
2022_MoRTH_731500_1 |
02/01/2023 |
27/12/2022
|
10/02/2023
Time
17:0Hrs
|
|
| 262 |
Consultancy Services for preparation of Feasibility Study and Detailed Project Report and providing preconstruction services for Rehabilitation / Upgradation of existing road to 2lane/4lane with paved shoulders configuration of Murum-Alur-Waghdari-Akkalkot-Nagansur-Tolnur-Maharashtra State Border NH 548B Km 263 00 (Dalimb Junction) to 344 562 (Maharashtra State Border) (Length = 81.562 km Approx)- District Solapur in the State of Maharashtra. |
2022_MoRTH_731561_1 |
02/01/2023 |
27/12/2022
|
10/02/2023
Time
17:0Hrs
|
|
| 263 |
Consultancy services of Feasibility Report cum DPR for Widening of the existing 2-lane road to 4-lane from Willingdon Island-Kundanoor or alternatively to Aroor-other suitable location on NH-66 to provide connectivity to Cochin Port Trust in Kerala |
NHAI/PC/ Willingdon-Kundanoor/2022 |
26/12/2022 |
21/12/2022
|
24/01/2023
Time
11:0Hrs
|
|
| 264 |
Consultancy services for the preparation of Feasibility studies and Detailed project report for the work of Rehabilitation, Upgradation & Widening of existing Highway to Rigid Pavement 2Lane / 4 Lane with Paved Shoulder of NH 160 near Sinnar connecting Shirdi, Ahmadnagar, Kolgaon, Daund, Phaltan, Dahiwadi, Vita, Tasgaon, Miraj in the state of Maharashtra. (Section Sangli District Border - Vita to Tasgaon Km 227/480 to 273/780) Total Length 46.30 Km ) |
5/EENHPUNE2434/2022dt5/12/2022 |
20/12/2022 |
19/12/2022
|
16/05/2023
Time
17:5Hrs
|
|
| 265 |
Consultancy services for the preparation of Feasibility studies and Detailed project report for the work of Rehabilitation, Upgradation & Widening of existing Highway to Rigid Pavement 2Lane / 4 Lane with Paved Shoulder of NH 160 near Sinnar connecting Shirdi, Ahmadnagar, Kolgaon, Daund, Phaltan, Dahiwadi, Vita, Tasgaon, Miraj in the state of Maharashtra. Section Tasgaon -Miraj Karnataka State Border ( including Tasgaon bypass) Km 273/780 to 321/780 ( Total Length 48.00 Km) |
5/EENH/Pune 2434/2022dt 5/12/2022 |
20/12/2022 |
19/12/2022
|
16/05/2023
Time
17:5Hrs
|
|
| 266 |
Consultancy service for preparation of Detailed Project Report for construction of 4 lane elevated corridor of NH-31 (New NH-10) from km 581.00 to km.595.00 including ROB on Sevoke at 592.400 km in the district of Darjeeling West Bengal. |
MORTH/RO-KOL/NIT/DPR/22-23/03 |
19/12/2022 |
16/12/2022
|
09/02/2023
Time
11:0Hrs
|
|
| 267 |
PMC Services for Up-gradation to 2 lane with paved shoulders configuration of NH310A starting from its junction with NH 310 near Tashi View Point connecting Penengla, Kabi, Phensong, Phodong, Namok, Rangrang and terminating at Mangan |
RW/GHT/PMC/DPR/Tender/SK/1067 |
16/12/2022 |
15/12/2022
|
14/01/2023
Time
15:0Hrs
|
|
| 268 |
Consultancy Services for DPR Preparation for realignment and upgradation to2-lane with paved shoulder/four lanning of NH133A from Km 5.40 (excluding Barharwa Bypass) to Km 24.90 (excluding Pakur Bypass) in the State of Jharkhand on EPC mode including Land Acquisition,Forest Clearance and Utility Shifting etc. |
2022_MoRTH_729153_1 |
17/12/2022 |
15/12/2022
|
29/12/2022
Time
16:30Hrs
|
|
| 269 |
Consultancy services for the preparation of Feasibility studies and Detailed project report for the work of Rehabilitation, Upgradation & Widening of existing Highway to Rigid Pavement 2Lane / 4 Lane with Paved Shoulder of NH 160 near Sinnar connecting Shirdi, Ahmadnagar, Kolgaon, Daund, Phaltan, Dahiwadi, Vita, Tasgaon, Miraj in the state of Maharashtra connecting chikhodi and Terminating at its junction with NH-48 in the state of Karnataka.( Section Phaltan to Dahiwadi Km 138/050 to 180/080 ) |
NIT No.05/EENH/PUNE/2434/2022 dt.05/12/2022 |
17/12/2022 |
12/12/2022
|
16/05/2023
Time
17:5Hrs
|
|
| 270 |
Consultancy services for the preparation of Feasibility studies and Detailed project report for the work of Rehabilitation, Upgradation & Widening of existing Highway to Rigid Pavement 2Lane / 4 Lane with Paved Shoulder of NH 160 near Sinnar connecting Shirdi, Ahmadnagar, Kolgaon, Daund, Phaltan, Dahiwadi, Vita, Tasgaon, Miraj in the state of Maharashtra. ( Section Dahiwadi to Sangli District Border Km 180/080 to 227/480 Total Lensth 47.40 km. |
2022-MoRTH-728614-1 |
16/12/2022 |
12/12/2022
|
16/05/2023
Time
17:5Hrs
|
|
| 271 |
Project Management Consultancy Services for Construction of Twin Tube Uni-directional Aizawl Bypass Tunnel (2.5 km) including approaches (2.1 km) from km 10.600 to km 15.200 (Package-2) on Sairang - Phaibawk section of NH-6 in the State of Mizoram under Bharatmala Pariyojna on EPC Mode |
NHIDCL/Mizoram/NH-6/Aizawl Bypass/PMC/Package-2 |
09/12/2022 |
12/12/2022
|
23/01/2023
Time
11:0Hrs
|
|
| 272 |
CONSULTANCY SERVICES FOR PREPARATION OF DETAILED PROJECT REPORT AND PROVIDING PRE CONSTRUCTION ACTIVITIES FOR CONSTRUCTION OF HIGHWAY TUNNEL BETWEEN KM 10pt250 TO KM 10pt650 ON MAR UNDER 108 RCC 759 BRTF PROJECT DEEPAK IN THE STATE OF HP ON EPC MODE |
CE (P) DPK/16/2022-23 |
05/01/2023 |
12/12/2022
|
28/02/2023
Time
17:0Hrs
|
|
| 273 |
Consultancy Services for Preparation of Feasibility study and Detailed Project Report for Construction of ROB at L/C No. 1/Class A Safiyasarai Ch-71.970 of NH-80, L/C No. 5/SPL/T Shivnarayanpur Ch-171.300 of NH-80 and ROB at L/C No. 2/C-T(SPL) Mirzachowk Ch-188.200 of NH-80 in the state of Bihar. |
RE NIT No. 05/NH-Bhagalpur/2022-23 Dt. 09.12.2022 |
10/12/2022 |
10/12/2022
|
24/01/2023
Time
17:0Hrs
|
|
| 274 |
Consultancy Services for preparation of Detailed Project Report for rehabilitation or reconstruction of existing retained bridges in Ranchi-Rargaon-Mahulia section from Km. 114.000 to Km. 277.500 of NH-33 in the state of Jharkhand |
NHAI/RO/RNC/JH/2022-23/20 |
04/01/2023 |
08/12/2022
|
23/01/2023
Time
11:0Hrs
|
|
| 275 |
Consultancy Services for Preparation of Feasibility Study, Detailed Project Report Survey,Preparation of Land plan for Widening to Four lane on NH-169 from Km.25.15 to 60.00 (excluding from Km. 53.775 to 55.060) on (Shimoga Mangalore Section) in the state of Karnataka |
RW/BNG/NH-169/Km.30-60/107/2022/DPR |
02/12/2022 |
02/12/2022
|
05/01/2023
Time
16:0Hrs
|
|
| 276 |
Consultancy Services for Preparation of feasibility study, detailed project report, survey and preparation of land plan for widening to two lane with paved shoulder on NH-169A from Km. 30.75 to Km. 51.60 (Agumbe Ghat) in the State of Karnataka |
RW/BNG/NH-169A/Km.33-41/23/2022/DPR |
02/12/2022 |
02/12/2022
|
05/01/2023
Time
16:0Hrs
|
|
| 277 |
Survey Investigation Land Acquisition feasibility study and preparation of DPR on NH. 227 Old NH. 104 for Construction of H.L. R.C.C bridge with approaches over Kamla River at chainage 159 280 in the state of Bihar for the year 2022-23 |
04/NH/JAINAGAR/2022-23 |
12/12/2022 |
01/12/2022
|
17/01/2023
Time
11:0Hrs
|
|
| 278 |
Consultancy Services for feasibility study, detailed project report, survey and preparation of land plan for widening to two lane with paved shoulders from Sagara-Havinahalli -Holebaglu -Kalasvalli -Sighandoor - Markutka (junction with NH-766c) in the state of Karnataka |
RW/BNG/NH-766C/SAGAR-MARAKUTTAKA/08/2019-DPR(1) |
01/12/2022 |
01/12/2022
|
02/01/2023
Time
15:0Hrs
|
|
| 279 |
Consultancy services for, feasibility study, detailed project report, survey and preparation of land plan for widening to two lane with paved shoulder from Km. 124.00 to153.00 of NH-169 (Tanikonda to SK Boarder) in the state of Karnataka |
RW/BNG/NH-169/Km.124-153/109/2022/DPR |
01/12/2022 |
01/12/2022
|
05/01/2023
Time
16:0Hrs
|
|
| 280 |
PMC services for construction of Double Lane Highway Tunnel across Fotula top on Zojila-Kargil-Leh road under Project Vijayak in UT of Ladakh |
RW/SR/Works(16)/Ladakh/01/2022 |
29/11/2022 |
29/11/2022
|
09/01/2023
Time
15:0Hrs
|
|
| 281 |
PMC services for construction of 2.50 km long road Tunnel across Namik La Pass on road Zojila-Kargil- Leh under Project Vijayak in UT of Ladakh |
RW/SR/Works(15)/Ladakh/2022 |
29/11/2022 |
29/11/2022
|
11/01/2023
Time
15:0Hrs
|
|
| 282 |
Consultancy Services for DPR Preparation for Widening and strengthening to 4 lane along with geometric improvement including Replacement of Culverts and Bridges from km 0.00 to km 41.00 of NH-220 in the State of Jharkhand including complete Land Acquisition, Forest Clearance and Utility Shifting etc |
2022_MoRTH_726284_1 |
29/11/2022 |
29/11/2022
|
03/01/2023
Time
14:30Hrs
|
|
| 283 |
Consultancy Services for Preparation of Detailed Project Report for rehabilitation and upgradation of NH-52 stretch in Autram Ghat Section (from Km.375 to Km.390) part of Aurangabad – Dhule section of NH-52 in the State of Maharashtra |
NHAI/RO-NAG/TENDERS/2022-23/23 |
26/11/2022 |
26/11/2022
|
14/12/2022
Time
11:0Hrs
|
|
| 284 |
Consultancy Services for Carrying out Feasibility Studies (FS) and preparation of Feasibility Report in respect of Upgradation & Widening of road to two lane with paved shoulders from Hilli (West Bengal) to Mahendraganj (Meghalaya) through Bangladesh. |
NHIDCL/HQ/DPR/Hilli-Mahendraganj/2022 |
23/11/2022 |
23/11/2022
|
16/01/2023
Time
15:0Hrs
|
|
| 285 |
Consultancy service for feasibility study & DPR preparation of Rangia Bypass of NH-127 D including ROB (L=8.00 Km) under Annual Plan 2022-23 in the State of Assam. |
RW/GHT/AS/PMC/TENDER/2022-23/957 |
24/11/2022 |
22/11/2022
|
05/01/2023
Time
15:0Hrs
|
|
| 286 |
Consultancy Services for Preparation of Feasibility DPR for Widening to Two lane with paved shoulders from km 41.90 to 84.30, 88.20 to 105.25, 148.23 to 161.55, 166.35 to 174.13, 176.12 to 186.55 and 191.90 to 192.90 on NH 766C of Byndoor –Ranebennur section in State of Karnataka |
RW/BNG/NH-766C/SAGAR-MARAKUTTAKA/08/2019-DPR |
22/11/2022 |
22/11/2022
|
02/01/2023
Time
15:0Hrs
|
|
| 287 |
Consultancy Services for Preparation of Detailed Project Report and providing Pre- Construction activities for connecting National Waterway – 2 at Dhubri to NH - 127B in the State of Assam |
NHIDCL/2022-23/AS/ Dhubri/DPR/NW2-NH127B |
09/11/2022 |
16/11/2022
|
23/11/2022
Time
15:0Hrs
|
|
| 288 |
CS FOR DPR FS DETAILED SURVEY/INVESTGN ALIGNMT OPTION PREPRN OF GAD ENGNG REPT FOR CONSTN OF PROPOSED FOB ND APPROACS ALONG WID SER ROAD ND PREPN OF LA PAPERS FS US DETAILS ON BATHINDA DABWALI ROAD KM297.115 NH54 IN PB |
RW/CH/W(40)/PB/2022/1 |
15/11/2022 |
15/11/2022
|
16/12/2022
Time
11:0Hrs
|
|
| 289 |
ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FEASIBILITY STUDY (FS) AND DETAILED PROJECT REPORT (DPR) FOR CONSTRUCTION OF FOLLOWING ROADS UNDER PROJECT UDAYAK IN THE STATE OF ARUNACHAL PRADESH (RECALL) PARTI MIPI-ANDRATHANG FROM KM 20.00 TO KM 50.00 (NET LENGTH 30.00 KMS) GREEN FIELD ALIGNMENT TO NHSL SPECIFICATIONS IN THE AOR OF 62 RCC UNDER 752 BRTF Part-II CHANGLOHGAM-KEPAPU FROM KM 16.50 TO KM 22.875 (LENGTH 6.375 KMS) GREEN FIELD ALIGNMENT TO NHSL SPECIFICATIONS IN THE AOR O |
CE (P) Udayak/DPR consultancy/12/2022-23 |
15/11/2022 |
15/11/2022
|
12/12/2022
Time
12:0Hrs
|
|
| 290 |
CS FOR FS DETAILED SURVEY/INVESTIGATION PREPARATION OF GAD DETAILED PR FOR CONSTRUCTION OF 4 LANE ROB IN LIEU OF RC NO A 8 A at KM 3.600 on NH 154 (PATHANKOT KULLU ROAD) DISTT PATHANKOT IN THE STATE OF PUNJAB |
RW/CH/W(41)/PB/2022/1 |
15/11/2022 |
15/11/2022
|
16/12/2022
Time
11:0Hrs
|
|
| 291 |
Consultancy Services for Preparation of Detailed Project Report for 2 lanes/ 4 lane with Paved Shoulder configuration for the stretch of Rajgarh Bypass of NH-52, Approximate length 12 Km in the State of Madhya Pradesh |
2022-MoRTH-713597-2 |
14/11/2022 |
14/11/2022
|
14/12/2022
Time
17:30Hrs
|
|
| 292 |
Consultancy services for Preparation of Detailed Project Report and Feasibility study for Construction of 2 lane CC Road with paved shoulder on Dahegaon- Kuhi Umred section of NH-247 from Km 17/870 to 32/000 & 51/420 to 72/000 (Including Feasibility Study of Bypass to Railway crossing at 17/870 in Kamptee village) in State of Maharashtra. |
13/EENH/NGP/2022-23/5036 |
20/12/2022 |
10/11/2022
|
02/01/2023
Time
17:0Hrs
|
|
| 293 |
PMC for preparation of Detailed Project Report, Pre construction activity and supervision for the work of Widening/Upgradation to 2L P.S. from Km. 58.600 to 105.177 ( Dramandganj to UP/MP Border) of NH-135C in the state of U.P. |
CE-RO/LKO/PMC/135C/2021-22 Dated.09.11.2022 |
29/11/2022 |
09/11/2022
|
29/12/2022
Time
17:0Hrs
|
|
| 294 |
preparation of detailed project report and pre construction activities for construction of Railway Over Bridge on NH 11 (21) (Prithvinath gate railway crossing no 6A) in district Agra in the state of Uttar Pradesh |
11202M/13M-NHCK/22 dated 01.11.2022 |
07/11/2022 |
03/11/2022
|
14/12/2022
Time
15:0Hrs
|
|
| 295 |
Consultancy Services for preparation of Detailed Project Report (DPR) for decongestion / bypass of NH-515 in Pasighat town (approx. 10Km) under Road Safety in the State of Arunachal Pradesh. |
Ar.P/RSA/Pasighat Bypasss/2022-23/RO-Ita |
02/11/2022 |
02/11/2022
|
09/12/2022
Time
12:0Hrs
|
|
| 296 |
Consultancy Services for Preparation of Detailed Project Report and preconstruction activities in respect of “Widening of existing carriageway into 2-lane with paved shoulder configuration and Several slope protection works, treatment of vulnerable sliding/sinking zones, Improvement of safety and sustainability of NH network by incorporating Bypasses, Viaducts, Bridges, Tunnels, etc along NH-10 from Km 52.00 (Rangpo) to Km 80.00 (Ranipool) in the State of Sikkim |
2022_NHIDC_720398_1 |
02/11/2022 |
28/10/2022
|
22/12/2022
Time
15:0Hrs
|
|
| 297 |
Consultancy Services for Preparation of Detailed Project Report for Provisioning of 4 lane Bridge over river Kushiyara (approx. Length 300 m) and its approaches between Karimganj, Assam (India) and Zakiganj Upazila (Sylhet district, Bangladesh) (approximate length of 900 m). |
NHIDCL/HQ/DPR/Karimganj-Zakiganj/2022 |
18/10/2022 |
28/10/2022
|
09/12/2022
Time
15:0Hrs
|
|
| 298 |
Preparation of Detailed Project Report and services for Pre-Construction activities in respect of Providing four nos. of bypasses with 2 lane with paved shoulder standard bypassing the stretches at (i) Km 4.00 to 4.5 at jamjuri (ii) Km 12.00 to 12.50 at Kakraban (iii) Km 20.00 to 22.00 at Melaghar (iv) Km 28.500 to 29.500 at Sonamura on NH-08 in State of Tripura (approximate length of 11.0 Km). |
NHIDCL/Tripura/NH-08/Udaipur-Sonamura/2022 |
25/10/2022 |
27/10/2022
|
19/01/2023
Time
15:0Hrs
|
|
| 299 |
Consultancy Services for preparation of DPR for Restoration / Upgradation of Road Manali_Leh from NHDL to two Lane Paved Shoulder specifications km 303.00 (Existing Chainage) to km 326.00 |
RW/SR/Works(17)/Ladakh/2022 |
27/10/2022 |
27/10/2022
|
12/12/2022
Time
11:0Hrs
|
|
| 300 |
Consultancy Services for preparation of Detailed Project Report for up-gradation of ( i ) Banda- Insuli- Sawantwadi- Buradi Devasu Titha (25.00 Km) in Sindhudurg District in state of Maharashtra (ii) NH 166A to two lane paved shoulder in Vadkhal |
2022_MoRTH_717360_1 |
26/10/2022 |
26/10/2022
|
21/11/2022
Time
15:0Hrs
|
|
| 301 |
Consultancy services for preparation of detailed project report for Rehabilation and upgradation 4L Standard of Karnaja Kherda Murtizapur NH 361C ( dESIGN kM 74.351 to Km 102.351) Total length 26.500 km in the state of Maharashtra on EPC Mode |
01/EENH/AMT/2022-23/1768 |
20/12/2022 |
22/10/2022
|
22/12/2022
Time
17:30Hrs
|
|
| 302 |
Project management Consultancy services for feasibility study and preparation of DPR, Supervision during construction and maintenance of NH-627(Pkj-I). |
No.RW/GHT/PMC/DPR/Tender/AS/837 |
21/10/2022 |
21/10/2022
|
12/12/2022
Time
15:0Hrs
|
|
| 303 |
Project management Consultancy services for feasibility study and preparation of DPR, Supervision during construction and maintenance of NH-627(Pkj-II). |
RW/GHT/PMC/DPR/Tender/AS/847 |
21/10/2022 |
21/10/2022
|
12/12/2022
Time
15:0Hrs
|
|
| 304 |
PMC services for upgradation of Zojila Kargil Leh section of NH 01 from km391.000(Nimmu) to km430.000 (Leh) from existing NHDL to NH four lane specifications in the UT of Ladakh (39 km approx.) |
RW/SR/Works(13)/Ladakh/2022 |
20/10/2022 |
20/10/2022
|
22/12/2022
Time
11:0Hrs
|
|
| 305 |
Consultancy Services for Preparation of Detailed Project Report and providing services for Pre-Construction activities in respect of Up-gradation & Widening of road to two lane with paved shoulders from Hilli (West Bengal) to Mahendraganj (Meghalaya) through Bangladesh (approximate length of 80.00 Km). |
NHIDCL/HQ/DPR/Hilli-Mahendraganj/2022 |
30/09/2022 |
20/10/2022
|
05/11/2022
Time
15:0Hrs
|
|
| 306 |
Consultancy Services for preparation of DPR of Mahuda More (NH-18) to Lututanr (NH-218) Bypass including Land Acquisition, Forest Clearance, R and R and Utility etc. all complete work as per latest guidelines of MoRTH, GOI, New Delhi. |
NH/Dhanbad/11/2022-23 (2nd Call) |
12/10/2022 |
17/10/2022
|
17/11/2022
Time
17:0Hrs
|
|
| 307 |
Consultancy Services for preparation of DPR of Lututanr (NH-218) to Nirsa (NH-19) Bypass including Land Acquisition, Forest Clearance, R and R and Utility etc. all complete work as per latest guidelines of MoRTH, GOI, New Delhi. |
NH/Dhanbad/12/2022-23(2nd Call) |
12/10/2022 |
17/10/2022
|
17/11/2022
Time
17:0Hrs
|
|
| 308 |
Consultancy Services for preparation of Feasibility cum DPR for development of various Port Connectivity stretches under Port Connectivity Master Plan (Package-I) |
NHAI/PC/DPR/Port Connectivity MasterPlan/ 2022/(Package-I) |
17/10/2022 |
17/10/2022
|
17/11/2022
Time
11:0Hrs
|
|
| 309 |
Consultancy Services for preparation of Feasibility cum DPR for development of various Port Connectivity stretches under Port Connectivity Master Plan (Package-2) |
NHAI/PC/DPR/Port Connectivity MasterPlan/ 2022/(Package-2) |
17/10/2022 |
17/10/2022
|
17/11/2022
Time
11:0Hrs
|
|
| 310 |
Consultancy Services for preparation of Feasibility cum DPR for development of various Port Connectivity stretches under Port Connectivity Master Plan (Package-3) |
NHAI/PC/DPR/Port Connectivity MasterPlan/ 2022/(Package-3) |
17/10/2022 |
17/10/2022
|
17/11/2022
Time
11:0Hrs
|
|
| 311 |
Consultancy Services for preparation of Feasibility cum DPR for development of various Port Connectivity stretches under Port Connectivity Master Plan (Package-4) |
NHAI/PC/DPR/Port Connectivity MasterPlan/ 2022/(Package-4) |
17/10/2022 |
17/10/2022
|
17/11/2022
Time
11:0Hrs
|
|
| 312 |
Preparation of Detailed Project Report, Pre construction activities and Project Supervision of various selected stretches on National Highways in the State of Gujarat on Fixed Cost Basis Km 61/658 to Km 105/00 of NH-953 (Ahwa to Maharastra Border) existing IL/2L/2L plus PS/4L |
2022_MoRTH_718002_1 |
14/10/2022 |
14/10/2022
|
16/12/2022
Time
18:0Hrs
|
-
|
| 313 |
Preparation of Detailed Project Report, Pre construction activities and Project Supervision of various selected stretches on National Highways in the State of Gujarat on Fixed Cost Basis Km 62/00 to Km 92/320 and Km 115/320 to Km 160/320 of NH-58 (Vadali to Palanpur) including Vadgam Bypass, Vadali Bypass and Chansol Bypass existing 2L/2L plus PS |
2022_MoRTH_717992_1 |
14/10/2022 |
14/10/2022
|
16/12/2022
Time
18:0Hrs
|
|
| 314 |
Preparation of Detailed Project Report, Pre construction activities and Project Supervision of various selected stretches on National Highways in the State of Gujarat on Fixed Cost Basis Km 221/800 to Km 290/200 of NH-41 (Naliya Jn to Narayan Sarovar) Existing 1L/2L/2L pluc PS |
2022_MoRTH_717972_1 |
14/10/2022 |
14/10/2022
|
16/12/2022
Time
18:0Hrs
|
-
|
| 315 |
Consultancy Services for preparation of Feasibility/DPR for Construction of 6 lane elevated corridor and its approaches from km 629.860 to km. 634.000 in Ranasthalam town portion, Construction of Grade separated structures at various junctions of NH16 passing through Visakhapatnam City limits from Km 682.980 to Km 741.246 and Construction of 6 lane flyover from Mahanadu Junction in Vijayawada City to Nidamanuru Railway Bridge on NH-16 in the state of Andhra Pradesh |
2022-NHAI-131099-1 |
14/10/2022 |
14/10/2022
|
04/11/2022
Time
15:0Hrs
|
|
| 316 |
Consultancy services for Detailed Project Report preparation for Rehabilitation and Upgradation to 2-lane from km 28.00 o Km 70.00 (Ramnagar to Shankarpur) of NH-121 (New NH-309) with paved shoulder in the State of Uttarakhand. |
2022_MoRTH_716949_1 |
10/10/2022 |
11/10/2022
|
08/12/2022
Time
15:0Hrs
|
|
| 317 |
CS for work of DPR(i)4 Lan of NH919(71B)frm Km26.460 to Km47.100 nd Km54.000 to Km78.900 Palwal (ii)Rehab/Redesg of extng 4Lan rd frm Km17.700 to Km26.460 nd Km49.750 to Km54.000(iii)4 Lan Palwal-Jewar-Alig. rd(NH-334D)Frm RD 0 to 15.66 Km |
RW/CH/HR/W(20)/2022 |
11/10/2022 |
11/10/2022
|
24/11/2022
Time
16:0Hrs
|
|
| 318 |
Consultancy Services for Preparation of DPR including detailed Geological, Geotechnical and Topographical Surveys/Investigations and Design of Cost Effective and Suitable remedial measures for prevention of landslides/rockfall in identified locations (approx. 44 Nos) on Kiratpur-Manali Section of NH-21 in the State of Himachal Pradesh |
131422 |
17/11/2022 |
10/10/2022
|
06/12/2022
Time
11:0Hrs
|
|
| 319 |
Project Management Consultancy services for Widening to 4-lane of NH-07 from Km 46/00 to 96/00 of Kala Amb Paonta Sahib Dehradun road in the State of Himachal Pradesh. |
RO/HP/Works(265)/2022-23/616 |
07/10/2022 |
07/10/2022
|
03/01/2023
Time
15:0Hrs
|
|
| 320 |
Survey Investigation LA feasibility study and preparation of DPR in NH 104 Old New NH227 for Construction of H.L. R.C.C bridge with approaches over Kamla River at chainage 159.280 in the state of Bihar for the year 2022 23 |
02 NH Jainagar 2022 23 |
06/11/2022 |
06/10/2022
|
15/11/2022
Time
11:0Hrs
|
|
| 321 |
PREPARATION OF DETAILED PROJECT REPORT (DPR) INCLUDING LAND ACQUISITION AND FOREST CLEARANCE OF ROAD DIRANG-MANDALA BETWEEN KM 0.000 AND KM 28.000 FROM CL-9 TO NHDL SPECIFICATIONS (NET LENGTH 28 KM) UNDER PROJECT VARTAK IN THE STATE OF ARUNACHAL PRADESH |
CE (P) VTK/NIT-13/2022-23 |
04/10/2022 |
01/10/2022
|
01/11/2022
Time
12:0Hrs
|
|
| 322 |
PREPARATION OF DETAILED PROJECT REPORT (DPR) ON EXISTING ROAD INCLUDING CONSULTANCY SERVICE FOR CONSTRUCTION OF SHAKTI-KUMROTSAR ROAD FROM KM 0.000 (SHAKTI) TO KM 36.000 (KUMROTSAR) (APPROX NET LENGTH 36.000 KMS) TO NHSL SPECIFICATIONS IN ARUNACHAL PRADESH STATE |
CE (P) VTK/NIT-15/2022-23 |
04/10/2022 |
01/10/2022
|
03/11/2022
Time
12:0Hrs
|
|
| 323 |
PREPARATION OF RECEE SURVEY AND TRACE CUT (RSTC) AND DETAILED PROJECT REPORT (DPR) THROUGH CONSULTANCY FOR CONSTRUCTION OF ROAD KLEMTA-PT 4634 FROM KM 0.00 TO KM 6.00 (APPX NET LENGTH 6.00 KM) TO NHDL SPECIFICATIONS (NEW ROAD) IN TAWANG DISTRICT OF ARUNACHAL PRADESH |
CE (P) VTK/NIT-16/2022-23 |
30/09/2022 |
30/09/2022
|
31/10/2022
Time
12:0Hrs
|
|
| 324 |
Consultancy Services for Preparation of Feasibility study and Detailed Project Report for Construction of ROB at L/C No. 1/Class A Safiyasarai Ch-71.970 of NH-80, L/C No. 5/SPL/T Shivnarayanpur Ch-171.300 of NH-80 and ROB at L/C No. 2/C-T(SPL) Mirzachowk Ch-188.200 of NH-80 in the state of Bihar. |
04/NH-BHAGALPUR/2022-23 |
30/09/2022 |
29/09/2022
|
28/11/2022
Time
17:0Hrs
|
|
| 325 |
CS FOR THE CONSTRUCTION OF NEW CIRCULAR BYPASS FOR(i)BHIWANI HANSI ROAD(NH148B) TO BHIWANI LOHARU ROAD(NH709Extn) VIA BHIWANI TOSHAM ROAD-PARTII(ii)VILLAGE DHIGAWA(iii)VILLAGE-LOHANI-JUI(iv)LOHARU-PILANI ROAD NH709(EXTN) TO LOHARU-SURAJGARH ROAD |
RW/CH/HR/W(388)/2021 |
26/09/2022 |
26/09/2022
|
11/11/2022
Time
11:0Hrs
|
|
| 326 |
Consultancy Services for Feasibility Study and Preparation of DPR for 4-laning of Nangal-Anandpur Sahib-Kiratpur Sahib of NH-503 Extn. (32.83 Km) in the State of Punjab |
RW/CH/W(42)/PB/2022 |
26/09/2022 |
26/09/2022
|
07/11/2022
Time
16:0Hrs
|
|
| 327 |
CONSULTANCY SERVICES FOR PREPARATION OF DPR CARRYING OUT FEASIBILITY STUDY DETAILED SURVEY/ INVESTIGATION ALIGNMENT OPTION PREPARATION OF GENERAL ARANGEMENT DRAWING ENGINEERING REPORT FOR CONSTRUCTION OF PROPOSED FLYOVER BRIDGE AND ITS APPROACHES ALONG WITH SERVICE ROAD AND PREPARATION OF LAND ACQUISITION PAPERS FOR ACQUISITION OF LAND, FOREST CLEARANCE AND UTILITY SHIFTING DETAILS COMPLETE IN ALL RESPECTS ON BATHINDA-DABWALI ROAD AT KM 297.115 ON NH-54 IN DISTT. BATHINDA IN THE STATE OF PUNJAB. |
RW/CH/W(40)/PB/2022 |
22/09/2022 |
23/09/2022
|
28/10/2022
Time
16:0Hrs
|
|
| 328 |
PMC Service for Construction of Highway 2- Lane Tunnel including approaches across the Bageshwar Hills in market area km 130 to km 136 of Rameshwar-Almora of NH-309A in the State of Uttarakhand |
RO/UK/ BAGHESWAR TUNNEL/01 |
23/09/2022 |
23/09/2022
|
16/11/2022
Time
15:0Hrs
|
|
| 329 |
Consultancy Services for preparation of Feasibility cum DPR for development of various Port Connectivity stretches under Port Connectivity Master Plan |
2022_NHAI_129508_1 |
23/09/2022 |
23/09/2022
|
27/10/2022
Time
11:0Hrs
|
|
| 330 |
Package I - Rev (1) DPR for Construction of 4-lane from Km 0/0 to Km 0/8, including land acquisition, Improvements of junctions, and Construction of Additional Two-lane Flyover works in the NH-532 (2) DPR for Construction of additional two lane flyovers at Kurinjipadi (km 22/6) and Virudhachalam (Km 51/2) in NH-532 (3) DPR for Construction of Vadalur bypass at Km 28/4 of NH-532 (4) DPR for formation of Bypass to Chengalpet Town on the Eastern Side of NH32 (Old NH45) to join ECR (NH-332A) |
TN.No.12/2022-23/HDO/NH/Dt.22.09.2022 |
27/09/2022 |
22/09/2022
|
08/11/2022
Time
15:0Hrs
|
|
| 331 |
CS FOR FEASIBILITY STUDY DETAILED SURVEY-INVESTIGATION PREPARATION OF GAD DPR FOR CONSTRUCTION OF 4-LANE ROB IN LIEU OF RAILWAY CROSSING NO A-8-A at KM 3-600 on NH-154 (PATHANKOT-KULLU ROAD) DISTT PATHANKOT IN THE STATE OF PUNJAB |
RW/CH/W(41)/PB/2022 |
22/09/2022 |
22/09/2022
|
28/10/2022
Time
16:0Hrs
|
|
| 332 |
Consultancy Services for Detail Project Report (DPR) for the project of Construction of Chibramau bypass on NH91 of Aligarh to Kanpur section under Bharatmala pariyojna |
2022_NHAI_129837_1 |
10/10/2022 |
22/09/2022
|
07/11/2022
Time
11:0Hrs
|
|
| 333 |
ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FEASIBILITY STUDY (FS) AND DETAILED PROJECT REPORT (DPR) FOR CONSTRUCTION OF FOLLOWING ROADS UNDER PROJECT UDAYAK IN THE STATE OF ARUNACHAL PRADESH (RECALL) PART-I MIPI-ANDRATHANG FROM KM 20.00 TO KM 50.00 (NET LENGTH 30.00 KMS) GREEN FIELD ALIGNMENT TO NHSL SPECIFICATIONS IN THE AOR OF 62 RCC UNDER 752 BRTF Part-II CHANGLOHGAM-KEPPAPU FROM KM 16.50 TO KM 22.875 (LENGTH 6.375 KMS) GREEN FIELD ALIGNMENT TO NHSL SPECIFICATIONS IN THE AOR OF 1 |
CE(P)Udayak/DPR consutancy/04/2022-23 |
21/09/2022 |
21/09/2022
|
08/10/2022
Time
15:0Hrs
|
|
| 334 |
Consultancy Services for Preparation of feasibility Study/Detailed Project Report for Construction of New Bridges Across Narmada River and 4 Major Bridges Falling in Vadodara- Bharuch section of NH-48 in the state of Gujarat |
2022-NHAI-129322-1 |
24/09/2022 |
19/09/2022
|
17/10/2022
Time
11:0Hrs
|
|
| 335 |
preparation of detailed project report and pre construction activities for construction of Railway Over Bridge on NH 11 (21) (Prithvinath gate, railway crossing no 6A) in district Agra in the state of Uttar Pradesh. |
1808M/13M-NHCK/22 dated 14.09.2022 |
23/09/2022 |
15/09/2022
|
14/10/2022
Time
15:0Hrs
|
|
| 336 |
PMC SERVICES FOR Construction of Leh Bypass to 4 Lane Specifications Including LA Utility Shifting(i) Starting Near Phyang Village near HPCL plant and join Leh-Manali Highway(NH-3) near Upshi ii) Bypass road of Leh from NH-01 Saboo-NH-3 |
RW/SR/Works(12)/Ladakh/2022 |
15/09/2022 |
15/09/2022
|
28/11/2022
Time
17:0Hrs
|
|
| 337 |
Preparation of Detailed Project Report DPR for Construction of Bridge with approaches at 1. km 126.744 TEL River on NH 26 and 2. km 92.200 Mahendratanaya River on NH 326A in the State of Odisha |
03-ROBBSR-2022-23/DPR |
15/09/2022 |
15/09/2022
|
14/11/2022
Time
15:0Hrs
|
|
| 338 |
Consultancy Services for Preparation of DPR for Construction of 2-Lane with paved shoulders bypass (with provision of Tunnels) at Lohaghat (Start of bypass Km 136.325 (Devradi Bend) of NH 9 End of bypass km 142 (Raikot Maher) of NH 9) |
2022_MoRTH_711739_1 |
14/09/2022 |
14/09/2022
|
20/10/2022
Time
16:0Hrs
|
|
| 339 |
CS FOR FEASIBILITY STUDY DETAILED SURVEY-INVESTIGATION PREPARATION OF GAD DPR FOR CONSTRUCTION OF 4-LANE ROB IN LIEU OF RAILWAY CROSSING NO A-8-A at KM 3-600 on NH-154 (PATHANKOT-KULLU ROAD) DISTT PATHANKOT IN THE STATE OF PUNJAB |
2022_MoRTH_712074_1 |
14/09/2022 |
14/09/2022
|
28/10/2022
Time
16:0Hrs
|
|
| 340 |
PMC for GI with widening to 2 lane with PS from end of proposed Barpeta Bypass to Amingaon passing through important locations of Amingaon, Dodora, Singimari, Hajo, Mukalmua, Rampur, Doulashal, Barpeta, Howly etc.(excluding Barpeta Bypass) on NH-427. |
RW/GHT/PMC/DPR/Tender/AS/661 |
15/09/2022 |
13/09/2022
|
13/10/2022
Time
15:0Hrs
|
|
| 341 |
Consultancy Services for preparation of Detailed Project Report for 4 laning of Gumla to Kolebira section of NH 23 New NH 143 in the State of Jharkhand |
NHAI/RO/RNC/JH/2022-23/8 |
10/09/2022 |
12/09/2022
|
19/10/2022
Time
11:0Hrs
|
|
| 342 |
PMC for 4 lane NH 15 from Baihata Chariali to Start Mangaldoi Bypass connecting NH-15 to NH-27 ( old NH-31 ) (Missing Link) with Junction design and 4 lane of NH-15 from Mangaldoi (excluding Mangaldoi bypass) to Mission Chariali of NH-15 |
RW/GHT/PMC/DPR/Tender/AS/646 |
12/09/2022 |
09/09/2022
|
10/10/2022
Time
15:0Hrs
|
|
| 343 |
Consultancy Services for Preparation of Detailed Project Report for Construction of Taksing-Ghora Camp-Lung OP Road Approved under ICBR (PH-II) Project in the State of Arunachal Pradesh |
2022_NHIDC_708907_1 |
14/09/2022 |
09/09/2022
|
16/09/2022
Time
11:0Hrs
|
|
| 344 |
PMC services for 4-laning of NH-17(NEW)/31(OLD) from km 816th (Baxirhat (Assam West Bengal Border)) to km 900 (Bilasipara (excluding Gauripur Bypass)) |
RW/GHT/PMC/DPR/Tender/AS/647 |
14/09/2022 |
09/09/2022
|
17/10/2022
Time
15:0Hrs
|
|
| 345 |
Project Management Consultancy Services for construction of Highway 2 lane Tunnel including approaches across the Nahan Town on Nahan Sarahan Kumarhatti Road NH 907A from Km 0 00 to Km 5 00 in the State of Himachal Pradesh |
RO/HP/Works(266)/2022-23/526 |
09/09/2022 |
09/09/2022
|
10/11/2022
Time
15:0Hrs
|
|
| 346 |
Consultancy Services for Preparation of Detailed Project Report for rehabilitation and upgradation of NH-52 stretch in Autram Ghat Section (from Km.375 to Km.390) part of Aurangabad – Dhule section of NH-52 in the State of Maharashtra |
NHAI/RO-NAG/TENDERS/2022-23/17 |
09/09/2022 |
09/09/2022
|
22/09/2022
Time
11:0Hrs
|
|
| 347 |
Preparation of Detailed Project Report, Pre construction activities and Project Supervision of various selected stretches on National Highways in the State of Gujarat on Fixed Cost Basis |
2022_MoRTH_710412_1 |
08/09/2022 |
08/09/2022
|
31/10/2022
Time
15:0Hrs
|
|
| 348 |
Consultancy services for Authority’s Engineer for Supervision of Construction of Animal Underpasses at Nagbhid - Bramhapuri - Armori Road, NH -353D in Km. 109.650 and 111.175 In State of Maharashtra on EPC Mode. |
10/EENH/NGP/2022-23/4026 |
23/09/2022 |
06/09/2022
|
30/09/2022
Time
17:0Hrs
|
-
|
| 349 |
Consultancy services of Feasibility Report cum DPR for Widening of the existing 2-lane road to 4-lane from Willingdon Island-Kundanoor or alternatively to Aroor-other suitable location on NH-66 to provide connectivity to Cochin Port Trust in Kerala |
NHAI/TECH/PC/ Willingdon-Kundanoor/2022 |
08/09/2022 |
05/09/2022
|
10/11/2022
Time
12:0Hrs
|
|
| 350 |
Consultancy Services for preparation of DPR of Azamgarh Dohrighat section (Length 42.7 Km) of NH128C in the state of UP |
NHAI/UP-East/DPR/ Azamgarh-Dohrighat |
07/09/2022 |
01/09/2022
|
17/11/2022
Time
11:0Hrs
|
|
| 351 |
Consultancy Services for preparation of DPR of 4 laning of Mungrabadshahpur Jaunpur section (Length 51 Km) of NH31 in the state of UP |
NHAI/UP-East/DPR/ Mungrabadshahpur-Jaunpur |
07/09/2022 |
01/09/2022
|
17/11/2022
Time
11:0Hrs
|
|
| 352 |
Consultancy Services for Preparation of DPR for suggesting suitable engg. measures/solution in the rock sliding reach of Km.12.85 to Km14.10and Km 26.00 to Km 28.25 for Upgradation to 2L PS configuration from Kundal to Jhadol sec. NH-58E on EPC mode |
02/2022-23 PWD NH Circle Udaipur |
01/11/2022 |
01/09/2022
|
17/11/2022
Time
11:0Hrs
|
|
| 353 |
Consultancy Services for Preparation of DPR for suggesting suitable engg. measures/solution in the rock sliding reach of Km.12.85 to Km14.10 and Km 26.00 to Km 28.25 for Upgradation to 2L PS configuration from Kundal to Jhadol sec. NH-58E on EPC mode |
02/2022-23 SE PWD NH Circle Udaipur |
12/10/2022 |
01/09/2022
|
14/10/2022
Time
12:0Hrs
|
-
|
| 354 |
PMC Services for Up-gradation to 2 lane with paved shoulders configuration of NH310A starting from its junction with NH 310 near Tashi View Point connecting Penengla, Kabi, Phensong, Phodong, Namok, Rangrang and terminating at Mangan |
RW/GHT/PMC/DPR/Tender/SK/612 |
01/09/2022 |
31/08/2022
|
01/10/2022
Time
15:0Hrs
|
|
| 355 |
ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FEASIBILITY STUDY (FS) AND DETAILED PROJECT REPORT (DPR) FOR CONSTRUCTION OF FOLOWING ROADS (A) MIPI-ANDRATHANG FROM KM 20.00 TO KM 50.00 (30.0 KMS) GREEN FIELD ALIGNMENT TO NHSL SPECIFICATIONS UNDER 62 RCC UNDER 752 BRTF AND (B) CHANGLOHGAM-KEPPAPU ROAD FROM KM 16.50 TO KM 22.875 (6.375 KMS) GREEN FIELD ALIGNMENT TO NHSL SPECIFICATIONS UNDER 116 RCC AOR OF 48 BRTF. (NET LENGTH 36.375 KMS), UNDER THE PROJECT UDAYAK IN THE STATE OF AR.P |
CE(P)Udayak/DPR Consultancy/01/2022-23 |
29/08/2022 |
30/08/2022
|
13/09/2022
Time
15:0Hrs
|
|
| 356 |
Consultancy Services for Preparation of Detailed Project Report for construction of 4 Lane Bypass starting from its junction with Gondia – Tirora Road NH 753 and terminating at its junction with Balaghat - Gondia Road NH 543in Gondia District in the state of Maharashtra |
08/EENH/NGP/2022-23/4302 |
21/09/2022 |
28/08/2022
|
04/10/2022
Time
17:0Hrs
|
|
| 357 |
Consultancy services for Preparation of Feasibility study, detailed project report, Survey and preparation of land plan for widening to Four lane on NH 169 from km 3.00 to 30.00 on Shivamogga - Mangalore Section in the State of Karnataka under Annual Plan 2022-23 |
EE/NH/SMG/AE1/NH169/NIB6/2022-23/1082 |
25/08/2022 |
26/08/2022
|
30/09/2022
Time
16:0Hrs
|
|
| 358 |
Consultancy Services for DPR Preparation for realignment &upgradation to2-lane with paved shoulder/four lanning ofNH133A from Km 5.40 (excluding Barharwa Bypass) to Km24.90(excluding Pakur Bypass) in the State of Jharkhand onEPC mode including Land Acquisition,Forest Clearance andUtility Shifting etc. |
NH/Deoghar/08/2022-23 |
30/08/2022 |
25/08/2022
|
15/09/2022
Time
14:0Hrs
|
|
| 359 |
Consultancy Services for Preparation of detailed project report of NH-2B for 4-laning from 00.00 km at Bardhaman to Bolpur and minimum 2-lane with paved shoulder configuration from Bolpur to 105.00 km at Mallarpur to merge with NH-60 in the District of Bardhaman and Birbhum, West Bengal. |
e-NIQ No 01 of 2022-23 |
05/09/2022 |
23/08/2022
|
16/11/2022
Time
11:0Hrs
|
|
| 360 |
Consultancy Services for, Feasibility study, detailed project report survey and preparation of land plan for widening to two lane with paved shoulders from Sagara – Havinahalli – Holebaglu – Kalasvalli – Sighandoor – Markutka (junction with NH-766C) in the State of Karnataka |
EE/NHD/SMG /AE-1/NH-766C/Consultancy/NIB04/2ndcall/2022-23/1069 |
23/08/2022 |
23/08/2022
|
23/09/2022
Time
16:0Hrs
|
|
| 361 |
preparation of detailed project report and pre construction activities for construction of Railway Over Bridge on NH 11 (21) (Prithvinath gate, railway crossing no 6A) in district Agra in the state of Uttar Pradesh. |
1620M/13M-NHCK/22 dated 18.08.2022 |
26/08/2022 |
20/08/2022
|
06/09/2022
Time
15:0Hrs
|
|
| 362 |
Project Management Consultancy services for Construction of Additional Major Bridge and its approaches across river Teesta (at Sevoke) starting around km 591.60 of NH‐31(New NH-17) in the District of Darjeeling, West Bengal. |
MORT&H/RO-KOL/NIT/PMC/2022-23/02 |
07/09/2022 |
18/08/2022
|
22/12/2022
Time
11:0Hrs
|
|
| 363 |
Project Management Consultancy Services for Feasibility study and detailed Engineering for Widening to 2-lane with paved shoulder and geometric improvements of NH-907A from Km 5/00 to Km 78/00 (Nahan to Kumarhatti Stretch) in the State of Himachal Pradesh |
RO/HP/WORKS(280)/2022-23-443 |
18/08/2022 |
18/08/2022
|
06/10/2022
Time
15:0Hrs
|
|
| 364 |
Consultancy services of Feasibility Report cum Detailed Project Report for 4 Laning of Sitarganj-Tanakpur (Km 0 to Km 52.2) section of NH-125 in the state of Uttarakhand |
2021-NHAI-125837-1 |
18/08/2022 |
17/08/2022
|
16/09/2022
Time
11:30Hrs
|
|
| 365 |
Detailed Engineering report for Consultancy Services for preparation of Detail Engineering report for Widening from two lane to four lane with paved shoulder from Km 180 500 End of Nagaur Bypass to 267 500 Netra Village on NH 62 |
01/2022-23-SE-NH-BK-NIT |
01/09/2022 |
17/08/2022
|
29/09/2022
Time
12:0Hrs
|
|
| 366 |
Consultancy Services for Preparation of Feasibility/ DPR for widening to two lane with paved shoulder from Km 5.00 to 48.20 (Hulsur to Halbarga Section) of NH-752K in the state of Karnataka. |
ENHD/KLB/DPR/TENDER/22-23/578 |
16/08/2022 |
16/08/2022
|
22/09/2022
Time
17:0Hrs
|
|
| 367 |
Consultancy Services for Preparation of Detailed Project Report for construction of 4 Lane Bypass starting from its junction with Gondia – Tirora Road NH 753 and terminating at its junction with Balaghat - Gondia Road NH 543in Gondia District in the state of Maharashtra. |
08/EENH/NGP/2022-23/3873 |
29/08/2022 |
12/08/2022
|
09/09/2022
Time
17:0Hrs
|
|
| 368 |
Consultancy Services for DPR Preparation for 4 / 6 Laning with 7.0m service road on either side of Ranchi circumferential road starting from Urkid (NH-20) - Brombey (NH-75) - Kurgi (NH-43) - Phudi (NH-75Ext.) - Harbul (NH-33) and terminated at Urkid (NH-20) with spurs road (Total Length- 195 Km) in the State of Jharkhand on EPC mode including Land Acquisition, Forest Clearance and Utility Shifting etc |
2022_MoRTH_705593_1 |
29/08/2022 |
12/08/2022
|
28/09/2022
Time
17:0Hrs
|
|
| 369 |
Consultancy Services for preparation of Feasibility Study and Detailed Project Report for Construction of Railway Over Bridge on NH 753 at Km. 46/300 in Gondia City (L.C. No. GJ1A-SPL/3E on Balaghat to Gondia line section between Nagra to Gondia) on Kohmara - Gondia - Tirora - Tumsar - Ramtek Road NH 753 in Gondia District in the state of Maharashtra. |
08/EENH/NGP/2022-23/3872 |
08/09/2022 |
12/08/2022
|
08/09/2022
Time
17:0Hrs
|
|
| 370 |
Consultancy Services for preparation of Feasibility Study and Detailed Project Report for Construction of Railway Over Bridge on NH 753 at Km. 46.300 in Gondia City (L.C. No. GJ1A-SPL/3E on Balaghat to Gondia line section between Nagra to Gondia) on Kohmara - Gondia - Tirora - Tumsar - Ramtek Road NH 753 in Gondia District in the state of Maharashtra. |
07/EENH/NGP/2022-23/3872 |
21/09/2022 |
12/08/2022
|
30/09/2022
Time
17:0Hrs
|
|
| 371 |
Detailed Engineering report for Consultancy Services for preparation of Detail Engineering report for construction Of Nagaur Bypass (Balance length) from existing Km 161/000 (Amarpura at old NH-65) to Km 173/100 (Gogelao on NH-62) |
04/2022-23 |
16/08/2022 |
10/08/2022
|
29/09/2022
Time
12:0Hrs
|
|
| 372 |
Consultancy Services for Preparation of Feasibility study and Detailed Project Report for Construction of Elevated corridor Anishabad (Patna) - Phulwari - AIIMS (7.00 Km) on Anishabad - Aurangabad - Hariharganj Road, NH-98 (New NH-139) in the state of Bihar. |
NH-12030/4/2022-RO Patna |
06/08/2022 |
06/08/2022
|
15/09/2022
Time
11:0Hrs
|
|
| 373 |
Consultancy Services for Feasibility Study and Preparation of DPR for Widening and Strengthening to 2-Lane with Paved Shoulder in Km 0 to 115 (Bariyarpur to Vamdah) of NH-333 in the State of Bihar. |
02 /NH-LAKHISARAI /2022-23 |
04/08/2022 |
05/08/2022
|
10/10/2022
Time
17:0Hrs
|
|
| 374 |
Consultancy Services for Preparation of Feasibility study and DPR for Construction of 4laning of Masrakh to Chakia Km 86 to Km 143 of NH227A and Chakia to Bhitha more Km 0 to 104 of old NH104 New NH227 section of RamJanki Marg in the State of Bihar. |
NH-12014/64/2022-RO Patna |
14/09/2022 |
02/08/2022
|
02/12/2022
Time
11:0Hrs
|
|
| 375 |
Consultancy Services for Preparation of Detail Engineering report for Widening and strengthening to 2 lanes with paved Shoulders of Pratapgarh - Padi Section (Km. 80.00 to Km. 180.00) of NH-113 |
01/2022-23 |
06/08/2022 |
01/08/2022
|
06/09/2022
Time
11:0Hrs
|
|
| 376 |
Consultancy Services for Preparation of Feasibility/DPR for Construction of New Bypass to Hubballi-Dharwad cities connecting NH-218(Near Kusugal) and NH-48(Near Narendra) in the State of Karnataka |
EENH/HBL/882 |
30/07/2022 |
30/07/2022
|
26/09/2022
Time
17:0Hrs
|
|
| 377 |
Consultancy Services for Preparation of Feasibility/DPR for Widening or Reconstruction of major bridge across Bennihalla at Km 160.900 on Bijapur –Hubli section of NH-218 in the State of Karnataka |
EENH/HBL/883 |
01/08/2022 |
30/07/2022
|
11/01/2023
Time
17:0Hrs
|
|
| 378 |
CONSULTANCY SERVICES FOR PREPARATION OF DETAILED PROJECT REPORT AND PROVIDING PRE-CONSTRUCTION ACTIVITIES FOR CONSTRUCTION OF HIGHWAY TUNNEL BETWEEN KM 10.250 TO KM 10.650 ON MALLING ALTERNATE ROUTE (MAR) UNDER 108 RCC/759 BRTF/PROJECT DEEPAK IN THE STATE OF HIMACHAL PRADESH |
CE (P) DPK/10 of 2022-23 |
29/07/2022 |
29/07/2022
|
20/10/2022
Time
12:0Hrs
|
|
| 379 |
Consultancy Services Preparation of Detail Engineering Report for Widening to lane of Mahwa to Mandawar section of NH_921 and ROB LC No.-95 on Alwar Nuh section of NH-248A |
2022_MoRTH_700859_1 |
27/07/2022 |
27/07/2022
|
16/08/2022
Time
18:0Hrs
|
|
| 380 |
Consultancy Services for Preparation of Feasibility/DPR for Widening to Two lane with paved shoulders from km 41.90 to 84.30, 88.20 to 105.25, 148.23 to 161.55, 166.35 to 174.13, 176.12 to 186.55 and 191.90 to 192.90 on NH 766C of Byndoor –Ranebennur section in State of Karnataka |
EE/NHD/SMG/AE1/NH-766C/NIB30/2ndcall/839 |
26/07/2022 |
26/07/2022
|
17/08/2022
Time
16:0Hrs
|
|
| 381 |
Consultancy Services for Preparation of Feasibility/DPR for Widening to Two lane with paved shoulders from km 41.90 to 84.30, 88.20 to 105.25, 148.23 to 161.55, 166.35 to 174.13, 176.12 to 186.55 and 191.90 to 192.90 on NH 766C of Byndoor –Ranebennur section in State of Karnataka |
EE/NHD/SMG/AE1/NH-766C/NIB30/2ndcall/839.. |
22/08/2022 |
26/07/2022
|
23/08/2022
Time
16:0Hrs
|
|
| 382 |
Project Management Consultancy Services for feasibility study and detailed engineering for rehabilitation and up gradation of NH 154A from km 84 00 to km 93 00 and km 130 00 to km 172 00 in the State of Himachal Pradesh |
RO/HP/Works (277)/2022-23/327 |
22/07/2022 |
22/07/2022
|
06/09/2022
Time
15:0Hrs
|
|
| 383 |
Consultancy Services for Preparation of Detailed Project Report for Widening to 4 lane existing ROB Including Detailed Estimate and Design etc on Barshi Yedashi Latur Udgir Degloor road NH 63 at Ch 83 600 Near Harangul Railway Station 2nd Call |
2022_MoRTH_702036_1 |
21/07/2022 |
20/07/2022
|
03/08/2022
Time
17:0Hrs
|
|
| 384 |
Consultancy Services for Preparation of DPC for Widening to 4 lane existing ROB including Detailed Estimate Design etc on Parali Pimpala Dahiguda Section NH 548B at Km 96 900 Shyama Prasad Mukharji ROB 2nd Call |
2022_MoRTH_701885_1 |
21/07/2022 |
20/07/2022
|
03/08/2022
Time
17:0Hrs
|
|
| 385 |
Consultancy Services for Detailed Project Report Preparation for Construction of Four lane Udgir city Eastern Bypass road on NH 50 in the State of Maharashtra Tentative Length 4 00 Km |
2022_MoRTH_702052_1 |
21/07/2022 |
20/07/2022
|
08/08/2022
Time
15:0Hrs
|
|
| 386 |
Consultancy services for Feasibility study and Preparation of detailed project report including LA and other clearances for construction of Jehanabad Bypass connecting NH33 and NH83 in the State of Bihar |
03-NH/GAYA/DPR/2022-23 |
29/09/2022 |
20/07/2022
|
06/10/2022
Time
15:0Hrs
|
|
| 387 |
Project Management Consultancy Services for Construction of 2 Lane Highway Tunnel including Approaches to Bypass Pauri Town on Kotdwar _Satpuli _Pauri_Srinager Road of NH_534 old NH 119 in the State of Uttarakhand |
RO/UK/PAURI TUNNEL/01 |
18/07/2022 |
19/07/2022
|
08/09/2022
Time
15:0Hrs
|
|
| 388 |
Consultancy Services for Preparation of Detailed Project Report for 4/6 lanes 4/6 lane with Paved Shoulder configuration for the stretch of Gwalior-Bhind upto MP/UP Border (NH-92) Total length 108 Km in the State of Madhya Pradesh |
2021-MoRTH-649159-2 |
01/08/2022 |
16/07/2022
|
12/09/2022
Time
17:30Hrs
|
|
| 389 |
Preparation of detailed project report and pre construction activities for construction of Railway Over Bridge on NH 11(21) (Prithvinath gate, railway crossing no.- 6A) in district Agra in the state of Uttar Pradesh |
1343M/13M-NHCK/22 dated 13.07.2022 |
02/08/2022 |
15/07/2022
|
17/08/2022
Time
15:0Hrs
|
|
| 390 |
Consultancy Services for Detailed Project Report Preparation of Detailed Design and Land Acquisition of Ashtamode ROB (Tentative Length 1.0 Km) on NH 63 In the state of Maharashtra 3 calll |
2022_MoRTH_701099_1 |
20/07/2022 |
15/07/2022
|
03/08/2022
Time
17:0Hrs
|
|
| 391 |
Consultancy services for preparation of Feasibility Report cum DPR for Upgradation to six laning of (i) Hoskote-Mulbagal section from Existing Chainage Km 237.700 to Existing Chainage Km 302.000 and Mulbagal-KNT/AP Border section from Existing Chainage Km 216.912 to Km 239.100 (ii) Existing 6 lane Hoskote-Mulbagal section for accessing any additional structure/any other facilities from Existing Chainage Km 302.000 to Existing Chainage Km 318.000 Km of NH-75 in the state of Karnataka |
NHAI/KNT/Hoskote-Mulbagal-KNT/AP Border/2022/137035 |
21/07/2022 |
13/07/2022
|
12/08/2022
Time
11:0Hrs
|
|
| 392 |
Consultancy Services for preparation of Detailed Project Report (DPR) for decongestion / bypass of NH-515 in Pasighat town (approx. 10Km) under Road Safety in the State of Arunachal Pradesh. |
Ar.P/RSA/Pasighat Bypasss/2022-23/RO-Ita |
18/07/2022 |
12/07/2022
|
26/08/2022
Time
11:0Hrs
|
|
| 393 |
Consultancy services for preparation of detailed project report for development of NH-114A from Km 138 to Km 290.7 excluding Deoghar bypass and Giridih bypass in the State of Jharkhand |
RW/Ranchi/AP-04/2022-23 |
26/07/2022 |
09/07/2022
|
08/08/2022
Time
17:0Hrs
|
|
| 394 |
Consultancy services for Feasibility study and detailed project report of 2-laning/4-laning from Naubatpur to Hariharganj of existing [Anisabad (Patna)-Arwal-Aurangabad-Hariharganj ] Section of NH-139 in Bihar. |
05-NH/AUR/DPR/2022-23 |
15/07/2022 |
06/07/2022
|
05/09/2022
Time
17:0Hrs
|
|
| 395 |
Consultancy Services for preparation of DPR for Capacity Augmentation of Existing 6-lane Highway of Jaipur-Kishangarh section from Ch. 273.500 to Ch. 363.885 of NH-8 (New NH-48) in the State of Rajasthan |
2022_NHAI_121253_1 |
23/07/2022 |
04/07/2022
|
03/08/2022
Time
11:0Hrs
|
|
| 396 |
Consultancy services for preparation of detailed project report for development of NH-133 from Km 94.00 to Km 131.00 in Dumka and Deoghar district in the State of Jharkhand |
RW/Ranchi/AP/06/2022-23 |
26/07/2022 |
30/06/2022
|
16/08/2022
Time
15:0Hrs
|
|
| 397 |
PACKAGE-I (1) DPR for Construction of 4-lane from Km 0/0 to Km 0/8, including land acquisition, Improvements of junctions, and Construction of Additional Two-lane Flyover works in the NH-532 (2) DPR for Construction of additional two lane flyovers at Kurinjipadi (km 22/6) and Virudhachalam (Km 51/2) in NH-532 (3) DPR for Construction of Vadalur bypass at Km 28/4 of NH-532 |
TN.No.07/2022-23/HDO/NH/Date.28.06.2022 |
30/06/2022 |
28/06/2022
|
17/08/2022
Time
15:0Hrs
|
|
| 398 |
Consultancy Services for preparation of DPR for 4-laning from existing stretch of 2 lane with paved shoulder of approx. length of 85.800 kms on NH-765 from Hyderabad (Tukkuguda) to Dindi (from Ch.23.000 km at Ch. 108.800 km) in the state of Telangana |
2022_NHAI_119644_1 |
28/06/2022 |
20/06/2022
|
11/08/2022
Time
11:0Hrs
|
|
| 399 |
1. Widening to 2 lane with paved shoulder from Km 99/0 - km 119/0 of NH 49 Extn (New NH 85) on EPC Mode, 2. Construction of Grade Separator in km 67/10 of NH 49 Extn. (New NH 85) on EPC Mode |
TN.No.06/DO/NH/2022/Dt. 17.06.2022 |
17/06/2022 |
17/06/2022
|
18/08/2022
Time
15:0Hrs
|
|
| 400 |
Consultancy Services for Detailed Project Report Preparation for Ashtamode ROB (Tentative Length 1.0 km) On NH 63 in the state of Maharashtra(2nd Call) |
2022_MoRTH_695521_1 |
21/06/2022 |
16/06/2022
|
29/06/2022
Time
17:0Hrs
|
|
| 401 |
Consultancy Services for DPR preparation for 4-laning from Km.519.150 to Km.545.176 section of NH-53 passing through Badrama Wildlife Sanctuary Portion in the State of Odisha. |
2022-NHAI-119201-1 |
28/06/2022 |
16/06/2022
|
01/08/2022
Time
11:0Hrs
|
|
| 402 |
Consultancy Services for Preparation of Feasibility/DPR for Out1er Ring Road to Gadag-Betageri Twin City in Gadag Taluka Gadag District SH-45( Arabhavi-Chellikere Road) intersection @ Km132.45 to, SH-06 ( Karwar-Ilkal Road Km 225.00 ),Intersection and to NH-63 Km 195.470.( @ VUP )Intersection |
EENHDHubli/2022-23/498 |
16/06/2022 |
16/06/2022
|
14/07/2022
Time
15:0Hrs
|
|
| 403 |
Consultancy Services for Preparation of Detailed Project Report for Tunnel Car Parking at the following locations in the State of Uttarakhand. (i) Nainital-Bhavali Road Cantonment Board Land, Nainital (ii) Nainital-Haldwani Road near Rajkiya Vaidhshala, first Bend, Nainital |
2022_NHIDC_694480_1 |
15/06/2022 |
15/06/2022
|
05/08/2022
Time
12:0Hrs
|
|
| 404 |
Consultancy Services for preparation of DPR for development of improvement from Km.0.000 to km 67.400 of Bhubaneswar-Puri Section of NH-316 (Old NH-203) in the State of Odisha |
NHAI/11011/37/RO/OD/2022 |
29/06/2022 |
14/06/2022
|
01/08/2022
Time
11:0Hrs
|
|
| 405 |
Consultancy Services for Detailed Project Report Preparation for Widening of existing ROB to four lane on Parali-Pimpala Dahiguda Section NH-548B at km.96/900 (Shyama Prasad Mukharji ROB) |
2022_MoRTH_694162_1 |
17/06/2022 |
09/06/2022
|
29/06/2022
Time
17:0Hrs
|
|
| 406 |
Consultancy Services for Detailed Project Report Preparation for Widening of existing ROB to four lane on Barshi - Yedashi - Latur - Udgir - Degloor Road NH 63 at Ch.83/600 (Near Harangul Railway Station) |
NIT No.05/EENHD/Latur/971/2022 |
17/06/2022 |
09/06/2022
|
29/06/2022
Time
17:0Hrs
|
|
| 407 |
Consultancy Services for Preparation of Detailed Project Report and providing services for Pre-Construction activities in respect of Up-gradation & Widening of road to two lane with paved shoulders from Udaipur to Srimantapur (Indo- Bangladesh Border) via Sonamura (approximate length of 35.000 Km) on existing SH-06 in the State of Tripura for providing better road connectivity to Comilla in Bangladesh. |
NHIDCL/Tripura/ DPR/Udp--Snmr/2022 |
06/06/2022 |
08/06/2022
|
15/06/2022
Time
15:0Hrs
|
|
| 408 |
Consultancy services for feasibility study and detailed Engineering for Construction of 4 lane flyover on NH 503 extn. between km. 31.00 to 35.00 or by pass to Una town in the state of Himachal Pradesh |
RO/HP/Works(236)/2022-23/201 |
08/06/2022 |
08/06/2022
|
25/07/2022
Time
17:0Hrs
|
|
| 409 |
Consultancy Services for Feasibility/Detail Project Report of elevated road from Thanagazi to Natni ka bara (via Bharatri Tiraha, Kushalgarh Tiraha) section of NH 248A (old SH 29A) |
2022_MoRTH_692274_1 |
08/06/2022 |
08/06/2022
|
07/07/2022
Time
18:0Hrs
|
|
| 410 |
PMC Services for preparation of DPR, pre-construction activity and construction supervision of 2-Laning with paved shoulder from Mokokchung to Zunheboto, Chozuba to Phek and from Losami Junction to Meluri on NH-702A in the State of Nagaland |
RW/GHT/NG/PMC/702A/2022-23/260 |
08/06/2022 |
08/06/2022
|
04/08/2022
Time
15:0Hrs
|
|
| 411 |
PMC Services for preparation of detailed project report, pre-construction activity and construction supervision of 2-Laning with paved shoulder from Mokokchung to Watiyim (Length-70.00 Km) on NH- 702D in the State of Nagaland |
RW/GHT/NG/PMC/702D/2022-23/261 |
09/06/2022 |
08/06/2022
|
04/08/2022
Time
15:0Hrs
|
|
| 412 |
PROJECT MANAGEMENT CONSULTANCY SERVICES FOR PREPARATION OF DETAILED PROJECT REPORT, PRE-CONSTRUCTION ACTIVITY AND CONSTRUCTION SUPERVISION OF 2-LANING WITH PAVED SHOULDER ON NH-306A IN MIZORAM |
RW/GHT/MZ/PMC/306A/2022-23 |
08/06/2022 |
03/06/2022
|
25/07/2022
Time
15:0Hrs
|
|
| 413 |
PMC Services for Up-gradation to 2 lane with paved shoulders configuration of NH310A starting from its junction with NH 310 near Tashi View Point connecting Penengla, Kabi, Phensong, Phodong, Namok, Rangrang and terminating at Mangan |
No RW/GHT/PMC/DPR/Tender/SK |
31/05/2022 |
30/05/2022
|
14/07/2022
Time
14:0Hrs
|
|
| 414 |
Consultancy Services for preparation of Detailed Project Report for Tunnel Car Parking at Kempty fall (Mussoorie) in the State of Uttarakhand (3rd call). |
2022_NHIDC_691828_1 |
31/05/2022 |
30/05/2022
|
06/06/2022
Time
11:0Hrs
|
|
| 415 |
Consultancy Services for Development of NH-114A from Km 138 to Km 290.7 excluding Deoghar Bypass in the State of Jharkhand |
RW/Ranchi/AP-04/2022-23 |
01/06/2022 |
27/05/2022
|
11/07/2022
Time
17:0Hrs
|
|
| 416 |
Consultancy services for preparation of detailed project report for development of NH-114A from Km 12.325 to Km 62.00 in Deoghar district in the State of Jharkhand. |
RW/Ranchi/AP-03/2022-23 |
01/06/2022 |
25/05/2022
|
21/07/2022
Time
15:0Hrs
|
|
| 417 |
Preparation of Feasibility study and Detailed Project report for construction of 4-laning of Chakia to Bhitha More section of Ram Janki Marg with land acquisition in Bihar |
01/NH-SITAMARHI/2022-23 |
31/05/2022 |
25/05/2022
|
19/07/2022
Time
17:0Hrs
|
|
| 418 |
Consultancy Services for preparation of DPR for development of Greenfield Access Controlled Highway from Patna to Purnia in the State of Bihar under Bharatmala Pariyojana Phase-II |
2022_NHAI_116959_1 |
30/05/2022 |
25/05/2022
|
02/08/2022
Time
11:0Hrs
|
|
| 419 |
PREP OF RSTC (RECCE SURVEY AND TRACE CUT) AND DPR FOR CONST OF ROAD LOWER GOMPA-SHYARO-JANGDA-BROKSAR FROM KM 0.00 TO KM 18.270 (EXISTING NET LENGTH-18.270 KM) TO NHSL SPECIFICATIONS UNDER 763 BRTF PROJECT VARTAK IN ARUNACHAL PRADESH STATE |
CE (P) VTK/01/2022-23 |
24/05/2022 |
24/05/2022
|
29/06/2022
Time
12:0Hrs
|
|
| 420 |
Consultancy Services for Detailed Project Report Preparation for Ashtamode ROB (Tentative Length 1.0 km) On NH 63 in the state of Maharashtra |
2022_MoRTH_690165_1 |
24/05/2022 |
23/05/2022
|
14/06/2022
Time
17:0Hrs
|
|
| 421 |
Consultancy services for preparation of Detailed Project Report (DPR) for the development of Nasrullaganj to Badi stretch (Length 94 Km) in the state of Madhya Pradesh |
2022_NHAI_116549_1 |
16/06/2022 |
20/05/2022
|
27/06/2022
Time
11:30Hrs
|
|
| 422 |
Consultancy Services for Preparation of Feasibility/DPR for the work of Widening to four lane from 100.00 to 106.00 and Km.112.800 to Km.128.850 of NH-63 Ankola-Gooty section in the State of Karnataka |
EENHDHubli/2022-23/270 |
16/05/2022 |
16/05/2022
|
25/06/2022
Time
17:0Hrs
|
|
| 423 |
PMC for preparation of Detailed Project Report, Pre construction activity and Construction supervision for the work of Widening / Upgradation to 4L from Km. 472.00 to 505.00 of NH-730 i/c Maharajganj bypass in the state of U.P. |
CE-RO/LKO/PMC/Lot-V/2021-22 Dated.13.05.2022 |
01/06/2022 |
13/05/2022
|
25/07/2022
Time
15:0Hrs
|
|
| 424 |
PMC for preparation of Detailed Project Report, Pre construction activity and Construction supervision for the work of Widening / Upgradation to 4L from Km. 564.00 to 603.00 of NH-730 in the state of U.P. |
CE-RO/LKO/PMC/Lot-VI/2021-22 Dated.13.05.2022 |
01/06/2022 |
13/05/2022
|
25/07/2022
Time
15:0Hrs
|
|
| 425 |
Consultancy Services for Detailed Project Report Preparation for Construction of four lane Udgir city Northern Bypass road on NH 63 in the state of Maharashtra. (Tentative Length 8.20 km). |
2022_MoRTH_688769_1 |
13/05/2022 |
12/05/2022
|
23/05/2022
Time
17:0Hrs
|
|
| 426 |
Consultancy services for, feasibility study, detailed project report, survey and preparation of land plan for widening to two lane with paved shoulders from Sagara-Havinahalli -Holebaglu - Kalasvalli -Sighandoor - Markutka (junction with NH-766C) in the State of Karnataka. |
EE/NHD/SMG/AE1/NH766C/consultancy/NIB04/2022-23/246 |
10/05/2022 |
10/05/2022
|
09/06/2022
Time
16:0Hrs
|
|
| 427 |
Consultancy Services for Preparation of Detailed Project Report and providing Pre-Construction activities for Construction of New NHs the highway starting from its junction with NH-37 near Pailapool connecting Jaipur, Harinagar, Kumarcherra, Zinam, Hagrum and terminating at its junction with NH-137(Mahur-Tamenglomg Road) in the state of Assam |
NHIDCL/Assam/DPR/ Pailapool/2021/202941 |
25/04/2022 |
09/05/2022
|
26/05/2022
Time
15:0Hrs
|
|
| 428 |
Consultancy Services for Preparation of Detailed Project Report and providing Pre-Construction activities for Construction of Two lane Highway Handenbroke-Zingpal Between Coordinates 34042-52.97-N, 76040-15.53-E (5 Km from Handenbroke End) and 34044-27.49-N, 76045-42.16-E (Km 4.013 from Zingpal end) in the Union Territory of Ladakh |
CE(P) Vijayak/02/2022-23 |
02/05/2022 |
05/05/2022
|
04/07/2022
Time
12:0Hrs
|
|
| 429 |
Consultancy Services for preparation of DPR for Construction of Elevated corridor / at grade Improvements to 2-lane / 4-lane from km 128.6 to km 191.100 of Hyderabad - Srisailam Section of NH-765 in the state of Telangana under Annual Plan 2022-23 on EPC mode |
SE RandB NH HYD 01 2022-23 dt. 16.04.2022 |
30/05/2022 |
05/05/2022
|
20/06/2022
Time
15:0Hrs
|
|
| 430 |
Consultancy Services for Preparation of Detailed Project Report including LA and other clearances for Construction of Supaul Bypass on NH-327(E) in the State of Bihar |
NIT No.01/NH-MADHEPURA/2022-23 |
06/07/2022 |
05/05/2022
|
20/06/2022
Time
17:0Hrs
|
|
| 431 |
Consultancy Services for Preparation of Detailed Project Report including LA and other clearances for Construction of Supaul Bypass on NH-327(E)in the State of Bihar |
NIT No.01/NH-MADHEPURA/2022-23 |
06/07/2022 |
05/05/2022
|
25/08/2022
Time
17:0Hrs
|
|
| 432 |
Consultancy Services for preparation of DPR for 4 laning from Ghaziabad /Hapur to Kanpur/Unnao Greenfield alignment via Farrukhabad (tentative length 380 Km) |
NHAI/11013/DPR/G-A Green Field/IV/2022/146850 |
06/05/2022 |
02/05/2022
|
07/06/2022
Time
11:0Hrs
|
-
|
| 433 |
PREP OF RSTC (RECCE SURVEY AND TRACE CUT) AND DPR FOR CONST OF ROAD LOWER GOMPA-SHYARO-JANGDA-BROKSAR FROM KM 0.00 TO KM 18.270 (EXISTING NET LENGTH-18.270 KM) TO NHSL SPECIFICATIONS UNDER 763 BRTF PROJECT VARTAK IN ARUNACHAL PRADESH STATE |
CE (P) VTK/01/2022-23 |
30/04/2022 |
30/04/2022
|
21/05/2022
Time
12:0Hrs
|
|
| 434 |
Preparation of Detailed Project Report for Construction of Bypass to Harur Town from Km.49/500 – 55/0 of NH 179A |
TN.No.01/2022-23/ DO/ Date. 29.04.2022 |
28/05/2022 |
29/04/2022
|
22/06/2022
Time
15:0Hrs
|
|
| 435 |
Preparation of Detailed Project Report for Construction of Bypass to Varatanapalli Town from km.7/0-9/0 of 2019 (New NH 42) |
TN.No.01/2022-23/ DO/ Date. 29.04.2022 (Sl No.2) |
28/05/2022 |
29/04/2022
|
22/06/2022
Time
15:0Hrs
|
|
| 436 |
Preparation of Detailed Project Report of Development of Kathua-Bhasoli-Bani-Bhaderwah-Doda state road to connect NH-44 with NH-244 (250 Km) to four lane NH standards under Bharatmala Phase IIA, Development of Bhaderwah-Chamba state road as extension to NH-154A to connect with NH-244 (130 Km) to four lane NH standards, and Development of Tawi Bridge(4th)- Satwari-Jammu Airport- Miran Sahib-R.S- Pura- Suchetgarh (old Jammu- Sialkot) Road (30 Km) to four/six lane NH standards |
2022_NHAI_114318_1 |
04/05/2022 |
28/04/2022
|
12/07/2022
Time
11:0Hrs
|
|
| 437 |
Consultancy services for preparation of Detailed Project Report (DPR) for Construction of 04 lane Elevated Corridor/ Double Decker flyover in the District of Prayagraj. |
CE-RO/LKO/DPR/PIU-PRG Dated.25.04.2022 |
27/04/2022 |
25/04/2022
|
15/06/2022
Time
11:0Hrs
|
|
| 438 |
DPR for construction of Lohaghat and Pithoragarh bypass of NH-9 |
2022_MoRTH_685204_1 |
29/04/2022 |
23/04/2022
|
24/05/2022
Time
16:0Hrs
|
|
| 439 |
Consultancy Services for preparation of Detailed Project Report (DPR) for 4 lane Ring Road around Mathura Vridavan of NH-19 |
CE-RO/LKO/DPR/2022-23 Dated.23.04.2022 |
26/04/2022 |
23/04/2022
|
07/06/2022
Time
11:0Hrs
|
|
| 440 |
Consultancy Services for Preparation of Detailed Project Report and providing services for Pre-Construction activities in respect of Up-gradation & Widening of road to two lane with paved shoulders from Udaipur to Srimantapur (Indo- Bangladesh Border) via Sonamura (approximate length of 35.000 Km) on existing SH-06 in the State of Tripura for providing better road connectivity to Comilla in Bangladesh. |
NHIDCL/Tripura/DPR/Udp-Snmr/2022 |
18/04/2022 |
22/04/2022
|
13/05/2022
Time
15:0Hrs
|
|
| 441 |
Consultancy Services for Preparation of Detailed Project Report for Tunnel Car Parking at Kampty fall (Mussoorie) in the State of Uttarakhand |
2022_NHIDC_684993_1 |
27/04/2022 |
21/04/2022
|
11/05/2022
Time
15:0Hrs
|
|
| 442 |
PROJECT MANGEMENT CONSULTANCY SERVICES FOR DETAILED PROJECT REPORT PROVIDING PRE-CONSTRUCTION ACTIVITIES AND CONSTRUCTION SUPERVISION FOR CONSTRUCTION OF HIGHWAY TUNNEL INCLUDING APPROACHES TO BYPASS CHIYALIK ZIGS BETWEEN KM 19.17 AND 37.60 ON NH-09 |
Bharatmala/21-22/Chiyalik Bypass |
13/04/2022 |
13/04/2022
|
14/06/2022
Time
16:0Hrs
|
|
| 443 |
Consultancy Services for preparation of DPR for construction of 4-lane greenfield Bypasses in Mohanlalganj & Bacchhrawa for NH -30,Gosaiganj , Haiderganj & Gangaganj for NH 731,Lalganj, Mohanganj & Raniganj for NH 31 and Jayas for NH 128 in the state of UP |
2022_NHAI_112785_1 |
12/04/2022 |
12/04/2022
|
27/06/2022
Time
13:0Hrs
|
|
| 444 |
RFP for providing Project Management Consultancy services for construction of elevated flyover including provision for metro (section from Nashik Phata to Khed of NH-60 (from Km. 12.190 to Km. 42.000)) |
NHAI/RO/MUM/Pune/ Nashik Phata-Khed/2022/09 |
20/04/2022 |
12/04/2022
|
11/05/2022
Time
11:0Hrs
|
|
| 445 |
Consultancy Services for Preparation of Detailed Project Report and providing Pre-Construction activities for Construction of Two lane Highway Tunnel including approaches across Hamboting La, in the Union Territory of Ladakh |
CE(P) Vijayak/01/2022-23 |
09/04/2022 |
11/04/2022
|
25/06/2022
Time
12:0Hrs
|
|
| 446 |
PROJECT MANAGEMENT CONSULTANCY SERVICES FOR UP-GRADATION TO 2 LANE WITH PAVED SHOULDERS CONFIGURATION OF NH310A STARTING FROM ITS JUNCTION WITH NH 310 NEAR TASHI VIEW POINT CONNECTING PENENGLA, KABI, PHENSONG, PHODONG, NAMOK, RANGRANG AND TERMINATING AT MANGAN IN THE STATE OF SIKKIM FOR A LENGTH OF 58.0 KM APPROX. |
01/CE(NH)/RBD/2022-23 |
11/04/2022 |
11/04/2022
|
08/06/2022
Time
11:0Hrs
|
|
| 447 |
Consultancy services for preparation of Detailed Project report (DPR) for Construction of flyover at km 163.5-165.3 (Thangachimadam Detailed Project Report) of NH 49 and Providing wayside amenities (Rest area) including development of Arichalmunai of NH 49 (Package - IX). |
TN.NO.1/HDO/NH/2022-23/08.04.2022 |
08/04/2022 |
08/04/2022
|
22/06/2022
Time
15:0Hrs
|
|
| 448 |
Consultancy services for Feasibility study and detailed project report of separate twolane road on bank of Varun-Sone canal from Naubatpur to Daudnagar and 4-laning of Daudnagar- Aurangabad-Hariharganj section for Patna-Aurangabad-Hariharganj Section of NH-139 in Bihar. |
05-NH/AUR/DPR/2021-22 |
13/05/2022 |
06/04/2022
|
22/06/2022
Time
17:0Hrs
|
|
| 449 |
Consultancy Services for Preparation of Feasibility/ DPR for widening to two lane with paved shoulder from Km 0.00 to Km 49.09 (Miriyan near Telangana Border to Bapur at Junction of NH-65 via Chincholi Section) of NH-167N in the state of Karnataka |
ENHD/KLB/DPR/TENDER/22-23/23. |
06/04/2022 |
06/04/2022
|
20/04/2022
Time
17:30Hrs
|
|
| 450 |
Consultancy Services for Preparation of Feasibility/ DPR for widening to two lane with paved shoulder from Km 0.00 to Km 49.09 (Miriyan near Telangana Border to Bapur at Junction of NH-65 via Chincholi Section) of NH-167N in the state of Karnataka |
ENHD/KLB/DPR/TENDER/22-23/23 |
05/04/2022 |
05/04/2022
|
05/04/2022
Time
15:0Hrs
|
|
| 451 |
Consultancy Services for Preparation of Detailed Project Report for Construction of 4 Lane elevated Road from Km 162 to Km 164 Vidhansabha chowk to Mohkampur flyover and Improvement of Jogiwala Junction in Km 164 on NH 72 New NH 07 in the State of UK |
2022_MoRTH_682013_1 |
04/04/2022 |
04/04/2022
|
18/05/2022
Time
15:0Hrs
|
|
| 452 |
Consultancy services for preparation of Detailed Project report (DPR) for capacity augmentation of various selected stretches on National Highways in the State of Tamil Nadu ( Package VI) |
TN.No.01/DO/NH/2022/Dt. 01.04.2022 |
03/04/2022 |
01/04/2022
|
08/06/2022
Time
15:0Hrs
|
|
| 453 |
Consultancy services for preparation of Detailed Project report (DPR) for capacity augmentation of various selected stretches on National Highways in the State of Tamil Nadu ( Package VII) |
TN.No.02/DO/NH/2022/Dt. 01.04.2022 |
03/04/2022 |
01/04/2022
|
08/06/2022
Time
15:0Hrs
|
|
| 454 |
Consultancy services for preparation of Detailed Project report (DPR) for capacity augmentation of various selected stretches on National Highways in the State of Tamil Nadu ( Package VIII) |
TN.No.03/DO/NH/2022/Dt. 01.04.2022 |
03/04/2022 |
01/04/2022
|
08/06/2022
Time
15:0Hrs
|
|
| 455 |
Consultancy services for preparation of Detailed Project report (DPR) for Construction of Western Bypass to Madurai town from Kappalur to Vadipatti on EPC Mode in the State of Tamil Nadu. |
TN.No.04/DO/NH/2022/Dt. 01.04.2022 |
03/04/2022 |
01/04/2022
|
08/06/2022
Time
15:0Hrs
|
|
| 456 |
PACKAGE-II (1. Preparation of DPR for Study of Landslide Mitigation in GHAT Section from Km 0/00 – 2/4 of NH-234, 2. DPR for 4 laning of NH – 234 from Km 0/0 to Km 202/60 (excluding Vellore, Gudiyatham Bypass, Vettavalam & Kaniyambadi Bypass and Km 0/0 – 2/4 GHAT Section)) |
TN.No.34/2021-22/HDO/NH/Dt.30.03.2022 |
01/04/2022 |
31/03/2022
|
08/06/2022
Time
15:0Hrs
|
|
| 457 |
PACKAGE-I (1) DPR for Construction of 4-lane from Km 0/0 to Km 0/8, including land acquisition, Improvements of junctions, and Construction of Additional Two-lane Flyover works in the NH-532 (2) DPR for Construction of additional two lane flyovers at Kurinjipadi (km 22/6) and Virudhachalam (Km 51/2) in NH-532 (3) DPR for Construction of Vadalur bypass at Km 28/4 of NH-532 |
TN.No.33/2021-22/HDO/NH/Dt.30.03.2022 |
01/04/2022 |
31/03/2022
|
08/06/2022
Time
15:0Hrs
|
|
| 458 |
Consultants for the Consultancy services for preparation of Detailed Project report (DPR) for capacity augmentation of various selected stretches on National Highways in the State of Tamil Nadu ( Package V) |
TN.No.22/DO/NH/2021/Dt. 30.03.2022 |
31/03/2022 |
30/03/2022
|
08/06/2022
Time
15:0Hrs
|
|
| 459 |
PMC for Construction of Additional Major Bridge and its approaches across river Teesta at Sevoke starting around km 591.60 of NH-31 New NH10 in the District of Darjeeling West Bengal. |
e-NIQ No.-03 of 2021-22 of SENHPDC |
01/04/2022 |
29/03/2022
|
17/06/2022
Time
14:0Hrs
|
|
| 460 |
Consultancy services for preparation of Detailed Project report (DPR) for capacity augmentation of various selected stretches on National Highways in the State of Tamil Nadu ( Package III) |
TN.No.30/HDO/NH/2021-22/Dt.29.03.2022 |
18/04/2022 |
29/03/2022
|
09/06/2022
Time
15:0Hrs
|
|
| 461 |
Consultancy services for preparation of Detailed Project report (DPR) for capacity augmentation of various selected stretches on National Highways in the State of Tamil Nadu ( Package IV) |
TN.No.31/HDO/NH/2021-22/Dt.29.03.2022 |
23/04/2022 |
29/03/2022
|
09/06/2022
Time
15:0Hrs
|
|
| 462 |
Consultancy Services for Detailed Project Report Preparation for Construction of Udgir city Northern Bypass road on NH 63 in the state of Maharashtra. (Tentative Length 8.20 km) |
2022_MoRTH_680740_1 |
13/04/2022 |
28/03/2022
|
11/04/2022
Time
12:0Hrs
|
|
| 463 |
Consultancy Services for preparation of DPR for development of Tunnel from Dehradun/Rishikesh to Tehri in the State of Uttarakhand |
2022_NHAI_111287_1 |
06/04/2022 |
26/03/2022
|
27/04/2022
Time
11:0Hrs
|
|
| 464 |
Consultancy Services for Preparation of Feasibility/DPR for Widening to Two lane with paved shoulders from km 41.90 to 84.30, 88.20 to 105.25, 148.23 to 161.55, 166.35 to 174.13, 176.12 to 186.55 and 191.90 to 192.90 on NH 766C of Byndoor –Ranebennur section in State of Karnataka. |
EE/NHD/SMG/AE1/NH-766C/NIB30/2534 |
24/03/2022 |
24/03/2022
|
25/04/2022
Time
16:0Hrs
|
|
| 465 |
PROJECT MANAGEMENT CONSULTANCY SERVICES FOR Construction of Elevated Road in Jodhpur city portion from Krishi Mandi circle (Mandore) to Akhaliya Chouraha |
2022-NHAI-110851-1 |
20/04/2022 |
23/03/2022
|
28/04/2022
Time
11:0Hrs
|
|
| 466 |
Preparation of Detailed Project Report for Construction of Bypass to Harur Town from Km.49/500 – 55/0 of NH 179A |
TN.No.14/2021-22/ DO/ Date. 18.03.2022 |
05/04/2022 |
18/03/2022
|
19/04/2022
Time
15:0Hrs
|
|
| 467 |
Preparation of Detailed Project Report for Construction of Bypass to Varatanapalli Town from km.7/0-9/0 of 219 (New NH 42) |
TN.No.14/2021-22/ DO/ Date. 18.03.2022(2) |
05/04/2022 |
18/03/2022
|
19/04/2022
Time
15:0Hrs
|
|
| 468 |
Consultancy Services for Preparation of DPR for Construction of 2 Lane with paved shoulders bypass with provision of Tunnels at Lohaghat Start of bypass Km 136 325 Devradi Bend of NH 9 End of bypass km 142 Raikot Mahe of NH 9 and at Pithoragarh Start of bypass Km 197 Ancholi of NH 9 End of bypass km 206 750 Satsilling of NH 9 on NH-09 in the State of Uttarakhand |
CHARDHAM/NH-125/2021-22/Bypass |
17/03/2022 |
17/03/2022
|
06/04/2022
Time
16:0Hrs
|
|
| 469 |
Consultancy services for, Preparation of Feasibility/DPR for Construction of 4 lane Fly over and its Approaches in Shimoga city limit on NH 206 at Km 209.90 near Ashoka circle and at Km 212.60 Alkola circle on NH 206 in the State of Karnataka under Annual Plan 2021-22 |
EE/NHD/SMG /AE1/NH206/Consultancy/NIB11/3rd call/2470 |
16/03/2022 |
16/03/2022
|
31/03/2022
Time
16:0Hrs
|
|
| 470 |
Consultancy Services for preparation of DPR cum feasibility report for 4-laning green field highway from Meerut-Haryana border in the state of Uttar Pradesh. |
2022_NHAI_110188_1 |
21/03/2022 |
16/03/2022
|
19/04/2022
Time
11:0Hrs
|
|
| 471 |
CONSULTANCY SERVICES FOR PREPARATION OF DETAILED PROJECT REPORT (DPR)FOR FOUR LANNING OF ROAD FROM TITRAM MOR KATTHAL TO DEOBAN KANCHT (SH-11) (KM.189.300 TO 193.300), DEOBAN KANCHI TO KTTHANA (SH-11A) (KM.0.000 To 18.680), KTTHANA-NAGURAN ROAD (SH-11A) (KM. 18.680 TO 30.000), JIND-JHANSI ROAD (SH-12) (KM. 85.600 TO 95.030) & KM. 95.030 1O 124.268 IN KAITHAL, JIND & HISAR DISTT (Under HAM Scheme. |
Jind/HSRDC/Prep. of DPR of Titiram Mor to Hansi |
27/03/2022 |
16/03/2022
|
05/04/2022
Time
15:0Hrs
|
|
| 472 |
Consultancy Services for preparation of DPR from existing 2 lane to 4-lane from Km.0.000 to Km-68.000 (old chainage Km.197.300 to Km.265.300) of Kanaktora - Jharsuguda Section of NH-49 in the State of Odisha |
2022-NHAI-110222-1 |
28/03/2022 |
16/03/2022
|
11/05/2022
Time
11:0Hrs
|
|
| 473 |
PMC for preparation of DPR, Pre construction activity and Project supervision for the work of Widening to 2 lane with pave shoulder of Shahjahanpur Bisalpur (Length 45.00 km) and Pilibhit to Khatima (Length 28km) of NH-731K in the State of U.P. |
CE-RO/LKO/PMC/Lot-IV/ 2021-22/PKG-I Dated 15.03.22 |
25/03/2022 |
15/03/2022
|
25/05/2022
Time
15:0Hrs
|
|
| 474 |
PMC for preparation of DPR, Pre construction activity and Project supervision for the work of 4 lane construction of Major of 1.20 Km length along with its approaches on NH 135A and construction of ROB at Km 406 on NH 730 in the State of U.P. |
CE-RO/LKO/PMC/Lot-IV/ 2021-22/PKG-II dt 15.03.2022 |
25/03/2022 |
15/03/2022
|
25/05/2022
Time
15:0Hrs
|
|
| 475 |
PMC for preparation of Detailed Project Report, Pre construction activity and Project supervision for the work of Elevated corridor from Ramadevi to GolChauraha on NH-91A in the State of U.P. |
CE-RO/LKO/PMC/Lot-I V/2021-22/PKG-III dt15.03.2022 |
25/03/2022 |
15/03/2022
|
25/05/2022
Time
15:0Hrs
|
|
| 476 |
Project Management Consultancy Services for construction of Highway 2- lane Tunnel including approaches across the Jalori Pass on Sainj 0/00-Luhri- Aut 97/00 Road NH-305 from Km. 46/080 to Km. 57/00 in the State of Himachal Pradesh. |
RO/HP/Works(227)/2020-21 |
17/03/2022 |
14/03/2022
|
28/04/2022
Time
11:0Hrs
|
|
| 477 |
Consultancy Services for preparation of Detailed Project Report (DPR) for capacity augmentation of various selected stretches on National Highways in the State of Uttar Pradesh (Package NO- CE-RO/LKO/DPR /Lot-II /Package-I) |
CE-RO/LKO/DPR/Lot-II/2021-22 Dated .11.03.2022 |
21/03/2022 |
12/03/2022
|
29/04/2022
Time
11:0Hrs
|
|
| 478 |
Consultancy Services for preparation of Detailed Project Report (DPR) for capacity augmentation of various selected stretches on National Highways in the State of Uttar Pradesh (Package NO- CE-RO/LKO/DPR/ Lot-II/Package-II) |
CE-RO/LKO/DPR/Lot-II/2021-22 Dated 11.03.2022 |
21/03/2022 |
12/03/2022
|
29/04/2022
Time
11:0Hrs
|
|
| 479 |
Consultancy Services for preparation of Detailed Project Report (DPR) for capacity augmentation of various selected stretches on National Highways in the State of Uttar Pradesh (Package NO- CE-RO/LKO/DPR/ Lot-II/Package-III) |
CE-RO/LKO/DPR/Lot-II/2021-22 Dated ..11.03.2022 |
21/03/2022 |
12/03/2022
|
29/04/2022
Time
11:0Hrs
|
|
| 480 |
Preparation of Feasibility study and Detailed Project Report for Construction of 4-laning of Chakia to Bhitha more section of Ram Janki Marg |
03/NH-SITAMARHI/2021-22 |
02/04/2022 |
09/03/2022
|
02/05/2022
Time
17:0Hrs
|
|
| 481 |
Consultancy services for Preparation of Feasibility/DPR for widening to Four lane on NH 169 from km 30.00 to 60.00 on Shimoga – Mangalore Section in the State of Karnataka under Annual Plan 2021-22 |
EENHD/AE1/NH169/NIB28/2436 |
09/03/2022 |
09/03/2022
|
19/03/2022
Time
16:0Hrs
|
|
| 482 |
Consultancy services for Preparation of Detailed Project Report for Widening to 2/4 laning of Road branching from km 54/2 of NH 209, Palani to Kodaikkanal and the road to join at km 40/8 of NH 45E (1. km 1/4 - km 13/2, Thekkampatty to Palani Adivaram (ODR) (branching from NH 209) - 11.80km 2. km 0/0 - km 38/0 Palani to Kodai Ghat road (MDR) - 38.00km 3. Km 0/0 - km 41/2 Kodai Ghat road 41.20km (SH) (Joining at 45E) on EPC Mode in the state of Tamil Nadu. |
TN.No.20/DO/NH/2021/Dt. 09.03.2022 |
10/03/2022 |
09/03/2022
|
26/04/2022
Time
15:0Hrs
|
|
| 483 |
PMC for preparation of Detailed Project Report, Pre construction activity and Project supervision for the work of Widening to 2 lane Paved shoulder of Pratapgarh-Amethi -Gauriganj-Musafirkhana of NH-931 in the state of U.P. |
CE-RO/LKO/PMC/ Lot-III/2021-22/PKG-III |
10/03/2022 |
08/03/2022
|
25/05/2022
Time
15:0Hrs
|
|
| 484 |
PMC for preparation of Detailed Project Report, Pre construction activity and Project supervision for the work of Widening to 2 lane Paved Shoulder of Jagdishpur-Jais-Salon of NH-931A in the state of U.P. |
CE-RO/LKO/PMC/ Lot-III/2021-22/PKG-IV |
10/03/2022 |
08/03/2022
|
25/05/2022
Time
15:0Hrs
|
|
| 485 |
PMC for preparation of Detailed Project Report, Pre construction activity and Project supervision for the work of widening to 4 lane of Ayodhya-Pratapgarh section of NH-96 (New NH-330) in the state of U.P. |
CE-RO/LKO/PMC/ Lot-III/2021-22/PKG-I |
09/03/2022 |
08/03/2022
|
25/05/2022
Time
15:0Hrs
|
|
| 486 |
PMC for preparation of Detailed Project Report, Pre construction activity and Project supervision for the work of widening to 4 lane of Rewa-Renukoot -Garwa-Daltonganj-Ranchi of NH-75E (For UP Portion) in the state of U.P. |
CE-RO/LKO/PMC/ Lot-III/2021-22/PKG-II |
09/03/2022 |
08/03/2022
|
25/05/2022
Time
15:0Hrs
|
|
| 487 |
Project Management Consultancy services for JNPT Package V Part 1 |
NHAI/RO/MUM/JNPT-V/PMC/2022 |
29/04/2022 |
08/03/2022
|
18/07/2022
Time
15:0Hrs
|
|
| 488 |
Consultancy Services for preparation of DPR for 4laning of Masrakh Rajapatti Fazillahpur Kesariya Chakia Sitamarhi Bhitha More (150 km) sec of Ram Janki Marg in Bihar |
2022-NHAI-108244-1 |
13/04/2022 |
03/03/2022
|
25/04/2022
Time
11:30Hrs
|
|
| 489 |
Consultancy Services for Balance works of Land acquisition Plan Forest clearance Proposals and other pre construction activities in respect DPR for Sainj Luhari Jalori Banjar Aut Road excluding Jalori Pass Tunnel of NH 305 from Km. 0 to Km. 97 |
PW-CE-NH-CTR-Ten Notice/Consultancy/22-5342-49 |
04/03/2022 |
03/03/2022
|
11/04/2022
Time
17:0Hrs
|
|
| 490 |
Consultancy services for Preparation of Detailed Project Report and Feasibility study for Construction of 4 lane CC Road on Nagpur – Katol Road NH-353J from Km 2/500 to 7/200 & Construction of Two lane CC road with paved shoulder from Km 7/200 to 13/000 (Including Feasibility Study of Flyover in Nagpur City Portion) in State of Maharashtra. |
NIT NO. 25/EENH/NGP/2021-22/1026 |
08/03/2022 |
02/03/2022
|
21/03/2022
Time
17:0Hrs
|
|
| 491 |
Consultancy Services for preparation of DPR for Reconstruction of narrow ROB at km 406/8, construction of additional minor bridge and approaches with hairpin bend improvements at km 406/10, construction of additional minor bridge and footpath bridge on both sides and curve improvements at km 409/4 (laws falls), narrow RUB at km 411/2 (Katteri bridge), for eliminating a level crossing near Coonoor railway station and bus stand with junction improvements and bridge for vehicles at km 414/4 and nar |
TN.No.18/HDO/NH/2021-22/Dt.28.02.2022(2) |
16/03/2022 |
01/03/2022
|
30/03/2022
Time
15:0Hrs
|
|
| 492 |
Consultancy Services for preparation of DPR for Construction of grade separator at Charring cross km 430/8 – 431/4 of NH 67 & Improvements and Road Safety measures at Ghat Section from km 390/0 – 434/0 of NH 67 in the state of Tamilnadu |
TN.No.18/HDO/NH/2021-22/Dt.28.02.2022(sl.3) |
16/03/2022 |
01/03/2022
|
30/03/2022
Time
15:0Hrs
|
|
| 493 |
Consultancy Services for preparation of DPR for Providing low level elevated corridor for vehicles in Mudumalai reserve area to give free access to elephants km 488/8 – 504/4 of NH 67 in the state of Tamilnadu |
TN.No.18/HDO/NH/2021-22/Dt.28.02.2022(4) |
16/03/2022 |
01/03/2022
|
30/03/2022
Time
15:0Hrs
|
|
| 494 |
Consultancy Services for preparation of DPR for Construction of alternate bridge to the existing old and narrow steel bridge at km 394/4 & 400/4 (Kurumbadi bridge) of NH 67 and construction of bridge with curve improvements at km 396/4 & km 400/2 of NH 67 in the state of Tamilnadu |
TN.No.18/HDO/NH/2021-22/Dt.28.02.2022 |
16/03/2022 |
28/02/2022
|
30/03/2022
Time
15:0Hrs
|
|
| 495 |
Consultancy Services for preparation of DPR for Improvements of hairpin bend nos, 8,9, 10 & 26 from km 245/2 – 253/0 at NH 209 |
TN.No.9/2021-22/ DO/ Date. 28.02.2022 |
17/03/2022 |
28/02/2022
|
30/03/2022
Time
15:0Hrs
|
-
|
| 496 |
Consultancy Services for preparation of DPR for Providing passenger facilities like parking at km 470/0 – 470/2 ( Thavalaimalai and Oosi malai) of NH 67 |
TN.No.9/2021-22/ DO/ Date. 28.02.2022(2) |
17/03/2022 |
28/02/2022
|
30/03/2022
Time
15:0Hrs
|
|
| 497 |
Consultancy Services for preparation of DPR for Construction of Bypass to Mettupalayam Town from km 377/10 – 382/10 of NH 67 |
TN.No.8/2021-22/ DO/ Date. 28.02.2022 |
14/03/2022 |
28/02/2022
|
30/03/2022
Time
15:0Hrs
|
|
| 498 |
Consultancy Services for preparation of DPR for Construction of Additional bridge at km 382/6 of NH 67 (km 49/6 of New NH 181) |
TN.No.8/2021-22/ DO/ Date. 28.02.2022(2) |
14/03/2022 |
28/02/2022
|
30/03/2022
Time
15:0Hrs
|
|
| 499 |
Consultancy Services for preparation of DPR for Construction of flyover from km 152/9 – 153/8 of NH 209 |
TN.No.8/2021-22/ DO/ Date. 28.02.2022(4) |
14/03/2022 |
28/02/2022
|
30/03/2022
Time
15:0Hrs
|
|
| 500 |
Consultancy Services for preparation of DPR for Construction of flyover from km 163/8 – 166/2 of Nh 209 (Blackspot ID – TN – 02 – 623) in Coimbatore City |
TN.No.8/2021-22/ DO/ Date. 28.02.2022(5) |
14/03/2022 |
28/02/2022
|
30/03/2022
Time
15:0Hrs
|
|
| 501 |
Consultancy Services for preparation of DPR for Construction of flyover from km 331/2 – 333/8 of NH 67 |
TN.No.8/2021-22/ DO/ Date. 28.02.2022(3) |
14/03/2022 |
28/02/2022
|
30/03/2022
Time
15:0Hrs
|
|
| 502 |
Consultancy Services for preparation of DPR for up gradation to 2 lane with paved shoulder of MDR-29 Ch. 2.530 (end point of Takoli-Kullu section ) to Ch. 41.375 (end point of Kullu-Manali Section) in the state of Himachal Pradesh |
2022-NHAI-107811-1 |
10/03/2022 |
28/02/2022
|
05/05/2022
Time
11:0Hrs
|
|
| 503 |
Consultancy services for Preparation of Detailed Project Report for Construction of ROB in lieu of LC 49(Km 46/0-2), LC 56(52/9-10), LC 68 (67/12-13) of NH 209 in the State of Tamilnadu |
Tender Notice No.10 /2021-22/DO dated. 25.2.2022 |
01/03/2022 |
26/02/2022
|
13/04/2022
Time
15:0Hrs
|
|
| 504 |
Consultancy Services for preparation of Feasibility Study and Detailed Project Report for 2 lane with paved shoulder of (i) Kopargaon to Aurangabad of NH-752I and (ii) Jalna–Pulgaon of NH-753C in the State of Maharashtra |
NHAI/RO-NAG/TENDERS/2021-22/33 |
25/02/2022 |
25/02/2022
|
11/04/2022
Time
11:0Hrs
|
-
|
| 505 |
Consultancy Services for preparation of DPR for Study of Landslide Mitigation in GHAT Section from Km 0/0-2/4 of NH 234 |
TN.No.09/2021-22/DO/NH/Dt.25.02.2022 |
05/03/2022 |
25/02/2022
|
29/03/2022
Time
15:0Hrs
|
|
| 506 |
Consultancy Services for preparation of DPR for Construction of Vadalur Bypass at Km 28/4 of NH-532 |
TN.No.02/2021-22/DO/NH/Dt.24.02.2022 |
03/03/2022 |
24/02/2022
|
29/03/2022
Time
15:0Hrs
|
|
| 507 |
Consultancy Services for preparation of DPR for Construction of 4-lane from Km 0/0 to Km 0/8, including land acquisition, improvement of junctions, and Construction of Additional Two Lane Flyover works in the NH 532 |
TN.No.02-1/2021-22/DO/NH/Dt.24.02.2022 |
03/03/2022 |
24/02/2022
|
29/03/2022
Time
15:0Hrs
|
|
| 508 |
Consultancy Services for preparation of DPR for Construction of Additional Two Lane Flyover at Kurinjipadi (Km 22/6) and Virudhachalam (Km 51/2) in NH-532 |
TN.No.02-2/2021-22/DO/NH/Dt.24.02.2022 |
03/03/2022 |
24/02/2022
|
29/03/2022
Time
15:0Hrs
|
|
| 509 |
Consultancy Services for preparation of DPR for development of Dehradun Ring Road |
NHAI/BM/DPR/Dehradun-Road/2022 |
08/03/2022 |
23/02/2022
|
24/03/2022
Time
11:0Hrs
|
|
| 510 |
Consultancy Service for Preparation of DPR for Construction of Flyover Bridge carrying out feasibility study Detailed Survey/ Investigation. Alignment Option, Preparation of General agreement Drawing Engineering Report for Construction of flyover Bridge and its approaches along with service road and preparation of land acquisition papers for acquisition of land, forest clearance and utility shifting details complete in all respects on Bathinda-Dabwali road from Km 9.40 to 10.40 of NH-54. |
CWD No.1 /BTI-NH/07 |
25/02/2022 |
23/02/2022
|
14/03/2022
Time
17:0Hrs
|
|
| 511 |
Consultancy services for Preparation of Detailed Project Report for Construction of flyover at km 163/5-165/3 (Thangachimadam) of NH 49 (New NH 87) |
TN.No.7/2021-22/ JDO/ Dated. 23.02.2022 |
28/02/2022 |
23/02/2022
|
11/04/2022
Time
15:0Hrs
|
|
| 512 |
Consultancy services for Preparation of Detailed Project Report for Providing wayside amenities (Rest area) including development of Arichalmunai of NH 49 (New NH 87) |
TN.No.8/2021-22/ JDO/ Dated. 23.02.2022 |
28/02/2022 |
23/02/2022
|
11/04/2022
Time
15:0Hrs
|
|
| 513 |
Consultancy Services for preparation of DPR for 4 laning of NH 234 from km 0/0 to km 202/60 (excluding Vellore, Gudiyatham Bypass, Vettavalam and Kaniyambadi Bypass and Km 0/0 to 2/4 Ghat Section) |
TN.No.26/2021-22/HDO/NH/Dt.23.02.2022 |
28/02/2022 |
23/02/2022
|
29/03/2022
Time
15:0Hrs
|
|
| 514 |
Consultancy services for Preparation of Detailed Project Report for Construction of Grade Separator in km 67/10 of NH 49 Extn. (New NH 85) (Madurai -Cochin road) on EPC Mode in the state of Tamilnadu |
Tender Notice No.15 /2021-22/DO dated.18.02.2022 |
01/03/2022 |
22/02/2022
|
21/03/2022
Time
15:0Hrs
|
|
| 515 |
Consultancy services for Preparation of Detailed Project Report for Construction of Kalaiyarkoil Bypass in km 62/6 - 68/2 of NH 230 (New NH 85) on EPC Mode in the state of Tamilnadu |
18/2021-22/DO dated.21.02.2022 |
01/03/2022 |
22/02/2022
|
24/03/2022
Time
15:0Hrs
|
|
| 516 |
Consultancy services for Preparation of Detailed Project Report for Construction of Singampunari bypass in Km 4/2 9/2 of NH 383 Extn.on EPC Mode in the State of Tamilnadu |
17/2021-22/DO dated.21.02.2022 |
01/03/2022 |
22/02/2022
|
24/03/2022
Time
15:0Hrs
|
|
| 517 |
Consultancy services for Preparation of Detailed Project Report for Construction of Thiruppathur bypass branching from km 28/4 of NH 383 Extn. and ending at Km 98/4 of NH 226 (New NH36) on EPC Mode in the state of Tamilnadu |
16 /2021-22/DO dated.18.02.2022 |
01/03/2022 |
22/02/2022
|
21/03/2022
Time
15:0Hrs
|
|
| 518 |
Consultancy services for Preparation of Detailed Project Report for Connecting the NH381B with NH67 near Musiri including HLB across Cauvery in the state of Tamil Nadu. |
TN.No. 09/2021-22/DO/Date. 22.02.2022 |
28/02/2022 |
22/02/2022
|
25/03/2022
Time
15:0Hrs
|
|
| 519 |
Consultancy services for Preparation of Detailed Project Report for Widening to 2 lane with paved shoulder from Km 99/0 - km 119/0 of NH 49 Extn (New NH No 85) on EPC Mode in the state of Tamil Nadu. |
TN.No.19/DO/NH/2021/Dt. 22.02.2022 |
22/02/2022 |
22/02/2022
|
19/04/2022
Time
15:0Hrs
|
|
| 520 |
Consultancy services for Preparation of Feasibility/DPR for widening to Four lane on NH 169 from km 30.00 to 60.00 on Shimoga – Mangalore Section in the State of Karnataka |
EENHD/AE1/NH169/NIB28/2243/22 |
21/02/2022 |
21/02/2022
|
14/03/2022
Time
16:0Hrs
|
|
| 521 |
Consultancy services for Preparation of Detailed Project Report for Widening to Four lane of NH 226 Extn (New NH No 136) from km 0/0 - 24/370, 29/210 – 53/0 and Ariyalur bypass at km 0/0 - 7/552 on EPC Mode in the state of Tamil Nadu. |
TN.No.17/DO/NH/2021/Dt. 21.02.2022 |
22/02/2022 |
21/02/2022
|
19/04/2022
Time
15:0Hrs
|
|
| 522 |
Consultancy services for Preparation of Detailed Project Report for Four laning of NH 230 from km 18/40 to km 111/40 (Excluding Kalayar koil and Thirubhuvanam Bypass) on EPC Mode in the state of Tamil Nadu. |
TN.No.18/DO/NH/2021/Dt. 21.02.2022 |
22/02/2022 |
21/02/2022
|
19/04/2022
Time
15:0Hrs
|
|
| 523 |
CONSULTANCY SERVICES FOR FEASIBILITY STUDY, PREPARATION OF DETAILED PROJECT REPORT (DPR) AND PROVIDING PRECONSTRUCTION SERVICES (INCLUDING SELECTION OF SITE, TYPE OF BRIDGE, SUB SOIL INVESTIGATION, ESTIMATION, PREPARATION OF TENDER DOCUMENTS ETC) FOR SPECIAL TYPE OF BRIDGE (CABLE STAYED BRIDGE. SUSPENSION BRIDGE OR STEEL ARCH BRIDGE) INDICATIVE LENGTH OF BRIDGE-300 MTR OVER KODAK RIVER AT KM 2.010 (ROAD TAKE OFF FROM KM 2.600 ON TUTING-BONA) & APPROACH ROAD -2.50 KMS ON ROAD TUTING- YORTUNG- ENK |
CE (P) BMK/EPC/04/2021-22 |
15/02/2022 |
17/02/2022
|
15/04/2022
Time
11:0Hrs
|
|
| 524 |
Consultancy Services for preparation of DPR for (i) Development of Road Connectivity from NH-16 to Astarang Port (Puri District) (ii) Development of Road Connectivity from NH-16 to Subarnarekha Port (Balasore District) under Bharatmala Pariyojana in the state of Odisha |
NHAI/BM/PC/Odisha/2022 |
21/02/2022 |
15/02/2022
|
11/04/2022
Time
11:0Hrs
|
|
| 525 |
Project Management Consultancy Services for Up-gradation to 4 Lane for the Highway Starting from its junction with NH216 near Amalapuram connecting Palivela and terminating at its junction with NH-216A at Ravulapalem in the State of Andhra Pradesh |
SE(R&B)/NH/VJA/50/2021-22 dt.22.11.2021 |
09/02/2022 |
09/02/2022
|
08/03/2022
Time
17:0Hrs
|
|
| 526 |
PMC for preparation of DPR, Pre construction activity and Project supervision for the work of Widening to 4 lane of Jaunpur Akbarpur section of NH135A and 4 lane Mirzapur Bypass along with 2 Nos ROBs on NH135A(Excluding Major Bridge over Ganga River) |
CE-RO/LKO/PMC/Lot-II/2021-22 Dated. 27.01.2022 |
28/01/2022 |
27/01/2022
|
11/02/2022
Time
15:0Hrs
|
|
| 527 |
Consultancy services for, Preparation of Feasibility/DPR for Construction of 4 lane Fly over and its Approaches in Shimoga city limit on NH 206 at Km 209.90 near Ashoka circle and at Km 212.60 Alkola circle on NH 206 in the State of Karnataka under Annual Plan 2021-22 |
EENHD/SMG/AE1/NH206/nIB11/2ndcall/corrigendum/2008 |
25/01/2022 |
25/01/2022
|
01/02/2022
Time
16:0Hrs
|
|
| 528 |
Consultancy Services for the preparation of Feasibility Report cum Detailed Project Report (DPR) for capacity augmentation to two lane with paved shoulder configuration of NH 183 (Old NH 220) from km 137/000(Ponkunnam) to 160/300 (Mundakkayam) |
01/DPR/SENH/CC/KOCHI/2021--2022 |
25/01/2022 |
22/01/2022
|
28/02/2022
Time
15:0Hrs
|
|
| 529 |
Carrying out survey geotechnical investigation and preparation of gads, BOQ, Detailed designing, working drawings, detailed estimates including required modifications during construction of 2 lane with pave shoulder 4 lane elevated road |
2022_HRY_205060_1 |
10/02/2022 |
21/01/2022
|
28/02/2022
Time
17:0Hrs
|
|
| 530 |
Consultancy Services for preparation of detailed project report (DPR) / feasibility study report for Construction of uninterrupted connectivity from eastern Faridabad to Western Faridabad (a) From Sanik Colony Mod - Badkhal Chowk (NH-44) Sector 19-28 Dividing Road – Double Canal up to Greater Faridabad/ Noida/ Greater Noida link. (b) From village pali via Sohna road, Ballabgarh through Green Belt along Gurugram Canal- Greater Faridabad up to proposed Highway in Master plan 2031 |
2022_HRY_205169_1 |
15/02/2022 |
21/01/2022
|
28/02/2022
Time
17:0Hrs
|
|
| 531 |
Consultancy services for Preparation of Feasibility/Detailed Project Report DPR for Construction of Grade Separators at km 16.490 Devegowda Circle Junction Km 25.820 Nanjanagud junction Km 30.100 Srirampura Junction Km 38.100 Bogadi Junction and at Km 40.200 Vijayanagar 4 stage junction of NH-275K Mysuru Ring Road in the State of Karnataka 2 call |
EENHD/Bng/AE2/NH-275K/Gr.Sep/DPRNIT-03/2021-22/-2nd call 11.1.2022 |
14/01/2022 |
14/01/2022
|
24/02/2022
Time
15:0Hrs
|
|
| 532 |
Consultancy Services for preparation of DPR for Augmentation from 4 to 6 laning from Km. 0.00 Km. 119.300 of Baleshwar to Kharagpur section of NH-60 in the state of West Bengal and Odisha |
2022_NHAI_101400_1 |
01/02/2022 |
11/01/2022
|
28/03/2022
Time
10:59Hrs
|
|
| 533 |
Consultancy Services for Preparation of Detailed Project Report and providing Pre-Construction activities and Land Acquisition for Construction of 4-Lane elevated Road from Km 162 to Km 164 ( Vidhansabha chowk to Mohkampur flyover ) and Improvement of jogiwala Juction in Km 164 on NH 72 (New No- 07) in the State of Uttarakhand |
05/13yata-NH-10/2022 dated 01.01.2022 |
24/01/2022 |
08/01/2022
|
21/02/2022
Time
12:0Hrs
|
|
| 534 |
Consultancy Services for Preparation of Detailed Project Report for Tunnel Car Parking at Kampty fall (Mussoorie) in the State of Uttarakhand |
NHIDCL/Tunnel Car Parking/ DPR/Uttarakhand/2022 |
23/03/2022 |
08/01/2022
|
11/04/2022
Time
15:0Hrs
|
|
| 535 |
Consultancy Services for Preparation of DPR for Construction of 4-Lane bypass to Ras town on NH-158 and Construction of 2-Lane with paved shoulders configuration of bypass (with provision of new ROB) to Mandal town connecting NH-158 to NH-48 |
2022-MoRTH-667113-1 |
17/01/2022 |
07/01/2022
|
24/02/2022
Time
16:0Hrs
|
|
| 536 |
CONSULTANCY SERVICES FOR FEASIBILITY STUDY, DETAILED SURVEY/INVESTIGATION, PREPARATION OF GENERAL ARRANGEMENT DRAWING,DETAILED PROJECT REPORT FOR CONSTRUCTION OF FOUR LANE RAIL OVER BRIDGE IN LIEU OF RAILWAY CROSSING NO. A-8-A at KM 3 600 on NH-154 (PATHANKOT-KULLU ROAD) DISTT PATHANKOT IN THE STATE OF PUNJAB |
07 of 2021-22 |
06/01/2022 |
06/01/2022
|
02/02/2022
Time
17:0Hrs
|
|
| 537 |
Consultancy services for Preparation of Detailed Project Report for Construction of 4 lane Flyover on Nagpur – Katol Road NH-353J from Km 3/000 to 7/500 including Rigid Pavement to service road with 4 Lane CC Road under Flyover & Construction of Two lane CC road with paved shoulder from Km 2/500 to 3/000 & 7/500 to 13/000 in State of Maharashtra. |
17/EENH/NGP/2021-22/29 |
13/01/2022 |
06/01/2022
|
20/01/2022
Time
17:0Hrs
|
|
| 538 |
Consultancy Services for preparation of DPR for widening of Coimbatore Bypass on NH-47 from Km 141/0 to Km 171/200 from existing 2 lane to 4 lane configuration in the State of Tamil Nadu. |
ChennaiMoRTH12014212018Part1 |
05/01/2022 |
03/01/2022
|
17/02/2022
Time
11:0Hrs
|
|
| 539 |
Consultancy Services for Widening of Well foundation bridges no 10/1,14/1,15/1,25/1, 48/1,60/1,69/1,83/1,90/1,96/1,101/1,103/1,111/1,112/1,114/1,119/1,129/1,131/1 (18nos) on NH-15, Bridge no. 10/1, 21/1, 22/1, 44/1, 47/2 (5 nos) on NH-127D and Bridge No. 6/1 (1 no) on NH-427 in the State of Assam. |
2021_MoRTH_666191_1 |
31/12/2021 |
31/12/2021
|
01/02/2022
Time
14:0Hrs
|
|
| 540 |
Project management Consultancy services for feasibility study and preparation of DPR, Supervision during construction and maintenance of NH-627(Pkj-I) |
2021_MoRTH_666123_1 |
31/12/2021 |
31/12/2021
|
07/02/2022
Time
14:0Hrs
|
|
| 541 |
Project management Consultancy services for feasibility study and preparation of DPR, Supervision during construction and maintenance of NH-627(Pkj-II) |
2021_MoRTH_666180_1 |
31/12/2021 |
31/12/2021
|
07/02/2022
Time
14:0Hrs
|
|
| 542 |
Project Management Consultancy Services for Feasibility Study and Preparation Of DPR, Supervision during Construction and Maintenance of New Bridge over river Jiabharali (Br. No. 166/1) on NH-15 |
2021_MoRTH_665730_1 |
31/12/2021 |
30/12/2021
|
07/02/2022
Time
14:0Hrs
|
|
| 543 |
Project Management Consultancy Services for Feasibility Study and Preparation of DPR, Supervision during Construction and Maintenance of New Bridge over river Dikrong (Br. No. 310/1) and over river Subansiri (Br. No. 376/1) on NH-15 |
2021_MoRTH_665794_1 |
31/12/2021 |
30/12/2021
|
07/02/2022
Time
14:0Hrs
|
|
| 544 |
Consultancy for preparation of DPR for construction of elevated corridor/grade separator connecting Indira Gandhi Square (at Km 0/0) & Rajiv Gandhi Square (at Km 1.1) on NH66 in Union Territory of Puducherry |
ROChennaiMoRTH12014DPR202122-PU |
04/01/2022 |
30/12/2021
|
14/02/2022
Time
11:0Hrs
|
|
| 545 |
Project Management Consultancy Services for Feasibility study and detailed Engineering for Widening to 2 lane with paved shoulder and geometric improvements of NH 907A from Km 5/00 to Km 78/00 Nahan to Kumarhatti Stretch in the State of HP. |
PW-CE-NH-CTR-Tender Notice/Consultancy/21-4169-77 |
05/01/2022 |
30/12/2021
|
07/02/2022
Time
17:0Hrs
|
|
| 546 |
Consultancy Services for Feasibility/Detail Engineering report of bypasses (Lalsot, Mandawari, Khedli, Piplai, Salimpur, Karauli) Between Lalsot Gangapur Karauli Section of NH-23 (OLD-11B) for Two lane Paved Shoulder Length of Bypasses 25.00 Km |
NIT 07/2021-22 EE PWD NH Dn.-I, Jaipur |
21/01/2022 |
29/12/2021
|
14/02/2022
Time
18:0Hrs
|
|
| 547 |
Consultancy services for, Preparation of Feasibility/DPR for Construction of 4 lane Fly over and its Approaches in Shimoga city limit on NH 206 at Km 209.90 near Ashoka circle and at Km 212.60 Alkola circle on NH 206 in the State of Karnataka under Annual Plan 2021-22 |
EENHD/SMG/AE1/NH206/Consultancy/NIB11/2nd call/2021-22/1793 |
27/12/2021 |
27/12/2021
|
25/01/2022
Time
16:0Hrs
|
|
| 548 |
Preparation of DPR for eliminating a level crossing near Coonoor Railway station and Bus stand and junction improvement @ km 414/4 and reconstruction of narrow ROB @ km 406/8 (HPB-12/14), narrow RUB @ km 411/2 (Katteri bridge) and narrow RUB @ km 416/10 of NH67 |
TN.No.10/2021-22/ DO/ Date. 24.12.2021 |
21/01/2022 |
24/12/2021
|
11/02/2022
Time
15:0Hrs
|
|
| 549 |
Preparation of DPR for construction of alternate bridges to the existing old and narrow steel bridges at Km 394/4 (10 feet bridge) and at Km 400/4 (Kurumbadi bridge) of NH 67 |
TN.No.6/2021-22/ DO/ Date. 24.12.2021 |
21/01/2022 |
24/12/2021
|
11/01/2022
Time
15:0Hrs
|
|
| 550 |
Preparation of DPR for construction of alternate bridges to the existing old and narrow steel bridges at Km 394/4 (10 feet bridge) and at Km 400/4 (Kurumbadi bridge) of NH 67 |
TN.No6/2021-22/ DO/ Date.24.12.21 |
21/01/2022 |
24/12/2021
|
11/02/2022
Time
15:0Hrs
|
|
| 551 |
Consultancy Services for Detailed Project Report Preparation for Rehabilitation and Upgradation of existing 4-Lane Road to Single tier 6-lane Elevated corridor on NH-753F Jalgoan, Sillod, and Aurangabad (Tisgaon Junction, A.S. Club) Ch. Km. 160-700 t |
EENH/Aurangabad/DPR/Tender No-1/2021-22/1974 |
21/12/2021 |
21/12/2021
|
11/03/2022
Time
17:30Hrs
|
|
| 552 |
Consultancy Services for PREPARATION OF DETAILED PROJECT REPORT (DPR) / FEASIBILITY STUDY REPORT FOR CONSTRUCTION OF 4-LANE ROB IN LIEU OF EXISTING 2-LANE ROB OVER L/C NO. 51-C OVER REWARI-HISAR RAILWAY LINE CROSSING NH-709 (EXTN.) IN KM. 122 IN BHIWANI TOWN |
PWD/NH-JIND/NH-BWN/100014(2) |
20/12/2021 |
20/12/2021
|
10/01/2022
Time
17:0Hrs
|
|
| 553 |
Widening to 4 lane of Jaunpur Akbarpur section of NH- 135A and 4 lane Mirzapur Bypass along with 2 Nos ROBs on NH-135A(Excluding Major Bridge over Ganga River) |
CE-RO/LKO/PMC/Lot-II/2021-22 |
22/12/2021 |
18/12/2021
|
24/01/2022
Time
15:0Hrs
|
|
| 554 |
Consultancy Services for Consultancy Services for Preparation of feasibility report cum Detailed Project Report (DPR) for the Capacity Augmentation to 2 lanes with paved shoulders configuration for NH Corridors and four lane Bypasses in Kerala) - New NH from Kayamkulam (NH 66) to junction near Thiruvalla (NH 183) |
01/SENH/SC/2021--2022 |
17/12/2021 |
14/12/2021
|
14/01/2022
Time
15:0Hrs
|
|
| 555 |
Consultancy Services for the preparation of Feasibility Report cum Detailed Project Report (DPR) for capacity augmentation to two lane with paved shoulder configuration of NH 183 (Old NH 220) from km 137/000(Ponkunnam) to 160/300 (Mundakkayam) |
01/DPR/SENH/CC/KOCHI/2021-2022 |
08/12/2021 |
08/12/2021
|
04/01/2022
Time
15:0Hrs
|
|
| 556 |
Consultancy services for, Preparation of Feasibility/DPR for widening to two lane with paved shoulder on NH 766C from Km 0.00 to 38.70 (Byndoor to Nittur) in the State of Karnataka |
eENH/AE1/766C/NIB15/2nd call/21-22/1553 |
20/11/2021 |
20/11/2021
|
13/12/2021
Time
16:0Hrs
|
|
| 557 |
Consultancy services for preparation of DPR for Rehabilitation and Upgradation of NH 117 from km 114.975 to km 137.684 to two lane paved shoulder configuration in the Dist. of South 24 Pgs.WB. |
NIQ No. 03 of 2021-22 of SE, NHPDC (2ND CALL) |
17/11/2021 |
17/11/2021
|
07/02/2022
Time
11:0Hrs
|
|
| 558 |
Preparation of Detailed Project Report for Construction of Bypass to Harur Town from Km.49/500 – 55/0 of NH 179A |
TN.No.7/2021-22/ DO/ Date. 17.11.2021 |
05/01/2022 |
17/11/2021
|
25/02/2022
Time
15:0Hrs
|
|
| 559 |
Consultancy Service for Rangia Bypass |
2021_MoRTH_657698_1 |
06/12/2021 |
15/11/2021
|
15/12/2021
Time
14:0Hrs
|
|
| 560 |
Consultancy Services for Preparation of Detailed Project Report and providing Pre-Construction activities for Construction of Highway Tunnel including approaches across Khardungla Pass Namik La & Fotu La in the Union Territory of Ladakh |
Ladakh/Tunnels/Re-invite/2021/DPR-01/02/03 |
03/11/2021 |
03/11/2021
|
24/11/2021
Time
11:0Hrs
|
|
| 561 |
Consultancy Services for Consultancy Services for Preparation of feasibility report cum Detailed Project Report (DPR) for the Capacity Augmentation to 2 lanes with paved shoulders configuration for NH Corridors and four lane Bypasses in Kerala) - New NH from Kayamkulam (NH 66) to junction near Thiruvalla (NH 183) |
01/SENH/SC2021-2022 |
04/11/2021 |
03/11/2021
|
14/12/2021
Time
15:0Hrs
|
|
| 562 |
Consultancy services for Preparation of Feasibility/DPR for Construction of Outer Ring Road on NH 766C for Shikaripura town in Shimoga Dist in the State of Karnataka under Annual Plan 2021-22. |
EE/NHD/SMG/AE-1/NH-766C/consultancy/NIB-13/2nd call/2021-22/1462 |
02/11/2021 |
02/11/2021
|
23/11/2021
Time
16:0Hrs
|
|
| 563 |
Consultancy services for Preparation of Feasibility/DPR for widening to two lane with paved shoulder from Km 0.00 to Km 26.32on NH-173 in the State of Karnataka |
EE/NHD/HSN/AE-1/NH-173/Consultancy/NIT/2021-22/07 |
02/11/2021 |
29/10/2021
|
30/11/2021
Time
17:30Hrs
|
|
| 564 |
Consultancy Services for Preparation of feasibility/DPR for Widening to two lane with paved shoulders from Km 86.200 to Km 99.200 and Km 113.710 to Km 146.400 on NH-73 in the state of Karnataka |
EE/NHD/HSN/AE-1/NH-73/Km.86.200 to 99.200 & 113.710 to 146.400/NIT/2021-22/08 |
04/11/2021 |
29/10/2021
|
30/11/2021
Time
17:30Hrs
|
|
| 565 |
Consultancy Services for Preparation of Feasibility/DPR for widening to 2L with PS from KM 146.400 to 194.555 on NH-73 in the state of Karnataka |
EE/NHD/HSN/AE-1/NH-73/Km.146.400 to 194.555/NIT/2021-22/09 |
08/11/2021 |
29/10/2021
|
30/11/2021
Time
17:30Hrs
|
|
| 566 |
Consultancy Services for Detailed Project Report Preparation for Construction of Single Tier 4 lane Elevated Corridor from Talegaon to Chakan to Shikrapur on NH-548D on DBFOT Toll Basis in the state of Maharashtra |
2021_MoRTH_654668_1 |
26/11/2021 |
27/10/2021
|
22/12/2021
Time
17:0Hrs
|
|
| 567 |
Consultancy services for, Preparation of Feasibility/DPR for widening to two lane with paved shoulder on NH 766C from Km 0.00 to 38.70 (Byndoor to Nittur) in the State of Karnataka |
EE/NHD/SMG/AE-1/NH766C/Consultancy/NIB15/2021-22/1436 |
27/10/2021 |
27/10/2021
|
17/11/2021
Time
16:0Hrs
|
|
| 568 |
CONSULTANCY SERVICES FOR FEASIBILITY STUDY, PREPARATION OF DETAILED PROJECT REPORT (DPR) AND PROVIDING PRECONSTRUCTION SERVICES (INCLUDING SELECTION OF SITE, TYPE OF BRIDGE, SUB SOIL INVESTIGATION, ESTIMATION, PREPARATION OF TENDER DOCUMENTS ETC.) (INDICATIVE LENGTH OF BRIDGE-300 MTR OVER KODAK RIVER AT KM 2.010 (ROAD TAKE OFF FROM KM 2.600 ON TUTING-BONA) & APPROACH ROAD -2.50 KMS) ON ROAD TUTING-YORTUNG-ENKUNJI-EMRA VALLEY-KANGRI-KARPOLA FROM EXISTING SPECIFICATIONS TO NHSL SPECIFICATIONS UNDE |
CE (P) BMK/EPC/03/2021-22 |
25/10/2021 |
26/10/2021
|
15/12/2021
Time
11:0Hrs
|
|
| 569 |
Consultancy Services for preparation of detailed project report (DPR) / feasibility study report for Construction of 4 lanning with paved shoulder of Gurgaon-Alwar road (NH-248A) Section from Nuh to Ferozepur Jhirka upto Rajasthan Border |
654404 |
22/11/2021 |
25/10/2021
|
10/12/2021
Time
17:0Hrs
|
|
| 570 |
PREPARATION OF RSTC (RECCE SURVEY AND TRACE CUT) AND DPR (DETAILED PROJECT REPORT) FOR CONSTRUCTION OF DAMTENG-SELUNGTHI-LUNGAR-CHUNA ROAD FROM KM 0.000 TO KM 67.000 (EXISTING LENGTH 67.00 KM) TO NHSL SPECIFICATIONS UNDER 763 BRTF/ PROJECT VARTAK IN ARUNACHAL PRADESH STATE |
CE (P) VTK/NIT-19/2021-22 |
07/10/2021 |
09/10/2021
|
03/12/2021
Time
17:0Hrs
|
|
| 571 |
Consultancy Services for preparation of detailed project report (DPR) for construction of Bhiwani bye pass (Connecting Bhiwani-Hansi road (NH-148 B) to Bhiwani-Loharu road (NH-709 Extn.) and Dhigawa bye pass |
PWD/NH-JIND/NH-BWN/100013 |
17/11/2021 |
09/10/2021
|
08/12/2021
Time
17:0Hrs
|
|
| 572 |
Consultancy Services for PREPARATION OF DETAILED PROJECT REPORT (DPR) / FEASIBILITY STUDY REPORT FOR CONSTRUCTION OF 4-LANE ROB IN LIEU OF EXISTING 2-LANE ROB OVER L/C NO. 51-C OVER REWARI-HISAR RAILWAY LINE CROSSING NH-709 (EXTN.) AT KM. 122 IN BHIWANI TOWN. |
PWD/NH-JIND/NH-BWN/100014 |
17/11/2021 |
09/10/2021
|
15/12/2021
Time
17:0Hrs
|
|
| 573 |
Consultancy services for, Preparation of Feasibility/DPR for Construction of ROB’s at LC 79 (Kumsi), LC 110 (Hossur) and LC 152 (Talaguppa) of NH 206 and LC 105 (Anandapura) of NH 766C in the State of Karnataka under Annual Plan 2021-22 |
EE/NHD/SMG/AE1/NH766C/consultancy/NIB12/2nd call/2021-22/1334 |
07/10/2021 |
08/10/2021
|
04/11/2021
Time
16:0Hrs
|
|
| 574 |
Consultancy Service for Preparation of DPR for Construction of Flyover bridge carrying out feasibility study Detailed Survey / Investigation. Alignment Option, Preparation of General agreement Drawing Engineering Report for Construction of proposed flyover Bridge and its approaches along with service road and preparation of land acquisition papers for acquisition of land, forest clearance and utility shifting details complete in all respects on Bathinda-Dabwali road from Km 9.40 to 10.40 of NH-5 |
CWD No.1 /BTI-NH/03 |
09/10/2021 |
08/10/2021
|
20/10/2021
Time
17:0Hrs
|
|
| 575 |
Consultancy Services for preparation of Detailed project report (including Road safety audit) for Six Laning of Dhanua Ghati section from km 249.525 to km 261.150 of NH-2 in the State of Jharkhand(3rd call) |
NHAI/RO/RNC/JH/2021-22/01(2) |
11/10/2021 |
07/10/2021
|
18/10/2021
Time
11:0Hrs
|
|
| 576 |
Consultancy Services for Preparation of Feasibility/DPR for widening to two lane with paved shoulder on NH 169A from km 33.00 to 41.00 (AgumbeGhat) in the State of Karnataka under Annual Plan 2021-22. |
EENHD/SMG/AE2/NH169A/Consultancy/NIB10/3rd call/2021-22/1324 |
07/10/2021 |
07/10/2021
|
04/11/2021
Time
16:0Hrs
|
|
| 577 |
Consultancy Services for Consultancy Services for Preparation of feasibility report cum Detailed Project Report (DPR) for the Capacity Augmentation to 2 lanes with paved shoulders configuration for NH Corridors and four lane Bypasses in Kerala) - New NH from Kayamkulam (NH 66) to junction near Thiruvalla (NH 183) |
01/SENH/SC/2021-2022 |
13/10/2021 |
01/10/2021
|
23/10/2021
Time
15:0Hrs
|
|
| 578 |
Consultancy Services for preparation of DPR and Feasibility report for construction of two nos. of Grade separated interchanges at km 113.730 and km 139.225 on 4 laning stretch of Ranchi Bypass of NH 33 in the State of Jharkhand 2nd Call |
NHAI/RO/Jharkhand/DPR/IC/2021/43 |
30/09/2021 |
28/09/2021
|
13/10/2021
Time
11:0Hrs
|
|
| 579 |
Consultancy services for, Preparation of Feasibility/DPR for Construction of ROBs at LC 79 (Kumsi), LC 110 (Hossur) and LC 152 (Talaguppa) of NH 206 and LC 105 (Anandapura) of NH 766C in the State of Karnataka |
eE/NHD/SMG/AE1/NH766C/consultancy/NIB12/2021-22/1256 |
27/09/2021 |
27/09/2021
|
04/10/2021
Time
16:0Hrs
|
|
| 580 |
Consultancy services for, Preparation of Feasibility/DPR for Construction of 4 lane Fly over and its Approaches in Shimoga city limit on NH 206 at Km 209.90 near Ashoka circle and at Km 212.60 Alkola circle on NH 206 in the State of Karnataka under Annual Plan 2021-22 |
EENHD/AE1/NH206/NIB11/2021-22/1206 |
24/09/2021 |
24/09/2021
|
30/09/2021
Time
16:0Hrs
|
|
| 581 |
Consultancy Services for Detailed Project Report Preparation for Widening & Improvement with footpath of Existing ROB on Bhokar Bypass of NH-61. Ch 128/400 km. Length 200 m. In state of Maharashtra. |
NHD/NED/TENDER/DPR/Nanded/2853/2021/3 |
22/09/2021 |
23/09/2021
|
29/09/2021
Time
17:30Hrs
|
|
| 582 |
Consultancy Services for Detailed Project Report Preparation for Rehabilitation and Upgradation of Nanded Bhokar Himayatnagar Kinwat Mahur Arni Road Section of NH-161A from Mudkhed to Nanded. km 0/00 to 18/500. In state of Maharashtra |
NHD/NED/TENDER/DPR/Nanded/2853/2021/4 |
22/09/2021 |
23/09/2021
|
29/09/2021
Time
17:30Hrs
|
|
| 583 |
Consultancy Services for Detailed Project Report Preparation for Construction of Degloor city bypass road on NH 63 in the state of Maharashtra Tentative Length 7 km. 2nd call |
NHD/NED/TENDER/DPR/2853/2021/1 |
22/09/2021 |
22/09/2021
|
29/09/2021
Time
17:30Hrs
|
|
| 584 |
Consultancy Services for Detailed Project Report Preparation for Widening of Existing ROB in Udgir City Portion stretch Length 0.710 km of NH 50 and Widening of Existing ROB in Udgir City Portion stretch Length 0.600 km of NH 63 in state of Maharasht |
NHD/NED/TENDER/DPR/2853/2021/2 |
22/09/2021 |
22/09/2021
|
29/09/2021
Time
17:30Hrs
|
|
| 585 |
Consultancy services for Preparation of Feasibility/DPR for Construction of Outer Ring Road on NH 766C for Shikaripura town in Shimoga Dist in the State of Karnataka under Annual Plan 2021-22. |
EE/NHD/SMG /AE-1/NH-766C/Consultancy/NIB-13/2021-22/1203 |
22/09/2021 |
21/09/2021
|
22/10/2021
Time
16:0Hrs
|
|
| 586 |
CONSULTANCY SERVICES FOR FEASIBILITY STUDY DETAIL SURVEY INVESTIGATION PREPARATION OFGENERAL ARRANGEMENT DRWAING DPR FOR CONSTRUCTIONOF FOUR LANE RAIL OVER BRIDGE INLIEU OF RAILWAY CROSSING NO A 47E2 ON PHAGWARA HOSHIARPUR ROAD NH 344B |
7 |
23/09/2021 |
20/09/2021
|
09/10/2021
Time
16:0Hrs
|
|
| 587 |
Consultancy Service for Preparation of DPR for Construction of Flyover bridge carrying out feasibility study Detailed Survey / Investigation. Alignment Option, Preparation of General agreement Drawing Engineering Report for Construction of proposed flyover Bridge and its approaches along with service road and preparation of land acquisition papers for acquisition of land, forest clearance and utility shifting details complete in all respects on Bathinda-Dabwali road from Km 9.40 to 10.40 |
CWD-1/BTI-NH/03 |
18/09/2021 |
18/09/2021
|
27/09/2021
Time
17:0Hrs
|
|
| 588 |
Consultancy Services for preparation of Detailed project report including Road safety audit for Six Laning of Dhanua Ghati section from km 249.525 to km 261.150 of NH 2 in the State of Jharkhand 2nd Call |
NHAI/RO/RNC/JH/2021-22/01(1) |
25/09/2021 |
17/09/2021
|
04/10/2021
Time
15:0Hrs
|
|
| 589 |
Consultancy Services for preparation of DPR for construction of Guwahati Ring Road from Khanapara-Narengi Chowki (Tinali)-Narengi End-Kurua End- Dumunichowki- Baihata Chairali- Jalukbari of approx. 72.45 km length under Bharatmala Pariyojana in the State of Assam |
2021NHAI886431 |
14/10/2021 |
17/09/2021
|
22/11/2021
Time
17:0Hrs
|
|
| 590 |
Consultancy Services for Preparation of Feasibility/DPR for widening to two lane with paved shoulder on NH 169A from km 33.00 to 41.00 (Agumbe Ghat) in the State of Karnataka under Annual Plan 2021-22. |
EENHD/AE2/NIB10/2nd call/2021-22/1164 |
14/09/2021 |
14/09/2021
|
30/09/2021
Time
16:0Hrs
|
|
| 591 |
CONSULTANCY SERVICES FOR FEASIBILITY STUDY, PREPARATION OF DETAILED PROJECT REPORT (DPR) AND PROVIDING PRECONSTRUCTION SERVICES (INCLUDING SELECTION OF SITE, TYPE OF BRIDGE, SUB SOIL INVESTIGATION, ESTIMATION, PREPARATION OF TENDER DOCUMENTS ETC.) (INDICATIVE LENGTH OF BRIDGE-300 MTR OVER KODAK RIVER & APPROACH ROAD -2.50 KMS) BETWEEN TUTING AND KANGRI KARPOLA FROM EXISTING SPECIFICATIONS TO NHSL SPECIFICATIONS UNDER 761 BRTF OF PROJECT BRAHMANK IN ARUNACHAL PRADESH STATE |
CE (P) BMK/EPC/02/2021-22 |
04/09/2021 |
11/09/2021
|
11/10/2021
Time
18:0Hrs
|
|
| 592 |
Consultancy Services for Preparation of Detailed Project Report of Rehabilitation and Upgradation of NH-117 from km 114.975 to km 137.684 km to two-lane paved shoulder configuration in the District of South 24 Parganas,West Bengal |
e-NIQ No. 02 of 2021-22 of SE, NHPDC. |
10/09/2021 |
10/09/2021
|
02/11/2021
Time
11:0Hrs
|
|
| 593 |
Consultancy Services for Preparation of Feasibility/DPR for widening to two lane with paved shoulder of NH 169 from Km 124.00 to 153.00(Tanikod to SK Border) in the State of Karnataka under Annual Plan 2021-22. |
EENHD/AE2/NIB9/2nd call/2021-22/789 |
14/09/2021 |
09/09/2021
|
30/09/2021
Time
16:0Hrs
|
|
| 594 |
Consultancy Services for Preparation of Detailed Project Report and providing Pre-Construction activities for Construction of Highway Tunnel including approaches across Khardungla Pass, Namik La & Fotu La in the Union Territory of Ladakh |
2021/NHIDC/647035/1 |
08/09/2021 |
07/09/2021
|
11/10/2021
Time
11:0Hrs
|
|
| 595 |
Consultancy Services for Preparation of Feasibility/DPR for Construction of 4/6 lane Grade separated Intersection at Gaddanakeri cross of NH218 and NH367 in the State of Karnataka |
799 Dt. 31.08.2021 |
09/09/2021 |
06/09/2021
|
29/10/2021
Time
17:0Hrs
|
|
| 596 |
Consultancy Services for Detailed Project Report Preparation for upgradation of existing 6 Lane road including elevated corridor as per site requirements from km 0 to km 12 of NH 47 (Narol Jn to Ujala Jn) in the State of Gujarat |
2021_MoRTH_636047_2 |
06/09/2021 |
06/09/2021
|
30/09/2021
Time
15:0Hrs
|
-
|
| 597 |
Consultancy Services for Detailed Project Report Preparation for upgradation/geometric improvement of existing 2 lane/2L PSS road to 2 lane with paved side shoulder/4L from km 62/00 to km 92/320 and km 115/320 to km 160/320 of NH-58 (Vadali to Palanpur) including Vadgam Bypass, Vadali Bypass and Chansol Bypass in the State of Gujarat |
2021_MoRTH_637769_2 |
06/09/2021 |
06/09/2021
|
30/09/2021
Time
15:0Hrs
|
|
| 598 |
Consultancy Services for Detailed Project Report Preparation for upgradation of existing single Lane/2 lane road to 2 lane with paved side shoulder from km 221/800 to km 291/450 of NH-41 (Naliya Jn to Nayaran Sarovar) in the State of Gujarat |
2021_MoRTH_637489_2 |
06/09/2021 |
06/09/2021
|
30/09/2021
Time
15:0Hrs
|
|
| 599 |
Consultancy Services for Detailed Project Report Preparation for upgradation/geometric improvement of existing road to 2 lane with paved side shoulder/4L from km 61/658 to km 105/00 of NH-953 (Ahwa to Maharashtra Border) in the State of Gujarat. |
2021_MoRTH_638140_2 |
06/09/2021 |
06/09/2021
|
30/09/2021
Time
15:0Hrs
|
|
| 600 |
Consultancy Service for Preparation of DPR for Construction of Flyover bridge carrying out feasibility study Detailed Survey Investgation and prepration of land acquisition papers |
CWD-1/BTI-NH/02 |
03/09/2021 |
06/09/2021
|
15/09/2021
Time
17:0Hrs
|
|
| 601 |
Project Management Consultancy Services for Feasibility study and detailed Engineering for Widening to 2- lane with paved shoulder and geometric improvements of NH-907A from Km 5/00 to Km 78/00 (Nahan to Kumarhatti Stretch) in the State of Himachal Pradesh. |
PW-CE-NH-CTR-Ten Notice/Consultancy/21-2208-17 |
03/09/2021 |
03/09/2021
|
07/10/2021
Time
11:0Hrs
|
|
| 602 |
PMC Services for construction of Highway 2- lane Tunnel including approaches across the Nahan Town on Nahan Sarahan Kumarhatti Road NH 907A from Km. 0 00 to Km. 5 00 in the State of Himachal Pradesh. |
PW-CE-NH-CTR-Ten Notice/Consultancy/21-2218-27 |
09/09/2021 |
03/09/2021
|
07/10/2021
Time
11:0Hrs
|
|
| 603 |
Consultancy Services for Identification & Preparation of Detailed Project Report for Slope Protection work on Hill & Valley Side, Sinking Zones and Bridges in between Km 368.000 to Km 468.000 (NH-07) , in the State of Uttarakhand |
NHIDCL/UK/NH-07/20-21/Slope protection-bridges/ |
09/09/2021 |
01/09/2021
|
11/10/2021
Time
15:0Hrs
|
|
| 604 |
Consultancy services for, Preparation of Feasibility/DPR for Construction of 4 lane Fly over and its Approaches in Shimoga city limit on NH 206 at Km 209.90 near Ashoka circle and at Km 212.60 Alkola circle on NH 206 in the State of Karnataka under Annual Plan 2021-22. |
EENHD/AE1/NH206/NIB11/2021-22/1023 |
30/08/2021 |
30/08/2021
|
20/09/2021
Time
16:0Hrs
|
|
| 605 |
Consultancy services for Preparation of Feasibility DPR for Construction of ROBs at LC 79 Kumsi LC 110 Hossur and LC 152 Talaguppa of NH 206 and LC 105 Anandapura of NH 766C in the State of Karnataka under Annual Plan 2021-22 |
EENHD/AE1/NH766C/NIB12/2021-22/1024 |
31/08/2021 |
30/08/2021
|
20/09/2021
Time
16:0Hrs
|
|
| 606 |
Consultancy Services for Detailed Project Report Preparation for Rehabilation and Upgradation of Nanded Bhokar Himayatnagar Kinwat Mahur Arni Road Section of NH 161A from Mudkhed to Nanded in state of Maharashtra. |
NHD/NED/TENDER/DPR/2416/2021/4 |
29/08/2021 |
29/08/2021
|
09/09/2021
Time
17:30Hrs
|
|
| 607 |
Consultancy Services for Detailed Project Report Preparation for Widening and Improvement with footpath of Existing ROB on Bhokar Bypass of NH 61km128.400 in state of Maharashtra. |
NHD/NED/TENDER/DPR/2416/2021/3 |
26/08/2021 |
27/08/2021
|
09/09/2021
Time
17:30Hrs
|
|
| 608 |
Consultancy services for preparation of detailed project report for 4 laning of NH-60 (New NH-14) from km 115.000 (Kharagpur) to Km. 422.450 (Moregram) in the State of West Bengal |
e-NIQ No 01 of 2021-22 |
26/08/2021 |
25/08/2021
|
26/10/2021
Time
11:0Hrs
|
|
| 609 |
Consultancy services for Preparation of Feasibility Detailed Project Report DPR for Construction of Grade Separators at km 16 490 Devegowda Circle Junction Km 25 820Nanjanagud junction Km 30 100 Srirampura Junction Km 38 100 Bogadi Junction and at Km 40 200 Vijayanagar 4 stage junction of NH 275K Mysuru Ring Road in the State of Karnataka |
EE/NHD/Bng/AE2/NH-275K/Grade-Separator/DPR/NIT-03/2021-22/ Dated 13.08.2021 |
18/08/2021 |
18/08/2021
|
27/09/2021
Time
16:0Hrs
|
|
| 610 |
Consultancy services for, preparation of feasibility /Detailed project report (DPR) for widening to two lane with paved shoulders from km.72.10 to 121.000 of NH-173 kadur to Holalkere section in the state of karnataka |
ENHD/CTA/NH-173/AE4/2021-22/279 |
18/08/2021 |
18/08/2021
|
31/08/2021
Time
11:0Hrs
|
|
| 611 |
Consultancy Services for Preparation of Detailed Project Report for upgradation to four lane/ two lane with paved shoulders configuration of Kalyan – Murbad – Malshej Ghat – Nirmal road NH- 61 km 15/200 to 84/000 including RoB at km 9/500 district Thane in the state of Maharashtra |
2021_MoRTH_643543_1 |
10/09/2021 |
17/08/2021
|
23/10/2021
Time
17:30Hrs
|
|
| 612 |
Consultancy services for preparation of Detailed Project Report for Rehabilitation Upgradation Widening of existing Highway to Rigid Pavement two Lane with Paved Shoulder of NH 965DD from Lonand Shirvar Bhor Mandangad Pachral |
2021_MoRTH_643566_1 |
16/09/2021 |
13/08/2021
|
27/09/2021
Time
17:0Hrs
|
|
| 613 |
Consultancy Services for Detailed Project Report Preparation for Construction of Degloor city bypass road on NH 63 in the state of Maharashtra Tentative Length 7 km. |
NHD/NED/TENDER/DPR/2416/2021/1 |
17/08/2021 |
13/08/2021
|
14/09/2021
Time
17:30Hrs
|
|
| 614 |
Consultancy Services for Detailed Project Report Preparation for Widening of Existing ROB in Udgir City Portion stretch Length 0.710 km of NH 50 and Widening of Existing ROB in Udgir City Portion stretch Length 0.600 km of NH 63 in state of Maharashtra |
NHD/NED/TENDER/DPR/2416/2 |
24/08/2021 |
13/08/2021
|
14/09/2021
Time
17:30Hrs
|
|
| 615 |
Consultancy Services for Preparation of Detailed Project Report and providing Pre-Construction activities for Construction of Highway 8.5 Km. Tunnel including approaches at Pir Ki Gali Pass in the Union Territory of Jammu Kashmir. |
NHIDCL/JK/Mughal Road/ Pir Ki Gali Tunnel/2021 |
13/08/2021 |
10/08/2021
|
07/10/2021
Time
11:0Hrs
|
|
| 616 |
DPR for 4/6 laning of Mumbai-Pune NH-4 from Shilphata (Km 131/200 To Nigadi (KM 20/400) |
NH/PUNE/DPR/02/2021-22 |
04/08/2021 |
02/08/2021
|
01/10/2021
Time
17:0Hrs
|
|
| 617 |
Detailed Project Report of Consultancy Services for preparation of DPR Feasibility Report for upgradation for Four Laning of km 10.900 to km 12.390 of NH 32 including construction of ROB at km 11.500 on NH 32 in the State of Jharkhand |
NHAI/RO/RNC/JH/2021-22/15 |
06/09/2021 |
02/08/2021
|
15/09/2021
Time
11:0Hrs
|
|
| 618 |
testbyadil 3 |
testbyadil 3 |
19/08/2021 |
01/08/2021
|
31/08/2024
Time
15:0Hrs
|
|
| 619 |
Consultancy Services for Preparation of Feasibility/DPR for widening to two lane with paved shoulder of NH 169 from Km 124.00 to 153.00(Tanikod to SK Border) in the State of Karnataka |
EENHD/AE2/NIB9/2021-22/789 |
30/07/2021 |
30/07/2021
|
21/08/2021
Time
16:0Hrs
|
|
| 620 |
Consultancy Services for Preparation of Feasibility/DPR for widening to two lane with paved shoulder on NH 169A from km 33.00 to 41.00 (Agumbe Ghat) in the State of Karnataka |
EENHD/AE2/NIB10/2021-22/790 |
30/07/2021 |
30/07/2021
|
21/08/2021
Time
16:0Hrs
|
|
| 621 |
Project Management Consultancy services for Widening to 4-lane of NH-105 from Km 35/00 to 66/275 of Nalagarh to Swarghat road in the State of Himachal Pradesh |
PW-CE-CTR-Tender Notice/Consultancy/21-1474-81 |
02/08/2021 |
29/07/2021
|
04/09/2021
Time
17:0Hrs
|
|
| 622 |
Project Management Consultancy services for Widening to 4-lane of NH-07 from Km 46/00 to 96/00 of Kala Amb Paonta Sahib Dehradun road in the State of Himachal Pradesh. |
PW-CE-NH-CTR-Tender Notice/Consultancy/21-1490-98 |
02/08/2021 |
29/07/2021
|
04/09/2021
Time
17:0Hrs
|
|
| 623 |
Project Management Consultancy Services for Feasibility study and detailed engineering for Widening to 2- lane with paved shoulder and geometric improvements of NH 907A from Km 0/00 to Km 78/00 (Nahan to Kumarhatti Stretch) in the State of HP. |
PW-CE-NH-CTR-Tender /Consultancy/21-1499-1506 |
02/08/2021 |
29/07/2021
|
28/08/2021
Time
17:0Hrs
|
|
| 624 |
Consultancy Services for Detailed Project Report Preparation for Construction of double tier Elevated Corridor from Pune to Shirur on NH- 753F on DBFOT (Toll Basis) in the state of Maharashtra |
NH/PUNE/DPR/01/2021-22 |
04/08/2021 |
29/07/2021
|
01/10/2021
Time
17:0Hrs
|
|
| 625 |
CONSULTANCY SERVICES FOR FEASIBILITY STUDY DETAILED SURVEY INVESTIGATION PREPARATION OF GENERAL ARRANGEMENT DRAWING DPR FOR CONSTRUCTION OF FOUR LANE RAIL OVER BRIDGE IN LIEU OF RAILWAY CROSSING NO A 47 E 2 ON PHAGWARA HOSHIARPUR ROAD NH 344B |
5 of 2021-22 |
17/08/2021 |
27/07/2021
|
13/09/2021
Time
17:0Hrs
|
|
| 626 |
Consultancy services for, preparation of feasibility /Detailed project report (DPR) for widening to two lane with paved shoulders from km.72.10 to 121.000 of NH-173 kadur to Holalkere section in the state of karnataka |
ENHD/CTA/NH173/AE4/2021-22/279 |
28/07/2021 |
26/07/2021
|
17/08/2021
Time
11:0Hrs
|
|
| 627 |
Consultancy service for preparation of DPR for Rehabilitation of Bridges Swarnamati at 4.123 km of NH-31C, Panchanai at 75.03 km of NH-55, Coronation at 595.200 km of NH-31, Sukha Nadi at 604.00 km of NH-31, Leesh at 607.151 km of NH-31, Gheesh at 611.740 km of NH-31, Chell at 614.70 km of NH-31, Mal at 628.720 km of NH-31, Newra at 630.12 km of NH-31 and Jarda New and Jarda Old at 672.830 km and 673.12 km of NH-31 under NH Division IX in the district of Darjeeling and Jalpaiguri. |
e_RFP3 |
02/08/2021 |
22/07/2021
|
09/09/2021
Time
17:0Hrs
|
|
| 628 |
Consultancy Services for Preparation of Feasibility/DPR for Realignment of NH 766 C from Km 56.00 to 86.00 (With realignment of 16.00 Km) with a major Bridge across Sharavathi Tributory/Backwater near Beckodi in the state of Karnataka under annual Plan 2021-22 |
EENHD/AE1/NIB07/2021-22/490 |
20/07/2021 |
16/07/2021
|
06/08/2021
Time
16:0Hrs
|
|
| 629 |
Consultancy services for, Consultancy Services for Preparation of Feasibility/DPR for Widening to 4 lane . Paved shoulder from Km 220.00 to Km 259.00 (Shimoga to Anandpura) in the State of Karnataka under Annual Plan 2021-22. |
EENHD/AE1/NIB08/2021-22/491 |
20/07/2021 |
16/07/2021
|
06/08/2021
Time
16:0Hrs
|
|
| 630 |
Consultancy services for DPR for 6 laning of Pune Hyderabad section of NH 65 from KM 493.0 to 524.0 from Sangareddy X road to Madinaguda in the state of Telangana |
SE RandB NH HYD 10 2021 22 dt. 29.05.2021 |
15/07/2021 |
15/07/2021
|
30/08/2021
Time
15:0Hrs
|
|
| 631 |
Consultancy Services for Detailed Project Report Preparation for upgradation/geometric improvement of existing road to 2 lane with paved side shoulder/4L from km 61/658 to km 105/00 of NH-953 (Ahwa to Maharashtra Border) in the State of Gujarat |
2021_MoRTH_638140_1 |
12/07/2021 |
13/07/2021
|
15/09/2021
Time
15:0Hrs
|
|
| 632 |
Consultancy Services for Detailed Project Report Preparation for upgradation/geometric improvement of existing 2 lane/2L PSS road to 2 lane with paved side shoulder/4L from km 62/00 to km 92/320 and km 115/320 to km 160/320 of NH-58 (Vadali to Palanpur) including Vadgam Bypass, Vadali Bypass and Chansol Bypass in the State of Gujarat. |
2021_MoRTH_637769_1 |
09/07/2021 |
09/07/2021
|
15/09/2021
Time
15:0Hrs
|
|
| 633 |
Consultancy Services for Detailed Project Report Preparation for upgradation of existing single Lane/ 2 lane road to 2 lane with paved side shoulder from km 221/800 to km 291/450 of NH-41 (Naliya Jn to Nayaran Sarovar) in the State of Gujarat. |
2021_MoRTH_637489_1 |
07/07/2021 |
07/07/2021
|
15/09/2021
Time
15:0Hrs
|
|
| 634 |
nsultancy Services for Preparation of Feasibilty DPR for 4 laning from Km 290.200 to 343.800 SiraMadhugiri Section of NH 234 in the State of Karnataka |
ENHD_TMK_NH234_DPR_2021_22_225 |
08/07/2021 |
03/07/2021
|
27/07/2021
Time
16:0Hrs
|
|
| 635 |
Project Management Consultancy Services for feasibility study and detailed engineering for rehablitation and upgradation of NH 154A from km 84 00 to km 93 00 and km 130 00 to km 172 00 in the State of Himachal Pradesh. |
2021_MoRTH_636330_1 |
01/07/2021 |
30/06/2021
|
23/08/2021
Time
17:0Hrs
|
|
| 636 |
Consultancy Services for preparation of DPR for Augmentation of existing 4 lane Section of NH-44 from Km.22.00 (Near Hyderabad Airport) to Km. 211.00 (Kurnool) to 6 lane Partial Access Controlled Highway standard in Telangana |
2021_NHAI_81017_1 |
22/07/2021 |
30/06/2021
|
16/08/2021
Time
11:0Hrs
|
-
|
| 637 |
CS for preparation of DPR for Augmentation of existing 4 lane Section of NH-44 from Km.211.00 (Kurnool) to Km. 534.72 (Devanahalli Village in the State of Karnataka) to 6 lane Partial Access Controlled Highway in Andhra Pradesh and Karnataka |
2021_NHAI_81019_1 |
22/07/2021 |
30/06/2021
|
16/08/2021
Time
11:0Hrs
|
|
| 638 |
DPR for formation of Bypass to Chengalpet Town on the Eastern Side of NH32 (Old NH45) to join ECR (NH-332A) |
TN.No.08/2022-23/HDO/NH/Date.30.06.2022 |
01/07/2022 |
30/06/2021
|
17/08/2022
Time
15:0Hrs
|
|
| 639 |
Consultancy Services for Detailed Project Report Preparation for upgradation of existing 6 Lane road including elevated corridor as per site requirements from km 0 to km 12 of NH 47 (Narol Jn to Ujala Jn) in the State of Gujarat |
2021_MoRTH_636047_1 |
29/06/2021 |
29/06/2021
|
15/09/2021
Time
15:0Hrs
|
|
| 640 |
CONSULTANCY SERVICES FOR PREPARTION OF DPR FOR ARIFKE-AMARKOT ROAD FROM 165.610 TO 201.500 SECTION OF NH-354 |
02 of 2021-22 |
29/06/2021 |
29/06/2021
|
23/07/2021
Time
12:0Hrs
|
|
| 641 |
PMC services for Widening to 4 lane of NH 503 Extn from Km 0 to 28 900 Amb to Una in the State of HP and Widening to 4lane of NH 70 New 03 Jallandhar Hoshiarpur Gagret Amb Nadaun Hamirpur TauniDevi Sarkaghat Mandi KM 58 400 to 114 0 |
2021_MoRTH_634088_1 |
16/06/2021 |
15/06/2021
|
26/07/2021
Time
17:0Hrs
|
|
| 642 |
Consultancy Services for preparation of Feasibility study and detailed project report for construction of NH-133 section from Ekchari to Mahagama (tentative length 40 km) in the State of Jharkhand. |
2021_NHAI_79234_1 |
10/06/2021 |
10/06/2021
|
29/07/2021
Time
11:0Hrs
|
|
| 643 |
sdgfcghvgh |
gfhfjj |
16/06/2021 |
02/06/2021
|
16/06/2021
Time
15:0Hrs
|
-
|
| 644 |
Consultancy Services for preparation of Detailed project report (including Road safety audit) for Six Laning of Dhanua Ghati section from km 249.525 to km 261.150 of NH-2 in the State of Jharkhand (as per Annexure-I) |
NHAI/RO/RNC/JH/2021-22/01 |
01/07/2021 |
02/06/2021
|
15/07/2021
Time
11:0Hrs
|
|
| 645 |
Consultancy Services for preparation of DPR and Feasibility report for construction of two nos. of Grade separated interchanges at km 113.730 and km 139.225 on 4 laning stretch of Ranchi Bypass of NH 33 in the State of Jharkhand |
NHAI/RO/JH/DPR/NH33/IC/2021/43 |
28/05/2021 |
25/05/2021
|
16/07/2021
Time
11:0Hrs
|
|
| 646 |
dfgd |
2021_MoRTH_630448_1 |
20/07/2021 |
19/05/2021
|
03/08/2021
Time
15:0Hrs
|
|
| 647 |
CONSULTANCY SERVICES FOR DETAILED PROJECT REPORT (DPR) FOR REHABILITATION AND UPGRADATION TO 2 LANE/2 LANE WITH PAVED SHOULDER CONFIGURATION & STRENGTHENING OF NATIONAL HIGHWAY NO. 34 (OLD NH-108) FROM KM 0.00 (GANGOTRI) TO KM 101.06 (DHARASU) IN THE STATE OF UTTARAKHAND |
CE(P)/UDK/DPR CONSULTANCY/16/2018-19 |
05/05/2021 |
07/05/2021
|
23/06/2021
Time
15:0Hrs
|
|
| 648 |
PMC |
125 |
21/05/2021 |
07/05/2021
|
31/05/2021
Time
15:0Hrs
|
|
| 649 |
Consultancy Services for preparation of Detailed Project Report (DPR) for capacity augmentation of various selected stretches of National Highways in the State of Uttar Pradesh ( RO/LKO/DPR/Package-I) |
RO/LKO/DPR/Package-I |
05/05/2021 |
04/05/2021
|
08/06/2021
Time
11:0Hrs
|
|
| 650 |
Consultancy Services for preparation of Detailed Project Report (DPR) for capacity augmentation of various selected stretches of National Highways in the State of Uttar Pradesh ( RO/LKO/DPR/Package-II) |
RO/LKO/DPR/Package-II |
05/05/2021 |
04/05/2021
|
08/06/2021
Time
11:0Hrs
|
|
| 651 |
Consultancy Services for preparation of Detailed Project Report (DPR) for capacity augmentation of various selected stretches of National Highways in the State of Uttar Pradesh ( RO/LKO/DPR/Package-III) |
RO/LKO/DPR/Package-III |
05/05/2021 |
04/05/2021
|
08/06/2021
Time
11:0Hrs
|
|
| 652 |
CONSULTANCY SERVICES FOR PREPARTION OF DPR FOR ARIFKE-AMARKOT ROAD FROM 165.610 TO 201.500 SECTION OF NH-354 |
01 of 2021 |
26/04/2021 |
28/04/2021
|
15/06/2021
Time
12:0Hrs
|
|
| 653 |
askj |
1234 |
22/05/2021 |
22/04/2021
|
31/05/2021
Time
15:0Hrs
|
|
| 654 |
Preparation of Detailed Project Report, Pre construction activities and Project Supervision of various selected stretches, ROBs, flyover, bridge on National Highways in the State of Uttar Pradesh |
CE-RO/LKO/PMC/2021-22/PKG-I |
24/05/2021 |
22/04/2021
|
21/06/2021
Time
15:0Hrs
|
|
| 655 |
Preparation of Detailed Project Report, Pre construction activities and Project Supervision of various selected stretches, ROBs, flyover, bridge on National Highways in the State of Uttar Pradesh |
CE-RO/LKO/PMC/2021-22/PKG-II |
25/05/2021 |
22/04/2021
|
21/06/2021
Time
15:0Hrs
|
|
| 656 |
Preparation of Detailed Project Report, Pre construction activities and Project Supervision of various selected stretches, ROBs, flyover, bridge on National Highways in the State of Uttar Pradesh |
CE-RO/LKO/PMC/2021-22/PKG-III |
25/05/2021 |
22/04/2021
|
21/06/2021
Time
15:0Hrs
|
|
| 657 |
Preparation of Detailed Project Report, Pre construction activities and Project Supervision of various selected stretches, ROBs, flyover, bridge on National Highways in the State of Uttar Pradesh |
CE-RO/LKO/PMC/2021-22/PKG-IV |
25/05/2021 |
22/04/2021
|
14/06/2021
Time
15:0Hrs
|
|
| 658 |
Preparation of Detailed Project Report, Pre construction activities and Project Supervision of various selected stretches, ROBs, flyover, bridge on National Highways in the State of Uttar Pradesh |
CE-RO/LKO/PMC/2021-22/PKG-V |
26/05/2021 |
22/04/2021
|
21/06/2021
Time
15:0Hrs
|
|
| 659 |
Preparation of Detailed Project Report, Pre construction activities and Project Supervision of various selected stretches, ROBs, flyover, bridge on National Highways in the State of Uttar PradeshNH |
CE-RO/LKO/PMC/2021-22/PKG-VI |
26/05/2021 |
22/04/2021
|
21/06/2021
Time
15:0Hrs
|
|
| 660 |
ENGAGING TECHNICAL CONSULTANT FOR FINALIZATION OF ALIGNMENT AND PREPARATION OF FEASIBILITY STUDY (FS) ON EPC MODE FOR DEVELOPMENT OF POONCH-URI ROAD TO NHDL SPECIFICATIONS (TENTATIVE LENGTH - 120 KM) IN UT OF JAMMU AND KASHMIR UNDER BHARATMALA PRIYOJANA |
CE(P)BCN/CON(EPC)/01/2021-22 |
21/04/2021 |
20/04/2021
|
24/06/2021
Time
11:0Hrs
|
|
| 661 |
consultancy services for preparation of DPR for development of Northern portion of Hyderabad Regional Ring Road Expressway under Bharatmala Pariyojana Phase-I in the State of Telangana |
NHAI/Tech/Telangana/DPR /HRRR/North-Part/2021 |
15/04/2021 |
09/04/2021
|
01/06/2021
Time
11:30Hrs
|
|
| 662 |
PROJECT MANAGEMENT CONSULTANCY SERVICES INCLUDING DPR PREPARATION FOR UP-GRADATION TO 2/4 LANE WITH PAVED SHOULDERS CONFIGURATION OF NEWLY DECLARED NH 167A FROM NAKREKAL (NAM ROAD JUNCTION) - NARASARAOPET - CHILAKALURIPET - VODAREVU SECTION IN THE STATE OF ANDHRA PRADESH FOR A LENGTH OF 81.690 KM (APPROX). |
SE(R AND B)/NH/VJA/57/2020-21 dated 19.03.2021 |
16/04/2021 |
25/03/2021
|
11/05/2021
Time
15:0Hrs
|
|
| 663 |
Consultancy Services for preparation of DPR/ Feasibility Report for upgradation to 4/6 lane Elevated Corridor of Kalimandir-Dimna Chowk-Baliguma (Jamshedpur) Section of NH-33 (from Km.243.000 to km. 248.500) (Tentative Length 5.5 Km) under NHDP Phase–III in the State of Jharkhand |
NIT No. NHAI/RO/Jharkhand/DPR/NH-33/2021/36 |
27/04/2021 |
18/03/2021
|
03/06/2021
Time
11:0Hrs
|
|
| 664 |
Preparation of Detailed Project report for New Alignment for 2 lanes /2 lane with paved shoulders configuration of stretch from km. 95.200 near S.S.B. Camp (Ausani village) to near U.P. Border on NH-727 in the boundary zone of Valmiki wildlife Sanctuary & Tiger Reserve& Tiger Reserve along Gandak river bank in Bihar State |
Preparation of Detailed Project report for New Alignment for 2 lanes /2 lane with paved shoulders configuration of stretch from km. 95.200 near S.S.B. Camp (Ausani village) to near U.P. Border on NH-727 in the boundary zone of Valmiki wildlife Sanctuary & Tiger Reserve& Tiger Reserve along Gandak river bank in Bihar State |
26/03/2021 |
16/03/2021
|
12/04/2021
Time
11:0Hrs
|
|
| 665 |
Consultancy Services for Preparation of DPR on NH 112 (New NH-25) Bar-Bilara-Jodhpur-Barmer road. (Khokhariya Phanta to Panch batti circle via circuit House) From km 111/0 to km 125/0 |
04/2020-21 |
01/04/2021 |
12/03/2021
|
27/04/2021
Time
11:0Hrs
|
|
| 666 |
pk 77 |
tnkkkk 656 |
12/03/2021 |
12/03/2021
|
31/03/2021
Time
15:0Hrs
|
|
| 667 |
Sample Project |
Sample Project |
03/03/2021 |
01/03/2021
|
31/03/2028
Time
15:0Hrs
|
|
| 668 |
test 9999 |
test tender |
22/02/2021 |
01/02/2021
|
28/02/2021
Time
15:0Hrs
|
|
| 669 |
BRIDGEDPR |
2021MORTH6117111 |
23/02/2021 |
23/01/2021
|
11/03/2021
Time
14:0Hrs
|
|